PEKERJAAN :
PR-02 PERENCANAAN TEKNIK
JEMBATAN TERSEBAR 1
PROVINSI KALIMANTAN SELATAN
TAHUN 2018
SAMPUL
DAFTAR GAMBAR 01 1
SINGKATAN 02 1
DATA JEMBATAN 04 1
DAFTAR KUANTITAS 06 1
PETA SITUASI / TOPOGRAFI 07 1
SINGKATAN
ABUT ABUTMENT/KEPALA JEMBATAN EVC END OF VERTICAL/LENGKUNGAN VERTIKAL AKHIR MM MILIMETER SB SLAB BRIDGE/LANTAI JEMBATAN
AH AHEAD/KEDEPAN EXIST EXISTING/YANG LAMA/KEBERADAAN Mo MID ORDINATE/TITIK ORDINAT AWAL SBST SINGLE BITUMINOUS/PERKERASAN SATU LAPIS (BURTU)
BC BOX CULVERT/KOTAK GORONG-GORONG o SUPERELEVATION/LANDAI MELINTANG NTS NOT TO SCALE/TANPA SKALA SqM SQUARE METER/METER PERSEGI
B/C BASE COURSE/ LAPISAN PONDASI JALAN FIN FINISH/SELESAI O/S OFFSET/CETAK SN STANDARD NEW CONSTRUCTION/STANDAR KONTRUKSI
BCK BACK/BELAKANG FILL FILLER/ABU BATU (BAHAN PENGISI) OUTL OUTLET/ARAH KELUAR (PADA GORONG-GORONG) BARU
BL BASE LINE POINT FLG FLANGE/SISI/TEPI % PERSENTASE SqCm SQUARE CENTIMETER/CENTIMETER PERSEGI
BM BENCH MARK/TITIK TETAP GL GRADE LEVEL/LANDAI MEMANJANG P PERLUASAN LENGKUNGAN LINGKARAN ST SPIRAL TO TANGENT/SPIRAL PERALIHAN KE TANGEN
BOTT BOTTOM/DASAR GWL GROUND WATER LEVEL/KETINGGIAN MUKA AIR TANAH P PAVED/PERKERASAN STA STATION/TITIK KEDUDUKAN
BVC BEGINNING OF VERTICAL CURVE/PERMULAAN HDWL OR HW HEADWALLS/DINDING KEPALA (PADA GORONG) P/C PRECAST/BETON CETAK STL STEEL/BAJA
LENGKUNGAN VERTIKAL HORZ HORIZONTAL/DATAR PCP PLAIN CONCRETE PIPE/RENCANA PIPA BETON STIRR STIRUUP/SENGKANG
C/C CENTER TO CENTER/AS KE AS HRS HOD ROLLET SHEET SURFANCING/LAPISAN PERMUKAAN TAK BERTULANG SYMM SYMMETRICAL/SAMA SENBANGUN (SIMETRIS)
CGR COUNCRETE GROUTED RIPRAP/BETON PENGISI RIPRAP (ASPAL) PG PROFLILE GRADE/BENTUK KETINGGIAN FROFIL TC TANGENT TO CURVE/TANGEN PERALIHAN KE LINGKARAN
CENTERLINE/AS SUMBU HIGH STRENGTH/TEGANGAN TINGGI POIN OF INTERSECTION/TITIK PERTEMUAN VERTIKAL TANGENT LENGHT OF CIRCULAR CURVE/PANJANG GARIS
CLR CLEARANCE/RUANGAN BEBAS HWL HIGH WATER LEVEL/PERMUKAAN AIR TINGGI PELAT SINGGUNG SPIRAL
CONC CONRETE/BETON IE IMPROVE EXISTING/PERBAIKAN YANG LAMA PL POST LIMIT/PATOK BATAS os CENTRAL ANGLE OF SPIRAL CURVE/SUDUT TENGAH
CONN CONNECTION,CONNECTOR/PENGHUBUNG INL INLET/LUBANG MASUK ARAH MASUK PADA GORONG - PVC POLYVINYL COMPOUND/PIPA PLASTIK LENGKUNG SPIRAL
CONST CONSTRUCT/KONTRUKSI GORONG PVI POIN OF VERTICAL INTERSECTION/TITIK PERTEMUAN T TON/SATUAN BERAT
CUBIC METER/CUBIC CENTIMETER/M3/CM3 INV INVERT/DASAR GORONG-GORONG BAGIAN DALAM VERTIKAL THK THICK/TEBAL
