REKAPITULASI

BILL OF QUANTITY
Triutama Jaya
Quantity Surveyor
PROYEK TECHNOPOLIS KARAWANG

PEKERJAAN STRUKTUR ,ARSITEKTUR & MEP


APARTMENT KAIRAKU & RUKO DOTONBURI BLOK A & BLOK I
REV.0 - 03-10-19

URAIAN PEKERJAAN JUMLAH JUMLAH

BILL. 1 - SUB TOTAL PEKERJAAN PRELIMINARY

BILL. NO. 2- PEKERJAAN PONDASI BORE PILE

BILL. NO. 3 - PEKERJAAN STRUKTUR BETON

BILL. NO. 4 - PEKERJAAN STRUKTUR BAJA

BILL. NO. 5 - PEKERJAAN ARSITEKTUR

BILL. NO. 6 - PEKERJAAN PROVISIONAL SUMS


SUB TOTAL APARTMENT KAIRAKU

BILL. 1 - SUB TOTAL - PEKERJAAN PRELIMINARY RUKO

RUKO BLOK A

BILL. 2A - PEKERJAAN PONDASI PANCANG

BILL. 2B - PEKERJAAN STRUKTUR BETON & BAJA ATAP

BILL. 2C - PEKERJAAN ARSITEKTUR

BILL. 2D - PEKERJAAN MEP - BLOK A

SUB TOTAL - RUKO BLOK A

RUKO BLOK I

BILL. 3A - PEKERJAAN PONDASI PANCANG

BILL. 3B - PEKERJAAN STRUKTUR BETON & BAJA ATAP

BILL. 3C - PEKERJAAN ARSITEKTUR

BILL. 3D - PEKERJAAN MEP - BLOK I

SUB TOTAL - RUKO BLOK I

SUB TOTAL 3 - RUKO BLOK A & BLOK I

TOTAL APARTMENT & RUKO Rp -

PPN TAX 10%


TOTAL

TOTAL PEMBULATAN
REKAPITULASI
BILL OF QUANTITY
Triutama Jaya SHOP HOUSE DOTONBURI
Quantity Surveyor
PROYEK TECHNOPOLIS KARAWANG

PEKERJAAN STRUKTUR & ARSITEKTUR


BLOK A & BLOK I
REV.0 - 03-10-19

URAIAN PEKERJAAN JUMLAH KETERANGAN

BILL. 1 - SUB TOTAL 1 - PEKERJAAN PRELIMINARY

RUKO BLOK A

BILL. 2A - PEKERJAAN PONDASI PANCANG

BILL. 2B - PEKERJAAN STRUKTUR BETON & BAJA ATAP

BILL. 2C - PEKERJAAN ARSITEKTUR

BILL. 2D - PEKERJAAN MEP - BLOK A

SUB TOTAL 2- RUKO BLOK A

RUKO BLOK I

BILL. 3A - PEKERJAAN PONDASI PANCANG

BILL. 3B - PEKERJAAN STRUKTUR BETON & BAJA ATAP

BILL. 3C - PEKERJAAN ARSITEKTUR

BILL. 3D - PEKERJAAN MEP - BLOK I

SUB TOTAL 3 - RUKO BLOK I

SUB TOTAL Rp -

PPN TAX 10%

TOTAL

TOTAL PEMBULATAN
BILL OF QUANTITY
APARTMENT TOWER A - KAIRAKU
Triutama Jaya
Quantity Surveyor
PROYEK TECHNOPOLIS KARAWANG

PAKET PEKERJAAN STRUKTUR & ARSITEKTUR

URAIAN PEKERJAAN

REKAPITULASI PEKERJAAN STRUKTUR & ARSITEKTUR

BILL. NO. 1 - PEKERJAAN PERSIAPAN

BILL. NO. 2- PEKERJAAN PONDASI BORE PILE

BILL. NO. 3 - PEKERJAAN STRUKTUR BETON

BILL. NO. 4 - PEKERJAAN STRUKTUR BAJA

BILL. NO. 5 - PEKERJAAN ARSITEKTUR

BILL - PEKERJAAN PROVISIONAL SUMS

SUB TOTAL 1

PPN TAX 10%


TOTAL
TOTAL PEMBULATAN
REV - 0 - 03-10-19

JUMLAH