Anda di halaman 1dari 6

Tahun

No Bulan
2019 2018 2017 2016 2015 2014
1 Januari 2.82% 3.25% 3.49% 4.14% 6.96%
2 Februari 2.57% 3.18% 3.83% 4.42% 6.29%
3 Maret 2.48% 3.40% 3.61% 4.45% 6.38%
4 April 2.83% 3.41% 4.17% 3.60% 6.79%
5 Mei 3.23% 4.33% 3.33% 7.15% 7.32%
6 Juni 3.12% 4.37% 3.45% 7.26% 6.70%
7 Juli 3.18% 3.88% 3.21% 7.26% 4.53%
8 Agustus 3.20% 3.82% 2.79% 7.18% 3.99%
9 September 2.88% 3.72% 3.07% 6.83% 4.53%
10 Oktober 3.16% 3.58% 3.31% 6.25% 4.83%
11 November 3.23% 3.30% 3.58% 4.89% 6.23%
12 Desember 3.13% 3.61% 3.02% 3.35% 8.36%
Rata-rata 4.34%
a. Tahun Solar Oli Mesin Oli Hidrolik b. Fuel (Lt/Jam)
Uraian Pekerjaan
1 13,259 42,000 27,000 Solar Oli Mesin
2 14,435 45,725 29,394 Excavator Backhoe PC 200 Gali Muat 21 0.05
3 15,061 47,709 30,670 Excavator Breacker PC 200 Breacking 13.4 0.05
4 15,715 49,780 32,001 Bulldozer Komatsu D65E Dozing 15.6 0.08
5 16,397 51,940 33,390 DT 4 m3 (Hino 130 HD) Angkut Soil 16.185 0.09
x 1.800 jam
Fuel (Lt/Jam)
Klik untuk Uraian Pekerjaan
Solar Oli Mesin
melihat formula Excavator Backhoe PC 200 Gali Muat 37,800 90
Excavator Breacker PC 200 Breacking 24,120 90
Bulldozer Komatsu D65E Dozing 28,080 144
DT 4 m3 (Hino 130 HD) Angkut Soil 29,133 162
Total 119,133 486

Biaya (Rp)
Tahun
Solar Oli Mesin
1 1,579,584,447 20,405,189
2 1,719,667,619 22,214,794
3 1,794,301,194 23,178,916
4 1,872,173,866 24,184,881
5 1,953,426,211 25,234,505
Total 8,919,153,337 115,218,285

Klik untuk
melihat formula
(Lt/Jam)
Oli Hidrolik
0.09
0.05
0.05
0.04

(Lt/Jam)
Oli Hidrolik
162
90
90
78
420

ya (Rp)
Oli Hidrolik
11,340,000
12,345,672
12,881,474
13,440,530
14,023,849
64,031,524

ntuk
t formula
Tahun
1 2 3 4 5
Harga Jual (Rp/Ton) 45,000 48,991 51,117 53,335 55,650

Klik untuk
melihat formula
Kebutuhan Bahan Bakar Harga Bahan Bakar Harga Jual Komodita
Fuel (Lt/Jam) Harga (Rp/liter)
Uraian Tahun Uraian
Solar Oli Mesin Oli Hidrolik Solar Oli Mesin Oli Hidrolik
Excavator Backhoe PC 200 21 0.05 0.09 1 11,050 43,000 29,000 Harga Jual (Rp/Ton)
Excavator Breacker PC 200 13.4 0.05 0.05
Bulldozer Komatsu D65E 15.6 0.08 0.05
DT 4 m3 (Hino 130 HD) 16.185 0.09 0.04
Tahun
1
40,000

Anda mungkin juga menyukai