ESTIMASI 1

DISUSUN OLEH:
REFO ADITIO 201001541008

NAMA ANGGOTA KELOMPOK 3


1. DEDEN MAULANA IBRAHIM 191001541000
2. ALZY ANAZAWEL 201001541000
3. ILHAM 201001541002
4. REFO ADITIO 201001541008
5. AFIFAH MUTI'AH FITRI 201001541002
6. SEKAR KOMALA DEWI 201001541001
7. RAHTU MAYRA FORTUNA 201001541004

KELAS 4A

DOSEN
Dr. DWIFITRA Y JUMAS, S.T, MSCE
VIVI ARIANI, S.T, M.T

TEKNIK EKONOMI KONSTRUKSI


FAKULTAS TEKNIK SIPIL DAN PERENCANAAN
UNIVERITAS BUNG HATTA
2022
2010015410085

ELOMPOK 3
1910015410007
2010015410006
2010015410028
2010015410085
2010015410029
2010015410011
2010015410045

AS, S.T, MSCE


.T, M.T

KONSTRUKSI
DAN PERENCANAAN
NG HATTA
GROSS FLOOR AREA

Project :
Taker off :
Drawing Da:
Drawing N :

D1 D2 D3 SubTotal ConversionTm1 Tm2

1.70 1.25 2.125 1 1


1.70 1.15 1.955 1 1
1.90 2.40 4.56 1 1
1.80 2.20 3.96 1 1
1.80 4.80 8.64 1 1
2.80 4.80 13.44 1 1
5.40 4.80 25.92 1 4

3.60 4.80 17.28 1 1


3.60 4.80 17.28 1 1
1.15 1.80 2.07 1 2
4.60 4.80 22.08 1 1
1.15 4.80 5.52 0.5 1
3.60 4.80 17.28 0.5 1
6.60 4.80 31.68 0.5 1
2.00 26.40 52.80 0.5 1
3.60 0.60 2.16 0.5 1
1.80 1.40 2.52 0.5 1

2.80 4.80 13.44 1 1


7.20 4.80 34.56 1 1
10.80 11.60 125.28 1 1
2.00 4.80 9.60 1 1
1.70 1.25 2.13 1 1
1.70 1.15 1.96 1 1
1.90 2.40 4.56 1 1
1.80 2.20 3.96 1 1
3.60 4.80 17.28 1 1
4.80 4.80 23.04 1 1
1.15 1.80 2.07 1 2

1.80 4.80 8.64 1 1


3.60 0.60 2.16 0.5 1
1.80 1.40 2.52 0.5 1
2.00 15.60 31.20 0.5 1
1.15 4.80 5.52 0.5 1
5.40 4.80 25.92 1 1
m2
Annotation Total
Lantai 1
Ground floor
Wc Pria 2.125
Wc wanita 1.955
Toilet Pria 4.56
Toilet Wanita 3.96
Gudang 8.64
Tangga 13.44
Kasubag Umum dan Kepegawaian 103.68
Kasubag Perencanaan dan Pelaporan
Kasi Ketentraman Dan Ketertiban Umum
Kasi Pemerintahan

R. Pasek 17.28
Kasi Perekonomian Pembangunan 17.28
Ruang Samping Teras 4.14
Kasi Kesejahteraan Sosial 22.08
Teras (-0.03) 2.76
Teras (-0.18) 8.64
Lobby / R. Tunggu 15.84
Koridor 26.40
Selasar (Bagian Toilet I) 1.08
Selasar (Bagian Toilet II) 1.26
Lantai 2
Tangga 13.44
R. Sekretaris Camat 34.56
R. Pertemuan / Aula (Bagian I) 125.28
R. Pertemuan / Aula (Bagian II) 9.60
Wc Pria 2.13
Wc Wanita 1.96
Toilet Pria 4.56
Toilet Wanita 3.96
Ruang Camat (Bagian I) 17.28
Ruang Camat (Bagian II) 23.04
Toilet R. Camat 4.14
R. Tambahan di Aula
Gudang 8.64
Selasar (Bagian Toilet I) 1.08
Selasar (Bagian Toilet II) 1.26
Koridor (Bagian I) 15.60
Koridor (Bagian II) 2.76
R. SUBAG Keuangan 25.92
TOTAL 550.32
ELEMENTAL COST ANALYSIS
Project:

SUMMARY OF ELEMENT COST


GFA: 550.32 m2

% Cost of
Total Cost Of Element Cost per m2 GFA
Element
Rp Rp
1 Pekerjaan Standar
1A Pondasi 100,743,803.04 183064.04 6%
1B Struktur 634,629,265.98 1153200.44 38%
1C Lantai 98,178,968.44 178403.42 6%
1D Dinding 180,831,971.14 328594.22 11%
1E Plafond 112,797,134.90 204966.45 7%
1F Atap 163,466,031.66 297038.14 10%
1G Utilitas 104,175,500.00 189299.86 6%
1H Finishing 69,932,119.39 127075.37 4%

Group Element Total 1,464,754,794.55 2661641.94 87%


2 Pekerjaan Non Standar
2A Tata Udara (AC) 0.00 0.00 0%
2B Elevator/Escalator 0.00 0.00 0%
2C Tata Suara 0.00 0.00 0%
2D Telepon dari PABX 0.00 0.00 0%
2E Elektrikal (termasuk g 35,751,630.00 64965.17 2%
2F Instalasi Pencegahan 0.00 0.00 0%
2G Pencegahan Bahaya 0.00 0.00 0%
2H Sewage Treatment Pla 0.00 0.00 0%
2I Interior (termasuk furni 0.00 0.00 0%
2J Pondasi Dalam 0.00 0.00 0%
2K Fasilitas Penyandang 0.00 0.00 0%
2L Penangkal Petir Khus 0.00 0.00 0%
2M Sarana/Prasarana Lin 34,561,734.02 62802.98 2%
2N Basement 0.00 0.00 0%
2O Peningkatan Mutu 0.00 0.00 0%

Group Element Total 70,313,364.02 127768.14 4%

Sub-total Konstruksi Fisik 1,535,068,158.57 2789410.09 91%

Preliminaries
Preliminaries
146,475,479.46 266164.19 9%

TOTAL (Less Contigencies) 1,681,543,638.03 3,055,574.28 100%


TENDER DATE:

Reinforced Reinforce-
Formwork
Concrete ment
m3 kg m2

213.20 3,580.20 127.84


118.14 0.00 1,777.41
161.73 - 703.54
8.58 1,571.86 3,416.00
- - 1,252.36
- - 686.83
- - -
- - 5,930.16
CONSEPTUAL ESTIMATE

PEKERJAAN PERENCANAAN KANTOR CAMAT BASO


LOKASI BASO KABUPATEN AGAM
TAHUN 2022
JUMLAH LANTAI 2 LANTAI 1.090
LUAS BANGUNAN 550.32
KELAS BANGUNAN SEDERHANA
HSBGN Kota Semarang

NO NAMA KABUPATEN/ KOTA HST BGN/M2 (Harga Satuan Tertinggi Bangunan/ M2)
GEDUNG NEGARA
TDK SEDERHANA SEDERHANA
KOTA SEMARANG 7,100,000.00 5,640,000.00

A Biaya Standar
Luas bangunan X HSBGN X harga satuan per M2 tertinggi
luas bangunan 550.32
Koefisien jumlah lantai 1.09
HSGBN Rp 7,100,000
Total biaya standar Rp 4,258,926,480

B Biaya non standar


Elektrikal 7% Rp 298,124,853.60
Instalasi Pengolahan Air Limbah 2% Rp 85,178,529.60
jumlah Rp 298,124,853.60
biaya fisik bangunan Rp 4,557,051,333.60

PPN 10% Rp 455,705,133.36


IMB dan Administrasi 1% Rp 45,570,513.34

Total biaya fisik bangunan Rp 5,058,326,980.30

C Biaya kegiatan konstruksi


Total biaya fisik bangunan Rp 5,058,326,980.30

Biaya perencanaan kontruksi Rp 247,858,022.03

Biaya pengawasan konstruksi Rp 156,808,136.39

Biaya kegiatan pengelolaan Rp 190,193,094.46


TOTAL BIAYA Rp 5,653,186,233.18
PAGAR PER M1
RUMAH NEGARA PAGAR GEDUNG NEGARA
TIPE A TIPE B TIPE C
6,870,000.00 6,640,000.00 5,850,000.00 DEPAN 2,780,000.00
BELAKANG 2,390,000.00
SAMPING 1,560,000.00
PAGAR RUMAH NEGARA

2,540,000.00
1,470,000.00
1,470,000.00
Proyek : PERENCANAAN KANTOR CAMAT BAS
Lokasi : BASO KABUPATEN AGAM
Jumlah Lantai : 2
Luas Bangunan : 550.92
HSBGN : Rp 5,640,000.00
Koef Jumlah Lant : 1.090
Klasifikasi Bangu : Bangunan Sederhana

A.Biaya Standar
= Luas Bangunan
= 550.92
= Rp 3,386,835,792

B.Biaya Non Standar


1 Pondasi Dalam
= 10%
= Rp 338,683,579

2 Instalasi Telephone
= 4%
= Rp 135,473,432

3 Instalasi Alarm Kebakaran


= 7%
= Rp 237,078,505

4 Tata Suara
= 3%
= Rp 101,605,074

5 Tata Udara/ AC
= 10%
= Rp 338,683,579

6 Electrical
= 7%
= 237,078,505.44

7 Sarana/Prasarana
= 3%
= 101,605,073.76

8 Elevator
= 0.08
= 270,946,863.36

Biaya Konstruksi = Rp 5,147,990,404

C. Biaya Perencanaan

### - 25,000,000,000
3.02 - 3.42
25,000,000,000.00
-0.4

### ¥ - 85,500,000,000.00
¥

Biaya Perencanaan

Biaya Perencanaan
D. Biaya Pengawasan

### 25,000,000,000.00
2 - 2.30
25,000,000,000.00
-0.3

### ¥ - 57,500,000,000.00
¥

Biaya Perencanaan

Biaya Pengawasan

E. Biaya Pengelolaan Proyek

### - 25,000,000,000.00
0.93 - 1.42
25,000,000,000.00
-0.49

### ¥ - 35,500,000,000.00
¥

Biaya Perencanaan

Biaya Pengelolaan Proyek

Total Biaya Proyek


Conceptual Estimation

N KANTOR CAMAT BASO


TEN AGAM

3,386,835,792.00

X Koef. Jumlah Lantai X


X 1.090 X

X Rp 3,386,835,792

X Rp 3,386,835,792

X Rp 3,386,835,792

X Rp 3,386,835,792

X Rp 3,386,835,792
X Rp 3,386,835,792

X 3,386,835,792.00

X 3,386,835,792.00

Total = Rp 1,761,154,612

5,147,990,403.84 - 25,000,000,000
=
¥ - 3.42
(19,852,009,596)
=
¥ - 3.42

= 7,940,803,838.46
= 93,440,803,838.46
25,000,000,000.00
= 3.74 %

= Persentase X Biaya Konstruksi Fisik


= 0.037 X Rp 5,147,990,403.84

= Perencana Rp 192,412,944.60
Rp 161,132,099.64
5,147,990,403.84 - 25,000,000,000.00
=
¥ - 2.3
-19852009596.16
=
¥ - 2.3

= 5,955,602,878.85
= 63,455,602,878.85
25,000,000,000.00
= 2.54 %

= Persentase X Biaya Konstruksi Fisik


= 0.03 X Rp 5,147,990,403.84

= Pengawas Rp 130,667,533.88

5,147,990,403.84 - 25,000,000,000.00
=
¥ - 1.42
-19852009596.16
=
¥ - 1.42

= 9,727,484,702.12
= 45,227,484,702.12
25,000,000,000.00
= 1.81 %

= Persentase X Biaya Konstruksi Fisik


= 1.81% X Rp 5,147,990,403.84

= Pengelola Rp 93,132,262.89

= Rp 5,564,203,145.21
al Estimation

HSBGN
Rp 5,640,000.00
5,147,990,403.84
5,147,990,403.84

5,147,990,403.84
25,000,000,000.00
(0.40)
3
(19,852,009,596)
3.42

124075059976000000000000%
NO NAMA KABUPATEN/ KOTA
GEDUNG NEGARA
TDK SEDERHANA
Rp 7,100,000.00
Kota Semarang 2022

PAGAR/M1
GEDUNG NEGARA

DEPAN Rp 2,780
BELAKANG Rp 2,390
SAMPING Rp 2,490
GEDUNG PER M2
GEDUNG NEGARA RUMAH NEGARA
SEDERHANA TIPE A TIPE B TIPE C
Rp 5,640,000.00 Rp 6,870,000.00 Rp 6,640,000.00 Rp 5,850,000.00

PAGAR/M1
EDUNG NEGARA RUMAH NEGARA

2,780,000.00 Rp 2,540,000.00
2,390,000.00 Rp 1,470,000.00
2,490,000.00 Rp 1,470,000.00
BAGIAN
No Uraian Pekerjaan
I Pekerjaan Pendahuluan
a. Papan Nama Proyek
b. Pas. Papan Bowplank

II Pekerjaan Pondasi
1. Pondasi Plat 130 x 130 x 40 cm
a. Galian Tanah Pondasi
b. Urugan Kembali Galian
c. Cor Beton K.100
d. Plat Pondasi
- Beton K.250
- Pembesian
- Bekisting
e. Kolom Pedestal 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting

III Pekerjaan Beton Bertulang


A. Balok Sloof
1. Balok S1 25 x 40 cm
- Beton K.250
- Lantai Kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting
2. Balok S2 25 x 40 cm
- Beton k.250
- Lantai Kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting
3. Balok SP 20 x 40 cm
- Beton K.250
- Lantai kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting
B. Kolom Lantai 1
1. Kolom K1 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Kolom
- Pengecatan Kolom
C. Balok Lantai 2
1. Balok Lantai 2 B1-1 25 x 40 cm
- Beton K.250
- Pembesian
- Bekesting
- Afreking Balok
- Pengecatan
2. Balok Lantai 2 B2-1 25 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan
3. Balok Lantai 2 B3-1 25 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan
4. Balok Lantai 2 B4-1 25 x 40 cm
- Beton K.250
- Pembesian
- Beksiting
- Afreking Balok
- Pengecatan
5. Balok Lantai 2 BT-1 20 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan
6. Balok Lantai 2 BT-2 20 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan
D. Plat Lantai II
1. Plat lantai 2 Tebal 12 cm
- Beton K.250
- Pembesian
- Bekisting
F. Kolom Lantai 2
1. Kolom K2 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
G. Balok Atap level + 7.40
1. Balok Atap RB1 20 x 30 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
H. Plat pet Atap Teras Depan
1. Plat Pet Atap tebal 8 cm Level + 7.40
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
I. Pekerjaan Tangga
1. Plat Tangga Tebal 15 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
2. Beton Tanjakan Tangga
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
3. Plat Bordes
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan

BAGIAN 3
No Uraian Pekerjaan
2. Tipe P3 (3 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati Tebal 5 mm
c. Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Me
d. Engsel Pintu
e. Kunci Pintu
f. Pasangan DorCloser
3. Tipe P4 (2 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati Tebal 5 mm
c. Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Me
d. Engsel Pintu
e. Kunci Pintu
4. Tipe P5 (2 Unit)
a. Kusen Alumunium
b. Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Me
c. Engsel Pintu
d. Kunci Pintu
5. Tipe J2 (2 Unit)
a. Kusen Alumunium
b. Pas. Jendela Kaca Mati Tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumuni
d. Engsel Jendela
e. Engsel Nyelon
f. Grendel Jendela Alumunium
6. Tipe J3 (3 Unit)
a. Kusen Alumunium
b. Pas. Jendela Kaca Mati Tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumuni
d. Engsel Jendela
e. Engsel Nyelon
f, Grendel Jendela Alumunium
7. Tipe J4 (20 Unit)
a. Kusen Alumunium
b. Pas. Jendela Kaca Mati Tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumuni
d. Engsel Jendela
e. Engsel Nyelon
f,. Grendel Jendela Alumunium
8. Tipe J5 (2 Unit)
a. Kusen Alumunium
b. Pas. Jendela Kaca Mati Tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumuni
d. Engsel Jendela
e. Engsel Nyelon
f, Grendel Jendela Alumunium
9. Tipe Ventilasi BV1 (1 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Selisih Tebal 5 mm
10. Tipe Ventilasi BV2 (8 Unit)
a. Kusen Alumunium
b. Pas. Ventilas Kaca Selisih Tebal 5 mm

VI Dinding Partisi
A. Lantai 1
1. Tipe PR1 (5 Unit)
a. Rangka Metal Stud + Dobel partisi gypsum Board
b. Papan Kayu Plin 1/12
c. Cat Partisi Gypsum Board T. 9 mm Warna Terang
d. Cat Kayu Plin
2. Tipe PR 2 (1 Unit)
a. Rangka Metal Stud + Dobel partisi gypsum Board
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood lapis Su
3). Engsel Pintu
4). Kunci Pintu
c. Papan Kayu Plin 1/12
d. cat Partisi Gypsum Board T. 9 mm Warna Terang
e. Cat Kayu Plin

BAGIAN
No Uraian Pekerjaan
Pekerjaan Elektrikal

I Pekerjaan Instalasi Listrik


Pengadaan, pemasangan dan pengujian seluruh pekerjaan
instalasi penerangan dan stop kontak lengkap dengan saklar dan accesoris
sesuai dengan gambar rencana dan spesifikasi tekniks

A. Lantai 1
1. Pas. Instalasi Titik lampu
2. Pas. Instalasi Titik Stop Kontak
3. Pas. Instalasi Titik Stop Kontak AC
4. Pas Lampu Downlight LED 18 W
5. Pas. Saklar Tunggal
6. Pas. Stop Kontak
7. Pas. Stop Kontak AC
B. Lantai 2
1. Pas. Instalasi Titik lampu
2. Pas. Instalasi Titik Stop Kontak
3. Pas. Instalasi Titik Stop Kontak AC
4. Pas Lampu Downlight LED 18 W
5. Pas. Saklar Tunggal
6. Pas. Stop Kontak
7. Pas. Stop Kontak AC
C. Kabel Feeder
Pengadaan dan pemasangan pekerjaan instalasi kabel distribusi lengkap
dengan material bantu dan aksesoris lainnya sesuai dengan gambar
rencana dan spesifikasi teknis
1. Pas. Kabel dr SDP 1 ke MDP
2. Pas. Kabel dr SDP 2 ke MDP
3. Pas. Kabel dr SDP 3 ke MDP
4. Pas. Kabel dr SDP 4 ke MDP
D. Pek Panel
Pengadaa, pemasangan dan pengujian pekerjaan Panel Tegangan Rendah
lengkap dengan MCCB,MCB,relay-relay, grounding dan aksesoris lainnya
sesuai dengan gambar rencana dan spesifikasi teknis
1. Pas. Panel MDP
2. Pas. Panel SDP 1
3. Pas. Panel SDP 2
4. Pas. Panel SDP 3
5. Pas. Panel SDP 4