CMP CORRUGATED METAL PIPE/PIPA BETON BM JT JOINT/SAMBUNGAN q TANGEBT DISTANCE FROM TS OR TS/PANJANG TEMP TEMPORARY/SEMENTARA
CP CONCRETE PIPE/PIPA BETON KG KILOGRAM TANGEN DARI TS ATAU TS ULT ULTIMATE/BATAS MAKSIMUM
CT CIRCLE TO TANGENT/PERALIHAN LINGKARAN KM KILOMETER ECC EXTENDED CIRCULAR CURVE/PERLUASAN LENGKUNGAN VERT VERTICAL/VERTIKAL,TEGAK
CWAY CARRIAGEWAY/JALUR LALU LINTAS Ltr LITER RBO REGIONAL BETTERMENT OFFICE/KANTOR WILAYAH W/ WITH/DENGAN
DEFLECTION ANGELE,CENTER ANGLE/SUSUT PERTEMUAN Lin m LINEAR METER/METER PANJANG PENINGKATAN JALAN W /W WINGWALL/DINDING
D DISTANCE,DEPTH/JARAK TEBAL/DALAM LS LUMP SUM/JUMLAH BULAT RCB REINFORCED CONCRETE BOX/GORONG-GORONG BETON W /O WITHOUT/TANPA
DBST DOUBLE BITUMINOUS SURFACE TREATMENT/BURDA LT LEFT/KIRI RCP REINFORCED CONCRETE PIPE/PIPA BETON BERTULANG WC WIDHT OF CURVE WIDENING/LEBAR LENGKUNG PADA
DIAMETER/GARIS TENGAH Lv LENGHT OF VERTICAL CURVE/PANJANGAN LENGKUNGAN RDWAY ROADWAY/JALAN RAYA PELEBARAN
DN DO NOTHING/TIDAK DIKERJAKAN VERTIKAL REINF REINFORCED,REINFORCEMENT/PEMBESIAN WRT WITH RESPECT TO/DENGAN ANGGAPAN
EA EACH/BUAH CS CURVE TO SPIRAL/ARAH LINGKARAN KE SPIRAL ROW,RMJ RIGHT OF WAY/RUANG MILIK JALAN
KELUAR PADA LENGKUNG LINGKARAN MIN MINIMUM S SOFT,SPACING OF GUIDE POSTS/LUNAK, JARAK DARI
PATOK PENGAMAN
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 03 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA :
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
POINT OF VERTICAL INTERSECTION JALAN PROPINSI TEMBOK PENAHAN TANAH MUKA TANAH ASLI
POINT OF CURVE JALAN KERETA API GORONG-GORONG YANG SUDAH ADA KEBUN KELAPA
DAERAH MILIK JALAN LEBAR BAHU JALAN GORONG-GORONG KOTAK (BOX CULVERT) KEBUN KARET
PERSEN KEMIRINGAN MELINTANG BAHU JALAN MESJID SALURAN DIPERKERAS SEBELAH KIRI DAN KANAN
JARI-JARI TIKUNGAN AS JALAN (CENTER LINE) GEREJA SALURAN DIPERKERAS SEBELAH KANAN
ELEVASI (KETINGGGIAN) LAPIS PERMUKAAN REL PENGAMAN AWAL DAN AKHIR LENGKUNG VERTICAL
KILO METER LAPIS PONDASI ATAS RAMBU LALU LINTAS TIANG PENUNTUN
MAKSIMUM LAPIS PONDASI BAWAH MUKA AIR NORMAL TIANG PENUNTUN RENCANA
DATA JEMBATAN
SEI ALIO IV KALIMANTAN SELATAN KANDANGAN - BATU LICIN 19.1 12.00 1 BOX CULVERT DOUBLE 6.0 x 6.0
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT 07
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA : 1 : 1700
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1 PETA SITUASI / TOPOGRAFI
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc.
