Anda di halaman 1dari 1

LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

PT. PLN (PERSERO)


UNIT INDUK TRANSMISI JAWA BAGIAN BARAT
UNIT PELAKSANA TRANSMISI CILEGON PT. GEMPAR SILIWANGI BERKARYA

PEKERJAAN : PENGGANTIAN PAGAR PANEL PERIODE : THN 2022


PELAKSANA : PT. GEMPAR SILIWANGI BERKARYA MINGGU KE : 2 ( DUA )
NOMOR KONTRAK : 0096.SPK/DAN.01.03/E34030000/2022 MULAI : 18-NOV-2022

PROGRESS
NO NAMA BARANG / PEKERJAAN JASA VOL SAT BOBOT TOTAL S/D MINGGU LALU MINGGU INI
Vol % Bobot Vol % Bobot
A PEKERJAAN PERSIAPAN 6 7 8 9
1 Survey dan Dokumentasi 1.00 ls 0.726 0.10 10.00% 0.073% 0.40 40.00% 0.290%
2 Mobilisasi dan demobilisasi (alat, tenaga dan material) 1.00 ls 3.029 0.20 20.00% 0.606% 0.55 55.00% 1.666%
3 pagar temporary (rangka bambu + seng gelombang kecil tinggi 1.8 meter) 107.89 m' 15.936 32.37 30.00% 4.781% 80.92 75.00% 11.952%
B PEKERJAAN PELAKSANAAN
1 Pembersihan area pekerjaan 103.89 m2 1.293 31.17 30.00% 0.388% 83.11 80.00% 1.034%
2 Pengukuran ulang dan bowplank 51.95 m2 1.509 2.60 5.00% 0.075% 33.76 65.00% 0.981%
3 Pembongkaran pasangan pagar panel miring berikut tiang 192.78 m2 4.079 67.47 35.00% 1.428% 144.59 75.00% 3.059%
4 Galian tanah pondasi 47.48 m3 1.871 12.34 26.00% 0.487% 26.59 56.00% 1.048%
5 Urugan pasir tebal 5cm bawah pedestal 0.65 m3 0.123 0.20 30.00% 0.037% 0.40 62.00% 0.076%
6 Lantai kerja ad.1:3:5 tebal 3cm bawah pedestal 0.39 m3 0.146 0.10 26.00% 0.038% 0.24 61.00% 0.089%
7 Pondasi batu belah ad.1:3 25.08 m3 7.312 5.02 20.00% 1.462% 15.05 60.00% 4.387%
8 Cor beton bertulang pedestal uk.500x500 tebal 15cm + kolom pedestal 250x250, ad.1:2:3 + bekisting 3.61 m3 7.703 0.87 24.00% 1.849% 1.66 46.00% 3.543%
9 Cor beton bertulang pedestal uk.500x500 tebal 15cm + kolom pedestal 150x250, ad.1:2:3 + bekisting 1.31 m3 2.789 0.33 25.00% 0.697% 0.59 45.00% 1.255%
10 Urug kembali galian tanah pondasi 16.44 m3 2.183 3.29 20.00% 0.437% 4.93 30.00% 0.655%
11 Cor beton bertulang sloof uk.150x200 ad.1:2:3 + bekisting 3.12 m3 0.665 0.62 20.00% 0.133% 1.25 40.00% 0.266%
12 Cor beton bertulang kolom utama uk.250x250 ad.1:2:3 + bekisting 6.78 m3 12.627 0.54 8.00% 1.010% 4.61 68.00% 8.586%
13 Cor beton bertulang kolom diagonal uk.150x250 ad.1:2:3 + bekisting 1.94 m3 3.858 0.00 0.00% 0.000% 0.00 0.00% 0.000%
14 Pasang dinding 1/2 batako tebal 10cm ad.1:4 228.48 m2 11.154 0.00 0.00% 0.000% 137.09 60.00% 6.692%
15 Cor beton bertulang ring balk uk.150x250 ad.1:2:3 + bekisting (tengah dan atas) 6.24 m3 11.085 0.00 0.00% 0.000% 1.87 30.00% 3.325%
16 Plesteran dan acian (u/ kolom, diagonal, balk dan sloof) 267.51 m2 10.877 0.00 0.00% 0.000% 0.00 0.00% 0.000%
C PEKERJAAN LAIN-LAIN DAN FINISHING
1 Finishing dan perapihan eks. Pekerjaan berikut merapihkan panel block ekisting 1.00 ls 1.037 0.00 0.00% 0.000% 0.00 0.00% 0.000%
100.00 HASIL PROGRESS MINGGU INI : 48.91 %

Disetujui Team Pengawas Labuan, 24 NOVEMBER 2022


PT. PLN (Persero) UPT. Cilegon PT. GEMPAR SILIWANGI BERKARYA
MULTG RANGKAS

Tedy Firmanudin
NOPI RIYANSYAH
(DIREKSI LAPANGAN)

Anda mungkin juga menyukai