II Pas. Ground Panel


BAGIAN 1
Satuan Volume No Uraian Pekerjaan
IV Pekerjaan Dinding
Ls 1.00 A. Lantai 1
M1 94.00

M3 106.62
M3 74.59
M3 3.33

M3 22.98
KG 1893.13
M2 70.72

M3 5.71
KG 1687.07
M2 57.12

M3 17.64
M3 2.20
KG 3923.66
M2 141.12

M3 1.28
M3 0.16
KG 224.77
M2 10.24
B. Lantai 2
M3 2.84
M3 0.35
KG 405.76
M2 28.40

M3 23.39
KG 2472.39
M2 233.92
M2 156.75
M2 156.75
M3 7.29
KG 1098.19
M2 62.20
M2 15.36
M2 15.36

M3 1.67
KG 282.04
M2 14.25
M2 2.20
M2 2.20

M3 6.68 V Pekerjaan Kusen, Pintu


KG 1370.60 A. Lantai 1
M2 57.02
M2 13.20
M2 13.20

M3 1.21
KG 228.34
M2 10.36
M2 1.60
M2 1.60

M3 0.34
KG 59.94
M2 3.45
M2 2.04
M2 2.04

M3 0.40
KG 70.91
M2 4.09
M2 2.48
M2 2.48

M3 26.85
KG 4501.96
M2 268.59

M3 15.39
KG 1868.59
M2 153.92
M2 104.04
M2 104.04

M3 7.00
KG 706.53
M2 93.44
M2 11.90
M2 11.90

M3 0.81
KG 96.00
M2 11.68
M2 11.38
M2 11.38

M3 1.40
KG 289.94
M2 11.73
M2 10.55
M2 10.55

M3 0.64 B. Lantai 2
KG 51.99
M2 5.35
M2 2.67
M2 2.67

M3 0.60
KG 115.69
M2 4.51
M2 4.00
M2 4.00

BAGIAN 3
Satuan Volume No Uraian Pekerjaan

M1 21.12
Mati Tebal 5 mm M2 1.24
ak Wood Lapis Sungkaifin Melamik + Kaca M2 5.04
BH 9.00
BH 3.00
BH 3.00

M1 13.68
Mati Tebal 5 mm M2 0.72
ak Wood Lapis Sungkaifin Melamik + Kaca M2 2.94
BH 6.00
BH 2.00

M1 9.80
ak Wood Lapis Sungkaifin Melamik + PP Plastik M2 2.94
BH 6.00
BH 2.00

M1 18.96
Mati Tebal 5 mm M2 2.98
ebal 5 mm + Rangka Alumunium M2 1.52
BH 4.00
BH 4.00
BH 2.00

M1 34.98
Mati Tebal 5 mm M2 4.36
ebal 5 mm + Rangka Alumunium M2 4.36
BH 12.00
BH 12.00
BH 6.00

M1 112.40
Mati Tebal 5 mm M2 7.28
ebal 5 mm + Rangka Alumunium M2 15.26
BH 40.00
BH 40.00
BH 20.00

M1 13.04
Mati Tebal 5 mm M2 0.72
ebal 5 mm + Rangka Alumunium M2 2.15
BH 4.00
BH 4.00
BH 2.00

M1 7.33
Selisih Tebal 5 mm M2 1.55

M1 21.92
Selisih Tebal 5 mm M2 8.16

+ Dobel partisi gypsum Board T. 9mm M2


M1 B. Lantai 2
Board T. 9 mm Warna Terang + Gelap M2
M2

+ Dobel partisi gypsum Board T. 9mm M2 2.96

Alumunium M1 5.10
ntu Dobel Teak Wood lapis Sungkaifin Melamik + Kaca M2 1.68
BH 3.00
BH 1.00
M1 2.52
Board T. 9 mm Warna Terang + Gelap M2 5.61
M2 0.30

BAGIAN 7
Satuan Volume

uh pekerjaan
dengan saklar dan accesoris lainnya
No Uraian Pekerjaan
s
Pekerjaan Mekanikal
TITIK 58.00
TITIK 20.00 Pengadaan dan pemasa
TITIK 9.00 accessories dan materia
BH 58.00 dan spesifikasi tekniks
BH 15.00
BH 20.00 I Pekerjaan Air Bersih D
BH 9.00 A. Lantai 1

TITIK 63.00
TITIK 22.00
TITIK 12.00
BH 63.00 II Pekerjaan Instalasi Air
BH 17.00 A. Pek. Air Bekas Dala
BH 22.00
BH 12.00 B. Pek. Air Bekas Dala
Lantai 1
si kabel distribusi lengkap
esuai dengan gambar Lantai 2

M1 8.00
M1 10.00 III Pekerjaan Instalasi Air
M1 16.00 A. Pek. Air Kotor Dala
M1 20.00
B. Pek. Air Kotor Dala
an Panel Tegangan Rendah Lantai 1
unding dan aksesoris lainnya
Lantai 2
UNIT 1.00
UNIT 1.00
UNIT 1.00 IV Pek. Instalasi Pipa Tega
UNIT 1.00
UNIT 1.00

UNIT 1.00

V Pek. Septictank

VI Pek. Roof Tank

VII Pek. Ground Tank

VIII Pek. Pompa Transfer

IX Pek. Buangan Air AC


A. Lantai 1

B. Lantai 2
BAGIAN 2
Uraian Pekerjaan
Pekerjaan Dinding
A. Lantai 1
1. Pas. Batu Bata 1:2 (1/2 Bata)
2. Pas Batu Bata 1:4 (1/2 Bata)
3. Plesteran 1:2
4. Plesteran 1:4
5. Plesteran Acian 1:2
6. Plesteran Acian 1:4
7. Profil Beton T = 10
8. Cat Dinding Batu Bata
9. Pekerjaan Balok Lathe 13 x 15 lev +2.93
a. Beton K.175
b. Pembesian
c. Bekisting
10. Pekerjaan Kolom Praktis 13 x13
a. Beton K.175
b. Pembesian
c. Bekisting
11. Pekerjaan Kolom Praktis 15 x 15
a. Beton K.175
b. Pembesian
c. Bekisting
d. Afreking
e. Pengecatan
12. Pekerjaan Plat Pet Lev +2.93
a. Beton K.175
b. Pembesian
c. Bekisting
d. Afreking
e. Pengecatan
B. Lantai 2
1. Pas. Batu Bata 1:2 (1/2 Bata)
2. Plesteran 1:4
3. Acian Plesteran 1:4
4. Cat Dinding Batu Bata
5. Pekerjaan Balok Lathe Lev +6.79
a. Beton K.175
b. Pembesian
c. Bekisting
6. Kolom Praktis 13 x 13
a. Beton K.175
b. Pembesian
c. Bekisting
7. Kolom Praktis 15 x 15
a. Beton K.175
b. Pembesian
c. Bekisting
d. Afreking
e. Pengecatan
8. Pekerjaan Plat Pet Lev +6.79
a. Beton K.175
b. Pembesian
c. Bekisting
d. Afreking
e. Pengecatan

Pekerjaan Kusen, Pintu, dan Jendela


A. Lantai 1
1. Tipe PJ1 (1 Buah)
a. Kusen Alumunium
b. Pas. Jendela Kaca Mati Tebal 5mm
c. Pas. Pintu Fremles Tempered Tebal 12 mm
d. Engsel Pintu Tanam
e. Kunci Pintu
f. Hendel Pintu Stenlis Stil
2. Tipe P1 (2 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Pintu Kaca Clear tebal 5mm + Rangka Alumunium
d. Engsel Pintu
e. Kunci Pintu
f. Grendel Pintu
3. Tipe P3 (2 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Pintu Dobelteak Wood Lapis Sungkaifin.Melamik + Kaca
d. Engsel Pintu
e. Kunci Pintu
4. Tipe P4 (2 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati Tebal 5 mm
c. Pas. Pintu Dobelteak Wood Lapis Sungkaifin.Melamik + Kaca
d. Engsel Pintu
e. Kunci Pintu
5. Tipe P5 (2 Unit)
a. Kusen Alumunium
b. Pas. Pintu Dobel teak Wood lapis Sungkaifin. Melamik + PP Plastik
c. Engsel Pintu
d. Kunci Pintu
6. Tipe J1 (6 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
d. Engsel Jendela
e. Engsel Nyelon
f. Grendel Jendela Alumunium
7. Tipe J2 (2 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
d. Engsel Jendela
e. Engsel Nyelon
f. Grendel Jendela Alumunium
8. Tipe J3 (3 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
d. Engsel Jendela
e. Engsel Nyelon
f. Grendel Jendela Alumunium
9. Tipe Ventilasi BV2 (7 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Selisih tebal 5 mm
B. Lantai 2
1. Tipe P2 (1 Unit)
a. Kusen Alumunium
b. Pas. Ventilasi Kaca Mati tebal 5 mm
c. Pas. Pintu Kaca Clear tebal 5mm + Rangka Alumunium
d. Engsel Pintu
e. Kunci Pintu
f. Grendel Pintu

BAGIAN 4
Uraian Pekerjaan
3. Tipe PR3 (3 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
c. Papan Kayu Plin 1/12
d. Cat Partisi Gypsum Board T. 9 mm Warna Gelap + Terang
e. Cat Kayu Plin
4. Tipe PR4 (2 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
c. Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
d. Papan Kayu Plin 1/12
e. Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
f. Cat Kayu Plin
5. Tipe PR5 (2 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
c. Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
d. Papan Kayu Plin 1/12
e. Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
f. Cat Kayu Plin
6. Tipe PR6 (1 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
c. Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
d. Papan Kayu Plin 1/12
e. Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
f. Cat Kayu Plin
7. Tipe PR7 (1 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
c. Papan Kayu Plin 1/12
d. Cat Partisi Gypsum Board T. 9 mm Warna Gelap + Terang
e. Cat Kayu Plin
B. Lantai 2
1. Tipe PR1 (1 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Papan Kayu Plin 1/12
c. Cat Partisi Gypsum Board T. 9mm Warna Gelap + terang
d. Cat Kayu Plin
2. Tipe PR8 (1 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
b. Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
c. Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
d. Papan Kayu Plin 1/12
e. Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
f. Cat Kayu Plin

BAGIAN 8
Uraian Pekerjaan Satuan Volume

Pekerjaan Mekanikal

Pengadaan dan pemasangan instalasi pekerjaan plambing lengkap dengan


accessories dan material bantu lainnya sesuai dengan gambar rencana
dan spesifikasi tekniks

Pekerjaan Air Bersih Dalam Bangunan


A. Lantai 1
1. Pas Pipa PVC Ø 3/4" M1 50.00
2. Pas. Pipa PVC Ø 1/2" M1 12.00
3. Pas. Floor Drain M1 4.00

Pekerjaan Instalasi Air Bekas


A. Pek. Air Bekas Dalam Tanah
1. Pas. Pipa PVC Ø 3" M1 5.00
B. Pek. Air Bekas Dalam Bangunan

1. Pas. Pipa PVC Ø 3" M1 25.00

1. Pas. Pipa PVC Ø 3" M1 28.00

Pekerjaan Instalasi Air Kotor


A. Pek. Air Kotor Dalam Tanah
1. Pas. Pipa PVC Ø 4" M1 7.00
B. Pek. Air Kotor Dalam Bangunan

1. Pas. Pipa PVC Ø 4" M1 18.00

1. Pas. Pipa PVC Ø 4" M1 23.00

Pek. Instalasi Pipa Tegak


1. Pas. Pipa PVC Ø 1" M1 8.00
2. Pas. Pipa PVC Ø 4" M1 8.00
3. Pas. Pipa PVC Ø 3" M1 8.00
4. Pas. Pipa PVC Ø 2" M1 6.00
5. Pas. Vent Cup M1 2.00

Pek. Septictank
1. Pas. Septictank UNIT 1.00

Pek. Roof Tank


1. Roof Tank 2 M3 UNIT 2.00

Pek. Ground Tank


1. Pas. Ground Tank UNIT 1.00

Pek. Pompa Transfer


1. Pompa Transfer UNIT 1.00

Pek. Buangan Air AC


A. Lantai 1
1. Pipa PVC Ø 3/4" M1 25.00
2. Pipa PVC Ø 1/2" M1 47.00
B. Lantai 2
1. Pipa PVC Ø 3/4" M1 27.00
2. Pipa PVC Ø 1/2" M1 55.00
Satuan Volume No Uraian Pekerjaan
3. Tipe PR9 (1 Unit)
a. Rangka Metal Stud + Double Partisi Gypsum Bo
M2 40.74 b. Pintu
M2 139.75 1). Kusen Alumunium
M2 81.48 2). Pas. Pintu Dobel Teak Wood Lapis
M2 299.02 3). Engsel Pintu
M2 81.48 4). Kunci Pintu
M2 299.02 c. Jendela
M1 16.22 1). Kusen Alumunium
M2 380.50 2). Pas. Kaca Mati Tebal 5 mm
d. Papan Kayu Plin 1/12
M3 0.94 e. Cat Partisi Gypsum Board T. 9 mm Warna Gela
KG 175.62 f. Cat Kayu Plin
M2 15.99
VII Pekerjaan Plafond
M3 0.70 A. Lantai 1
KG 147.76 1. Plafon Gypsum Plat T=9mm + Rangka Metal Furing
M2 10.92 2. Plafond GRC T=4mm + Rangka Metal Furing
3. Lis Gypsum T=12cm
M3 0.31 4. Lis GRC
KG 52.13 5. Cat Plafond Gypsum T=9mm dan GRC T=4mm
M2 4.20
M2 3.96 B. Lantai 2
M2 3.84 1. Plafond gypsum T=9mm + Rangka Metal Furing
2. Plafond GRC T=4mm + Rangka Metal Furing
M3 2.15 3. Lis Gypsum T=12cm
KG 357.08 4. Lis GRC
M2 31.43 5. Cat Plafond Gypsum T=9mm dan GRC T=4mm
M2 57.47
M2 57.47 VIII Pekerjaan Lantai
A. Lantai 1
M2 234.58 1. Tanah urug (Timbunan Lantai)
M2 498.95 2. Urugan Pasir tebal 10 cm
M2 49.95 3. Lantai Kerja K.100 Tebal 7cm
M2 498.95 4. Keramik 40x40 cm
5. Anti Slip (Stok Norsing)
M3 1.25
KG 232.91 B. Lantai 2
M2 21.22 1. Keramik 40x40 cm
2. Anti Slip (Stok Norsing)
M3 1.20
KG 251.19 IX Pekerjaan Rangka + Penutup Atap
M2 18.56 1. Rangka Atap Baja Ringan (Mutu Baja G550)
2. Penutup Atap Genteng
M3 0.33 3. Pas. Lisplank Sisik Ikan
KG 59.49 4. Ukiran Gonjong Kayu + Rangka
M2 4.41 5. Pas. Plafond Lambersering Atap Gonjong
M2 4.41 6. Pas. Perabung Genteng
M2 4.08 7. Pas. Papan Kisi Kisi pada Gonjong Kecil + Rangka
8. Pas. Jurai Genteng
M3 1.78 9. Pas. Lisplank Zingkalume
MKG 295.68 10. Pas. Ornamen Puncak Gonjong
M2 29.74
M2 47.59 X Pekerjan Toilet (WC) dan Aksesoris
M2 47.59 A. Lantai 1
1. Toilet Tipe A 1
a. Kolom Praktis 13x13 cm (K-175)
1). Beton K-175
2). Pembesian
M1 18.48 3). Bekisting
M2 4.67 b. Pas. Batu Bata 1:2 (1/2 Bata)
M2 3.36 c. Pas. Batu Bata 1:4 (1/2 Bata)
BH 2.00 d. Plesteran 1:2
BH 2.00 e. Plesteran 1:4
BH 4.00 f. Acian
g. Cat Dinding Batu Bata
M1 16.48 h. Keramik Dinding 25x40 cm + Plink Keramik
M2 1.45 i. Keramik Lantai Teksture 25x25 cm
M2 5.88 j. Kloset Jongkok (Setara TOTO)
BH 12.00 k. Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Closet
BH 2.00 l. Urugan Pasir Peninggian Closet
BH 8.00 m. Beton K-100 Peninggian Closet
n. Cor Beton K-100 Pijakan Kaki Tempat Wudhu
M1 14.08 o. Kran Air
M2 0.83 p. Floor Drain
M2 3.36 B. Lantai 2
BH 6.00 1. Toilet Tipe A 1
BH 2.00 a. Kolom Praktis 13x13 cm (K-175)
1). Beton K-175
M1 13.68 2). Pembesian
M2 0.72 3). Bekisting
M2 2.94 b. Pas. Batu Bata 1:2 (1/2 Bata)
BH 6.00 c. Pas. Batu Bata 1:4 (1/2 Bata)
BH 2.00 d. Plesteran 1:2
e. Plesteran 1:4
M1 9.80 f. Acian
M2 2.94 g. Cat Dinding Batu Bata
BH 6.00 h. Keramik Dinding 25x40 cm + Plink Keramik
BH 2.00 i. Memasang Membrane Waterproofing
j. Keramik Lantai teksture 25x25 cm
M1 103.20 k. Kloset Jongkok (Setara TOTO)
M2 17.89 l. Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Closet
M2 9.15 m. Urugan Pasir Peninggian Closet
BH 24.00 n. Beton K-100 Peninggian Closet
BH 24.00 o. Cor Beton K-100 Pijakkan Kaki Tempat Wudhu
BH 12.00 p. Kran Air
q. Floor Drain
M1 18.96 2. Toilet Tipe A 2
M2 2.98 1. Pas. Batu Bata 1:2 (1/2 Bata)
M2 1.52 2. Pas. Batu Bata 1:4 (1/2 Bata)
BH 4.00 3. Plesteran 1:2
BH 4.00 4. Plesteran 1:4
BH 2.00 5. Acian
6. Cat Dinding Batu Bata
M1 34.98 7. Keramik Dinding 25x40 cm + Plint Keramik
M2 4.36 8. Memasang Membrane Waterproofing
M 4.36 9. Keramik Lantai Teksture 25x25 cm
BH 12.00 10. Kloset Jongkok (Setara TORO)
BH 12.00 11. Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Close
BH 6.00 12. Urugan Pasir Peninggian Closet
13. Beton K-100 Peninggian Closet
M1 19.18 14. Kran Air
M2 8.40 15. Floor Drain

