TAJUK KONTRAK
PERKHIDMATAN PENYELENGGARAAN SISTEM PENYAMAN UDARA PAKEJ B UNTUK TEMPOH DUA (2) TAHUN, UNIVERSITI
MALAYSIA TERENGGANU
UMT/T003/2021
OKTOBER 2022
NO. RUJUKAN
BIL NO. SURAT ARAHAN NO. SERVICE SHEET LOKASI KOS (RM)
SURAT
1 S 18217 165.00
2 S 18218 165.00
UMT/PEMB/300- M1
3 S 18219 PUSAT ASASI STEM 88.00
2/4/67 JILID 3 (15) (02/10/2022)
4 S 18216 165.00
5 S 18220 7.00
JUMLAH (RM) 590.00
Tarikh: Tarikh:
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : PUSAT ASASI STEM TARIKH : 02/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
1 S 18217 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 12 5.00 60.00 SER 1/4 NO 2/1 (II)-B
S 18217 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (III)-B
S 18217 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (V)-B
S 18217 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 12 6.00 72.00 SER 2/4 NO 2/1 (II)-C
S 18217 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (III)-C
S 18217 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 2 6.00 12.00 SER 2/4 NO 2/1 (V)-C
2 S 18218 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 15 5.00 75.00 SER 1/4 NO 2/1 (II)-B
S 18218 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 15 6.00 90.00 SER 2/4 NO 2/1 (II)-C
3 S 18219 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 8 5.00 40.00 SER 1/4 NO 2/1 (II)-B
S 18219 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 8 6.00 48.00 SER 2/4 NO 2/1 (II)-C
4 S 18216 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 14 5.00 70.00 SER 1/4 NO 2/1 (II)-B
S 18216 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (III)-B
S 18216 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 14 6.00 84.00 SER 2/4 NO 2/1 (II)-C
S 18216 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (III)-C
5 S 18220 KERJA-KERJA SERVIS EXHAUST FAN - 2 3.50 7.00 SER 4/4 NO 2/3-E
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
LAMPIRAN BERGAMBAR KEMAJUAN KERJA - KERJA SERVIS
LOKASI : PUSAT ASASI STEM
TARIKH : 02/10/2022
PPH/B/PEMB-02
RINGKASAN JOB SHEET & CUSTCARE Keluaran 3 Semakan 0
TAJUK KONTRAK
PERKHIDMATAN PENYELENGGARAAN SISTEM PENYAMAN UDARA PAKEJ B UNTUK TEMPOH DUA (2) TAHUN, UNIVERSITI
MALAYSIA TERENGGANU
UMT/T003/2021
OKTOBER 2022
NO. RUJUKAN
BIL NO. SURAT ARAHAN NO. SERVICE SHEET LOKASI KOS (RM)
SURAT
1 S 18125 167.00
2 S 18124 FAKULTI TEKNOLOGI
165.00
UMT/PEMB/300- M1 KEJURUTERAAN
3 S 18126 168.00
2/4/67 JILID 3 (15) (03/10/2022) KELAUTAN DAN
4 S 18127 INFORMATIK 44.00
5 S 18145 66.50
JUMLAH (RM) 610.50
Tarikh: Tarikh:
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 03/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
1 S 18125 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 5 5.00 25.00 SER 1/4 NO 2/1 (III)-B
S 18125 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (IV)-B
S 18125 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 8 5.00 40.00 SER 1/4 NO 2/1 (V)-B
S 18125 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 5 6.00 30.00 SER 2/4 NO 2/1 (III)-C
S 18125 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 2 7.00 14.00 SER 2/4 NO 2/1 (IV)-C
S 18125 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 8 6.00 48.00 SER 2/4 NO 2/1 (V)-C
2 S 18124 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 13 5.00 65.00 SER 1/4 NO 2/1 (II)-B
S 18124 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (III)-B
S 18124 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 13 6.00 78.00 SER 2/4 NO 2/1 (II)-C
S 18124 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 6.00 12.00 SER 2/4 NO 2/1 (III)-C
3 S 18126 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 3 5.00 15.00 SER 1/4 NO 2/1 (IV)-B
S 18126 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 12 5.00 60.00 SER 1/4 NO 2/1 (V)-B
S 18126 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 3 7.00 21.00 SER 2/4 NO 2/1 (IV)-C
S 18126 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 12 6.00 72.00 SER 2/4 NO 2/1 (V)-C
4 S 18127 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (V)-B
S 18127 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 6.00 24.00 SER 2/4 NO 2/1 (V)-C
5 S 18145 KERJA-KERJA SERVIS EXHAUST FAN - 19 3.50 66.50 SER 4/4 NO 2/3-E
JUMLAH KESELURUHAN RM 610.50
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
LAMPIRAN BERGAMBAR KEMAJUAN KERJA - KERJA SERVIS
LOKASI : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK
TARIKH : 03/10/2022
PPH/B/PEMB-02
RINGKASAN JOB SHEET & CUSTCARE Keluaran 3 Semakan 0
