SUMMARY PROJECT PEMBANGUNAN KANDANG


AYAM,PRODUKSI DAN MARKET AYAM BROILER
DI TASIKMALAYA DAN CIAMIS
SUMMARY PROJECT : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER
LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS
PT.SENTRA INSAN GARUDA

LOKASI PROJECT INTAN UNIT KONTRUKSI PRODUKSI TOTAL


1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 39,222,000,000 8,773,016,250 47,995,016,250
2 Desa Cijulang Kec Cineam Tasikmalaya 110 41,159,500,000 8,583,016,250 49,742,516,250
3 Desa Kawasen Kec Banjarsari Ciamis 220 70,559,500,000 15,303,672,500 85,863,172,500
JUMLAH 440 150,941,000,000 32,659,705,000 183,600,705,000

LOKASI PROJECT INTAN UNIT EKOR RESIKO MATI 15% TOTAL


1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 325,000 48,750 276,250
2 Desa Cijulang Kec Cineam Tasikmalaya 110 325,000 48,750 276,250
3 Desa Kawasen Kec Banjarsari Ciamis 220 650,000 97,500 552,500
JUMLAH 440 1,300,000 195,000 1,105,000

LOKASI PROJECT INTAN EKOR PRODUKSI TOTAL


1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 16,210 4,478,117,875
2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 16,250 4,489,117,875
3 Desa Kawasen Kec Banjarsari Ciamis 552,500 15,778 8,717,139,750
JUMLAH 1,105,000 48,238 17,684,375,500

LOKASI PROJECT INTAN EKOR HARGA JUAL TOTAL


1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 17,800 4,917,250,000
2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 17,800 4,917,250,000
3 Desa Kawasen Kec Banjarsari Ciamis 552,500 17,800 9,834,500,000
JUMLAH 1,105,000 19,669,000,000

URAIAN JUMLAH PANEN KREDIT


1 MODAL INVESTOR 200,000,000,000 -
2 PENGEMBALIAN MODAL 200,000,000,000 1 1,666,666,667
3 PROFIT MARGIN 2,360,280,000,000 120 19,669,000,000
PROFIT MARGIN
LOKASI PROJECT INTAN MARGIN PRODUKSI PROFIT
1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 4,917,250,000 4,071,016,250 846,233,750
2 Desa Cijulang Kec Cineam Tasikmalaya 4,917,250,000 4,081,016,250 836,233,750
3 Desa Kawasen Kec Banjarsari Ciamis 9,834,500,000 7,924,672,500 1,909,827,500
JUMLAH 19,669,000,000 16,076,705,000 3,592,295,000

URAIAN PROFIT KREDIT SALDO


1 Pengembalian modal 3,592,295,000 1,666,666,667 1,925,628,333
2 Bunga 3,592,295,000 1.00% 35,922,950
JUMLAH 1,889,705,383
1 Pengembangan usaha 10% 188,970,538
1,889,705,383
2 Social work 2.50% 47,242,635
JUMLAH 236,213,173
JUMLAH PROFIT 1,653,492,210
NETT PROFIT
I INVESTOR 60% 992,095,326.25
II OWNER 40% 661,396,884.17
TOTAL 1,653,492,210.42
RENCANA ANGGARAN BIAYA : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER
LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS
PT.SENTRA INSAN GARUDA

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH


I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
1 Pek.Persiapan I Item 6 1,343,500,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000
5 Pek.Tahap 3 Electrical Item 4 2,160,000,000
6 Pek.Tahap 4 Mekanical Item 4 870,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000
8 Biaya oprasional produksi I Item 5 2,795,000,000
9 Biaya oprasional produksi II Item 6 2,340,000,000
10 Biaya oprasional produksi III Item 9 2,362,000,000
11 Biaya oprasional produksi IV Item 4 212,016,250
12 Biaya oprasional kantor Item 4 1,064,000,000
13 Biaya pajak dan lain-lain Item 5 4,196,000,000
JUMLAH I 52,191,016,250 52,191,016,250
II DESA CIJULANG,CINEAM TASIKMALAYA
1 Pek.Persiapan I Item 6 1,366,000,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000
5 Pek.Tahap 3 Electrical Item 4 2,160,000,000
6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000
8 Biaya oprasional produksi I Item 5 2,795,000,000
9 Biaya oprasional produksi II Item 6 2,340,000,000
10 Biaya oprasional produksi III Item 9 2,162,000,000
11 Biaya oprasional produksi IV Item 4 212,016,250
12 Biaya oprasional kantor Item 4 1,074,000,000
13 Biaya pajak dan lain-lain Item 5 4,387,500,000
JUMLAH II 54,130,016,250 54,130,016,250
III DESA KAWASEN,BANJARSARI CIAMIS
1 Pek.Persiapan I Item 6 1,591,000,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000
5 Pek.Tahap 3 Electrical Item 4 3,205,000,000
6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000
8 Biaya oprasional produksi I Item 5 5,590,000,000
9 Biaya oprasional produksi II Item 6 4,680,000,000
10 Biaya oprasional produksi III Item 9 2,699,000,000
11 Biaya oprasional produksi IV Item 4 384,672,500
12 Biaya oprasional kantor Item 4 1,950,000,000
13 Biaya pajak dan lain-lain Item 5 7,705,000,000
JUMLAH III 93,568,172,500 93,568,172,500
JUMLAH I+II+III 199,889,205,000
Dibulatkan 200,000,000,000