XI Pekerjaan Tangga
M1 8.24 A. Finishing Tangga
M2 0.72 1. Keramik 30x30 cm (Anak Tangga)
M2 2.94 2. Keramik 40x40 cm Bordes
BH 6.00 3. StopNosing
BH 1.00 4. Railling Tangga Besi Hollo
BH 4.00 5. Tangan Tangan Tangga Besi Hollo

Satuan Volume No Uraian Pekerjaan


XII Pekerjaan Teras dan rabat
M1 19.54 A. Teras Keliling Bangunan
1. Pasangan Batu Bata Keliling Bangunan
M1 35.11 2. Plesteran
M2 10.29 3. Acian
M1 38.40 4. Tanah Urugan (Timbunan Lantai)
M2 34.48 5. Urugan Pasir Tebal 7 cm
M2 4.60 6. Cor Lantai K-100 tebal 7 cm
7. Keramik Teksture 40x40 cm
M2 12.30 B. Tangga Teras Depan
1. Pasangan Batu Bata 1:2
M1 10.20 2. Plesteran Batu Bata 1:2
M2 3.36 3. Urugan Tanah
BH 6.00 4. urugan Pasir Tebal 7 cm
BH 2.00 5. Cor Lantai K-100 tebal 7 cm
6. Keramik Teksture 40x40 Tangga teras
M1 10.72 7. Keramik Teksture 40x40 cm Teras
M2 3.44
M1 18.40 XIII Pekerjaan Ornamen Luar Bangunan
M2 22.40 1. Pas Kisi Kisi Besi Holo Enteren + Finishing Cat
M2 2.20 2. Les Profil Beton Depan + Finishing Cat
3. Merek dan Logo Kantor Camat Baso Dari Stenlis
M2 11.07

M1 10.20
M2 3.36
BH 6.00
BH 2.00

M1 15.18
M2 4.74
M1 18.40
M2 19.94
M2 2.20

M2 7.38

M1 5.10
M2 1.68
BH 3.00
BH 1.00

M1 2.53
M2 0.79
M1 9.20
M2 13.66
M2 1.10

M2 6.37

M1 10.20
M2 3.36
BH 6.00
BH 2.00
M1 5.60
M2 12.06
M2 0.67
M2 14.97
M2 18.72
M2 27.70
M2 2.24

M2 12.79

M1 10.20
M2 3.36
BH 6.00
BH 2.00

M1 15.18
M2 4.74
M1 20.50
M2 23.12
M2 2.46
BAGIAN 5
Satuan Volume

+ Double Partisi Gypsum Board T. 9mm M2 13.36

Alumunium M1 5.10
ntu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca M2 1.68
BH 3.00
BH 1.00

Alumunium M1 17.71
ca Mati Tebal 5 mm M2 5.53
M1 23.60
Board T. 9 mm Warna Gelap + Terang M2 23.90
M2 2.83

Rangka Metal Furing M2 272.41


a Metal Furing M2 10.77
M1 218.42
M1 25.78
an GRC T=4mm M2 311.96

ngka Metal Furing


a Metal Furing M2 304.67
M2 12.35
M1 201.57
an GRC T=4mm M1 31.08
M2 340.28

M3 107.01
M3 32.19
M3 22.53
M2 307.53
M1 15.74

M2 275.14
M1 1.15
tu Baja G550) M2 433.57
M2 447.03
M1 90.60
M2 45.42
M2 140.27
M1 47.24
ong Kecil + Rangka M2 20.54
M1 12.28
M1 57.13
BH 5.00

3 cm (K-175)
M3 0.47
KG 101.04
M2 7.28
M2 25.23
M2 32.30
M2 47.18
M2 67.89
M2 89.85
M2 89.85
5x40 cm + Plink Keramik M2 25.23
sture 25x25 cm M2 9.07
BH 2.00
1/2 Bata) Peninggian Closet M3 0.62
gian Closet M3 0.70
ggian Closet M3 0.75
jakan Kaki Tempat Wudhu M3 0.25
BH 6.00
BH 4.00

3 cm (K-175)
M3 0.45
KG 97.81
M2 7.07
M2 25.23
M2 30.39
M2 47.18
M2 64.06
M2 86.01
M2 86.01
5x40 cm + Plink Keramik M2 25.23
ne Waterproofing M2 10.31
ture 25x25 cm M2 9.07
tara TOTO) BH 2.00
1/2 Bata) Peninggian Closet M3 0.62
ggian Closet M3 0.70
ggian Closet M3 0.70
jakkan Kaki Tempat Wudhu' M3 0.25
BH 6.00
BH 4.00

M2 6.27
M2 7.07
M2 6.27
M2 7.07
M2 13.34
M2 13.34
5x40 cm + Plint Keramik M2 5.20
ne Waterproofing M2 1.70
ksture 25x25 cm M2 1.44
etara TORO) BH 1.00
(1/2 Bata) Peninggian Closet M3 0.27
nggian Closet M3 0.70
nggian Closet M3 0.70
BH 1.00
BH 1.00

M2 10.58
M2 4.00
M1 25.20
M1 8.07
M1 13.52

BAGIAN 6

Satuan Volume

M2 30.79
M2 23.09
M2 23.09
M3 28.20
M3 5.11
M3 3.65
M2 73.14

M2 2.95
M2 2.95
M3 0.89
M3 0.49
M3 0.34
M2 10.82
M2 11.52

n + Finishing Cat M1 70.40


M1 6.00
Baso Dari Stenlis Ls 1.00
DAFTAR HARGA SATUAN UPAH/BAHAN 2022
DAFTAR UPAH KERJA PER ORANG PER HARI

Kota Semarang
Propinsi : Jawa Tengah

No Jenis Tenaga Kerja Satuan

1 Pekerja O/H/J
2 Tukang O/H/J
3 Mandor O/H/J
4 Operator O/H/J
5 Pembantu operator O/H/J
6 Supir/driver O/H/J
7 Supervisor O/H/J
8 Elektrikal O/H/J
9 Pembantu mekanik O/H/J
10 Kepala Tukang O/H/J

DAFTAR HARGA SATUAN MATEIAL/BAHAN

NO URAIAN/JENIS BAHAN BANGUNAN SATUAN

UPAH PEMBONGKARAN BANGUNAN


1 Upah bongkar atap genteng/sirap/asbest/seng glb M²
2 Upah bongkar lantai lama M²
3 Upah bongkar rangkap atap kayu M²
4 Upah bongkar plafond + rangka M²

BAHAN BANGUNAN GEDUNG


A Bahan-bahan Galian, Semen
1 Aspal 60/70 liter
2 Aspal Cair liter
3 Batu Gunung M³
4 Batu kali M³
5 Batu koral M³
6 Batu pecah 15/20cm M³
7 Batu pecah 5-10 cm M³
8 Batu pecah 3-5 cm M³
9 Batu pecah 2-3 cm M³
10 Batu kelapa M³
11 Batu alam (paras) M²
12 Batu templek M²
13 Batu bata cetak mesin Bh
14 Batu ringan Bh
15 Batu kerawang Bh
16 Batako Bh
17 Paving Block Bh
18 Kerikil beton guli (2-3 cm) M³
19 Pasir pasang/beton M³
20 Pasir urug M³
21 Semen putih 40 Kg zak
22 Semen portland (andalas) 40 Kg zak
23 Semen portland (andalas) Kg
24 Semen Alpha Kg
25 Sirtu (pasir batu) M³
26 Tanah timbun M³
27 Tanah humas M³
28 Urugan porus M³
29 Tiang Pancang D 30 cm M'

B Bahan-bahan Perkayuan
1 ijuk Kg
2 kayu dolken/bulat Ø8-10 btg
3 kayu profil 2" M'
4 kayu plint 1" x 4" M'
5 kayu papan/broti (setara kayu kuat kls 1) M³
6 kayu papan/broti (setara kayu kuat kls 2) M³
7 kayu papan/broti (setara kayu kuat kls 3) M³
8 kayu setara dolken Btg
9 lem kayu Kg
10 lem kuning Kg
11 Listplank motif bunga/melayu 14x40 lbr
12 Tepas kelapa sawit lbr
13 Tepas bambu lbr
14 Tripleks 4 mm Lembar
15 Tripleks 6 mm Lembar
16 Tripleks 9 mm Lembar
17 Tripleks sungkai 3 mm Lembar

C Bahan-bahan Besi, Alumunium


1 Besi beton polos Kg
2 Besi wiremesh M8 Kg
3 Besi beton ulir Kg
4 Besi profil Kg
5 Besi baja IWF Kg
6 Besi plat strip Kg
7 Besi pipa Kg
8 Steel Deck t. 0,75 mm M²
9 Kawat licin/brojong Kg
10 Kawat beton Kg
11 Kawat las Dos
12 Kawat jaring galvanis (harmonika) Lbr
13 Kusen Pintu aluminium (80x210) coklat Bh
14 Kusen Pintu aluminium (80x210) putih Bh
15 Kusen Jendela aluminium (120x60) coklat Bh
16 Kusen Jendela aluminium (120x60) putih M¹
17 Kusen Jendela aluminium (120x60) coklat M¹
18 Kusen Jendela aluminium (120x60) putih Bh
19 Jerjak Besi biasa M²
20 Jendela Besi bermotif M²
21 Jendela Besi M²
22 Jendela aluminium + kaca (120x60) coklat Bh
23 Jendela aluminium + kaca (120x60) putih Bh
24 Pintu gulung aluminium/rolling door M²
25 Pintu Besi M²
26 Pintu Besi lipat harmonika M²
27 Pintu KM/C PVC set
28 Pintu aluminium putih set
29 Pintu kaca#5mm bingkai aluminium + engsel tanam Unit
30 plat baja profil Kg
31 paku biasa Kg
32 paku sekrup Kg
33 paku seng Kg
34 pagar Besi strip M²
35 Pagar besi hollow terpasang M²
36 Venetion blind aluminium M²
37 Venetion blind kayu M²
38 sunscreen aluminium M²
39 vertical blinds M²
40 frame aluminium hollow M¹
41 aluminium composit panel (ACP) M²
42 dinabolt Bh
43 seallent M¹
44 pagar BRC 120 polos M²
45 rangka atap kanopi besi hollow terpasang M²
46 rangka atap polikarbonat M²
47 Kusen Pintu UPVC 80X210 atau 90x210 Unit
48 Kusen UPVC Jendela Unit
49 daun Pintu UPVC 80x210 atau 90x210 M²
50 daun Jendela kaca rangka UPVC M²

D Bahan-bahan penutup lantai


1 conblock #6cm mutu K-125 Bh
2 conblock #8cm mutu K-175 Bh
3 floor hardener Kg
4 geotextile non woven M²
5 gebalan rumput M²
6 Keramik polos 20 x 20 cm Bh
7 Keramik polos 25 x 25 cm Bh
8 Keramik polos 30 x 30 cm Bh
9 Keramik polos 40 x 40 cm Bh
10 Keramik 60 x 60 cm Bh
11 Keramik 40 x 40 cm setara granito Bh
12 Keramik 40 x 40 cm setara esensa Bh
13 Keramik warna polos 20 x 20 Bh
14 Keramik siku bon bon M¹
15 Karpet Wool M²
16 Karpet Wool + nylon M²
17 kanstin 10 x 15 x 45 cm Bh
18 kanstin 15 x 30 x 6 cm Bh
19 porselin polos 30x30 cm Bh
20 parquent kayu solid M²
21 lantai kayu sintetis (Gym floor) M²
22 plint keramik 10x30 cm Bh
23 plint keramik 10x40 cm Bh
24 plint keramik 10x60 cm Bh
25 wallpaper biasa M¹
26 wallpaper lux M¹
27 Step Nossing 10/30 HT Set
28 Waterproofing Membrane Roll
29 Prime Coat Tb

E Bahan-bahan kaca
1 kaca 5 mm M²
2 kaca 3 mm M²
3 kaca 8 mm M²
4 kaca buram/reyben 5 mm M²
5 kaca cermin 5 mm M²
6 kaca Jendela nako + rangka M²
7 kaca blok bh
F Bahan-bahan atap
1 Atap asbes gelombang 7 kaki lbr
2 Atap zincalum gelombang #0.30 mm kaki
3 Atap supert dex kaki
4 Atap plastik gelbang fiber lembar
5 Atap genteng metal #0,30 M²
6 Atap bitumen lembar
7 Genteng keramik keping
8 Genteng beton warna keping
9 Rabung genteng beton keping
10 Rabung genteng metal #0,30 M¹
11 Rabung zinzcalum #0,30 M¹
12 Rabung seng lbr 30 cm lembar
13 Rabung atap bitumen lembar
14 Rabung genteng keramik keping
15 Rangka atap zinzcalum M²
16 Rangka atap baja ringan atap seng M²
17 Rangka atap baja ringan atap genteng metal M²
18 Rangka atap baja ringan atap genteng keramik/beton M²
19 Rabung asbes panjang 0,5m lembar
20 seng gelombang 7 kaki BJLS 20 lembar
21 seng gelombang 7 kaki BJLS 35 lembar
22 seng plat BJLS 30 kaki
23 Seng plat BJLS 30 lbr
24 Talang kantong seng BJLS M¹
25 isolasi atap/aluminium foil M²
26 atap polikarbonat M²
27 Listplank GRC M¹

G Bahan-bahan plafond
1 Asbes keping
2 Gypsum board 9 mm lembar
3 Gypsum board 6 mm lembar
4 Gypsum board 12 mm lembar
5 Calsi board 9 mm lembar
6 GRC lembar
7 profil gipsum 6" M¹
8 profil gipsum 4" M¹
9 profil gipsum 3" M¹
10 profil gipsum 2" M¹
11 rangka furing plafond gypsum M²

H Bahan sistem plafond akustik rangka tampak


1 rangka utama (main tee) btg
2 rangka silang (cross tee) btg
3 rangka ke dinding (wall angle) btg
4 penggantung (adjustable hanger clip) Bh
5 pengikat (suspension rod) 3mm x 2400 mm Bh
6 braket sudut (angle bracket) Bh
7 paku ramset Bh
8 paku beton Bh
9 panel plafond akustik setara jaya tekstur byhua 9mm x 1200 lbr

I bahan-bahan cat
1 cat kilat serara bee brand Kg
2 cat perak setara bee brand Kg
3 cat tembok setara paragon Kg
4 cat tembok setara vinilex Kg
5 cat tembok setara weathershields Kg
6 cat vernis Kg
7 cat minie Besi Kg
8 cat minie kayu Kg
9 cat dasar Kg
10 dempul Kg
11 filler Kg
12 plamir Kg
13 flinkote Kg
14 soda api Kg
15 residu kolter ltr
16 Cat Acrilyc ICI Warna Kg
17 Sealer ICI Kg

J Bahan-bahan sanitari
1 bak air fiberglass Bh
2 bk cuci piring 2 lobang komplet Unit
3 fiber plastik M²
4 floor drain Bh
5 instalasi air bersih Titik
6 Kloset duduk (dengan bak air) Bh
7 Kloset duduk (dengan bak air) setara TOTO Bh
8 Kloset jongkok porselein Bh
9 Kloset jongkok setara TOTO dengan flusher Bh
10 Kran air ¾" lokal Bh
11 Kran air bebek lokal Bh
12 Kran air setara San Ei Bh
13 Kran air bebek setara San Ei Bh
14 Kran shower Bh
15 Kran bidet/cebok Bh
16 Stop Kran ¾" Bh
17 septiktank kapasitas 3 M³ Bh
18 tempat sabun keramik 10x20cm Bh
19 urinoir Bh
20 Wastafel biasa Bh
21 Wastafel setara TOTO Bh
22 Jet washer setara TOTO Bh

K Bahan-bahan listrik
1 Lampu TL 1 x 20 watt +Armature set
2 Lampu TL 1 x 40 watt +Armature set
3 Lampu TL 2 x 20 watt +Armature set
4 Lampu TL 2 x 40 watt +Armature set
5 Lampu pijar 5 wt + fitting set
6 Lampu pijar 10 wt + fitting set
7 Lampu pijar 20 wt + fitting set
8 Lampu pijar 40 wt + fitting set
9 Lampu pijar 100 wt + fitting set
10 Lampu Down Light 18 Watt Bh
11 Lampu Baret Bh
12 Saklar tunggal Bh
13 Saklar ganda Bh
14 Saklar Triple Bh
15 Stop kontak tanam Bh
16 Downlight Bh
17 MCCB 100A Bh
18 MCCB 50A Bh
19 MCB DIN 10A Bh
20 MCB DIN 25A Bh
21 Box 20x50x70 3 phase Unit
22 Box 20x50x60 3 phase Unit
23 Box zekering 3 Group Bh
24 Box zekering 4 Group Bh
25 Kabel NYA 1.5 mm Bh
26 Kabel NYA 2,5 mm Bh
27 Kabel NYA 4 mm Bh
28 Kabel NYM 2 x 1.5 mm Bh
29 Kabel NYM 2 x 2.5 mm Bh
30 Kabel NYM 2 x 4 mm Bh
31 Kabel NYA 3 x 2,5 mm² M¹
32 Kabel NYY 4 x 16 mm² M¹
33 Conduit Btg
34 Instalasi titik nyala titik
35 Instalasi stop kontak titik