TAJUK KONTRAK
PERKHIDMATAN PENYELENGGARAAN SISTEM PENYAMAN UDARA PAKEJ B UNTUK TEMPOH DUA (2) TAHUN, UNIVERSITI
MALAYSIA TERENGGANU
UMT/T003/2021
OKTOBER 2022
NO. RUJUKAN
BIL NO. SURAT ARAHAN NO. SERVICE SHEET LOKASI KOS (RM)
SURAT
1 S 18128 172.00
2 S 18129 FAKULTI TEKNOLOGI
176.00
UMT/PEMB/300- M1 KEJURUTERAAN
3 S 18130 165.00
2/4/67 JILID 3 (15) (04/10/2022) KELAUTAN DAN
4 S 18131 INFORMATIK 88.00
5 S 18146 56.00
JUMLAH (RM) 657.00
Tarikh: Tarikh:
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 04/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
1 S 18128 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (III)-B
S 18128 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 7 5.00 35.00 SER 1/4 NO 2/1 (IV)-B
S 18128 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 7 5.00 35.00 SER 1/4 NO 2/1 (V)-B
S 18128 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (III)-C
S 18128 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 7 7.00 49.00 SER 2/4 NO 2/1 (IV)-C
S 18128 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 7 6.00 42.00 SER 2/4 NO 2/1 (V)-C
2 S 18129 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 3.00 3.00 SER 1/4 NO 2/1 (I)-B
S 18129 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 3 5.00 15.00 SER 1/4 NO 2/1 (II)-B
S 18129 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (IV)-B
S 18129 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (V)-B
S 18129 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 3 7.00 21.00 SER 1/4 NO 2/1 (VI)-B
S 18129 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (I)-C
S 18129 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 3 6.00 18.00 SER 2/4 NO 2/1 (II)-C
S 18129 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 4 7.00 28.00 SER 2/4 NO 2/1 (IV)-C
S 18129 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 6.00 24.00 SER 2/4 NO 2/1 (V)-C
S 18129 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 3 7.00 21.00 SER 2/4 NO 2/1 (VI)-C
3 S 18130 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 15 5.00 75.00 SER 1/4 NO 2/1 (II)-B
S 18130 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 15 6.00 90.00 SER 2/4 NO 2/1 (II)-C
JUMLAH KESELURUHAN RM 513.00
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 04/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
4 S 18131 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (III)-B
S 18131 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (V)-B
S 18131 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 4 6.00 24.00 SER 2/4 NO 2/1 (III)-C
S 18131 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 6.00 24.00 SER 2/4 NO 2/1 (V)-C
5 S 18146 KERJA-KERJA SERVIS EXHAUST FAN - 16 3.50 56.00 SER 4/4 NO 2/3-E
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
LAMPIRAN BERGAMBAR KEMAJUAN KERJA - KERJA SERVIS
LOKASI : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK
TARIKH : 04/10/2022
PPH/B/PEMB-02
RINGKASAN JOB SHEET & CUSTCARE Keluaran 3 Semakan 0
TAJUK KONTRAK
PERKHIDMATAN PENYELENGGARAAN SISTEM PENYAMAN UDARA PAKEJ B UNTUK TEMPOH DUA (2) TAHUN, UNIVERSITI
MALAYSIA TERENGGANU
UMT/T003/2021
OKTOBER 2022
NO. RUJUKAN
BIL NO. SURAT ARAHAN NO. SERVICE SHEET LOKASI KOS (RM)
SURAT
Tarikh: Tarikh:
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 05/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
1 S 18132 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 13 5.00 65.00 SER 1/4 NO 2/1 (II)-B
S 18132 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (III)-B
S 18132 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 13 6.00 78.00 SER 2/4 NO 2/1 (II)-C
S 18132 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 6.00 12.00 SER 2/4 NO 2/1 (III)-C
2 S 18133 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (II)-B
S 18133 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 10 5.00 50.00 SER 1/4 NO 2/1 (III)-B
S 18133 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 5.00 20.00 SER 1/4 NO 2/1 (V)-B
S 18133 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (II)-C
S 18133 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 10 6.00 60.00 SER 2/4 NO 2/1 (III)-C
S 18133 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 4 6.00 24.00 SER 2/4 NO 2/1 (V)-C
3 S 18134 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 3 5.00 15.00 SER 1/4 NO 2/1 (II)-B
S 18134 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 6 5.00 30.00 SER 1/4 NO 2/1 (III)-B
S 18134 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (IV)-B
