LANTAI DSASAR

1 Pekerjaan Dinding Area Parkir


Dinding pasangan batako 7/20/40 cm 4,011,915.60
Plesteran dinding 5,284,239.84
Batu Alam 9,072,257.04
Cat Tembok Interior 1,960,479.58
total 20,328,892.06

2 Plint keramik lntai dasar 1,739,671.21

LANTAI SATU
1 Plint keramik lntai satu 3,332,057.69
2 Instalasi Fire Alarm
Kabel NYA 2x1x1.5 mm dalam High Impact conduit dia. 20 mm
- Instalasi Heat Detector type Rate Of Rise (ROR) 7 Titik
- Heat Detector ROR (Detektor panas) 5 Bh
- Smoke Detector 2 Bh
- Kabel NYA 2x2x1.5 mm dalam High Impact conduit dia. 20 mm
- Instalasi Manual Push Button/Break Glass 1 Titik
- Instalasi Indicator Lamp 1 Titik
- Instalasi Alarm Bell 1 Titik
- Manual Push Button/Break Glass 1 Bh
- Indicator Lamp 1 Bh
- Alarm Bell 1 Bh
- End of Line 2 Unit
- Peralatan Utama
- Main Control Fire Alarm (MCFA) 5 Zone lengkap dengan pe 1 Unit
- Pemrograman MCFA 1 Unit
- Annunciator include instalasi (dr MCFA ke Pos Jaga ) 1 Unit
- Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 + BOX 3 Unit
- Perijinan 1 Ls
- Material Bantu 1 Ls
LANTAI DUA
1 Plint keramik lntai dua 2,922,443.64
2 Instalasi Fire Alarm
Kabel NYA 2x1x1.5 mm dalam High Impact conduit dia. 20 mm
- Instalasi Heat Detector type Rate Of Rise (ROR) 17 titik
- Heat Detector ROR (Detektor panas) 9 bh
- Smoke Detector 8 bh
- Fire Alarm Terminal Box 02 (FATB 02) 1 unit
- Kabel NYA 6x1x1,5 mm (FATB 02 - MCFA) 42 meter
- Instalasi Manual Push Button/Break Glass 2 titik
- Instalasi Indicator Lamp 2 titik
- Instalasi Alarm Bell 2 titik
- Manual Push Button/Break Glass 2 bh
- Indicator Lamp 2 bh
- Alarm Bell 2 bh
- End of Line 2 unit
- Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 + BOX 3 unit
PEKERJAAN ELEKTRONIK
PEKERJAAN ACCESS CONTROL
Peralatan Utama
- Proximity Card For HID Reader 100 unit
- Access Control System dengan Processors intel Core 2 duo 1 unit

Peralatan Access Control


- Control Panel c/w Power Supply & Back Up Battery 1 unit
- HID Reader 2 unit
- Exit Push Botton 2 unit
- Eletromagnetic Lock 2 unit
- Emergency Break Glass 2 unit
- Power Supply 2 unit
- Door Contact 2 unit

Instalasi Access Control


- Instalasi Access Control dengan kabel UTP Cat 5e dan Inst 1 lot
- Material Bantu 1 lot

Distribusi listrik
Pengadaan Sambungan Daya PLN
Pengadaan/Pasang baru Daya PLN 105 Kva 3 phase
- Biaya penyambungan 105 Kva 105 Kva
- Uang jaminan langganan 1 Ls
- Biaya administrasi 1 Ls
Pekerjaan Perijinan
- Perijinan Depnaker 1 Lot

Air Bersih Insfratruktur


1 SAMBUNGAN PDAM KE RESERVOAR UTAMA
- Pipa PVC AW dia. 20 atau 3/4 30 m
- Pipa PVC AW dia. 25 atau 1 62 m
- Paket Pompa transfer air bersih kap. 1x 100 LPM Total head 1 set
- Pompa Transfer dari PDAM ke GWT 1 bh
- Gate valve 1 1/2 2 bh
- Foot valve 1 1 bh
2 Penyambungan Water meter ke PDAM 1 ls
3 Bangunan/Struktur reservoir kap. 30 m3 & rumah pompa
- PP Pompa Reservoar Utama air bersih wall mounted lengk 1 unit
- Kabel NYY 4x6 mm (SDP - PP Pompa) 16 m
- Grounding Arus kuat
- Kabel NYA 4 mm (SDP - PP Pompa) 16 m