L Bahan-bahan pengunci penggantung


1 door closer Bh
2 Engsel Nyelon Bh
3 Engsel Pintu Nyilon 4" pasang
4 Engsel Jendela Nyilon 3" pasang
5 grendel besar 4" Bh
6 grendel besar 3" Bh
7 hak angin biasa pasang
8 handle (pegangan) Jendela biasa Bh
9 kunci tanam 4" Bh
10 kunci lock KCL biasa 6" (antik) Bh
11 kunci lock besar Uk. 4" Bh
12 kunci slinder Bh
13 kunci lemari Bh
14 rel Pintu dorong Bh
M Bahan pendukung, minyak dan lain lain
1 Amplas lbr
2 Kipas angin stainless steel lengkap bh
3 Hot mix (HRS) ton
4 Oksigen las kg
5 Waterprrofing membran bakar M2
6 Prime cote kg
7 Kuas Bh
8 Minyak bekesting Kg
9 Bensin premium bersubsidi liter
10 Minyak pelumas (silinder) liter
11 Minyak gemuk liter
12 Minyak solar bersubsidi liter
13 Minyak tanah/ lampu liter
14 Kerosene liter
15 Minyak gerdang liter
16 Minyak cat liter
17 Pertamax liter
N bahan-bahan perpipaan
1 Pipa Porous M¹
2 Pipa PVC AW 6 m ½" M¹
3 Pipa PVC AW 6 m ¾" M¹
4 Pipa PVC AW 6 m 1" M¹
5 Pipa PVC AW 6 m 1½" M¹
6 Pipa PVC AW 6 m 2" M¹
7 Pipa PVC AW 6 m 2½" M¹
8 Pipa PVC AW 6 m 3" M¹
9 Pipa PVC AW 6 m 4" M¹
10 Pipa PVC AW 6 m 6" M¹
11 Pipa GIP Ø 6 m ½" M¹
12 Pipa GIP Ø 6 m ¾" M¹
13 Pipa GIP Ø 6 m 1" M¹
14 Pipa GIP Ø 6 m 1½" M¹
15 Pipa GIP Ø 6 m 2" M¹
16 Pipa GIP Ø 6 m 2½" M¹

O Peralatan Konstruksi
Concrete mixer Jam
Concrete vibrator Jam
Bulldozer Jam
Mesin Genset Jam
Mesin Las Jam
Waterpump Jam
Tandem roller 6-8 Ton Jam
Excavator Jam
Vibrator roller Jam
Pneumatic tyre roller Jam
Dump Truck Jam
Truck bak terbuka Jam
Watertank truck Jam
Truck 3 suku trip

P Tambahan
Air Liter
Balok 6 cm x 15 cm x 400 cm m3
Balok 8 cm x 12 cm x 400 cm m3
Balok 6 cm x 12 cm x 400 cm m3
Balok 5 cm x 10 cm x 400 cm m3
Profil Alumunium M
Skrup Fixer Buah
Kaca 12 mm M2
Pegangan Pintu Set
Teakwood 4 mm Lembar
Chanel 75 tbl 0.75 mm M1
Talang / Valley Gutter M1
L-Plate BH
Reng M1
Keramik 25x40 BH
Raliing Besi Stainless 2' M1
Ralling Besi Stainless 1' M1
Beton Profil T=10 M1
Seal Tape Bh
Tangan Tangga Hollow M1
Engsel Pintu Tanam Bh
Lisplang Sisik Ikan M1
Ukiran Gonjong Kayu + Rangka M2
Papan Kisi Kisi pada Gonjong Kecil + Rangka M1
Jurai Genteng M1
Ornamen Puncak Gonjong Bh
PVC High Impact Dia. 20 mm2 M1
Socket Dia. 20 mm2 Bh
Clamp Cable Bh
Junction Box Bh
Kabel NYA 1 x 16 mm2 M1
Ampermeter Bh
Volt Meter Bh
Indicator Lamp Bh
Switch Selector Bh
Ground Panel Unit
Septictank Unit
Roof Tank 2 m3 Unit
Ground Tank Unit
Pompa transfer Unit
Kisi-Kisi Besi Holo M1
Profil Beton +Cat M1
Merek dan Logo Kantor Camat Baso Dari Stenlis Ls
Harga Satuan Harga Satuan
(Rp/ Hari) (Rp/jam)
105,000.00 13,125.00
120,000.00 15,000.00
130,000.00 16,250.00
147,500.00 18,437.50
120,000.00 15,000.00
145,000.00 18,125.00
165,000.00 20,625.00
147,500.00 18,437.50
120,000.00 15,000.00
140,000.00 17,500.00

HARGA SATUAN
(Rp)

8,000.00
17,500.00
27,500.00
11,000.00

7,000.00
8,000.00
180,000.00
160,000.00
175,000.00
225,000.00
250,000.00
260,000.00
230,000.00
175,000.00
240,000.00
210,000.00
900.00
19,800.00
14,000.00
4,000.00
1,600.00
215,000.00
150,000.00
125,000.00
150,000.00
60,000.00
1,300.00
5,500.00
160,000.00
125,000.00
200,000.00

390,000.00

39,000.00
36,000.00
5,500.00
30,000.00
5,500,000.00
3,500,000.00
3,000,000.00

19,000.00
25,000.00
33,000.00
35,000.00
35,000.00
70,500.00
98,000.00
120,000.00
150,000.00

14,000.00
19,000.00
15,000.00
15,000.00
24,000.00
24,000.00
24,000.00
125,000.00
18,500.00
25,000.00
185,000.00
350,000.00
380,000.00
450,000.00
420,000.00
750,000.00
700,000.00
1,050,000.00
800,000.00
1,199,000.00
450,000.00
1,100,000.00
3,000,000.00
23,000.00
25,000.00
30,000.00
40,000.00
450,000.00
500,000.00
385,000.00
440,000.00
600,000.00
230,000.00
75,000.00
300,000.00
2,500.00
11,000.00
605,000.00
500,000.00
500,000.00
1,144,000.00
1,035,320.00
1,830,000.00
1,823,000.00

2,200.00
2,500.00
4,400.00
52,500.00
21,000.00
2,640.00
4,125.00
7,820.00
15,250.00
66,000.00
59,900.00
74,500.00
2,550.00
13,000.00
70,000.00
55,000.00
30,000.00
70,000.00
9,450.00
360,000.00
210,000.00
2,600.00
3,800.00
9,900.00
60,000.00
100,000.00
107,913.00
800,000.00
35,000.00

80,000.00
60,000.00
190,000.00
125,000.00
180,000.00
135,000.00
25,000.00

75,000.00
7,500.00
21,000.00
63,000.00
90,000.00
150,000.00
16,500.00
13,000.00
12,000.00
48,470.00
31,000.00
24,230.00
40,000.00
26,000.00
227,000.00
200,000.00
240,000.00
300,000.00
30,000.00
56,510.00
76,650.00
15,750.00
108,000.00
152,250.00
37,000.00
260,000.00
58,000.00

19,800.00
110,000.00
80,000.00
150,000.00
121,000.00
80,000.00
14,300.00
12,000.00
8,250.00
6,000.00
88,000.00

70,000.00
22,000.00
40,000.00
7,500.00
8,500.00
3,000.00
3,500.00
300.00
35,000.00

75,000.00
75,000.00
22,700.00
30,000.00
90,000.00
60,000.00
40,000.00
44,000.00
55,000.00
32,000.00
24,250.00
30,000.00
44,000.00
23,000.00
9,900.00
78,906.40
78,906.40

480,000.00
932,000.00
20,000.00
34,000.00
77,000.00
1,800,000.00
3,000,000.00
170,000.00
2,840,000.00
16,500.00
48,000.00
129,000.00
161,000.00
200,000.00
137,000.00
18,000.00
4,235,000.00
43,500.00
2,000,000.00
820,000.00
1,100,000.00
385,000.00

93,500.00
143,000.00
187,000.00
286,000.00
20,000.00
28,000.00
34,000.00
46,000.00
80,000.00
235,000.00
291,500.00
15,000.00
20,000.00
25,000.00
15,000.00
65,000.00
1,376,300.00
1,054,000.00
77,000.00
90,000.00
1,427,000.00
1,264,300.00
66,000.00
71,500.00
3,500.00
7,500.00
12,000.00
12,000.00
12,100.00
14,200.00
13,000.00
104,500.00
9,350.00
121,000.00
121,000.00

210,000.00
20,000.00
16,500.00
12,500.00
29,700.00
24,200.00
7,700.00
9,900.00
73,260.00
198,000.00
73,260.00
39,600.00
16,500.00
275,000.00

4,000.00
1,237,500.00
2,000,000.00
12,050.00
80,000.00
25,000.00
27,000.00
29,000.00
6,200.00
28,000.00
29,000.00
6,600.00
10,000.00
10,000.00
44,500.00
17,800.00
10,000.00
18,000.00
25,000.00
35,000.00
45,000.00
75,000.00
95,000.00
165,000.00
180,000.00
200,000.00
2,300,000.00
16,000.00
20,000.00
28,000.00
38,000.00
45,000.00
55,000.00

90,400.00
83,200.00
500,000.00
70,000.00
170,000.00
60,000.00
640,000.00
674,000.00
270,000.00
230,000.00
287,700.00
250,000.00
353,200.00
375,000.00

5,000.00
5,300,000.00
5,300,000.00
5,300,000.00
5,300,000.00
135,000.00
900.00
798,000.00
89,000.00
195,000.00
52,500.00
38,000.00
5,000.00
35,000.00
9,500.00
98,000.00
67,500.00
50,000.00
2,700.00
450,000.00
255,000.00
75,000.00
324,500.00
74,500.00
93,000.00
365,000.00
4,200.00
3,000.00
2,500.00
13,200.00
17,500.00
269,400.00
237,600.00
141,500.00
120,700.00
2,500,000.00
4,150,000.00
3,200,000.00
3,200,000.00
2,500,000.00
76,500.00
167,000.00
6,790,000.00
ANALISA HARGA SATUAN PEKERJAAN
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAMPEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA
PEKERJAAN PERSIAPAN

JENIS PEKERJAAN : Pengukuran dan Pemasangan 1 m1 Bowplank


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN : Rp 108,847.50

NO URAIAN KODE SATUAN KOEFISIEN

A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.100
Kepala Tukang L.03 OH 0.100
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Kayu Balok 5/7 m3 0.012
Paku 2"-3" Kg 0.020
Kayu Papan 3/20 m3 0.007
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pekerjaan Papan Nama Proyek


SATUAN PEKERJAAN : Ls
HARGA SATUAN PEKERJAAN : Rp 19,550.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.10
Mandor L.04 OH 0.05
JUMLAH TENAGA K
B BAHAN

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN TANAH

JENIS PEKERJAAN : Penggalian Tanah 1 m3 Tanah Biasa Sedalam 1 m


SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 94,300.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA K
B BAHAN

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Urugan Kembali 1 m3 Galian Tanah


SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 67,850.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA K
B BAHAN

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pengurugan 1 m3 dengan Pasir Urug


SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 210,220.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.3000
Mandor L.04 OH 0.0100
JUMLAH TENAGA K
B BAHAN
Pasir Urug M3 1.200
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pengurugan 1 m3 Sirtu Padat


SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 254,725.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.2500
Mandor L.04 OH 0.0250
Jumlah Tenag
B BAHAN
Sirtu M3 1.200
Jumlah Harga
C PERALATAN

Jumlah Har
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksimum)
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN BETON

JENIS PEKERJAAN : Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7.4 Mpa Slump (3-6
SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 686,445.97

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893
Kerikil (Maks 30 mm) Kg 1027
Air Liter 200
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Membuat 1 m3 Beton Mutu f'c = 14.5 Mpa (K175) Slump (120±20
SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 883,722.80

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760
Kerikil (Maks 30 mm) Kg 1029
Air Liter 215
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Membuat Lantai kerja beton mutu f 3c = 21.7 Mpa (K 250)
SATUAN PEKERJAAN : M3
HARGA SATUAN PEKERJAAN: Rp 962,837.65

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 384.000
Pasir Beton Kg 692
Kerikil (Maks 30 mm) Kg 1039
Air Liter 215
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : Pembesian 1 Kg Dengan Besi Ulir atau Besi Polos
SATUAN PEKERJAAN : Kg
HARGA SATUAN PEKERJAAN: Rp 199,237.50 1 kg : Rp 19,923.75

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.070
Tukang Besi L.02 OH 0.070
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA K
B BAHAN
Besi Beton (Ulir / Polos ) Kg 10.500
Kawat Beton Kg 0.15
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Pondasi


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 256,703.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.040
Paku 5-10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Sloof
SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 273,953.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.045
Paku 5-10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Kolom


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 514,176.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.040
Paku 5-12 cm kg 0.400
Minyak Bekisting liter 0.200
Balok Kayu Kelas II m3 0.015
Plywood 9 mm lbr 0.350
Dolken Kayu Ø8-10 cm - Pjg 4 m batang 2.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Balok


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 532,461.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.040
Paku 5-12 cm kg 0.400
Minyak Bekisting liter 0.200
Balok Kayu Kelas II m3 0.018
Plywood 9 mm lbr 0.350
Dolken Kayu Ø8-10 cm - Pjg 4 m batang 2.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Lantai


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 679,776.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.040
Paku 5-12 cm kg 0.400
Minyak Bekisting liter 0.200
Balok Kayu Kelas II m3 0.015
Plywood 9 mm lbr 0.350
Dolken Kayu Ø8-10 cm - Pjg 4 m batang 6.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Bekisting Untuk Tangga


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 478,009.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA K
B BAHAN
Kayu Kelas III m3 0.030
Paku 5-12 cm kg 0.400
Minyak Bekisting liter 0.150
Balok Kayu Kelas II m3 0.015
Plywood 9 mm lbr 0.350
Dolken Kayu Ø8-10 cm - Pjg 4 m batang 2.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN BESI DAN ALUMUNIUM

JENIS PEKERJAAN : Memasang Struktur Baja IWF / 1kg


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 48,679.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.060
Tukang Las Konstruksi L.02 OH 0.060
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA K
B BAHAN
Profil Baja IWF Kg 1.150
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 M Kusen Alumunium


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 185,736.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja OH 0.043
Tukang Khusus Alumunium OH 0.043
Kepala Tukang OH 0.0043
Mandor OH 0.0021
JUMLAH TENAGA K
B BAHAN
Profil Alumunium M 1.100
Skrup Fixer Buah 2.000
Sealant Tube 0.060
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m Pintu/Jendela Kaca Rangka Alumunium T. 5mm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 802,705.75

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja OH 0.085
Tukang Khusus Alumunium OH 0.085
Kepala Tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA K
B BAHAN
Profil Alumunium M1 4.400
Kaca T. 5mm M2 1.000
Sealant Tube 0.270
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m Pintu/Jendela Kaca Tempered Rangka Alumuniu


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 1,628,405.75

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja OH 0.0850
Tukang Khusus Alumunium OH 0.0850
Kepala Tukang OH 0.0090
Mandor OH 0.0050
JUMLAH TENAGA K
B BAHAN
Profil Alumunium M1 4.400
Kaca T. 12 mm M2 1.000
Sealant Tube 0.270
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Rangka Besi Hollow 1x40.40.2 mm, Modul 60


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 530,138.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.350
Tukang L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA K
B BAHAN
Rangka Metal Hollow M1 4.000
Aksesoris Ls 1.000

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : 1 M2 Pasang Daun Pintu Kayu Lapis Teakwood Lapis Sungkaifin
SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 756,470.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.700
Tukang Kayu L.02 OH 2.100
Kepala Tukang L.03 OH 0.210
Mandor L.04 OH 0.035
JUMLAH TENAGA K
B BAHAN
Papan Kayu Kelas II m3 0.025
Paku 1-2.5 cm Kg 0.030
Lem Kayu Kg 0.500
Teakwood Lapis Sungkaifin Melamik Lbr 1.000
Kaca T. 5mm M2 0.070
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN PASANGAN DINDING

JENIS PEKERJAAN : Pemasangan 1 m2 Dinding Bata Merah (5x11x22)cm Tebal 1 Bat


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 331,487.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.2000
Kepala Tukang L.03 OH 0.02
Mandor L.04 OH 0.0300
JUMLAH TENAGA K
B BAHAN
Bata Merah Buah 140.000
Semen Portland Kg 43.500
Pasir Pasang M3 0.080
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Dinding Bata Merah (5x11x22)cm Tebal 1 Bat


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 308,389.75

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA K
B BAHAN
Bata Merah Buah 140.000
Semen Portland Kg 26.550
Pasir Pasang M3 0.093
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN PLESTERAN

JENIS PEKERJAAN : Pemasangan 1 m2 Plesteran 1SP : 2PP Tebal 15 mm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 80,317.38

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 10.224
Pasir Pasang M3 0.020
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Plesteran 1SP : 4PP Tebal 15 mm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 75,051.30

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 6.240
Pasir Pasang M3 0.024
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Acian


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 45,913.75
NO URAIAN KODE SATUAN KOEFISIEN
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 3.250
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Memasang Pekerjaan Afwerking Beton / M2


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 66,993.48

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.200
Tukang L.02 OH 0.100
Kepala Tukang L.03 OH 0.01
Mandor L.04 OH 0.01
JUMLAH TENAGA K
B BAHAN
Semen Portland Kg 15.5040
Pasir Pasang M3 0.0160
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN LANTAI DAN PENUTUP DINDING


JENIS PEKERJAAN : Pasangan Keramik Lantai 40 x 40 cm
SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 273,265.30

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.620
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA K
B BAHAN
Keramik 40x40 Bh 6.300
Semen Portland Kg 8.190
Pasir Pasang M3 0.045
Semen Warna/Tepung Alpha Kg 1.500
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Lantai Keramik ukuran 30 x 30 cm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 179,010.15

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA K
B BAHAN
Keramik 30x30cm Bh 1.050
Semen Portland Kg 10.000
Pasir Pasang M3 0.045
Semen Warna/Tepung Alpha Kg 0.500
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 M2 Pasang Keramik Lantai Ukuran 25 x 25 cm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 168,562.69

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.620
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA K
B BAHAN
Keramik 25x25cm Bh 1.050
Semen Portland Kg 10.400
Pasir Pasang M3 0.045
Semen Putih Kg 1.620
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 M2 Pasang Keramik Dinding Ukuran 25 x 40 cm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 173,624.13

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.620
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA K
B BAHAN
Keramik 25x40cm Bh 1.050
Semen Portland Kg 9.300
Pasir Pasang M3 0.018
Semen Putih Kg 2.750
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN LANGIT-LANGIT (PLAFOND)

JENIS PEKERJAAN : Pemasangan 1 m2 Langit-Langit Gypsum Board Ukuran (120 x 2


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 69,736.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.100
Tukang L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Gypsum Board Lembar 0.364
paku Triplek Kg 0.110