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
N 9663500.000
E 338100.000
E 338200.000
E 338400.000
E 338500.000
E 338700.000
E 338300.000
E 338600.000
N 9663400.000
JT 1/1
KE KANDANGAN
0+000
X : 338376.122
0+025
Y : 9663276.979
PC = 0+021.582
0+0
Z : 26.607
50
SONDIR 1
PC
X : 338387.727
0+
=
PT
0+
07
09
=
Y : 9663264.828
0+
2.
73
07
PT =
9
Z : 26.545
2.
24
2
0+1
0+
BOR 1
10
26.8
0
X : 338388.665
180+1
N 9663300.000 Y : 9663264.079
5 2 Z : 26.653
0+1
50
BOR 2
0+1
TS =
75
X : 338419.823
SC
0+1
Y : 9663243.248
=0
0
CS
68.4
+2
+18
Z : 27.026
00
=0
98
3.4
+1
SONDIR 2
ST
PC
95
98
.13
=
0+
X : 338421.715
0+
0+
7
21
2
25
41
0.
Y : 9663241.887
.2
37
95
Z : 27.011
PT
0+
=
2
0+
50
27
2.5
KE BATULICIN
94
0+444.75
0+
PC
27
0+425 = 0+424.274
5
PT
0+
=0
9
30
PT
0+4 PC
4
+3
. 58
00 = 0+
0+
76
8
30
.84
0
09+3
N 9663200.000
7
0+3
3
5
98
0+350
.14
25
5
JT 1/2
X : 338412.558
Y : 9663235.162
Z : 27.297
N 9663100.000
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 08.1 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA : 1 : 1700
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1 DENAH SITUASI, PROFIL DAN
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc.
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TAMPAK MEMANJANG TANGGAL :
0
00
0. 0
86
0
33
00
0.
E
0
87
IN
33
C
LI
E
TU
BA
KE
0 0
.0
0+
0
44
40
4.
75
00
9
33
.0
BOR 1
00
00 X : 338388.665
0+
5
42
.0
8
5
0 PT
33
50 Y : 9663264.079 =
63
0+
E
42
96 Z : 26.653 4.
27
N 0+4
4
00
JT 1/1 PC
=0
X : 338376.122 +39
8.1
45
Y : 9663276.979 PT
=0
Z : 26.607 +37
0
6.8
00
490+
375
.
00
83
33
E
PC = 0+304.588
0+
PT = 0+272.594
PC = 0+241.295
35
0
00
.0
0+3
0
B
20
25
0+300
0+275
0+250
0+225
0+200
8
A A
33
0+1
ST = 0+210.137
CS = 0+19
PT
E
SC =
75
C B
=0
PC = 0+092.739
TS
DENAH
0+1
+12
0+18
=0
50
6.8
5.137
+16
3.49
108
+12
8.4
8
SONDIR 2
0+075
98
0+100
5
0+05
X : 338421.715 00
PT = 0+072.242
.0
0
Y : 9663241.887 00
0+
1
63
02
Z : 27.011
5
96
PC
N
=
0+
0 JT 1/2
0+
02
0
.0
1.
0
X : 338412.558
00
58
00
2
4 Y : 9663235.162
63
96 AN Z : 27.297
N
NG
DA 0
0
N 00
00
KA 0.
.
0
00
2
KE 63
81
96
33
N
E
000
0.
