TIME SCHEDULE

Kegiatan : Supervisi Pembangunan Sungai dan Pantai


Lokasi : Kabupaten Merauke dan Kabupaten Boven Digoel
Tanggal SPMK : 10 Maret 2021
Nomor SPMK : HK.01.02/SPMK/SUPAN/Bws22/08/2021
Waktu Pelaksanan : 210 (Dua Ratus Sepuluh) Hari Kalender
Tahun Anggaran : APBN 2021
Konsultan : PT. GLOBETEK GLORY KONSULTAN, KSO
Maret 2021 April 2021 Mei 2021 Juni 2021 Juli 2021 Agustus 2021 September 2021
Unit

RL
Bobot M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28
No. Uraian Pekerjaan Sat Vol Keterangan

&
10 Mar 17 Mar 24 Mar 01 Apr 08 Apr 15 Apr 22 Apr 01 Mei 08 Mei 15 Mei 22 Mei 01 Jun 08 Jun 15 Jun 22 Jun 01 Jul 08 Jul 15 Jul 22 Jul 01 Agu 08 Agu 15 Agu 22 Agu 01 Sep 08 Sep 15 Sep 22 Sep 29 Sep

RC
(%) 16 Mar 23 Mar 31 Mar 07 Apr 14 Apr 21 Apr 30 Apr 07 Mei 14 Mei 21 Mei 31 Mei 07 Jun 14 Jun 21 Jun 30 Jun 07 Jul 14 Jul 21 Jul 31 Jul 07 Agu 14 Agu 21 Agu 31 Agu 07 Sep 14 Sep 21 Sep 28 Sep 06 Okt
A. BIAYA LANGSUNG PERSONIL
A.1. Tenaga Ahli
1 Supervision Engineer OB 1 7 RC 18.258 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 0.652 100%
RI 0.652 0.652
2 Quality/Quantity Engineer OB 1 7 RC 12.640 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451 0.451
RI 0.451 0.451
3 Ahli K3 OB 1 5 RC 11.536 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524
RI 0.524 0.524 90%
A.2. Tenaga Pendukung
1 Inspector OB 1 6 RC 6.922 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288
RI
2 Inspector OB 1 6 RC 6.922 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288 0.288
RI 0.288 0.288
3 Inspector OB 1 5 RC 5.768 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 0.262 80%
RI
4 Operator CAD OB 1 1 RC 0.752 0.188 0.188 0.188 0.188
RI
5 Surveyor/Juru Ukur OB 1 14 RC 11.938 2.984 2.984 2.984 2.984
RI 2.984 2.984
70%
6 Operator Komputer OB 1 7 RC 5.267 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188
RI 0.188 0.188

B. BIAYA LANGSUNG NON PERSONIL


B.1. Biaya Kantor
1 Sewa Kantor Bln 1 7 RC 4.564 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 60%
RI 0.163 0.163
2 Sewa Komputer Unit.bln 1 7 RC 1.053 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038
RI 0.038 0.038
3 Sewa Printer dan scaner A3 Unit.bln 1 7 RC 0.527 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
RI 0.019 0.019
4 Alat Tulis Kantor (ATK) Bln 1 RC 0.702 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
50%
7
RI 0.025 0.025
5 Sewa Digital Camera Unit.bln 1 7 RC 0.316 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
RI 0.011 0.011
6 Komunikasi Bln 1 7 RC 0.702 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
RI 0.025 0.025 40%
6 Rapid Test Org 1 15 RC 0.376 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
RI 0.047 RENCANA
6 K3 (APD protokol covid, masker, hand sanitizer, Ls 1 1 RC 1.505 0.752 0.752
sarung tangan) RI 1.505

RI 30%
B.2. Biaya Kendaraan
1 Kendaraan Roda 4 Bln 1 7 RC 7.022 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251
RI 0.251 0.251
2 Kendaraan Roda 2 Bln 1 7 RC 2.107 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075
RI 0.075 0.075 20%
B.3. Biaya Laporan
1 Laporan Pendahuluan Buku 1 5 RC 0.125 REALISASI 0.125
RI
2 Laporan Bulanan (7 bulan) Buku 7 5 RC 0.702 0.100 0.10 0.100 0.100 0.100 0.100 0.100
RI
3 Laporan Akhir Buku 1 5 RC 0.125 0.125 10%
RI
4 Foto Dokumentasi dan CD Set 1 2 RC 0.092 0.092
RI
5 SSD (1 TB) Buah 1 1 RC 0.078 0.078
RI
0%

TOTAL BOBOT 100.000

Rencana Mingguan 6.495 6.448 6.146 6.372 3.497 3.450 3.362 3.309 3.262 3.262 3.362 3.309 3.262 3.262 3.362 3.309 3.262 3.262 3.362 3.309 3.262 3.262 2.838 2.785 2.187 2.187 2.187 2.630
6.495
Komulatif Rencana Mingguan 6.50 12.94 19.09 25.46 28.96 32.41 35.77 39.08 42.34 45.60 48.96 52.27 55.54 58.80 62.16 65.47 68.73 71.99 75.35 78.66 81.92 85.19 88.02 90.81 93.00 95.18 97.37 100.00

Realisasi Mingguan 7.25 5.70


12.94
Komulatif Realisasi Mingguan 7.25 12.94

Deviasi ( + / - ) 0% 0.00 0.75 0.00

Jayapura, Maret 2021