Anda di halaman 1dari 1

0.

90

ALDERON 830 WARNA PUTIH


DYNABOLT M16x160 (DIPASANG TIAP 1m) HOLLOW 50x100x2,0mm
GALVALUM 90cm (T=0,4mm) FIN.CAT
HOLLOW 30x60x1,8mm TALANG PVC DIPASANG DI TIAP KOLOM

0.20
0.25
0.40
HOLLOW 50x100x2,0mm

GRC BOARD 40cm (T=10mm)


HOLLOW 20x40x1,8mm HOLLOW 20x40x1,8mm
HOLLOW 50x100x2,0mm

HOLLOW 50x100x2,0mm

2.20
2.15

ANGKUR BAUT Ø13mm (TERTANAM 20cm)


PELAT 6mm (15cm x 15cm)
KOLOM PEDESTAL 15cm x 20cm

0.30

3.60 1.00 0.30

DETAIL STRUKTUR KANOPI


BANGUNAN UTAMA
SKALA 1 : 70
TALANG GALVALUM 0,4mm
LISPLANK GRC BOARD 10mm
LEBAR 40cm
HOLLOW 50x100x2,0mm HOLLOW 20x40x1,8mm
0.10
0.40
0.30

0.40

1.00 1.00 1.00 1.00


0.30 HOLLOW 20x40x1,8mm

DETAIL TALANG DETAIL BRACING


BANGUNAN UTAMA BANGUNAN UTAMA
SKALA 1 : 70 SKALA 1 : 70

KOLOM 20cm x 15cm


TULANGAN KOLOM (4 D 13)
KOLOM HOLLOW 50x100x2,0mm SENGKANG KOLOM (Ø8-50)
0.20
PLAT LANDAS T=6mm
0.15

15cm x 15cm
KOLOM 20cm x 15cm
ANGKUR BAUT 4 Ø 13 0.20
0.30

TERTANAM 20cm
SENGKANG KOLOM (Ø8-50) DETAIL PENULANGAN KOLOM
BANGUNAN UTAMA
SKALA 1 : 70

TULANGAN KOLOM (4 D 13)


0.15

0.15
0.20
DETAIL KOLOM PEDESTAL
BANGUNAN UTAMA DETAIL PELAT LANDAS
SKALA 1 : 70 BANGUNAN UTAMA
SKALA 1 : 70
Tenaga Ahli
Struktur
Elektrikal
Mekanikal

Arsitek

KETUA PEMBANGUNAN DAN PENGELOLAAN ASET

YAYASAN BADAN WAKAF SULTAN AGUNG


KODE

RSI - SULTAN AGUNG


PENGAWASAN PEMBANGUNAN
STR

Jl. Raya Kaligawe Km. 04 Semarang


MENGETAHUI dan MENYETUJUI
YAYASAN BADAN WAKAF SULTAN AGUNG

SULTAN AGUNG SEMARANG


YAYASAN BADAN WAKAF

YAYASAN BADAN WAKAF


GAMBAR

dr. H. Masyhudi, AM, M.Kes

H. Hasan Toha Putra. MBA


RSI SULTAN AGUNG GROUP

Dr. Ir. H. Sumirin, MS

SULTAN AGUNG

PEMBERI TUGAS
BOARD OF DIRECTOR
Syamsul Ma'arif, ST, MT
Dwi Hendro Puspito Aji, ST

KETERANGAN

BANJARBARU
GAMBAR

PEKERJAAN
PERENCANA

KETUA UMUM
SULTAN AGUNG
JL. RAYA KALIGAWE KM.04 SEMARANG

PENGELOLAAN ASET
BIDANG PEMBANGUNAN DAN
YAYASAN BADAN WAKAF
NO

Nama
REV / NO

SKALA

Paraf

Anda mungkin juga menyukai