TOTAL JUMLAH Tasikmalaya,....Nopember 2013


Rp.200,000,000,000,00
Terbilang
( Dua ratus milyar rupiah )
Managemen
RENCANA ANGGARAN BIAYA : PEMBANGUNAN INFRASTUKTUR,KANDANG AYAM,FASILITAS,MEKANIKAL,ELEKTRIKAL &PENUNJANG
LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS
PT.SENTRA INSAN GARUDA

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH


I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
1 Pek.Persiapan I Item 6 1,343,500,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000
5 Pek.Tahap 3 Electrical Item 4 2,160,000,000
6 Pek.Tahap 4 Mekanical Item 4 870,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000
JUMLAH I 39,222,000,000 39,222,000,000
II DESA CIJULANG,CINEAM TASIKMALAYA
1 Pek.Persiapan I Item 6 1,366,000,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000
5 Pek.Tahap 3 Electrical Item 4 2,160,000,000
6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000
JUMLAH II 41,159,500,000 41,159,500,000
III DESA KAWASEN,BANJARSARI CIAMIS
1 Pek.Persiapan I Item 6 1,591,000,000
2 Pek.Persiapan II Item 6 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000
5 Pek.Tahap 3 Electrical Item 4 3,205,000,000
6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000
7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000
JUMLAH III 70,559,500,000 70,559,500,000
JUMLAH I+II+III 150,941,000,000
TOTAL 150,941,000,000

TOTAL JUMLAH Tasikmalaya,....Nopember2013


Rp.150,941,000,000,00
Terbilang
( Seratus lima puluh milyar sembilan ratus empat puluh satu juta rupiah )

Management
RENCANA ANGGARAN BIAYA : PRODUKSI,DISTRIBUSI DAN MARKET AYAM BROILER
LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS
PT.SENTRA INSAN GARUDA

NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH


I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
1 Biaya oprasional produksi I Item 5 2,795,000,000
2 Biaya oprasional produksi II Item 6 2,340,000,000
3 Biaya oprasional produksi III Item 9 2,362,000,000
4 Biaya oprasional produksi IV Item 4 212,016,250
5 Biaya oprasional kantor Item 4 1,064,000,000
JUMLAH II 8,773,016,250 8,773,016,250 8,773,016,250
I DESA CIJULANG,CINEAM TASIKMALAYA
1 Biaya oprasional produksi I Item 5 2,795,000,000
2 Biaya oprasional produksi II Item 6 2,340,000,000
3 Biaya oprasional produksi III Item 9 2,162,000,000
4 Biaya oprasional produksi IV Item 4 212,016,250
5 Biaya oprasional kantor Item 4 1,074,000,000
JUMLAH II ############ 8,583,016,250 8,583,016,250
II DESA KAWASEN,BANJARSARI CIAMIS
1 Biaya oprasional produksi I Item 5 5,590,000,000
2 Biaya oprasional produksi II Item 6 4,680,000,000
3 Biaya oprasional produksi III Item 9 2,699,000,000
4 Biaya oprasional produksi IV Item 4 384,672,500
5 Biaya oprasional kantor Item 4 1,950,000,000
JUMLAH III ############ 15,303,672,500 15,303,672,500
JUMLAH I+II+III 32,659,705,000
TOTAL 32,659,705,000

TOTAL JUMLAH
Rp. 32,659,705,000
Terbilang
( Tiga puluh dua milyar seratus enam puluh juta sembilan ratus lima ribu rupiah )

Tasikmalaya,....Nopember 2013

Management
CASH FLOW :PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER
LOKASI :KEC CINEAM,KARANGNUNGGAL KAB TASIKMALAYA & KEC BANJARSARI KAB CIAMIS
PT.SENTRA INSAN GARUDA