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Langit-Langit GRC Ukuran (120 x 240 x 4 ) m


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 165,623.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.150
Tukang L.02 OH 0.500
Kepala Tukang L.03 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
GRC Lembar 0.364
paku Triplek Kg 0.110
Metal Furing M1 5.750

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m2 Langit-Langit Lambisering


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 286,522.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.800
Tukang L.02 OH 0.800
Kepala Tukang L.03 OH 0.080
Mandor L.04 OH 0.040
JUMLAH TENAGA K
B BAHAN
Kayu Papan Kelas II M3 0.015
Paku 5-10cm Kg 0.010
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
PEKERJAAN PENUTUP ATAP

JENIS PEKERJAAN : Pemasangan 1 M2 Atap Genteng Metal Berpasir


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 150,536.64

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.200
Tukang L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.001
JUMLAH TENAGA K
B BAHAN
Genteng Metal Berpasir M2 1.020
Paku Genteng Metal Bh 8.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 M1 Perabung Genteng


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 223,403.93

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.250
Tukang L.02 OH 0.150
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA K
B BAHAN
Genteng Metal Berpasir M1 1.620
Paku Seng Kg 0.200
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m1 Lisplank Zingkalume


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 84,525.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.100
Tukang L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA K
B BAHAN
Alumunium Zinkalume M1 1.100
Paku Seng Kg 0.020
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN KUNCI DAN KACA

JENIS PEKERJAAN : Pemasangan 1 Buah Kunci Tanam


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 163,254.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.5000
Kepala Tukang L.03 OH 0.0500
Mandor L.04 OH 0.0050
Jum
B BAHAN
Kunci Tanam Bh 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Analisa Pasang Pegangan Pintu /Bh


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 185,886.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0500
Tukang L.02 OH 0.5000
Kepala Tukang L.03 OH 0.0500
Mandor L.04 OH 0.0030
Jum
B BAHAN
Pegangan Pintu Set 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 buah Engsel Pintu


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 44,020.85

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
Jum
B BAHAN
Engsel Pintu Set 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 buah Engsel Jendela


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 31,067.25

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0005
Jum
B BAHAN
Engsel Jendela Bh 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 buah Engsel Nyelon Jendela


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 40,365.00

No Uraian Kode Satuan Koefisien


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
Jum
B BAHAN
Engsel Nyelon Bh 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 buah Door Closer


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 325,036.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0500
Tukang L.02 OH 0.5000
Kepala Tukang L.03 OH 0.0500
Mandor L.04 OH 0.0030
Jum
B BAHAN
Door Closer Set 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasnagan 1 m2 Kaca Tebal 5 mm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 126,878.35
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
Jum
B BAHAN
Kaca T. 5mm M2 1.100
Sealant Kg 0.050
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasnagan 1 m2 Kaca Tempered Tebal 12 mm


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 1,052,093.60

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0250
Tukang L.02 OH 0.2500
Kepala Tukang L.03 OH 0.0250
Mandor L.04 OH 0.0013
Jum
B BAHAN
Kaca T. 12mm M2 1.100
Sealant Kg 0.070
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : Analisa Pasang Grendel Jendela/Bh
SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 44,597.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0010
Jum
B BAHAN
Grendel Jendela Bh 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Analisa Pasang Grendel Pintu/Bh


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 50,922.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0010
Jum
B BAHAN
Grendel Pintu Bh 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)
PEKERJAAN PENGECATAN

JENIS PEKERJAAN : Pengecatan Bidang Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Da
SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 49,182.05

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0200
Tukang Cat L.02 OH 0.0630
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0025
JUMLAH TENAGA K
B BAHAN
Plamir kg 0.100
Cat Dasar kg 0.100
Cat Tembok 2x kg 0.260
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN SANITAIR GEDUNG

JENIS PEKERJAAN : Pemasangan 1 Buah Closet Jongkok


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 582,015.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 1.0000
Tukang L.02 OH 1.5000
Kepala Tukang L.03 OH 0.1500
Mandor L.04 OH 0.1600
JUMLAH TENAGA K
B BAHAN
Closet Duduk Unit 1.000
Semen Portland kg 6.000
Pasir Pasang M3 0.010
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 Buah Floor Drain


SATUAN PEKERJAAN : Bh
HARGA SATUAN PEKERJAAN: Rp 56,465.00

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
Jum
B BAHAN
Floor Drain Unit 1.000
Ju
C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (Maksim
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 1/2'


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 400,579.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA K
B BAHAN
Pipa PVC 1/2" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 3/4'


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 555,254.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA K
B BAHAN
Pipa PVC 3/4" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 1'


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 709,929.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA K
B BAHAN
Pipa PVC 1" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 2'


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 1,490,250.50

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0540
Tukang L.02 OH 0.0900
Kepala Tukang L.03 OH 0.0090
Mandor L.04 OH 0.0030
JUMLAH TENAGA K
B BAHAN
Pipa PVC 2" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 3'
SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 2,815,332.25

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0810
Tukang L.02 OH 0.1350
Kepala Tukang L.03 OH 0.0135
Mandor L.04 OH 0.0040
JUMLAH TENAGA K
B BAHAN
Pipa PVC 3" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diameter 4'


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 3,124,682.25

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.0810
Tukang L.02 OH 0.1350
Kepala Tukang L.03 OH 0.0135
Mandor L.04 OH 0.0040
JUMLAH TENAGA K
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA PERAL


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN TAMBAHAN

JENIS PEKERJAAN : Pemasangan 1 m1 Anti Slip (Stop Nosing)


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 43,710.93

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Plint Keramik Bh 5.300
Semen Portland Kg 1.140
Pasir Pasang M3 0.003
Semen Warna/Tepung Alpha Kg 0.025
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan List Plafond Dari Gypsum


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 31,803.25

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.050
Tukang L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA K
B BAHAN
Profil Gypsum M1 1.050
Paku Profil Kg 0.010

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan List Plafond Dari GRC


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 26,697.25

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.025
Tukang L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA K
B BAHAN
List Profil M1 1.100
Paku Profil Kg 0.010

JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan Rangka Baja Ringan Hi-Tensile G550 setara Sm


SATUAN PEKERJAAN : M2
HARGA SATUAN : Rp 485,850.28

NO URAIAN KODE SATUAN KOEFISIEN


A Pemotongan Bahan Kuda-Kuda/500 m2
Pekerja OH 6.00
Tukang OH 6.00
Mandor OH 3.00
Supervisor OH 3.00

Untuk 1 m2 = 1/500

B Pemasangan Metal Beam/500 M2


Pekerja OH 4.00
Tukang OH 4.00
Mandor OH 2.00
Supervisor OH 2.00

Untuk 1 m2 = 1/500

C Pabrikasi Kuda-Kuda/500 M2
Pekerja OH 16.00
Tukang OH 16.00
Mandor OH 8.00
Supervisor OH 4.00

Untuk 1 m2 = 1/500

D Instalasi Kuda-Kuda Diatas Ring Balok/500 M2


Pekerja OH 24.00
Tukang OH 24.00
Mandor OH 12.00
Supervisor OH 12.00

Untuk 1 m2 = 1/500

E Pemasangan Reng/500 M2
Pekerja OH 14.00
Tukang OH 14.00
Mandor OH 7.00
Supervisor OH 3.50
Untuk 1 m2 = 1/500

F Pemakaian Material
Chanel 75 tbl 0.75 mm M1 1,890.00
Chanel 75 tbl 0.75 mm M1 462.00
Reng M1 1,680.00
Baut Screw Bh 14,175.00
Tallang/ Valley Gatter M1 63.00
L-Plate Bh 210.00
Dynabolt Bh 210.00

Untuk 1 m2 = 1/500

G Alat Bantu
Alat Bantu Kerja Ls 1.00

H Jumlah (A+B+C+D+E+F+G)
I Overhead & Profit 15% x Jumlah
J Harga Satuan Pekerjaan (H+I)

JENIS PEKERJAAN : 1 M2 Analisa Pekerjaan Partisi Gypsum Teb. 9 mm + Rangka Stu


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 248,198.75

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.200
Tukang L.02 OH 0.600
Kepala Tukang L.03 OH 0.06
Mandor L.04 OH 0.010
JUMLAH TENAGA K
B BAHAN
Paku Gypsum Kg 0.045
Kain Strimin + Kompon + Amplas Ls 1.000
Gypsum T. 9 mm Lbr 0.700
Chanel Stud M2 1.000
Pengelasan Besi Hollow dan Alat Bant Ls 1.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA B

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Pemasangan 1 m1 Lisplank Zingkalume


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 84,525.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.100
Tukang L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA K
B BAHAN
Alumunium Zinkalume M1 1.100
Paku Kg 0.020
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : Memasang Railling tangga Stainless


SATUAN PEKERJAAN : M1
HARGA SATUAN PEKERJAAN: Rp 745,775.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.300
Tukang L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.020
JUMLAH TENAGA K
B BAHAN
Railling Besi Stainless 2'' M1 2.000
Railling Besi Stainless 1'' M1 6.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : 1 M2 Waterproofing Membrane


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 166,129.00

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.120
Tukang L.02 OH 0.120
Kepala Tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA K
B BAHAN
Waterproofing Membrane Roll 0.100
Prime Coat Membrane M2 1.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

JENIS PEKERJAAN : 1 Bh Memasang Kran Air


SATUAN PEKERJAAN : M2
HARGA SATUAN PEKERJAAN: Rp 36,417.63

NO URAIAN KODE SATUAN KOEFISIEN


A TENAGA
Pekerja L.01 OH 0.010
Tukang L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Kran Air Setara TOTO Bh 1.000
Seal Tape Bh 0.025
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)

NO ANALISA SAT. KOEFISIEN


PEK. ELEKTRIKAL
1 Pas. Instalasi Titik Lampu

Kabel NYM 2x2.5 mm2 M1 12


PVC High Impact Dia. 20 mm2 M1 12
Coupling/Socket Dia.20 mm2 Bh 5
Clamp Cable Dia. 20 mm2 Bh 6
Junction Box Bh 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

2 Pas Instalasi Stop Kontak

Kabel NYM 3x2.5 mm2 M1 12


PVC High Impact Dia. 20 mm2 M1 12
Coupling/Socket Dia.20 mm2 Bh 5
Clamp Cable Dia. 20 mm2 Bh 6
Junction Box Bh 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

3 Pas. Instalasi Stop Kontak AC

Kabel NYM 3x2.5 mm2 M1 30


PVC High Impact Dia. 20 mm2 M1 30
Coupling/Socket Dia.20 mm2 Bh 5
Clamp Cable Dia. 20 mm2 Bh 6
Junction Box Bh 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1
4 Pas. Kabel NYY 4 x 16 mm2 + NYA 1 x 16 mm2

Kabel NYY 4 x 16 mm2 M1 1


Material/Alat Bantu Ls 1
Upah Pasang OH 1
Kabel NYA 1 x 16 mm2 M1 1

PEK. PANEL
5 Pek. Panel MDP

Box Besi 20 x 50 x70 3 phase Unit 1


MCCB 3 Pole 100A Ajustable Bh 1
MCCB 3 Pole 50A Ajustable Bh 4
Ampermeter Bh 3
Volt Meter Bh 1
Switch Selector Bh 1
Indicator Lamp Bh 3
Accessories (Hanger,Support, Pentahanan, cat, dll) Ls 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

6 Pek. Panel SDP 1


Box Besi 20 x 40 x 60 3 Phase Unit 1
MCCB 3 Pole 50A Aajustable Bh 1
MCB Type DIN 1 Pole 10A Bh 11
Indicator Lamp Bh 3
Accessories (Hanger,Support,Pentahanan,Cat,dll) Ls 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

7 Pek Panel SDP 2


Box Besi 20 x 10 x 60 3 Phase Unit 1
MCCB 3 Pole 50A Aajustable Bh 1
MCB Type DIN 1 Pole 25A Bh 12
Indicator Lamp Bh 3
Accessories (Hanger,Support,Pentahanan,Cat,dll) Ls 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

8 Pek. Panel SDP 3


Box Besi 20 x 40 x 60 3 Phase Unit 1
MCCB 3 Pole 50A Aajustable Bh 1
MCB Type DIN 1 Pole 10A Bh 12
Indicator Lamp Bh 3
Accessories (Hanger,Support,Pentahanan,Cat,dll) Ls 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1

9 Pek. Panel SDP 4


Box Besi 20 x 40 x 60 3 Phase Unit 1
MCCB 3 Pole 50A Aajustable Bh 1
MCB Type DIN 1 Pole 25A Bh 15
Indicator Lamp Bh 3
Accessories (Hanger,Support,Pentahanan,Cat,dll) Ls 1
Material/Alat Bantu Ls 1
Upah Pasang OH 1
KERJAAN

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 10,500.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 14,000.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 37,150.00

Rp 3,000,000.00 Rp 36,000.00
Rp 25,000.00 Rp 500.00
Rp 3,000,000.00 Rp 21,000.00
JUMLAH HARGA BAHAN Rp 57,500.00

JUMLAH HARGA ALAT

Rp 94,650.00
5% x D (maksimum) Rp 14,197.50
Rp 108,847.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 10,500.00
Rp 130,000.00 Rp 6,500.00
JUMLAH TENAGA KERJA Rp 17,000.00

JUMLAH HARGA BAHAN Rp -


JUMLAH HARGA ALAT

Rp 17,000.00
5% x D (maksimum) Rp 2,550.00
Rp 19,550.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 78,750.00
Rp 130,000.00 Rp 3,250.00
JUMLAH TENAGA KERJA Rp 82,000.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Rp 82,000.00
5% x D (maksimum) Rp 12,300.00
Rp 94,300.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 52,500.00
Rp 130,000.00 Rp 6,500.00
JUMLAH TENAGA KERJA Rp 59,000.00

JUMLAH HARGA BAHAN


JUMLAH HARGA ALAT

Rp 59,000.00
5% x D (maksimum) Rp 8,850.00
Rp 67,850.00

Harga Satuan (Rp) Jumlah Harga (Rp)

Rp 105,000.00 Rp 31,500.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 32,800.00

Rp 125,000.00 Rp 150,000.00
JUMLAH HARGA BAHAN Rp 150,000.00

JUMLAH HARGA ALAT

Rp 182,800.00
5% x D (Maksimum) Rp 27,420.00
Rp 210,220.00

Harga Satuan (Rp) Jumlah Harga (Rp)

Rp 105,000.00 Rp 26,250.00
Rp 130,000.00 Rp 3,250.00
Jumlah Tenaga Kerja Rp 29,500.00

Rp 160,000.00 Rp 192,000.00
Jumlah Harga Bahan Rp 192,000.00

Jumlah Harga Alat


Rp 221,500.00
5% x D (Maksimum) Rp 33,225.00
Rp 254,725.00

tu f'c = 7.4 Mpa Slump (3-6) cm, w/c = 0.87

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 126,000.00
Rp 120,000.00 Rp 24,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 7,800.00
JUMLAH TENAGA KERJA Rp 160,600.00

Rp 1,300.00 Rp 299,000.00
Rp 103.45 Rp 92,379.31
Rp 43.00 Rp 44,161.00
Rp 3.85 Rp 769.23
JUMLAH HARGA BAHAN Rp 436,309.54

JUMLAH HARGA ALAT

Rp 596,909.54
5% x D (maksimum) Rp 89,536.43
Rp 686,445.97

Mpa (K175) Slump (120±20) mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
Rp 105,000.00 Rp 173,250.00
Rp 120,000.00 Rp 33,000.00
Rp 140,000.00 Rp 3,920.00
Rp 130,000.00 Rp 10,790.00
JUMLAH TENAGA KERJA Rp 220,960.00

Rp 1,300.00 Rp 423,800.00
Rp 103.45 Rp 78,620.69
Rp 43.00 Rp 44,247.00
Rp 3.85 Rp 826.92
JUMLAH HARGA BAHAN Rp 547,494.61

JUMLAH HARGA BAHAN

Rp 768,454.61
5% x D (maksimum) Rp 115,268.19
Rp 883,722.80

= 21.7 Mpa (K 250)

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 173,250.00
Rp 120,000.00 Rp 33,000.00
Rp 140,000.00 Rp 3,920.00
Rp 130,000.00 Rp 10,790.00
JUMLAH TENAGA KERJA Rp 220,960.00

Rp 1,300.00 Rp 499,200.00
Rp 103.45 Rp 71,586.21
Rp 43.00 Rp 44,677.00
Rp 3.85 Rp 826.92
JUMLAH HARGA BAHAN Rp 616,290.13

JUMLAH HARGA ALAT

Rp 837,250.13
5% x D (maksimum) Rp 125,587.52
Rp 962,837.65
u Besi Polos

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 7,350.00
Rp 120,000.00 Rp 8,400.00
Rp 140,000.00 Rp 980.00
Rp 130,000.00 Rp 520.00
JUMLAH TENAGA KERJA Rp 17,250.00

Rp 14,500.00 Rp 152,250.00
Rp 25,000.00 Rp 3,750.00
JUMLAH HARGA BAHAN Rp 156,000.00

JUMLAH HARGA BAHAN

Rp 173,250.00
5% x D (maksimum) Rp 25,987.50
Rp 199,237.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 54,600.00
Rp 120,000.00 Rp 31,200.00
Rp 140,000.00 Rp 3,640.00
Rp 130,000.00 Rp 3,380.00
JUMLAH TENAGA KERJA Rp 92,820.00

Rp 3,000,000.00 Rp 120,000.00
Rp 25,000.00 Rp 7,500.00
Rp 29,000.00 Rp 2,900.00
JUMLAH HARGA BAHAN Rp 130,400.00

JUMLAH HARGA ALAT

Rp 223,220.00
5% x D (maksimum) Rp 33,483.00
Rp 256,703.00
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 54,600.00
Rp 120,000.00 Rp 31,200.00
Rp 140,000.00 Rp 3,640.00
Rp 130,000.00 Rp 3,380.00
JUMLAH TENAGA KERJA Rp 92,820.00

Rp 3,000,000.00 Rp 135,000.00
Rp 25,000.00 Rp 7,500.00
Rp 29,000.00 Rp 2,900.00
JUMLAH HARGA BAHAN Rp 145,400.00