S 18134 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 5 5.00 25.00 SER 1/4 NO 2/1 (V)-B
S 18134 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 3 6.00 18.00 SER 2/4 NO 2/1 (II)-C
S 18134 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 6 6.00 36.00 SER 2/4 NO 2/1 (III)-C
S 18134 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 1 7.00 7.00 SER 2/4 NO 2/1 (IV)-C
S 18134 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 5 6.00 30.00 SER 2/4 NO 2/1 (V)-C
4 S 18147 KERJA-KERJA SERVIS EXHAUST FAN - 33 3.50 115.50 SER 4/4 NO 2/3-E
JUMLAH KESELURUHAN RM 611.50
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
LAMPIRAN BERGAMBAR KEMAJUAN KERJA - KERJA SERVIS
LOKASI : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK
TARIKH : 05/10/2022
PPH/B/PEMB-02
RINGKASAN JOB SHEET & CUSTCARE Keluaran 3 Semakan 0
TAJUK KONTRAK
PERKHIDMATAN PENYELENGGARAAN SISTEM PENYAMAN UDARA PAKEJ B UNTUK TEMPOH DUA (2) TAHUN, UNIVERSITI
MALAYSIA TERENGGANU
UMT/T003/2021
OKTOBER 2022
NO. RUJUKAN
BIL NO. SURAT ARAHAN NO. SERVICE SHEET LOKASI KOS (RM)
SURAT
Tarikh: Tarikh:
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 06/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
1 S 18138 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (II)-B
S 18138 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 11 5.00 55.00 SER 1/4 NO 2/1 (V)-B
S 18138 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 3 7.00 21.00 SER 1/4 NO 2/1 (VI)-B
S 18138 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (II)-C
S 18138 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 28,000 - 39,000 BTU/HR 11 6.00 66.00 SER 2/4 NO 2/1 (V)-C
S 18138 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 3 7.00 21.00 SER 2/4 NO 2/1 (VI)-C
2 S 18139 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 3.00 3.00 SER 1/4 NO 2/1 (I)-B
S 18139 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 5 5.00 25.00 SER 1/4 NO 2/1 (II)-B
S 18139 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (III)-B
S 18139 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 3 5.00 15.00 SER 1/4 NO 2/1 (IV)-B
S 18139 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 4 7.00 28.00 SER 1/4 NO 2/1 (VI)-B
S 18139 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (I)-C
S 18139 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 5 6.00 30.00 SER 2/4 NO 2/1 (II)-C
S 18139 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 2 6.00 12.00 SER 2/4 NO 2/1 (III)-C
S 18139 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 3 7.00 21.00 SER 2/4 NO 2/1 (IV)-C
S 18139 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 40,000 - 49,000 BTU/HR 4 7.00 28.00 SER 2/4 NO 2/1 (VI)-C
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
BORANG PERINCIAN KERJA
PEJABAT PEMBANGUNAN DAN HARTA
PENOLONG JURUTERA : EN. IRWADI BIN MUHAMMAD YUNUS KONTRAKTOR : PENYELENGGARAAN : SERVIS :
ZON : B NAA REDIWORKS SDN. BHD. MEKANIKAL / PENYAMAN UDARA /
BANGUNAN : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK TARIKH : 06/10/2022 ELEKTRIK PENCEGAH KEBAKARAN
NO. RUJUKAN SURAT : UMT/PEMB/300-2/4/67 JILID 3 (15) AWAM MENCUCI BANGUNAN
NO. SURAT ARAHAN : M1 (01-08/10/2022) KEBERSIHAN KAWASAN
BIL NO. JOB PERKARA PERINCIAN KUANTITI KADAR (RM) JUMLAH (RM) CATATAN
SHEET
3 S 18140 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 3.00 3.00 SER 1/4 NO 2/1 (I)-B
S 18140 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 2 5.00 10.00 SER 1/4 NO 2/1 (II)-B
S 18140 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 6 5.00 30.00 SER 1/4 NO 2/1 (III)-B
S 18140 KERJA-KERJA SERVIS FAN COIL UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 1 5.00 5.00 SER 1/4 NO 2/1 (IV)-B
S 18140 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 8,000 - 10,000 BTU/HR 1 6.00 6.00 SER 2/4 NO 2/1 (I)-C
S 18140 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 13,000 - 16,000 BTU/HR 2 6.00 12.00 SER 2/4 NO 2/1 (II)-C
S 18140 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 18,000 - 20,000 BTU/HR 6 6.00 36.00 SER 2/4 NO 2/1 (III)-C
S 18140 KERJA-KERJA SERVIS CONDENSOR UNIT WITH ALL NECESSARY ACCESSORIES - 22,000 - 27,000 BTU/HR 1 7.00 7.00 SER 2/4 NO 2/1 (IV)-C
4 S 18107 KERJA-KERJA SERVIS EXHAUST FAN - 7 3.50 24.50 SER 4/4 NO 2/3-E
PENGESYORAN :
……………………………………………………….
PENOLONG JURUTERA
PPH/B/PERINCIAN-01
Keluaran 03 - Semakan 0
LAMPIRAN BERGAMBAR KEMAJUAN KERJA - KERJA SERVIS
LOKASI : FAKULTI TEKNOLOGI KEJURUTERAAN KELAUTAN DAN INFORMATIK
TARIKH : 06/10/2022