NO URAIAN PEKERJAAN JUMLAH BULAN 1 BULAN 2 BULAN 3


I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
1 Pek.Persiapan I 1,343,500,000 1,343,500,000
2 Pek.Persiapan II 918,500,000 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 4,110,000,000 2,055,000,000 2,055,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000
5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000
6 Pek.Tahap 4 Mekanical 870,000,000 261,000,000
7 Pek.Tahap 5 Sarana penunjang 4,850,000,000 2,425,000,000
8 Biaya oprasional produksi I 2,795,000,000
9 Biaya oprasional produksi II 2,340,000,000
10 Biaya oprasional produksi III 2,362,000,000
11 Biaya oprasional produksi IV 212,016,250
12 Biaya oprasional kantor 1,064,000,000
13 Biaya pajak dan lain-lain 4,196,000,000 4,196,000,000
JUMLAH I 52,191,016,250 8,513,000,000 9,807,000,000 3,721,000,000
II DESA CIJULANG,CINEAM TASIKMALAYA
1 Pek.Persiapan I 1,366,000,000 1,366,000,000
2 Pek.Persiapan II 918,500,000 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 5,840,000,000 2,920,000,000 2,920,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000
5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000
6 Pek.Tahap 4 Mekanical 1,005,000,000 301,500,000
7 Pek.Tahap 5 Sarana penunjang 4,900,000,000 2,450,000,000
8 Biaya oprasional produksi I 2,795,000,000
9 Biaya oprasional produksi II 2,340,000,000
10 Biaya oprasional produksi III 2,162,000,000
11 Biaya oprasional produksi IV 212,016,250
12 Biaya oprasional kantor 1,074,000,000
13 Biaya pajak dan lain-lain 4,387,500,000 4,387,500,000
JUMLAH II 54,130,016,250 9,592,000,000 10,712,500,000 3,746,000,000
III DESA KAWASEN,BANJARSARI CIAMIS
1 Pek.Persiapan I 1,591,000,000 1,591,000,000
2 Pek.Persiapan II 918,500,000 918,500,000
3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 8,140,000,000 4,070,000,000 4,070,000,000
4 Pek.Tahap 2 Pembangunan kandang ayam 49,940,000,000 14,982,000,000
5 Pek.Tahap 3 Electrical 3,205,000,000 1,923,000,000
6 Pek.Tahap 4 Mekanical 1,365,000,000 409,500,000
7 Pek.Tahap 5 Sarana penunjang 5,400,000,000 2,700,000,000
8 Biaya oprasional produksi I 5,590,000,000
9 Biaya oprasional produksi II 4,680,000,000
10 Biaya oprasional produksi III 2,699,000,000
11 Biaya oprasional produksi IV 384,672,500
12 Biaya oprasional kantor 1,950,000,000
13 Biaya pajak dan lain-lain 7,705,000,000 7,705,000,000
JUMLAH III 93,568,172,500 14,284,500,000 19,461,500,000 4,623,000,000
JUMLAH TOTAL 199,889,205,000 32,389,500,000 39,981,000,000 12,090,000,000

KETERANGAN WARNA DALAM KOLOM


1 PEK PERSIAPAN
2 PEK INFRASTRUKTUR DAN KONTRUKSI KANDANG
3 PEK PEMBANGUNAN GUDANG DAN KANTOR
4 PRODUKSI BERJALAN
5 PERALATAN PRODUKSI
6 PAJAK DAN BIAYA LAIN-LAIN
BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12

8,739,500,000 7,491,000,000 1,248,500,000


864,000,000
435,000,000 174,000,000
1,455,000,000 970,000,000
2,795,000,000
2,340,000,000
2,362,000,000
212,016,250
1,064,000,000

13,876,500,000 6,390,016,250 7,665,000,000 2,218,500,000 -

8,739,500,000 7,491,000,000 1,248,500,000


864,000,000
502,500,000 201,000,000
1,470,000,000 980,000,000
2,795,000,000
2,340,000,000
2,162,000,000
212,016,250
1,074,000,000

13,744,000,000 6,415,016,250 7,692,000,000 2,228,500,000 -

17,479,000,000 14,982,000,000 2,497,000,000


1,282,000,000
682,500,000 273,000,000
1,620,000,000 1,080,000,000
5,590,000,000
4,680,000,000
2,699,000,000
384,672,500
1,950,000,000