330
6
96
N
KE BATULICIN
NO SAMPLE
BOR PROFILE
KIND OF TEST
NO SAMPLE
DISCRIPTION
DATE
DEPTH
DATE
10 20 30 40 50 60
10 20 30 40 50 60 0.00
0.00
1.00
1.00
2.00
2.00
3.00
3.00
4.00
4.00
6.00
6.00
8.00
8.00
9.00
9.00
10.00
10.00
11.00
11.00
12.00
12.00
33.141
33.241
32.182
31.240
31.338
30.672
30.171
30.268
29.949
29.812
29.923
30.006
30.143
30.241
29.990
29.793
29.893
29.071
28.377
28.478
27.950
27.535
27.635
27.225
26.993
27.100
27.029
25.689
27.100
25.164
27.328
27.100
27.932
28.775
28.875
29.889
30.886
30.986
31.750
32.521
32.630
33.173
33.717
33.795
34.068
34.315
34.412
34.332
34.452
34.558
34.775
35.053
35.121
35.238
NOTE :
NOTE :
SPT UDS DS
SPT UDS DS
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 0+225 0+250 0+275 0+300 0+325 0+350 0+375 0+400 0+425
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 08.2 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA :
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan 1 : 500
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI DENAH SITUASI, PROFIL DAN
JEMBATAN TERSEBAR 1
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc. TAMPAK MEMANJANG
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
BOR 2
SONDIR 1 X : 338419.823
BOR 1
X : 338387.727 Y : 9663243.248
X : 338388.665
Y : 9663264.828 Z : 27.026
Y : 9663264.079
Z : 26.545 Z : 26.653 SONDIR 2
X : 338421.715
JT 1/1 Y : 9663241.887
X : 338376.122 Z : 27.011
Y : 9663276.979
Z : 26.607
PC = 0+304.588
PT = 0+272.594
PC = 0+241.295
0+3
BOX CULVERT
B
25
0+300
0+275
0+250
0+225
0+200
A A
AS BOX CULVERT
JALAN
ST = 0+210.137
CS = 0+19
0+1
SC =
75
C B
0+18
5.
TS
DENAH
SKALA 1 : 100
JT 1/2
137
3.49
=0
X : 338412.558
0+1
+16
Y : 9663235.162
8
50
Z : 27.297
8.4
98
0+1
25
BOR PROFILE
KIND OF TEST
NO SAMPLE
BOR PROFILE
KE BATULICIN
KIND OF TEST
KE KANDANGAN
NO SAMPLE
DEPTH
N - SPT SPT GRAFIK DISCRIPTION
DATE
DEPTH
DATE
10 20 30 40 50 60
10 20 30 40 50 60 0.00
0.00 Lempung,Pasir,Batu Padat Coklat /
Lempung,Pasir,Batu Padat Coklat / Urugan Bahu Jalan.
1.00
1.00 Urugan Bahu Jalan.
3 5 7 12
3 3 4 7 2.00
2.00 15 15 15 NO 1
15 15 15 NO 1 Lempung Kelanauan Padat
Kuning . 3.00 Lempung Kelanauan Padat
3.00 Kuning .
7 11 17 22
22
4.00
5 9 13
4.00
15 15 15 NO 2
Lempung Pasir Kasar Berbatu Padat
M.A.B = 22.060 5.00
15 15 15 NO 2
5.00
7 18 27 45
Abu - Abu .
M.A.N = 21.054 6.00
17 21 28 49
Lempung Pasir Kasar Berbatu Padat
6.00 15 15 15 NO 3
Abu - Abu .
15 15 15 NO 3
7.00
7.00
11 23 29 52
+19.100 +19.100 8.00 23 27 35 52
8.00 15 15 15 NO 4
15 15 15 NO 4 Batuan Sangat Padat Abu-Abu Coklat.
9.00 Batuan Sangat Padat Abu-Abu Coklat.
9.00
21 25 33 58
19 25 31 56 10.00
10.00 15 15 15 NO 5
15 15 15 NO 5
11.00
11.00
12.00 27 31 37 68
12.00 25 27 35 62
15 15 15 NO 6 End This Boring
27.029
25.689
25.164
27.328
27.100
27.932
28.775
28.875
29.889
30.886
30.986
31.750
32.521
32.630
29.071
28.377
28.478
27.950
27.535
27.635
27.225
26.993
27.100
27.100
NOTE :
NOTE :
0+150 SPT UDS DS
0+175 0+200 0+225 0+250 SPT 0+275 UDS DS 0+300 0+325
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK SKALA :
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc.
