BARANG
I. Material Langsung ( Bahan Baku) 7.578.831.542,10 - 7.578.831.542,10 100,00 7.578.831.542,10 70,00
II. Peralatan (Barang Jadi) - - - - - -
JASA
III. Manejemen Proyek Dan Perekayasaan 216.538.044,06 - 216.538.044,06 100,00 216.538.044,06 2,00
IV. Alat Kerja/Fasilitas Kerja 1.299.228.264,36 - 1.299.228.264,36 100,00 1.299.228.264,36 12,00
V. Konstruksi dan Fabrikasi 1.624.035.330,45 - 1.624.035.330,45 100,00 1.624.035.330,45 15,00
VI. Jasa Umum 108.269.022,03 - 108.269.022,03 100,00 108.269.022,03 1,00
Formulir Perhitungan :
% TKDN ( Gabungan Barang) 7.578.831.542,10 - 0,00
= 70,00%
10.826.902.203,00
% TKDN ( Gabungan Jasa) 3.248.070.660,90 - -
= 30,00%
10.826.902.203,00
100,00%