25,540,500,000 10,826,672,500 15,255,000,000 3,577,000,000


53,161,000,000 23,631,705,000 30,612,000,000 8,024,000,000

Tasikmalaya,.......Nopember 2013

Managemen
SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA SARIMANGGU
KARANGNUNGGAL - TASIKMALAYA
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7
I PEK.PERSIAPAN I
1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000
2 Pengukuran Lahan M2 150,000 1 450 67,500,000
3 Pengukuran jalan akses M2 40,000 1 400 16,000,000
4 Land Clearing Lahan/Ganti rugi pohon M2 150,000 1 1,000 150,000,000
5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000
6 Perijinan Proyek & usaha peternakan M2 150,000 1 800 120,000,000
JUMLAH I 1,343,500,000
II PEK.PERSIAPAN II
1 Direksi kit Unit 2 1 10,000,000 20,000,000
2 Peralatan kantor List 10 1 5,000,000 50,000,000
3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000
4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000
5 Motoris Kantor Unit 2 1 15,000,000 30,000,000
6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
JUMLAH II 918,500,000
III PEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
1 Cut and fill M2 75,000 1 18,000 1,350,000,000
2 Pematangan lahan/land clearing M2 75,000 1 2,000 150,000,000
3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000
4 Drainase M2 8,000 1 70,000 560,000,000
5 Overhead M2 150,000 1 3,000 450,000,000
JUMLAH III 4,110,000,000
IV PEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000
2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000
3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000
4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000
5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000
6 Overhead Unit 110 1 10,000,000 1,100,000,000
JUMLAH IV 24,970,000,000
V PEK.TAHAP 3 ELECTRIKAL
1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000
2 Beli Genset Unit 2 1 250,000,000 500,000,000
3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000
4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000
5 Overhead Unit 110 1 2,500,000 275,000,000
JUMLAH IV 2,160,000,000
VI PEK.TAHAP 4 MEKANICAL
1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000
2 instalisasi air bersih Unit 11 1 20,000,000 220,000,000
3 Pemasangan water pump Unit 11 1 15,000,000 165,000,000
4 Overhead Unit 11 1 10,000,000 110,000,000
JUMLAH V 870,000,000
VII PEK.TAHAP 5 SARANA PENUNJANG
1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000
2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000
3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000
4 Pembangunan pos satpam dan musolah Unit 13 1 50,000,000 650,000,000
5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000
6 Overhead Unit 1 1 500,000,000 500,000,000
JUMLAH VII 4,850,000,000
VIII BIAYA OPERASIONAL PRODUKSI 1
1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000
2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000
3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000
4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000
5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000
JUMLAH VIII 2,795,000,000
IX BIAYA OPERASIONAL PRODUKSI 2
1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000
2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000
3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000
4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000
5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000
6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000
JUMLAH VIII 2,340,000,000
X BIAYA OPERASIONAL PRODUKSI 3
1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000
2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000
3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000
4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000
5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000
6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000
7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000
8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000
9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000
JUMLAH IX 2,362,000,000
XI BIAYA OPERASIONAL PRODUKSI 4
1 Biaya Marketing List 30 2 500,000 30,000,000
2 Biaya Trucking Unit 69 1 2,500,000 172,656,250
3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000
4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
JUMLAH X 212,016,250
XII BIAYA OPERASIONAL KANTOR
1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000
2 Gaji karyawan kandang Orang 457 1 2,000,000 914,000,000
3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000
4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
JUMLAH XI 1,064,000,000
XIII PAJAK DAN BIAYA LAINNYA
1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000
2 Pajak infrastruktur Persen 10 1 4,110,000,000 411,000,000
3 Pajak mekanikal & elektrikal Persen 10 1 3,030,000,000 303,000,000
4 Pajak kontruksi gudang Persen 10 1 4,850,000,000 485,000,000
5 Biaya tambahan List 5 1 100,000,000 500,000,000
JUMLAH XII 4,196,000,000
JUMLAH TOTAL 52,191,016,250

ASUMSI I
BIAYA PENGELUARAN PEMBANGUNAN 48,120,000,000 48,120,000,000
BIAYA PENGELUARAN PRODUKSI
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000
II BIAYA OPRASIONAL KANTOR 1,276,016,250
TOTAL PENGELUARAN PRODUKSI BERJALAN 4,071,016,250
TOTAL 52,191,016,250

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 325,000
2 RESIKO KEMATIAN 15% Ekor 48,750
3 JUMLAH AYAM BERSIH Ekor 276,250
4 MODAL DASAR AYAM/EKOR JUMLAH 14,737
PPN 10% 1,474
TOTAL 16,210

HARGA JUAL AYAM PER EKOR Ekor 276,250 17,800 4,917,250,000


TOTAL 4,917,250,000
KEUNTUNGAN JUAL AYAM PER EKOR Ekor 276,250 1,590 439,132,125

ASUMSI PROFIT PER PANEN


PROFIT MARGIN Per panen 1 4,917,250,000
BIAYA PRODUKSI Per panen 1 4,071,016,250
PROFIT Per panen 1 846,233,750
ASUMSI
PENGEMBALIAN MODAL Bulan 120 52,191,016,250 434,925,135.42
ASUMSI BUNGA Persen 1% 2,174,625.68
JUMLAH 437,099,761.09