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
19100
14500
BOX CULVERT
B BOX CULVERT DOUBLE 6.0 X 6.0 M
500
19100
400 400
1000
C 2800 500 11700 500 2800
500
1500
1500
Plat Injak
500
400
A
3540
A
AS BOX CULVERT
JALAN
6500
12000
8000
6000
400
500 500
+19.100 +19.100
1500
2300 14500 2300
POTONGAN A - A
500
SKALA 1 : 100
C B
14500
DENAH
SKALA 1 : 100
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK SKALA :
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc.
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
12000
12000
500 1500 8000 1500 500
500 1500 8000 1500 500
-2.00% -2.00%
-4.00% -4.00%
-2.00% -2.00%
-4.00% -4.00%
1000
500 500
500
400
400
Plat Injak
Timbunan
6000
Pilihan
6000
LANTAI KERJA 10 cm
(fc' 10 MPa)
1500
400
500 500
500 500
500 11000 500
11000
500 1000 500 500 1000 500 POTONGAN C - C
LANTAI KERJA 10 cm SKALA 1 : 100
POTONGAN B - B (fc' 10 MPa)
SKALA 1 : 100
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 10.1 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA : 1 : 100
1 : 75
PENULANGAN BOX CULVERT
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
A C A
B B
C
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 13.1 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA : 1 : 100
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1 POTONGAN MELINTANG SUNGAI
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc. STA. 0+040 - STA. 0+045
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
0+045
21.844
21.844
21.000 21.000
0+040
22.046
22.046
22.000 22.000
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : 13.2 Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA : 1 : 100
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI JEMBATAN TERSEBAR 1 POTONGAN MELINTANG SUNGAI
Ir. Masliah Ir. Masliah Ir. Ahsani Fauzan A., MSc. STA. 0+050 - STA. 0+055
SATKER P2JN PROVINSI KALIMANTAN SELATAN PROVINSI KALIMANTAN SELATAN Ahli Jembatan Ahli Jembatan Ketua Tim
TANGGAL :
0+055
20.254
27.100
20.000 20.000
0+050
21.410
21.410
21.000 21.000
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : - Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA :
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
SINGKATAN
ABUT ABUTMENT/KEPALA JEMBATAN EVC END OF VERTICAL/LENGKUNGAN VERTIKAL AKHIR MM MILIMETER SB SLAB BRIDGE/LANTAI JEMBATAN
AH AHEAD/KEDEPAN EXIST EXISTING/YANG LAMA/KEBERADAAN Mo MID ORDINATE/TITIK ORDINAT AWAL SBST SINGLE BITUMINOUS/PERKERASAN SATU LAPIS (BURTU)
BC BOX CULVERT/KOTAK GORONG-GORONG o SUPERELEVATION/LANDAI MELINTANG NTS NOT TO SCALE/TANPA SKALA SqM SQUARE METER/METER PERSEGI
