PROYEK : PT ASIAN NAGRO AGUNG JAYA

PEKERJAAN : Overhaul Boiler Capacity : 8 TPH


LOKASI : Jln. Semarang blok A6/no.1 KBN Marunda Cilincing Jakarta Utara
No Surat : 264/I/2022

HARGA SATUAN HARGA TOTAL


NO. URAIAN PEKERJAAN VOL SAT
JASA MATERIAL JASA MATERIAL

I Overhaul Boiler Capacity : 8 TPH


1 CLEANING BOILER 1 Lot Rp 26.500.000 55.000.000 Rp 26.500.000 Rp 55.000.000
-Mechanical Cleaning Sisi Api
-Chemical Cleaning Sisi Api
-Penggantian Packing Boiler
-Setting Safety Valve
-Hydrostatic Test

2 REFRACTORY 1 Lot Rp 5.500.000 10.500.000 Rp 5.500.000 Rp 10.500.000


-Penggantian Semen Api

3 WATER LEVEL CONTROL 1 Lot Rp 2.800.000 4.200.000 Rp 2.800.000 Rp 4.200.000


-Cleaning Water level Control

4 TESTING & COMISIONING


-Seting Burner 1 Lot Rp 10.000.000 Rp 10.000.000

5 CONTROL BURNER ( RWF ) 1 Unit Rp 5.600.000 14.000.000 Rp 5.600.000 Rp 14.000.000


-Siemens RWF 55

Penjumlahan Rp 50.400.000 Rp 83.700.000


II Persiapan

1 Transport & Akomudasi For Manpower 1 lot Rp 4.000.000 Rp 4.000.000


1
3 Mobilisasi dan demolisasi for material utama lot Rp 4.000.000 Rp 4.000.000

4 Prevention Covid 19 1 Lot Rp 1.000.000 Rp 1.000.000


Ke penjumlahan Persiapan : Rp 9.000.000 Rp -
Sub Total : Rp 59.400.000 Rp 83.700.000
PEMBAYARAN : Grand Total Rp143.100.000

1 100 % , setelah pekerjaan selesai Waktu Pekerjaan 7 Hari


2 Harga Belum Termasuk PPN Note : - Harga diluar pekerjaan Retubing