TOTAL PROFIT PER PANEN 409,133,988.91

PROFIT PER 1 KALI PANEN


1 PENGEMBANGAN USAHA Per panen 1 10% 40,913,398.89
2 SOCIAL WORK Per panen 1 2.50% 10,228,349.72
JUMLAH 51,141,748.61
SHARING PROFIT 357,992,240.29
1 INVESTOR Per panen 1 60% 214,795,344.18
2 OWNER Per panen 1 40% 143,196,896.12

ASUMSI II
BIAYA PENGELUARAN PRODUKSI
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000
II BIAYA OPRASIONAL KANTOR 1,276,016,250 120 153,121,950,000
TOTAL PENGELUARAN PRODUKSI 488,521,950,000
TOTAL 488,521,950,000

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 39,000,000
2 RESIKO KEMATIAN 15% Ekor 5,850,000
3 JUMLAH AYAM BERSIH Ekor 33,150,000
4 MODAL DASAR AYAM/EKOR JUMLAH 14,737
PPN 10% 1,474
TOTAL 16,210

HARGA JUAL AYAM PER EKOR Ekor 33,150,000 17,800 590,070,000,000


TOTAL 590,070,000,000
KEUNTUNGAN JUAL AYAM PER EKOR Ekor 33,150,000 1,590 52,695,855,000

ASUMSI PROFIT PANEN


PROFIT MARGIN Panen 120 590,070,000,000
BIAYA PRODUKSI Panen 120 488,521,950,000
PROFIT Panen 120 101,548,050,000

ASUMSI
PENGEMBALIAN MODAL Bulan 120 52,191,016,250 434,925,135.42 52,191,016,250.00
ASUMSI BUNGA Persen 1% 260,955,081.25
JUMLAH 52,451,971,331.25

TOTAL PROFIT 49,096,078,668.75

PROFIT 120 KALI PANEN


1 PENGEMBANGAN USAHA Panen 120 10% 4,909,607,866.88
2 SOCIAL WORK Panen 120 2.50% 1,227,401,966.72
JUMLAH 6,137,009,833.59
NETT PROFIT 42,959,068,835.16
RENCANA ANGGARAN BIAYA PROJECT INDUSTRI TERNAK AYAM NUSANTARA"INTAN"
DESA CIJULANG KEC CINEAM KAB TASIKMALAYA
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7
I PEK.PERSIAPAN I
1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000
2 Pengukuran Lahan M2 160,000 1 450 72,000,000
3 Pengukuran jalan akses M2 40,000 1 400 16,000,000
4 Land Clearing Lahan/Ganti rugi pohon M2 160,000 1 1,000 160,000,000
5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000
6 Perijinan Proyek & usaha peternakan M2 160,000 1 800 128,000,000
JUMLAH I 1,366,000,000
II PEK.PERSIAPAN II
1 Direksikeet Unit 2 1 10,000,000 20,000,000
2 Peralatan kantor List 10 1 5,000,000 50,000,000
3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000
4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000
5 Motoris Kantor Unit 2 1 15,000,000 30,000,000
6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
JUMLAH II 918,500,000
III PEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
1 Cut and fill M2 160,000 1 18,000 2,880,000,000
2 Pematangan lahan/Land clearing M2 160,000 1 2,000 320,000,000
3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000
4 Drainase M2 8,000 1 70,000 560,000,000
5 Overhead M2 160,000 1 3,000 480,000,000
JUMLAH III 5,840,000,000
IV PEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000
2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000
3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000
4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000
5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000
6 Overhead Unit 110 1 10,000,000 1,100,000,000
JUMLAH IV 24,970,000,000
V PEK.TAHAP 3 ELECTRIKAL
1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000
2 Beli Genset Unit 2 1 250,000,000 500,000,000
3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000
4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000
5 Overhead Unit 110 1 2,500,000 275,000,000
JUMLAH IV 2,160,000,000
VI PEK.TAHAP 4 MEKANIKAL
1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000
2 instalisasi air bersih Unit 14 1 20,000,000 280,000,000
3 Pemasangan water pump Unit 14 1 15,000,000 210,000,000
4 Overhead Unit 14 1 10,000,000 140,000,000
JUMLAH V 1,005,000,000
VII PEK.TAHAP 5 SARANA PENUNJANG
1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000
2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000
3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000
4 Pembangunan pos satpam dan musolah Unit 14 1 50,000,000 700,000,000
5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000
6 Overhead Unit 1 1 500,000,000 500,000,000
JUMLAH VII 4,900,000,000
VIII BIAYA OPERASIONAL PRODUKSI 1
1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000
2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000
3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000
4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000
5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000
JUMLAH VIII 2,795,000,000
IX BIAYA OPERASIONAL PRODUKSI 2
1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000
2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000
3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000
4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000
5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000
6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000
JUMLAH IX 2,340,000,000
X BIAYA OPERASIONAL PRODUKSI 3
1 Beli Mesin peghangat C-50AT Set 1,000 1 200,000 200,000,000
2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000
3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000
4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000
5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000
6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000
7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000
8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000
9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000
JUMLAH X 2,162,000,000
XI BIAYA OPERASIONAL PRODUKSI 4
1 Biaya Marketing List 30 2 500,000 30,000,000
2 Biaya Trucking Unit 69 1 2,500,000 172,656,250
3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000
4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
JUMLAH XI 212,016,250
XII BIAYA OPERASIONAL KANTOR
1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000
2 Gaji karyawan kandang Orang 462 1 2,000,000 924,000,000
3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000
4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
JUMLAH XII 1,074,000,000
XIII PAJAK DAN BIAYA LAINNYA
1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000
2 Pajak infrastruktur Persen 10 1 5,840,000,000 584,000,000
3 Pajak mekanikal & elektrikal Persen 10 1 3,165,000,000 316,500,000
4 Pajak kontruksi gudang Persen 10 1 4,900,000,000 490,000,000
5 Biaya tambahan List 5 1 100,000,000 500,000,000
JUMLAH XIII 4,387,500,000
JUMLAH TOTAL 54,130,016,250