JUMLAH HARGA ALAT

Rp 238,220.00
5% x D (maksimum) Rp 35,733.00
Rp 273,953.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 69,300.00
Rp 120,000.00 Rp 39,600.00
Rp 140,000.00 Rp 4,620.00
Rp 130,000.00 Rp 4,290.00
JUMLAH TENAGA KERJA Rp 117,810.00

Rp 3,000,000.00 Rp 120,000.00
Rp 25,000.00 Rp 10,000.00
Rp 29,000.00 Rp 5,800.00
Rp 5,300,000.00 Rp 79,500.00
Rp 120,000.00 Rp 42,000.00
Rp 36,000.00 Rp 72,000.00
JUMLAH HARGA BAHAN Rp 329,300.00

JUMLAH HARGA PERALATAN

Rp 447,110.00
15% x D Rp 67,066.50
Rp 514,176.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 69,300.00
Rp 120,000.00 Rp 39,600.00
Rp 140,000.00 Rp 4,620.00
Rp 130,000.00 Rp 4,290.00
JUMLAH TENAGA KERJA Rp 117,810.00

Rp 3,000,000.00 Rp 120,000.00
Rp 25,000.00 Rp 10,000.00
Rp 29,000.00 Rp 5,800.00
Rp 5,300,000.00 Rp 95,400.00
Rp 120,000.00 Rp 42,000.00
Rp 36,000.00 Rp 72,000.00
JUMLAH HARGA BAHAN Rp 345,200.00

JUMLAH HARGA PERALATAN

Rp 463,010.00
15% x D Rp 69,451.50
Rp 532,461.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
Rp 105,000.00 Rp 69,300.00
Rp 120,000.00 Rp 39,600.00
Rp 140,000.00 Rp 4,620.00
Rp 130,000.00 Rp 4,290.00
JUMLAH TENAGA KERJA Rp 117,810.00

Rp 3,000,000.00 Rp 120,000.00
Rp 25,000.00 Rp 10,000.00
Rp 29,000.00 Rp 5,800.00
Rp 5,300,000.00 Rp 79,500.00
Rp 120,000.00 Rp 42,000.00
Rp 36,000.00 Rp 216,000.00
JUMLAH HARGA BAHAN Rp 473,300.00

JUMLAH HARGA PERALATAN

Rp 591,110.00
15% x D Rp 88,666.50
Rp 679,776.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 69,300.00
Rp 120,000.00 Rp 39,600.00
Rp 140,000.00 Rp 4,620.00
Rp 130,000.00 Rp 4,290.00
JUMLAH TENAGA KERJA Rp 117,810.00

Rp 3,000,000.00 Rp 90,000.00
Rp 25,000.00 Rp 10,000.00
Rp 29,000.00 Rp 4,350.00
Rp 5,300,000.00 Rp 79,500.00
Rp 120,000.00 Rp 42,000.00
Rp 36,000.00 Rp 72,000.00
JUMLAH HARGA BAHAN Rp 297,850.00

JUMLAH HARGA PERALATAN


Rp 415,660.00
15% x D Rp 62,349.00
Rp 478,009.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 6,300.00
Rp 120,000.00 Rp 7,200.00
Rp 140,000.00 Rp 840.00
Rp 130,000.00 Rp 390.00
JUMLAH TENAGA KERJA Rp 14,730.00

Rp 24,000.00 Rp 27,600.00
JUMLAH HARGA BAHAN Rp 27,600.00

JUMLAH HARGA PERALATAN

Rp 42,330.00
15% x D Rp 6,349.50
Rp 48,679.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 4,515.00
Rp 120,000.00 Rp 5,160.00
Rp 140,000.00 Rp 602.00
Rp 130,000.00 Rp 273.00
JUMLAH TENAGA KERJA Rp 10,550.00
Rp 135,000.00 Rp 148,500.00
Rp 900.00 Rp 1,800.00
Rp 11,000.00 Rp 660.00
JUMLAH HARGA BAHAN Rp 150,960.00

JUMLAH HARGA PERALATAN

Rp 161,510.00
15% x D Rp 24,226.50
Rp 185,736.50

Rangka Alumunium T. 5mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 8,925.00
Rp 120,000.00 Rp 10,200.00
Rp 140,000.00 Rp 1,260.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 21,035.00

Rp 135,000.00 Rp 594,000.00
Rp 80,000.00 Rp 80,000.00
Rp 11,000.00 Rp 2,970.00
JUMLAH HARGA BAHAN Rp 676,970.00

JUMLAH HARGA PERALATAN

Rp 698,005.00
15% x D Rp 104,700.75
Rp 802,705.75

empered Rangka Alumunium T. 12mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
Rp 105,000.00 Rp 8,925.00
Rp 120,000.00 Rp 10,200.00
Rp 140,000.00 Rp 1,260.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 21,035.00

Rp 135,000.00 Rp 594,000.00
Rp 798,000.00 Rp 798,000.00
Rp 11,000.00 Rp 2,970.00
JUMLAH HARGA BAHAN Rp 1,394,970.00

JUMLAH HARGA PERALATAN

Rp 1,416,005.00
15% x D Rp 212,400.75
Rp 1,628,405.75

w 1x40.40.2 mm, Modul 60x60 cm, Plafond

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 36,750.00
Rp 120,000.00 Rp 42,000.00
Rp 140,000.00 Rp 4,900.00
Rp 130,000.00 Rp 2,340.00
JUMLAH TENAGA KERJA Rp 85,990.00

Rp 75,000.00 Rp 300,000.00
Rp 75,000.00 Rp 75,000.00

JUMLAH HARGA BAHAN Rp 375,000.00

JUMLAH HARGA BAHAN

Rp 460,990.00
5% x D (maksimum) Rp 69,148.50
Rp 530,138.50

Teakwood Lapis Sungkaifin. Melamik, Rangka Tertutup Kayu Kelas II (Lebar Sampai 90 cm)
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 73,500.00
Rp 120,000.00 Rp 252,000.00
Rp 140,000.00 Rp 29,400.00
Rp 130,000.00 Rp 4,550.00
JUMLAH TENAGA KERJA Rp 359,450.00

Rp 3,500,000.00 Rp 87,500.00
Rp 25,000.00 Rp 750.00
Rp 19,000.00 Rp 9,500.00
Rp 195,000.00 Rp 195,000.00
Rp 80,000.00 Rp 5,600.00
JUMLAH HARGA BAHAN Rp 298,350.00

JUMLAH HARGA PERALATAN

Rp 657,800.00
15% x D Rp 98,670.00
Rp 756,470.00

h (5x11x22)cm Tebal 1 Batu Campuran 1 SP : 2 PP

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 63,000.00
Rp 120,000.00 Rp 24,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 93,700.00

Rp 900.00 Rp 126,000.00
Rp 1,300.00 Rp 56,550.00
Rp 150,000.00 Rp 12,000.00
JUMLAH HARGA BAHAN Rp 194,550.00
JUMLAH HARGA PERALATAN

Rp 288,250.00
15% x D Rp 43,237.50
Rp 331,487.50

h (5x11x22)cm Tebal 1 Batu Campuran 1 SP : 4 PP

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 63,000.00
Rp 120,000.00 Rp 24,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 93,700.00

Rp 900.00 Rp 126,000.00
Rp 1,300.00 Rp 34,515.00
Rp 150,000.00 Rp 13,950.00
JUMLAH HARGA BAHAN Rp 174,465.00

JUMLAH HARGA PERALATAN

Rp 268,165.00
15% x D Rp 40,224.75
Rp 308,389.75

Tebal 15 mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 31,500.00
Rp 120,000.00 Rp 18,000.00
Rp 140,000.00 Rp 2,100.00
Rp 130,000.00 Rp 1,950.00
JUMLAH TENAGA KERJA Rp 53,550.00

Rp 1,300.00 Rp 13,291.20
Rp 150,000.00 Rp 3,000.00
JUMLAH HARGA BAHAN Rp 16,291.20

JUMLAH HARGA PERALATAN

Rp 69,841.20
15% x D Rp 10,476.18
Rp 80,317.38

Tebal 15 mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 31,500.00
Rp 120,000.00 Rp 18,000.00
Rp 140,000.00 Rp 2,100.00
Rp 130,000.00 Rp 1,950.00
JUMLAH TENAGA KERJA Rp 53,550.00

Rp 1,300.00 Rp 8,112.00
Rp 150,000.00 Rp 3,600.00
JUMLAH HARGA BAHAN Rp 11,712.00

JUMLAH HARGA PERALATAN

Rp 65,262.00
15% x D Rp 9,789.30
Rp 75,051.30
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 21,000.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 1,400.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 35,700.00

Rp 1,300.00 Rp 4,225.00
JUMLAH HARGA BAHAN Rp 4,225.00

JUMLAH HARGA PERALATAN

Rp 39,925.00
15% x D Rp 5,988.75
Rp 45,913.75

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 21,000.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 1,400.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 35,700.00

Rp 1,300.00 Rp 20,155.20
Rp 150,000.00 Rp 2,400.00
JUMLAH HARGA BAHAN Rp 22,555.20

JUMLAH HARGA BAHAN

Rp 58,255.20
5% x D (maksimum) Rp 8,738.28
Rp 66,993.48
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 65,100.00
Rp 120,000.00 Rp 42,000.00
Rp 140,000.00 Rp 4,900.00
Rp 130,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 115,900.00

Rp 15,250.00 Rp 96,075.00
Rp 1,300.00 Rp 10,647.00
Rp 150,000.00 Rp 6,750.00
Rp 5,500.00 Rp 8,250.00
JUMLAH HARGA BAHAN Rp 121,722.00

JUMLAH HARGA BAHAN

Rp 237,622.00
5% x D (maksimum) Rp 35,643.30
Rp 273,265.30

ran 30 x 30 cm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 73,500.00
Rp 120,000.00 Rp 42,000.00
Rp 140,000.00 Rp 4,900.00
Rp 130,000.00 Rp 4,550.00
JUMLAH TENAGA KERJA Rp 124,950.00

Rp 7,820.00 Rp 8,211.00
Rp 1,300.00 Rp 13,000.00
Rp 150,000.00 Rp 6,750.00
Rp 5,500.00 Rp 2,750.00
JUMLAH HARGA BAHAN Rp 30,711.00

JUMLAH HARGA BAHAN


Rp 155,661.00
5% x D (maksimum) Rp 23,349.15
Rp 179,010.15

ntai Ukuran 25 x 25 cm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 65,100.00
Rp 120,000.00 Rp 42,000.00
Rp 140,000.00 Rp 4,900.00
Rp 130,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 115,900.00

Rp 4,125.00 Rp 4,331.25
Rp 1,300.00 Rp 13,520.00
Rp 150,000.00 Rp 6,750.00
Rp 3,750.00 Rp 6,075.00
JUMLAH HARGA BAHAN Rp 30,676.25

JUMLAH HARGA BAHAN

Rp 146,576.25
5% x D (maksimum) Rp 21,986.44
Rp 168,562.69

nding Ukuran 25 x 40 cm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 65,100.00
Rp 120,000.00 Rp 42,000.00
Rp 140,000.00 Rp 4,900.00
Rp 130,000.00 Rp 3,900.00
JUMLAH TENAGA KERJA Rp 115,900.00

Rp 9,500.00 Rp 9,975.00
Rp 1,300.00 Rp 12,090.00
Rp 150,000.00 Rp 2,700.00
Rp 3,750.00 Rp 10,312.50
JUMLAH HARGA BAHAN Rp 35,077.50

JUMLAH HARGA BAHAN

Rp 150,977.50
5% x D (maksimum) Rp 22,646.63
Rp 173,624.13

um Board Ukuran (120 x 240 x 9 ) mm Tebal 9 mm

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 10,500.00
Rp 120,000.00 Rp 6,000.00
Rp 140,000.00 Rp 700.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 17,850.00

Rp 110,000.00 Rp 40,040.00
Rp 25,000.00 Rp 2,750.00

JUMLAH HARGA BAHAN Rp 42,790.00

JUMLAH HARGA BAHAN

Rp 60,640.00
5% x D (maksimum) Rp 9,096.00
Rp 69,736.00

Ukuran (120 x 240 x 4 ) mm Tebal 4 mm + Metal Furing


HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 15,750.00
Rp 120,000.00 Rp 60,000.00
Rp 140,000.00 Rp 7,000.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 83,400.00

Rp 80,000.00 Rp 29,120.00
Rp 25,000.00 Rp 2,750.00
Rp 5,000.00 Rp 28,750.00

JUMLAH HARGA BAHAN Rp 60,620.00

JUMLAH HARGA BAHAN

Rp 144,020.00
5% x D (maksimum) Rp 21,603.00
Rp 165,623.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 84,000.00
Rp 120,000.00 Rp 96,000.00
Rp 140,000.00 Rp 11,200.00
Rp 130,000.00 Rp 5,200.00
JUMLAH TENAGA KERJA Rp 196,400.00

Rp 3,500,000.00 Rp 52,500.00
Rp 25,000.00 Rp 250.00
JUMLAH HARGA BAHAN Rp 52,750.00

JUMLAH HARGA ALAT

Rp 249,150.00
5% x D (maksimum) Rp 37,372.50
Rp 286,522.50
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 21,000.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 1,400.00
Rp 130,000.00 Rp 130.00
JUMLAH TENAGA KERJA Rp 34,530.00

Rp 90,000.00 Rp 91,800.00
Rp 571.43 Rp 4,571.43
JUMLAH HARGA BAHAN Rp 96,371.43

JUMLAH HARGA ALAT

Rp 130,901.43
5% x D (maksimum) Rp 19,635.21
Rp 150,536.64

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 26,250.00
Rp 120,000.00 Rp 18,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 48,350.00

Rp 90,000.00 Rp 145,800.00
Rp 571.43 Rp 114.29
JUMLAH HARGA BAHAN Rp 145,914.29
JUMLAH HARGA ALAT

Rp 194,264.29
5% x D (maksimum) Rp 29,139.64
Rp 223,403.93

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 10,500.00
Rp 120,000.00 Rp 24,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 38,600.00

Rp 31,000.00 Rp 34,100.00
Rp 40,000.00 Rp 800.00
JUMLAH HARGA BAHAN Rp 34,900.00

JUMLAH HARGA ALAT

Rp 73,500.00
5% x D (maksimum) Rp 11,025.00
Rp 84,525.00

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.5000 Rp 120,000.00 Rp 60,000.00
0.0500 Rp 140,000.00 Rp 7,000.00
0.0050 Rp 130,000.00 Rp 650.00
Jumlah Tenaga Kerja Rp 68,700.00

1.000 Rp 73,260.00 Rp 73,260.00


Jumlah Harga Bahan Rp 73,260.00

Jumlah Harga Alat

Rp 141,960.00
15% x D (Maksimum) Rp 21,294.00
Rp 163,254.00

Koefisien Harga Satuan Jumlah Harga (Rp)


(Rp)

0.0500 Rp 105,000.00 Rp 5,250.00


0.5000 Rp 120,000.00 Rp 60,000.00
0.0500 Rp 140,000.00 Rp 7,000.00
0.0030 Rp 130,000.00 Rp 390.00
Jumlah Tenaga Kerja Rp 72,640.00

1.000 Rp 89,000.00 Rp 89,000.00


Jumlah Harga Bahan Rp 89,000.00

Jumlah Harga Alat

Rp 161,640.00
15% x D (Maksimum) Rp 24,246.00
Rp 185,886.00

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)
0.0150 Rp 105,000.00 Rp 1,575.00
0.1500 Rp 120,000.00 Rp 18,000.00
0.0150 Rp 140,000.00 Rp 2,100.00
0.0008 Rp 130,000.00 Rp 104.00
Jumlah Tenaga Kerja Rp 21,779.00

1.000 Rp 16,500.00 Rp 16,500.00


Jumlah Harga Bahan Rp 16,500.00

Jumlah Harga Alat

Rp 38,279.00
15% x D (Maksimum) Rp 5,741.85
Rp 44,020.85

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.1000 Rp 120,000.00 Rp 12,000.00
0.0100 Rp 140,000.00 Rp 1,400.00
0.0005 Rp 130,000.00 Rp 65.00
Jumlah Tenaga Kerja Rp 14,515.00

1.000 Rp 12,500.00 Rp 12,500.00


Jumlah Harga Bahan Rp 12,500.00

Jumlah Harga Alat

Rp 27,015.00
15% x D (Maksimum) Rp 4,052.25
Rp 31,067.25

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.1000 Rp 120,000.00 Rp 12,000.00
0.0100 Rp 140,000.00 Rp 1,400.00
0.0050 Rp 130,000.00 Rp 650.00
Jumlah Tenaga Kerja Rp 15,100.00

1.000 Rp 20,000.00 Rp 20,000.00


Jumlah Harga Bahan Rp 20,000.00

Jumlah Harga Alat

Rp 35,100.00
15% x D (Maksimum) Rp 5,265.00
Rp 40,365.00

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0500 Rp 105,000.00 Rp 5,250.00


0.5000 Rp 120,000.00 Rp 60,000.00
0.0500 Rp 140,000.00 Rp 7,000.00
0.0030 Rp 130,000.00 Rp 390.00
Jumlah Tenaga Kerja Rp 72,640.00

1.000 Rp 210,000.00 Rp 210,000.00


Jumlah Harga Bahan Rp 210,000.00

Jumlah Harga Alat

Rp 282,640.00
15% x D (Maksimum) Rp 42,396.00
Rp 325,036.00
Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0150 Rp 105,000.00 Rp 1,575.00


0.1500 Rp 120,000.00 Rp 18,000.00
0.0150 Rp 140,000.00 Rp 2,100.00
0.0008 Rp 130,000.00 Rp 104.00
Jumlah Tenaga Kerja Rp 21,779.00

1.100 Rp 80,000.00 Rp 88,000.00


0.050 Rp 11,000.00 Rp 550.00
Jumlah Harga Bahan Rp 88,550.00

Jumlah Harga Alat

Rp 110,329.00
15% x D (Maksimum) Rp 16,549.35
Rp 126,878.35

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0250 Rp 105,000.00 Rp 2,625.00


0.2500 Rp 120,000.00 Rp 30,000.00
0.0250 Rp 140,000.00 Rp 3,500.00
0.0013 Rp 130,000.00 Rp 169.00
Jumlah Tenaga Kerja Rp 36,294.00