B/C BASE COURSE/ LAPISAN PONDASI JALAN FIN FINISH/SELESAI O/S OFFSET/CETAK SN STANDARD NEW CONSTRUCTION/STANDAR KONTRUKSI
BCK BACK/BELAKANG FILL FILLER/ABU BATU (BAHAN PENGISI) OUTL OUTLET/ARAH KELUAR (PADA GORONG-GORONG) BARU
BL BASE LINE POINT FLG FLANGE/SISI/TEPI % PERSENTASE SqCm SQUARE CENTIMETER/CENTIMETER PERSEGI
BM BENCH MARK/TITIK TETAP GL GRADE LEVEL/LANDAI MEMANJANG P PERLUASAN LENGKUNGAN LINGKARAN ST SPIRAL TO TANGENT/SPIRAL PERALIHAN KE TANGEN
BOTT BOTTOM/DASAR GWL GROUND WATER LEVEL/KETINGGIAN MUKA AIR TANAH P PAVED/PERKERASAN STA STATION/TITIK KEDUDUKAN
BVC BEGINNING OF VERTICAL CURVE/PERMULAAN HDWL OR HW HEADWALLS/DINDING KEPALA (PADA GORONG) P/C PRECAST/BETON CETAK STL STEEL/BAJA
LENGKUNGAN VERTIKAL HORZ HORIZONTAL/DATAR PCP PLAIN CONCRETE PIPE/RENCANA PIPA BETON STIRR STIRUUP/SENGKANG
C/C CENTER TO CENTER/AS KE AS HRS HOD ROLLET SHEET SURFANCING/LAPISAN PERMUKAAN TAK BERTULANG SYMM SYMMETRICAL/SAMA SENBANGUN (SIMETRIS)
CGR COUNCRETE GROUTED RIPRAP/BETON PENGISI RIPRAP (ASPAL) PG PROFLILE GRADE/BENTUK KETINGGIAN FROFIL TC TANGENT TO CURVE/TANGEN PERALIHAN KE LINGKARAN
CENTERLINE/AS SUMBU HIGH STRENGTH/TEGANGAN TINGGI POIN OF INTERSECTION/TITIK PERTEMUAN VERTIKAL TANGENT LENGHT OF CIRCULAR CURVE/PANJANG GARIS
CLR CLEARANCE/RUANGAN BEBAS HWL HIGH WATER LEVEL/PERMUKAAN AIR TINGGI PELAT SINGGUNG SPIRAL
CONC CONRETE/BETON IE IMPROVE EXISTING/PERBAIKAN YANG LAMA PL POST LIMIT/PATOK BATAS os CENTRAL ANGLE OF SPIRAL CURVE/SUDUT TENGAH
CONN CONNECTION,CONNECTOR/PENGHUBUNG INL INLET/LUBANG MASUK ARAH MASUK PADA GORONG - PVC POLYVINYL COMPOUND/PIPA PLASTIK LENGKUNG SPIRAL
CONST CONSTRUCT/KONTRUKSI GORONG PVI POIN OF VERTICAL INTERSECTION/TITIK PERTEMUAN T TON/SATUAN BERAT
CUBIC METER/CUBIC CENTIMETER/M3/CM3 INV INVERT/DASAR GORONG-GORONG BAGIAN DALAM VERTIKAL THK THICK/TEBAL
CMP CORRUGATED METAL PIPE/PIPA BETON BM JT JOINT/SAMBUNGAN q TANGEBT DISTANCE FROM TS OR TS/PANJANG TEMP TEMPORARY/SEMENTARA
CP CONCRETE PIPE/PIPA BETON KG KILOGRAM TANGEN DARI TS ATAU TS ULT ULTIMATE/BATAS MAKSIMUM
CT CIRCLE TO TANGENT/PERALIHAN LINGKARAN KM KILOMETER ECC EXTENDED CIRCULAR CURVE/PERLUASAN LENGKUNGAN VERT VERTICAL/VERTIKAL,TEGAK
CWAY CARRIAGEWAY/JALUR LALU LINTAS Ltr LITER RBO REGIONAL BETTERMENT OFFICE/KANTOR WILAYAH W/ WITH/DENGAN
DEFLECTION ANGELE,CENTER ANGLE/SUSUT PERTEMUAN Lin m LINEAR METER/METER PANJANG PENINGKATAN JALAN W /W WINGWALL/DINDING
D DISTANCE,DEPTH/JARAK TEBAL/DALAM LS LUMP SUM/JUMLAH BULAT RCB REINFORCED CONCRETE BOX/GORONG-GORONG BETON W /O WITHOUT/TANPA