ASUMSI I
BIAYA PENGELUARAN PEMBANGUNAN 50,049,000,000 50,049,000,000
BIAYA PENGELUARAN PRODUKSI
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000
II BIAYA OPRASIONAL KANTOR 1,286,016,250
TOTAL PENGELUARAN PRODUKSI BERJALAN 4,081,016,250
TOTAL 54,130,016,250

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 325,000
2 RESIKO KEMATIAN 15% Ekor 48,750
3 JUMLAH AYAM BERSIH Ekor 276,250
4 MODAL DASAR AYAM/EKOR JUMLAH 14,773
PPN 10% 1,477
TOTAL 16,250

HARGA JUAL AYAM PER KILOGRAM Kilogram 276,250 17,800 4,917,250,000


TOTAL 4,917,250,000
KEUNTUNGAN JUAL AYAM PER KILOGRAM Kilogram 276,250 1,550 428,132,125

ASUMSI PROFIT PER PANEN


PROFIT MARGIN Per panen 1 4,917,250,000
BIAYA PRODUKSI Per panen 1 4,081,016,250
PROFIT Per panen 1 836,233,750
ASUMSI
PENGEMBALIAN MODAL Bulan 120 54,130,016,250 451,083,468.75
ASUMSI BUNGA Persen 1% 2,255,417.34
JUMLAH 453,338,886.09

TOTAL PROFIT PER PANEN 382,894,863.91

PROFIT PER 1 KALI PANEN


1 PENGEMBANGAN USAHA Per panen 1 10% 38,289,486.39
2 SOCIAL WORK Per panen 1 2.50% 9,572,371.60
JUMLAH 47,861,857.99
SHARING PROFIT 335,033,005.92
1 INVESTOR Per panen 1 60% 201,019,803.55
2 OWNER Per panen 1 40% 134,013,202.37

ASUMSI II
BIAYA PENGELUARAN PRODUKSI
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000
II BIAYA OPRASIONAL KANTOR 1,286,016,250 120 154,321,950,000
TOTAL PENGELUARAN PRODUKSI 489,721,950,000
TOTAL 489,721,950,000

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 39,000,000
2 RESIKO KEMATIAN 15% Ekor 5,850,000
3 JUMLAH AYAM BERSIH Ekor 33,150,000
4 MODAL DASAR AYAM/EKOR JUMLAH 14,773
PPN 10% 1,477
TOTAL 16,250

HARGA JUAL AYAM PER EKOR Ekor 33,150,000 17,800 590,070,000,000


TOTAL 590,070,000,000
KEUNTUNGAN JUAL AYAM PER EKOR Ekor 33,150,000 1,550 51,375,855,000

ASUMSI PROFIT PANEN


PROFIT MARGIN Panen 120 590,070,000,000
BIAYA PRODUKSI Panen 120 489,721,950,000
PROFIT Panen 120 100,348,050,000

ASUMSI
PENGEMBALIAN MODAL Bulan 120 54,130,016,250 451,083,468.75 54,130,016,250.00
ASUMSI BUNGA Persen 1% 270,650,081.25
JUMLAH 54,400,666,331.25

