II SOIL INVESTIGASI
2.1 Sondir Titik 3 4,500,000 13,500,000
2.2 Laporan Buku 1 1,000,000 1,000,000
Sub Jumlah II 13,500,000
Total Biaya (I + II + III + IV) 20,000,000
Yodi Litha, ST
Pimpinan Teknis