PENAWARAN BIAYA PEMBORAN

NO JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


I MOBILISASI DAN DEMOBILISASI
1.1 Mob-Demob Personil Trip 2 2,500,000 5,000,000
1.2 Mob-Demob Alat Bor Trip 2 750,000 1,500,000
Sub Jumlah I 6,500,000

II SOIL INVESTIGASI
2.1 Sondir Titik 3 4,500,000 13,500,000
2.2 Laporan Buku 1 1,000,000 1,000,000
Sub Jumlah II 13,500,000
Total Biaya (I + II + III + IV) 20,000,000

Jayapura, 29 Januari 2022