TOTAL PROFIT 45,947,383,668.75

PROFIT 120 KALI PANEN


1 PENGEMBANGAN USAHA Panen 120 10% 4,594,738,366.88
2 SOCIAL WORK Panen 120 2.50% 1,148,684,591.72
JUMLAH 5,743,422,958.59
NETT PROFIT 40,203,960,710.16
SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA KAWASEN
BANJARSARI -CIAMIS
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7
I PEK.PERSIAPAN I
1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000
2 Pengukuran Lahan M2 260,000 1 450 117,000,000
3 Pengukuran jalan akses M2 40,000 1 400 16,000,000
4 Land Clearing Lahan/Ganti rugi pohon M2 260,000 1 1,000 260,000,000
5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000
6 Perijinan Proyek & usaha peternakan M2 260,000 1 800 208,000,000
JUMLAH I 1,591,000,000
II PEK.PERSIAPAN II
1 Direksi kit Unit 2 1 10,000,000 20,000,000
2 Peralatan kantor List 10 1 5,000,000 50,000,000
3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000
4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000
5 Motoris Kantor Unit 2 1 15,000,000 30,000,000
6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
JUMLAH II 918,500,000
III PEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
1 Cut and fill M2 260,000 1 18,000 4,680,000,000
2 Pematangan lahan/Land clearing M2 260,000 1 2,000 520,000,000
3 infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000
4 Drainase M2 8,000 1 70,000 560,000,000
5 Overhead M2 260,000 1 3,000 780,000,000
JUMLAH III 8,140,000,000
IV PEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
1 Pembangunan Kandang ayam Unit 220 1 170,000,000 37,400,000,000
2 Pembangunan fasilitas pendukung Unit 22 1 10,000,000 220,000,000
3 infrastruktur jalan kandang ayam List 22 1 215,000,000 4,730,000,000
4 Pemagaran per 10 unit kandang List 22 1 120,000,000 2,640,000,000
5 Pekerjaan tambahan Unit 22 1 125,000,000 2,750,000,000
6 Overhead Unit 220 1 10,000,000 2,200,000,000
JUMLAH IV 49,940,000,000
V PEK.TAHAP 3 ELECTRIKAL
1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000
2 Beli Genset Unit 2 1 250,000,000 500,000,000
3 instalasi listrik kandang ayam Unit 2200 1 300,000 660,000,000
4 Pekerjaan tambahan Unit 220 1 4,000,000 880,000,000
5 Overhead Unit 220 1 2,500,000 550,000,000
JUMLAH IV 3,205,000,000
VI PEK.TAHAP 4 MEKANICAL
1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000
2 instalisasi air bersih Unit 22 1 20,000,000 440,000,000
3 Pemasangan water pump Unit 22 1 15,000,000 330,000,000
4 Overhead Unit 22 1 10,000,000 220,000,000
JUMLAH V 1,365,000,000
VII PEK.TAHAP 5 SARANA PENUNJANG
1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000
2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000
3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000
4 Pembangunan pos satpam dan musolah Unit 24 1 50,000,000 1,200,000,000
5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000
6 Overhead Unit 1 1 500,000,000 500,000,000
JUMLAH VII 5,400,000,000
VIII BIAYA OPERASIONAL PRODUKSI 1
1 Beli DOC Ekor 650,000 1 4,500 2,925,000,000
2 Beli Pakan ayam Kilo gram 19,500,000 1 100 1,950,000,000
3 Beli Vaksin ayam Kilo gram 1,300,000 1 250 325,000,000
4 Beli Vitamin ayam Kilo gram 9,750,000 1 25 243,750,000
5 Biaya Lain-lain Kilo gram 9,750,000 1 15 146,250,000
JUMLAH VIII 5,590,000,000
IX BIAYA OPERASIONAL PRODUKSI 2
1 Peralatan Makan dan minum ayam Unit 220 1 8,000,000 1,760,000,000
2 Keranjang ayam kecil Pcs 2,000 1 240,000 480,000,000
3 Keranjang ayam besar Pcs 2,000 1 290,000 580,000,000
4 Pemanas LPG kap.1000+kelengkapannya Pcs 2,000 1 600,000 1,200,000,000
5 Peralatan obat dan vaksin Unit 220 1 2,000,000 440,000,000
6 Peralatan pendukung fasilitas 10 unit Unit 220 1 1,000,000 220,000,000
JUMLAH IX 4,680,000,000
X BIAYA OPERASIONAL PRODUKSI 3
1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000
2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000
3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000
4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 2 1 156,000,000 312,000,000
5 Beli mobil Panter pick up Unit 2 1 145,000,000 290,000,000
6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000
7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000
8 Perawatan kendaraan inventaris Unit 17 12 500,000 102,000,000
9 Perbaikan kendaraan inventaris Unit 17 12 1,000,000 204,000,000
JUMLAH X 2,699,000,000
XI BIAYA OPERASIONAL PRODUKSI 4
1 Biaya Marketing List 30 2 500,000 30,000,000
2 Biaya Trucking Unit 138 1 2,500,000 345,312,500
3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000
4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
JUMLAH XI 384,672,500
XII BIAYA OPERASIONAL KANTOR
1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000
2 Gaji karyawan kandang Orang 900 1 2,000,000 1,800,000,000
3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000
4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
JUMLAH XII 1,950,000,000
XIII PAJAK DAN BIAYA LAINNYA
1 Pajak kontruksi kandang ayam Persen 10 1 49,940,000,000 4,994,000,000
2 Pajak infrastruktur Persen 10 1 8,140,000,000 814,000,000
3 Pajak mekanikal & elektrikal Persen 10 1 4,570,000,000 457,000,000
4 Pajak kontruksi gudang Persen 10 1 5,400,000,000 540,000,000
5 Biaya tambahan List 9 1 100,000,000 900,000,000 7,705,000,000
JUMLAH XIII
JUMLAH TOTAL 93,568,172,500

