APLIKASI DENGAN CARA MANUAL APLIKASI DENGAN CARA MANUAL

No Keterangan Jumlah Satuan No Keterangan


1 TK / Ha 12 HK 1 TK / Ha
2 Rit / Pokok 7 Rit 2 Rit / Pokok
3 Target Kerja 0.08 Ha/Hk 3 Target Kerja
4 Output 3,500 Ton/Hk 4 Output
5 Waktu Kerja 7 Jam/Hk 5 Waktu Kerja
6 Waktu Aplikasi 0.7 (38.60 Mnt) Jam/Pokok 6 Waktu Aplikasi
7 Biaya TK 1,517,316 Rupiah/Ha 7 Biaya TK
8 Biaya Premi
9 Cost/Ha

38.60294117647
27,499
885,101

857,602
ASI DENGAN CARA MANUAL Variance Variance Modal (Investasi Alat Kerja)
Jumlah Satuan Bentor Vs Manual % No Uraian Harga
5 HK (7.00) 41.67 58.33 1 Harga Motor 4,200,000
3 Rit (4.00) 42.86 2 Harga Becak 900,000
0.18 Ha/Hk 0.10 225.00 Total 5,100,000
8,570 Ton/Hk 5,070 244.86
7 Jam/Hk - 100.00 Upah
0.29 (17.15 Mnt) Jam/Pokok -0.41 (21.45 Mnt) 41.43 18,063 No Uraian Harga
632,215 Rupiah/Ha (885,101) 41.67 54,190 1 HK 126,443
912,600 Rupiah/Ha 2 Target 3,500
1,544,815 Rupiah/Ha 3 Rp/Kg 36.00
4 Output 8,570
17.1568627451 5 Premi (Ton) 5,070
21.45 6 Premi (Rp) 182,520
17500 Total 308,963

Estimasi Pengembalian Modal


(Investasi Alat Kerja)
25 HKE 7,724,075
Biaya Bentor 5,100,000
Sisa 2,624,075
Hari Kerja 17

24.48
2000 2500
2.5 2.5
Upah HK 126443 126443
Basis Janjang 60 60
Output Janjang 150 70
Output Tonase 2,700 1,260
Output Ha 1.5 1.5
Lebih Basis 90 10
LB 1 (1200) 21,600 21,600
LB 2 (1700) 122,400 -
Premi 144,000 21,600

Premi Siap Borong 10,000 10,000


Total Biaya 280,443 158,043
Cost/Kg 104 125.430952
Cost/Ha 186,962 105,362

18 18
72