38.60294117647
27,499
885,101
857,602
ASI DENGAN CARA MANUAL Variance Variance Modal (Investasi Alat Kerja)
Jumlah Satuan Bentor Vs Manual % No Uraian Harga
5 HK (7.00) 41.67 58.33 1 Harga Motor 4,200,000
3 Rit (4.00) 42.86 2 Harga Becak 900,000
0.18 Ha/Hk 0.10 225.00 Total 5,100,000
8,570 Ton/Hk 5,070 244.86
7 Jam/Hk - 100.00 Upah
0.29 (17.15 Mnt) Jam/Pokok -0.41 (21.45 Mnt) 41.43 18,063 No Uraian Harga
632,215 Rupiah/Ha (885,101) 41.67 54,190 1 HK 126,443
912,600 Rupiah/Ha 2 Target 3,500
1,544,815 Rupiah/Ha 3 Rp/Kg 36.00
4 Output 8,570
17.1568627451 5 Premi (Ton) 5,070
21.45 6 Premi (Rp) 182,520
17500 Total 308,963
24.48
2000 2500
2.5 2.5
Upah HK 126443 126443
Basis Janjang 60 60
Output Janjang 150 70
Output Tonase 2,700 1,260
Output Ha 1.5 1.5
Lebih Basis 90 10
LB 1 (1200) 21,600 21,600
LB 2 (1700) 122,400 -
Premi 144,000 21,600
18 18
72