ASUMSI I
BIAYA PENGELUARAN PEMBANGUNAN 85,643,500,000 85,643,500,000
BIAYA PENGELUARAN PRODUKSI 1
I BIAYA OPRASIONAL PRODUKSI 5,590,000,000
II BIAYA OPRASIONAL KANTOR 2,334,672,500
TOTAL PENGELUARAN PRODUKSI BERJALAN 7,924,672,500
TOTAL 93,568,172,500

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 650,000
2 RESIKO KEMATIAN 15% Ekor 97,500
3 JUMLAH AYAM BERSIH Ekor 552,500
4 MODAL DASAR AYAM/EKOR JUMLAH 14,343
PPN 10% 1,434
TOTAL 15,778

HARGA JUAL AYAM PER EKOR Ekor 552,500 17,800 9,834,500,000


TOTAL 9,834,500,000
KEUNTUNGAN JUAL AYAM PER EKOR Ekor 552,500 2,022 1,117,360,250

ASUMSI PROFIT PER PANEN


PROFIT MARGIN Per panen 1 9,834,500,000
BIAYA PRODUKSI Per panen 1 7,924,672,500
PROFIT Per panen 1 1,909,827,500
ASUMSI
PENGEMBALIAN MODAL Bulan 120 93,568,172,500 779,734,770.83
ASUMSI BUNGA Persen 1% 3,898,673.85
JUMLAH 783,633,444.69

TOTAL PROFIT PER PANEN 1,126,194,055.31

PROFIT PER 1 KALI PANEN


1 PENGEMBANGAN USAHA Per panen 1 10% 112,619,405.53
2 SOCIAL WORK Per panen 1 2.50% 28,154,851.38
JUMLAH 140,774,256.91
SHARING PROFIT 985,419,798.40
1 INVESTOR Per panen 1 60% 591,251,879.04
2 OWNER Per panen 1 40% 394,167,919.36

ASUMSI II
BIAYA PENGELUARAN PRODUKSI
I BIAYA OPRASIONAL PRODUKSI 5,590,000,000 120 670,800,000,000
II BIAYA OPRASIONAL KANTOR 2,334,672,500 120 280,160,700,000
TOTAL PENGELUARAN PRODUKSI 950,960,700,000
TOTAL 950,960,700,000

RENCANA PENDAPATAN
1 VOLUME AYAM Ekor 78,000,000
2 RESIKO KEMATIAN 15% Ekor 11,700,000
3 JUMLAH AYAM BERSIH Ekor 66,300,000
4 MODAL DASAR AYAM/EKOR JUMLAH 14,343
PPN 10% 1,434
TOTAL 15,778

HARGA JUAL AYAM PER EKOR Ekor 66,300,000 17,800 1,180,140,000,000


TOTAL 1,180,140,000,000
KEUNTUNGAN JUAL AYAM PER EKOR Ekor 66,300,000 2,022 134,083,230,000

ASUMSI PROFIT PANEN


PROFIT MARGIN Panen 120 1,180,140,000,000
BIAYA PRODUKSI Panen 120 950,960,700,000
PROFIT Panen 120 229,179,300,000

ASUMSI
PENGEMBALIAN MODAL Bulan 120 93,568,172,500 779,734,770.83 93,568,172,500.00
ASUMSI BUNGA Persen 1% 467,840,862.50
JUMLAH 94,036,013,362.50

TOTAL PROFIT 135,143,286,637.50

PROFIT 120 KALI PANEN


1 PENGEMBANGAN USAHA Panen 120 10% 13,514,328,663.75
2 SOCIAL WORK Panen 120 2.50% 3,378,582,165.94
JUMLAH 16,892,910,829.69
NETT PROFIT 118,250,375,807.81
1 INVESTOR Panen 120 60% 70,950,225,484.69
2 OWNER Panen 120 40% 47,300,150,323.13

Catatan
Harga Kontruksi dan Produksi sewaktu-waktu dapat berubah mengikuti pasar,kebijakan pemerintah dan
management.