DBST DOUBLE BITUMINOUS SURFACE TREATMENT/BURDA LT LEFT/KIRI RCP REINFORCED CONCRETE PIPE/PIPA BETON BERTULANG WC WIDHT OF CURVE WIDENING/LEBAR LENGKUNG PADA
DIAMETER/GARIS TENGAH Lv LENGHT OF VERTICAL CURVE/PANJANGAN LENGKUNGAN RDWAY ROADWAY/JALAN RAYA PELEBARAN
DN DO NOTHING/TIDAK DIKERJAKAN VERTIKAL REINF REINFORCED,REINFORCEMENT/PEMBESIAN WRT WITH RESPECT TO/DENGAN ANGGAPAN
EA EACH/BUAH CS CURVE TO SPIRAL/ARAH LINGKARAN KE SPIRAL ROW,RMJ RIGHT OF WAY/RUANG MILIK JALAN
KELUAR PADA LENGKUNG LINGKARAN MIN MINIMUM S SOFT,SPACING OF GUIDE POSTS/LUNAK, JARAK DARI
PATOK PENGAMAN
PEKERJAAN : PT. WIRA WIDYATAMA (JO.) PT. KWARSA HEXAGON JEMBATAN SEI. ALIO IV No. Gbr : - Jlh. Gbr : --
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. WIRA WIDYATAMA Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh : JUDUL
DIREKTORAT JENDERAL BINA MARGA PR-02 PERENCANAAN TEKNIK
KONSULTAN - ARSITEK - INSINYUR
Jalan Manggis No. 02 Telp. (0511) 3258121
SKALA :
Fax. (0511) 3253555 Banjarmasin 70236 Kalimantan Selatan
POINT OF VERTICAL INTERSECTION JALAN PROPINSI TEMBOK PENAHAN TANAH MUKA TANAH ASLI
POINT OF CURVE JALAN KERETA API GORONG-GORONG YANG SUDAH ADA KEBUN KELAPA
DAERAH MILIK JALAN LEBAR BAHU JALAN GORONG-GORONG KOTAK (BOX CULVERT) KEBUN KARET
PERSEN KEMIRINGAN MELINTANG BAHU JALAN MESJID SALURAN DIPERKERAS SEBELAH KIRI DAN KANAN
JARI-JARI TIKUNGAN AS JALAN (CENTER LINE) GEREJA SALURAN DIPERKERAS SEBELAH KANAN
ELEVASI (KETINGGGIAN) LAPIS PERMUKAAN REL PENGAMAN AWAL DAN AKHIR LENGKUNG VERTICAL
KILO METER LAPIS PONDASI ATAS RAMBU LALU LINTAS TIANG PENUNTUN
MAKSIMUM LAPIS PONDASI BAWAH MUKA AIR NORMAL TIANG PENUNTUN RENCANA
30
100
30
R0.6m
30
100
30
R0.3m
MARKA JALAN
500
200 300
S1=1.0m
S2=1m
.
10 50 30
R
O1=1.5m
.
200 300
30
10 90 70
30
R0.6m
30
0
25
25
30
30
100
140 110 300
30
35
25
30
500 500
GARIS PERINGATAN GARIS PENDEKAT CHEVRON
30 250
L=1200 MIN.
SPIRAL-LINGKARAN-SPIRAL
PI
ES
TS
16.000
LC
p CS
SC
LS
LS
ST
TS
CL
TS SC CS ST
e max
KETERANGAN :
FULL CIRCLE
(m) 50 60 70 80 90 100
E T
T 1500 0.00 0.00 0.00 0.00 0.00 0.00
L
1000 0.00 0.00 0.10 0.10 0.10 0.10
CT
TC W 0.00 0.00
750 0.10 0.10 0.10 0.20
Bs Bp Bs
80 1.00
70 1.00
KETERANGAN :
TC CT
PI = Point of Intersection / Titik pertemuan
DAERAH TIKUNGAN = L
dua tangen
R = Radius / Jari-jari busur lingkaran
AWAL PELEBARAN
L = Panjang busur lingkaran
CL
TC = Titik perubahan dari bagian lurus ke bagian lingkaran
e normal
CT = Titik perubahan dari bagian lingkaran ke bagian lurus
Bp = Lebar Perkerasan
ELEVASI TEPI KANAN
Bs = Lebar Bahu Jalan
SUPER ELEVASI MAKSIMUM
TEPI DALAM SETELAH DIPERLEBAR - Gambar tidak berskala