1.100 Rp 798,000.00 Rp 877,800.00


0.070 Rp 11,000.00 Rp 770.00
Jumlah Harga Bahan Rp 878,570.00

Jumlah Harga Alat

Rp 914,864.00
15% x D (Maksimum) Rp 137,229.60
Rp 1,052,093.60
Koefisien Harga Satuan Jumlah Harga (Rp)
(Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.1000 Rp 120,000.00 Rp 12,000.00
0.0100 Rp 140,000.00 Rp 1,400.00
0.0010 Rp 130,000.00 Rp 130.00
Jumlah Tenaga Kerja Rp 14,580.00

1.000 Rp 24,200.00 Rp 24,200.00


Jumlah Harga Bahan Rp 24,200.00

Jumlah Harga Alat

Rp 38,780.00
15% x D (Maksimum) Rp 5,817.00
Rp 44,597.00

Harga Satuan
Koefisien Jumlah Harga (Rp)
(Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.1000 Rp 120,000.00 Rp 12,000.00
0.0100 Rp 140,000.00 Rp 1,400.00
0.0010 Rp 130,000.00 Rp 130.00
Jumlah Tenaga Kerja Rp 14,580.00

1.000 Rp 29,700.00 Rp 29,700.00


Jumlah Harga Bahan Rp 29,700.00

Jumlah Harga Alat

Rp 44,280.00
15% x D (Maksimum) Rp 6,642.00
Rp 50,922.00
apis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 2,100.00
Rp 120,000.00 Rp 7,560.00
Rp 140,000.00 Rp 882.00
Rp 130,000.00 Rp 325.00
JUMLAH TENAGA KERJA Rp 10,867.00

Rp 30,000.00 Rp 3,000.00
Rp 55,000.00 Rp 5,500.00
Rp 90,000.00 Rp 23,400.00
JUMLAH HARGA BAHAN Rp 31,900.00

JUMLAH HARGA PERALATAN

Rp 42,767.00
15% x D Rp 6,415.05
Rp 49,182.05

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 105,000.00
Rp 120,000.00 Rp 180,000.00
Rp 140,000.00 Rp 21,000.00
Rp 130,000.00 Rp 20,800.00
JUMLAH TENAGA KERJA Rp 326,800.00

Rp 170,000.00 Rp 170,000.00
Rp 1,300.00 Rp 7,800.00
Rp 150,000.00 Rp 1,500.00
JUMLAH HARGA BAHAN Rp 179,300.00

JUMLAH HARGA PERALATAN

Rp 506,100.00
15% x D Rp 75,915.00
Rp 582,015.00

Koefisien Harga Satuan


(Rp) Jumlah Harga (Rp)

0.0100 Rp 105,000.00 Rp 1,050.00


0.1000 Rp 120,000.00 Rp 12,000.00
0.0100 Rp 140,000.00 Rp 1,400.00
0.0050 Rp 130,000.00 Rp 650.00
Jumlah Tenaga Kerja Rp 15,100.00

1.000 Rp 34,000.00 Rp 34,000.00


Jumlah Harga Bahan Rp 34,000.00

Jumlah Harga Alat

Rp 49,100.00
15% x D (Maksimum) Rp 7,365.00
Rp 56,465.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)
Rp 105,000.00 Rp 3,780.00
Rp 120,000.00 Rp 7,200.00
Rp 140,000.00 Rp 840.00
Rp 130,000.00 Rp 260.00
JUMLAH TENAGA KERJA Rp 12,080.00

Rp 25,000.00 Rp 30,000.00
Rp 8,750.00 Rp 306,250.00
JUMLAH HARGA BAHAN Rp 336,250.00

JUMLAH HARGA PERALATAN

Rp 348,330.00
15% x D Rp 52,249.50
Rp 400,579.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 3,780.00
Rp 120,000.00 Rp 7,200.00
Rp 140,000.00 Rp 840.00
Rp 130,000.00 Rp 260.00
JUMLAH TENAGA KERJA Rp 12,080.00

Rp 35,000.00 Rp 42,000.00
Rp 12,250.00 Rp 428,750.00
JUMLAH HARGA BAHAN Rp 470,750.00

JUMLAH HARGA PERALATAN

Rp 482,830.00
15% x D Rp 72,424.50
Rp 555,254.50
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 3,780.00
Rp 120,000.00 Rp 7,200.00
Rp 140,000.00 Rp 840.00
Rp 130,000.00 Rp 260.00
JUMLAH TENAGA KERJA Rp 12,080.00

Rp 45,000.00 Rp 54,000.00
Rp 15,750.00 Rp 551,250.00
JUMLAH HARGA BAHAN Rp 605,250.00

JUMLAH HARGA PERALATAN

Rp 617,330.00
15% x D Rp 92,599.50
Rp 709,929.50

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 5,670.00
Rp 120,000.00 Rp 10,800.00
Rp 140,000.00 Rp 1,260.00
Rp 130,000.00 Rp 390.00
JUMLAH TENAGA KERJA Rp 18,120.00

Rp 95,000.00 Rp 114,000.00
Rp 33,250.00 Rp 1,163,750.00
JUMLAH HARGA BAHAN Rp 1,277,750.00

JUMLAH HARGA PERALATAN

Rp 1,295,870.00
15% x D Rp 194,380.50
Rp 1,490,250.50
HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 8,505.00
Rp 120,000.00 Rp 16,200.00
Rp 140,000.00 Rp 1,890.00
Rp 130,000.00 Rp 520.00
JUMLAH TENAGA KERJA Rp 27,115.00

Rp 180,000.00 Rp 216,000.00
Rp 63,000.00 Rp 2,205,000.00
JUMLAH HARGA BAHAN Rp 2,421,000.00

JUMLAH HARGA PERALATAN

Rp 2,448,115.00
15% x D Rp 367,217.25
Rp 2,815,332.25

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 8,505.00
Rp 120,000.00 Rp 16,200.00
Rp 140,000.00 Rp 1,890.00
Rp 130,000.00 Rp 520.00
JUMLAH TENAGA KERJA Rp 27,115.00

Rp 200,000.00 Rp 240,000.00
Rp 70,000.00 Rp 2,450,000.00
JUMLAH HARGA BAHAN Rp 2,690,000.00

JUMLAH HARGA PERALATAN


Rp 2,717,115.00
15% x D Rp 407,567.25
Rp 3,124,682.25

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 9,450.00
Rp 120,000.00 Rp 10,800.00
Rp 140,000.00 Rp 1,260.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 22,160.00

Rp 2,600.00 Rp 13,780.00
Rp 1,300.00 Rp 1,482.00
Rp 150,000.00 Rp 450.00
Rp 5,500.00 Rp 137.50
JUMLAH HARGA BAHAN Rp 15,849.50

JUMLAH HARGA BAHAN

Rp 38,009.50
5% x D (maksimum) Rp 5,701.43
Rp 43,710.93

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 5,250.00
Rp 120,000.00 Rp 6,000.00
Rp 140,000.00 Rp 700.00
Rp 130,000.00 Rp 390.00
JUMLAH TENAGA KERJA Rp 12,340.00
Rp 14,300.00 Rp 15,015.00
Rp 30,000.00 Rp 300.00
Rp -
Rp -
JUMLAH HARGA BAHAN Rp 15,315.00

JUMLAH HARGA BAHAN

Rp 27,655.00
5% x D (maksimum) Rp 4,148.25
Rp 31,803.25

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 2,625.00
Rp 120,000.00 Rp 6,000.00
Rp 140,000.00 Rp 700.00
Rp 130,000.00 Rp 390.00
JUMLAH TENAGA KERJA Rp 9,715.00

Rp 12,000.00 Rp 13,200.00
Rp 30,000.00 Rp 300.00
Rp -
Rp -
JUMLAH HARGA BAHAN Rp 13,500.00

JUMLAH HARGA BAHAN

Rp 23,215.00
5% x D (maksimum) Rp 3,482.25
Rp 26,697.25

Hi-Tensile G550 setara Smartruss Classic/m2

HARGA SATUAN
(RP) JUMLAH HARGA (RP)
Rp 105,000.00 Rp 630,000.00
Rp 120,000.00 Rp 720,000.00
Rp 140,000.00 Rp 420,000.00
Rp 130,000.00 Rp 390,000.00

Jumlah Rp 2,160,000.00
Jumlah Rp 4,320.00

Rp 105,000.00 Rp 420,000.00
Rp 120,000.00 Rp 480,000.00
Rp 140,000.00 Rp 280,000.00
Rp 130,000.00 Rp 260,000.00

Jumlah Rp 1,440,000.00
Jumlah Rp 2,880.00

Rp 105,000.00 Rp 1,680,000.00
Rp 120,000.00 Rp 1,920,000.00
Rp 140,000.00 Rp 1,120,000.00
Rp 130,000.00 Rp 520,000.00

Jumlah Rp 5,240,000.00
Jumlah Rp 10,480.00

Rp 105,000.00 Rp 2,520,000.00
Rp 120,000.00 Rp 2,880,000.00
Rp 140,000.00 Rp 1,680,000.00
Rp 130,000.00 Rp 1,560,000.00

Jumlah Rp 8,640,000.00
Jumlah Rp 17,280.00

Rp 105,000.00 Rp 1,470,000.00
Rp 120,000.00 Rp 1,680,000.00
Rp 140,000.00 Rp 980,000.00
Rp 130,000.00 Rp 455,000.00

Jumlah Rp 4,585,000.00
Jumlah Rp 9,170.00

Rp 52,500.00 Rp 99,225,000.00
Rp 52,500.00 Rp 24,255,000.00
Rp 35,000.00 Rp 58,800,000.00
Rp 30.00 Rp 425,250.00
Rp 38,000.00 Rp 2,394,000.00
Rp 5,000.00 Rp 1,050,000.00
Rp 2,500.00 Rp 525,000.00

Jumlah Rp 186,674,250.00
Jumlah Rp 373,348.50

Rp 5,000.00 Rp 5,000.00

Jumlah Rp 5,000.00

Rp 422,478.50
Rp 63,371.78
Rp 485,850.28

m Teb. 9 mm + Rangka Stud Chanel

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 21,000.00
Rp 120,000.00 Rp 72,000.00
Rp 140,000.00 Rp 8,400.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 102,700.00

Rp 25,000.00 Rp 1,125.00
Rp 7,000.00 Rp 7,000.00
Rp 110,000.00 Rp 77,000.00
Rp 23,000.00 Rp 23,000.00
Rp 5,000.00 Rp 5,000.00
JUMLAH HARGA BAHAN Rp 113,125.00
JUMLAH HARGA BAHAN

Rp 215,825.00
5% x D (maksimum) Rp 32,373.75
Rp 248,198.75

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 10,500.00
Rp 120,000.00 Rp 24,000.00
Rp 140,000.00 Rp 2,800.00
Rp 130,000.00 Rp 1,300.00
JUMLAH TENAGA KERJA Rp 38,600.00

Rp 31,000.00 Rp 34,100.00
Rp 40,000.00 Rp 800.00
JUMLAH HARGA BAHAN Rp 34,900.00

JUMLAH HARGA ALAT

Rp 73,500.00
5% x D (maksimum) Rp 11,025.00
Rp 84,525.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 31,500.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 1,400.00
Rp 130,000.00 Rp 2,600.00
JUMLAH TENAGA KERJA Rp 47,500.00

Rp 98,000.00 Rp 196,000.00
Rp 67,500.00 Rp 405,000.00
JUMLAH HARGA BAHAN Rp 601,000.00

JUMLAH HARGA ALAT

Rp 648,500.00
5% x D (maksimum) Rp 97,275.00
Rp 745,775.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 12,600.00
Rp 120,000.00 Rp 14,400.00
Rp 140,000.00 Rp 1,680.00
Rp 130,000.00 Rp 780.00
JUMLAH TENAGA KERJA Rp 29,460.00

Rp 800,000.00 Rp 80,000.00
Rp 35,000.00 Rp 35,000.00
JUMLAH HARGA BAHAN Rp 115,000.00

JUMLAH HARGA ALAT

Rp 144,460.00
5% x D (maksimum) Rp 21,669.00
Rp 166,129.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

Rp 105,000.00 Rp 1,050.00
Rp 120,000.00 Rp 12,000.00
Rp 140,000.00 Rp 1,400.00
Rp 130,000.00 Rp 650.00
JUMLAH TENAGA KERJA Rp 15,100.00
Rp 16,500.00 Rp 16,500.00
Rp 2,700.00 Rp 67.50
JUMLAH HARGA BAHAN Rp 16,567.50

JUMLAH HARGA ALAT

Rp 31,667.50
5% x D (maksimum) Rp 4,750.13
Rp 36,417.63

HARGA UPAH (Rp) JUMLAH HARGA (Rp)

Rp 12,100.00 Rp 145,200.00
Rp 4,200.00 Rp 50,400.00
Rp 3,000.00 Rp 15,000.00
Rp 2,500.00 Rp 15,000.00
Rp 13,200.00 Rp 13,200.00
Rp 5,000.00 Rp 5,000.00
Rp 18,437.50 Rp 18,437.50
Jumlah Total Harga Rp 262,237.50

Rp 13,000.00 Rp 156,000.00
Rp 4,200.00 Rp 50,400.00
Rp 3,000.00 Rp 15,000.00
Rp 2,500.00 Rp 15,000.00
Rp 13,200.00 Rp 13,200.00
Rp 5,000.00 Rp 5,000.00
Rp 18,437.50 Rp 18,437.50
Jumlah Total Harga Rp 273,037.50

Rp 13,000.00 Rp 390,000.00
Rp 4,200.00 Rp 126,000.00
Rp 3,000.00 Rp 15,000.00
Rp 2,500.00 Rp 15,000.00
Rp 13,200.00 Rp 13,200.00
Rp 5,000.00 Rp 5,000.00
Rp 18,437.50 Rp 18,437.50
Jumlah Total Harga Rp 582,637.50
Rp 104,500.00 Rp 104,500.00
Rp 5,000.00 Rp 5,000.00
Rp 18,437.50 Rp 18,437.50
Rp 17,500.00 Rp 17,500.00
Jumlah Total Harga Rp 145,437.50

Rp 1,427,000.00 Rp 1,427,000.00
Rp 1,376,300.00 Rp 1,376,300.00
Rp 1,054,000.00 Rp 4,216,000.00
Rp 269,400.00 Rp 808,200.00
Rp 237,600.00 Rp 237,600.00
Rp 120,700.00 Rp 120,700.00
Rp 141,500.00 Rp 424,500.00
Rp 250,000.00 Rp 250,000.00
Rp 400,000.00 Rp 400,000.00
Rp 500,000.00 Rp 500,000.00
Jumlah Total Harga Rp 9,760,300.00

Rp 1,264,300.00 Rp 1,264,300.00
Rp 1,054,000.00 Rp 1,054,000.00
Rp 77,000.00 Rp 847,000.00
Rp 141,500.00 Rp 424,500.00
Rp 250,000.00 Rp 250,000.00
Rp 200,000.00 Rp 200,000.00
Rp 250,000.00 Rp 250,000.00
Jumlah Total Harga Rp 4,289,800.00

Rp 1,264,300.00 Rp 1,264,300.00
Rp 1,054,000.00 Rp 1,054,000.00
Rp 90,000.00 Rp 1,080,000.00
Rp 141,500.00 Rp 424,500.00
Rp 250,000.00 Rp 250,000.00
Rp 200,000.00 Rp 200,000.00
Rp 250,000.00 Rp 250,000.00
Jumlah Total Harga Rp 4,522,800.00

Rp 1,264,300.00 Rp 1,264,300.00
Rp 1,054,000.00 Rp 1,054,000.00
Rp 77,000.00 Rp 924,000.00
Rp 141,500.00 Rp 424,500.00
Rp 250,000.00 Rp 250,000.00
Rp 200,000.00 Rp 200,000.00
Rp 250,000.00 Rp 250,000.00
Jumlah Harga Rp 4,366,800.00

Rp 1,264,300.00 Rp 1,264,300.00
Rp 1,054,000.00 Rp 1,054,000.00
Rp 90,000.00 Rp 1,350,000.00
Rp 141,500.00 Rp 424,500.00
Rp 250,000.00 Rp 250,000.00
Rp 200,000.00 Rp 200,000.00
Rp 250,000.00 Rp 250,000.00
Jumlah Harga Rp 4,792,800.00
RENCANA ANGGARAN BIA
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

NO URAIAN PEKERJAAN

A. PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek
2 Pas. Papan Bowplank

B PEKERJAAN PONDASI
1 Pondasi Plat 130 x 130 x 40 cm
a. Galian Tanah Pondasi
b. Urugan Kembali Galian
c. Cor Beton K.100
d. Plat Pondasi
- Beton K.250
- Pembesian
- Bekisting
e Kolom Pedestal 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting

C PEKERJAAN BETON BERTULANG


1 Balok Sloof
a. Balok S1 25 x 40 cm
- Beton K.250
- Lantai Kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting

b. Balok S2 25 x 40 cm
- Beton K.250
- Lantai Kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting

c. Balok SP 20 x 40 cm
- Beton K.250
- Lantai kerja Bawah Sloof Tebal 5 cm
- Pembesian
- Bekisting
2 Kolom Lt. 1
a. Kolom K1 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking Kolom
- Pengecatan Kolom

3 Kolom Lantai 2
a. Kolom K2 40 x 40 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
4 Balok Lantai 2
a. Balok Lantai 2 B1-1 25 x 40 cm
- Beton K.250
- Pembesian
- Bekesting
- Afreking Balok
- Pengecatan

b. Balok Lantai 2 B2-1 25 x 40 cm


- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan

c. Balok Lantai 2 B3-1 25 x 40 cm


- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan

d. Balok Lantai 2 B4-1 25 x 40 cm


- Beton K.250
- Pembesian
- Beksiting
- Afreking Balok
- Pengecatan

e. Balok Lantai 2 BT-1 20 x 40 cm


- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan

f. Balok Lantai 2 BT-2 20 x 40 cm


- Beton K.250
- Pembesian
- Bekisting
- Afreking Balok
- Pengecatan

5 Balok Atap level + 7.40


a. Balok Atap RB1 20 x 30 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan

6 Plat Lantai II
a. Plat lantai 2 Tebal 12 cm
- Beton K.250
- Pembesian
- Bekisting

7 Plat pet Atap Teras Depan


a. Plat Pet Atap tebal 8 cm Level + 7.40
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan

8 Pekerjaan Tangga
a. Plat Tangga Tebal 15 cm
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
b. Beton Tanjakan Tangga
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
c. Plat Bordes
- Beton K.250
- Pembesian
- Bekisting
- Afreking
- Pengecatan
ANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


SAT. VOLUME
(Rp) (Rp) (Rp)

Ls 1.00 Rp 19,550.00 Rp 19,550.00


M1 94.00 Rp 108,847.50 Rp 10,231,665.00
Total Pekerjaan Rp 10,251,215.00

M3 106.62 Rp 94,300.00 Rp 10,054,266.00


M3 74.59 Rp 67,850.00 Rp 5,060,931.50
M3 3.33 Rp 686,445.97 Rp 2,285,865.09

M3 22.98 Rp 962,837.65 Rp 22,126,009.18


KG 1,893.13 Rp 19,923.75 Rp 37,718,248.84
M2 70.72 Rp 256,703.00 Rp 18,154,036.16

M3 5.71 Rp 962,837.65 Rp 5,497,802.98


KG 1,687.07 Rp 19,923.75 Rp 33,612,760.91
M2 57.12 Rp 514,176.50 Rp 29,369,761.68
3,921.27 Total Pekerjaan Rp 163,879,682.34

M3 17.64 Rp 962,837.65 Rp 16,984,456.14


M3 2.20 Rp 686,445.97 Rp 1,510,181.14
KG 3,923.66 Rp 19,923.75 Rp 78,174,020.93
M2 141.12 Rp 273,953.00 Rp 38,660,247.36

M3 1.28 Rp 962,837.65 Rp 1,232,432.19


M3 0.16 Rp 686,445.97 Rp 109,831.36
KG 224.77 Rp 19,923.75 Rp 4,478,261.29
M2 10.24 Rp 273,953.00 Rp 2,805,278.72

M3 2.84 Rp 962,837.65 Rp 2,734,458.92


M3 0.35 Rp 686,445.97 Rp 240,256.09
KG 405.76 Rp 19,923.75 Rp 8,084,260.80
M2 28.40 Rp 273,953.00 Rp 7,780,265.20
M3 23.39 Rp 962,837.65 Rp 22,520,772.62
KG 2,472.39 Rp 19,923.75 Rp 49,259,280.26
M2 233.92 Rp 514,176.50 Rp 120,276,166.88
M2 156.75 Rp 66,993.48 Rp 10,501,227.99
M2 156.75 Rp 49,182.05 Rp 7,709,286.34

M3 15.39 Rp 962,837.65 Rp 14,818,071.43


KG 1,868.59 Rp 19,923.75 Rp 37,229,320.01
M2 153.92 Rp 514,176.50 Rp 79,142,046.88
M2 104.04 Rp 66,993.48 Rp 6,970,001.66
M2 104.04 Rp 49,182.05 Rp 5,116,900.48

M3 7.29 Rp 962,837.65 Rp 7,019,086.46


KG 1,098.19 Rp 19,923.75 Rp 21,880,063.01
M2 62.20 Rp 532,461.50 Rp 33,119,105.30
M2 15.36 Rp 66,993.48 Rp 1,029,019.85
M2 15.36 Rp 49,182.05 Rp 755,436.29

M3 1.67 Rp 962,837.65 Rp 1,607,938.87


KG 282.04 Rp 19,923.75 Rp 5,619,294.45
M2 14.25 Rp 532,461.50 Rp 7,587,576.38
M2 2.20 Rp 66,993.48 Rp 147,385.66
M2 2.20 Rp 49,182.05 Rp 108,200.51

M3 6.68 Rp 962,837.65 Rp 6,431,755.50


KG 1,370.60 Rp 19,923.75 Rp 27,307,491.75
M2 57.02 Rp 532,461.50 Rp 30,360,954.73
M2 13.20 Rp 66,993.48 Rp 884,313.94
M2 13.20 Rp 49,182.05 Rp 649,203.06

M3 1.21 Rp 962,837.65 Rp 1,165,033.56


KG 228.34 Rp 19,923.75 Rp 4,549,389.08
M2 10.36 Rp 532,461.50 Rp 5,516,301.14
M2 1.60 Rp 66,993.48 Rp 107,189.57
M2 1.60 Rp 49,182.05 Rp 78,691.28

M3 0.34 Rp 962,837.65 Rp 327,364.80


KG 59.94 Rp 19,923.75 Rp 1,194,229.58
M2 3.45 Rp 532,461.50 Rp 1,836,992.18
M2 2.04 Rp 66,993.48 Rp 136,666.70
M2 2.04 Rp 49,182.05 Rp 100,331.38

M3 0.40 Rp 962,837.65 Rp 385,135.06


KG 70.91 Rp 19,923.75 Rp 1,412,793.11
M2 4.09 Rp 532,461.50 Rp 2,177,767.54
M2 2.48 Rp 66,993.48 Rp 166,143.83
M2 2.48 Rp 49,182.05 Rp 121,971.48

M3 7.00 Rp 962,837.65 Rp 6,739,863.55


KG 706.53 Rp 19,923.75 Rp 14,076,727.09
M2 93.44 Rp 532,461.50 Rp 49,753,202.56
M2 11.90 Rp 66,993.48 Rp 797,222.41
M2 11.90 Rp 49,182.05 Rp 585,266.40

M3 26.85 Rp 962,837.65 Rp 25,852,190.89


KG 4,501.96 Rp 19,923.75 Rp 89,695,925.55
M2 268.59 Rp 679,776.50 Rp 182,581,170.14

M3 0.81 Rp 962,837.65 Rp 779,898.50


KG 96.00 Rp 19,923.75 Rp 1,912,680.00
M2 11.68 Rp 679,776.50 Rp 7,939,789.52
M2 11.38 Rp 66,993.48 Rp 762,385.80
M2 11.38 Rp 49,182.05 Rp 559,691.73

M3 1.40 Rp 962,837.65 Rp 1,347,972.71


KG 289.94 Rp 19,923.75 Rp 5,776,692.08
M2 11.73 Rp 679,776.50 Rp 7,973,778.35
M2 10.55 Rp 66,993.48 Rp 706,781.21
M2 10.55 Rp 49,182.05 Rp 518,870.63

M3 0.64 Rp 962,837.65 Rp 616,216.10


KG 51.99 Rp 19,923.75 Rp 1,035,835.76
M2 5.35 Rp 679,776.50 Rp 3,636,804.28
M2 2.67 Rp 66,993.48 Rp 178,872.59
M2 2.67 Rp 49,182.05 Rp 131,316.07

M3 0.60 Rp 962,837.65 Rp 577,702.59


KG 115.69 Rp 19,923.75 Rp 2,304,978.64
M2 4.51 Rp 679,776.50 Rp 3,065,792.02
M2 4.00 Rp 66,993.48 Rp 267,973.92
M2 4.00 Rp 49,182.05 Rp 196,728.20
Total Pekerjaan Rp 1,090,492,179.96
Total Keseluruhan Struktur Rp 1,264,623,077.30
RENCANA ANGGARAN BIA
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2015
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

URAIAN PEKERJAAN

A PEKERJAAN DINDING
1 Lantai 2
a. Pas. Batu Bata 1:2 (1/2 Bata)
b. Plesteran 1:4
c. Acian Plesteran 1:4
d. Cat Dinding Batu Bata
e. Pekerjaan Balok Lathe Lev +6.79
-Beton K.175
-Pembesian
-Bekisting
f. Kolom Praktis 13 x 13
-Beton K.175
-Pembesian
-Bekisting
g. Kolom Praktis 15 x 15
-Beton K.175
-Pembesian
-Bekisting
-Afreking
-Pengecatan
h. Pekerjaan Plat Pet Lev +6.79
-Beton K.175
-Pembesian
-Bekisting
-Afreking
-Pengecatan

B PEKERJAAN KUSEN, PINTU & JENDELA


1 Lantai 2
a. Tipe P2 (1 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Pintu Kaca Clear tebal 5mm + Rangka Alumunium
-Engsel Pintu
- Kunci Pintu
-Grendel Pintu

b. Tipe P3 (3 Unit)
- Kusen Alumunium
-Pas. Ventilasi Kaca Mati Tebal 5 mm
-Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
-Engsel Pintu
-Kunci Pintu
-Pasangan DorCloser

c. Tipe P4 (2 Unit)
- Kusen Alumunium
-Pas. Ventilasi Kaca Mati Tebal 5 mm
-Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
-Engsel Pintu
-Kunci Pintu

d. Tipe P5 (2 Unit)
-Kusen Alumunium
-Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + PP Plastik
- Engsel Pintu
-Kunci Pintu

e. Tipe J2 (2 Unit)
-Kusen Alumunium
-Pas. Jendela Kaca Mati Tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
-Engsel Nyelon
-Grendel Jendela Alumunium

f. Tipe J3 (3 Unit)
-Kusen Alumunium
-Pas. Jendela Kaca Mati Tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
- Engsel Nyelon
-Grendel Jendela Alumunium

g. Tipe J4 (20 Unit)


-Kusen Alumunium
-Pas. Jendela Kaca Mati Tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
- Engsel Nyelon
-Grendel Jendela Alumunium

h. Tipe J5 (2 Unit)
- Kusen Alumunium
-Pas. Jendela Kaca Mati Tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
-Engsel Nyelon
-Grendel Jendela Alumunium

i. Tipe Ventilasi BV1 (1 Unit)


-Kusen Alumunium
- Pas. Ventilasi Kaca Selisih Tebal 5 mm

j. Tipe Ventilasi BV2 (8 Unit)


-Kusen Alumunium
-Pas. Ventilas Kaca Selisih Tebal 5 mm

C PEKERJAAN DINDING PARTISI


1 Lantai 2
a. Tipe PR1 (1 Unit)
-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
- Papan Kayu Plin 1/12
-Cat Partisi Gypsum Board T. 9mm Warna Gelap + terang
-Cat Kayu Plin

b. Tipe PR8 (1 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin

c. Tipe PR9 (1 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum Board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin
D PEKERJAAN PLAFOND
1 Lantai 2
a. Plafond gypsum T=9mm + Rangka Metal Furing
b. Plafond GRC T=4mm + Rangka Metal Furing
c. Lis Gypsum T=12cm
d. Lis GRC
e. Cat Plafond Gypsum T=9mm dan GRC T=4mm

E PEKERJAAN LANTAI
1 Lantai 2
a. Keramik 40x40 cm
b. Anti Slip (Stok Norsing)

F PEKERJAAN RANGKA + PENUTUP ATAP


a. Rangka Atap Baja Ringan
b. Penutup Atap Genteng
c. Pas. Lisplank Sisik Ikan
d. Ukiran Gonjong Kayu + Rangka
e. Pas. Plafond Lambersering Atap Gonjong
f. Pas. Perabung Genteng
g. Pas. Papan Kisi Kisi pada Gonjong Kecil + Rangka
h. Pas. Jurai Genteng
i. Pas. Lisplank Zingkalume
j. Pas. Ornamen Puncak Gonjong

G PEKERJAAN TOILET (WC) DAN ACCESSORIES


1 Lantai 2
a. Toilet Tipe A 1
-Kolom Praktis 13x13 cm (K-175)
1). Beton K-175
2). Pembesian
3). Bekisting
- Pas. Batu Bata 1:2 (1/2 Bata)
-Pas. Batu Bata 1:4 (1/2 Bata)
-Plesteran 1:2
-Plesteran 1:4
-Acian
-Cat Dinding Batu Bata
-Keramik Dinding 25x40 cm + Plink Keramik
-Memasang Membrane Waterproofing
-Keramik Lantai teksture 25x25 cm
-Kloset Jongkok (Setara TOTO)
-Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Closet
-Urugan Pasir Peninggian Closet
-Beton K-100 Peninggian Closet
-Cor Beton K-100 Pijakkan Kaki Tempat Wudhu'
-Kran Air
-Floor Drain

b. Toilet Tipe A 2
-Pas. Batu Bata 1:2 (1/2 Bata)
-Pas. Batu Bata 1:4 (1/2 Bata)
- Plesteran 1:2
-Plesteran 1:4
-Acian
-Cat Dinding Batu Bata
-Keramik Dinding 25x40 cm + Plint Keramik
-Memasang Membrane Waterproofing
- Keramik Lantai Teksture 25x25 cm
-Kloset Jongkok (Setara TORO)
-Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Closet
-Urugan Pasir Peninggian Closet
-Beton K-100 Peninggian Closet
-Kran Air
-Floor Drain
ANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


SAT. VOLUME
(Rp) (Rp) (Rp)

M2 234.58 Rp 331,487.50 Rp 77,760,337.75


M2 498.95 Rp 75,051.30 Rp 37,446,846.14
M2 49.95 Rp 45,913.75 Rp 2,293,391.81
M2 498.95 Rp 49,182.05 Rp 24,539,383.85

M3 1.25 Rp 883,722.80 Rp 1,104,653.51


KG 232.91 Rp 19,923.75 Rp 4,640,440.61
M2 21.22 Rp 532,461.50 Rp 11,298,833.03

M3 1.20 Rp 883,722.80 Rp 1,060,467.37


KG 251.19 Rp 19,923.75 Rp 5,004,646.76
M2 18.56 Rp 514,176.50 Rp 9,543,115.84

M3 0.33 Rp 883,722.80 Rp 291,628.53


KG 59.49 Rp 19,923.75 Rp 1,185,263.89
M2 4.41 Rp 514,176.50 Rp 2,267,518.37
M2 4.41 Rp 66,993.48 Rp 295,441.25
M2 4.08 Rp 49,182.05 Rp 200,662.76

M3 1.78 Rp 883,722.80 Rp 1,573,026.59


MKG 295.68 Rp 19,923.75 Rp 5,891,054.40
M2 29.74 Rp 679,776.50 Rp 20,216,553.11
M2 47.59 Rp 66,993.48 Rp 3,188,219.71
M2 47.59 Rp 49,182.05 Rp 2,340,573.76
2303.86 Total Pekerjaan Rp 212,142,059.03

M1 8.24 Rp 185,736.50 Rp 1,530,468.76


M2 0.72 Rp 126,878.35 Rp 91,352.41
M2 2.94 Rp 802,705.75 Rp 2,359,954.91
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 1.00 Rp 163,254.00 Rp 163,254.00
BH 4.00 Rp 50,922.00 Rp 203,688.00
M1 21.12 Rp 185,736.50 Rp 3,922,754.88
M2 1.24 Rp 126,878.35 Rp 157,329.15
M2 5.04 Rp 756,470.00 Rp 3,812,608.80
BH 9.00 Rp 44,020.85 Rp 396,187.65
BH 3.00 Rp 163,254.00 Rp 489,762.00
BH 3.00 Rp 325,036.00 Rp 975,108.00

M1 13.68 Rp 185,736.50 Rp 2,540,875.32


M2 0.72 Rp 126,878.35 Rp 91,352.41
M2 2.94 Rp 756,470.00 Rp 2,224,021.80
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 9.80 Rp 185,736.50 Rp 1,820,217.70


M2 2.94 Rp 756,470.00 Rp 2,224,021.80
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 18.96 Rp 185,736.50 Rp 3,521,564.04


M2 2.98 Rp 126,878.35 Rp 378,097.48
M2 1.52 Rp 802,705.75 Rp 1,220,112.74
BH 4.00 Rp 31,067.25 Rp 124,269.00
BH 4.00 Rp 40,365.00 Rp 161,460.00
BH 2.00 Rp 44,597.00 Rp 89,194.00

M1 34.98 Rp 185,736.50 Rp 6,497,062.77


M2 4.36 Rp 126,878.35 Rp 553,189.61
M2 4.36 Rp 802,705.75 Rp 3,499,797.07
BH 12.00 Rp 31,067.25 Rp 372,807.00
BH 12.00 Rp 40,365.00 Rp 484,380.00
BH 6.00 Rp 44,597.00 Rp 267,582.00

M1 112.40 Rp 185,736.50 Rp 20,876,782.60


M2 7.28 Rp 126,878.35 Rp 923,674.39
M2 15.26 Rp 802,705.75 Rp 12,249,289.75
BH 40.00 Rp 31,067.25 Rp 1,242,690.00
BH 40.00 Rp 40,365.00 Rp 1,614,600.00
BH 20.00 Rp 44,597.00 Rp 891,940.00

M1 13.04 Rp 185,736.50 Rp 2,422,003.96


M2 0.72 Rp 126,878.35 Rp 91,352.41
M2 2.15 Rp 802,705.75 Rp 1,725,817.36
BH 4.00 Rp 31,067.25 Rp 124,269.00
BH 4.00 Rp 40,365.00 Rp 161,460.00
BH 2.00 Rp 44,597.00 Rp 89,194.00

M1 7.33 Rp 185,736.50 Rp 1,361,448.55


M2 1.55 Rp 126,878.35 Rp 196,661.44

M1 21.92 Rp 185,736.50 Rp 4,071,344.08


M2 8.16 Rp 126,878.35 Rp 1,035,327.34
Total Pekerjaan Rp 90,695,719.47

M2 14.97 Rp 248,198.75 Rp 3,715,535.29


M1 18.72 Rp 30,000.00 Rp 561,600.00
M2 27.70 Rp 49,182.05 Rp 1,362,342.79
M2 2.24 Rp 49,182.05 Rp 110,167.79

M2 12.79 Rp 248,198.75 Rp 3,174,462.01

M1 10.20 Rp 185,736.50 Rp 1,894,512.30


M2 3.36 Rp 756,470.00 Rp 2,541,739.20
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 15.18 Rp 185,736.50 Rp 2,819,480.07


M2 4.74 Rp 126,878.35 Rp 601,403.38
M1 20.50 Rp 30,000.00 Rp 615,000.00
M2 23.12 Rp 49,182.05 Rp 1,137,089.00
M2 2.46 Rp 49,182.05 Rp 120,987.84

M2 13.36 Rp 248,198.75 Rp 3,315,935.30

M1 5.10 Rp 185,736.50 Rp 947,256.15


M2 1.68 Rp 756,470.00 Rp 1,270,869.60
BH 3.00 Rp 44,020.85 Rp 132,062.55
BH 1.00 Rp 163,254.00 Rp 163,254.00

M1 17.71 Rp 185,736.50 Rp 3,289,393.42


M2 5.53 Rp 126,878.35 Rp 701,637.28
M1 23.60 Rp 30,000.00 Rp 708,000.00
M2 23.90 Rp 49,182.05 Rp 1,175,451.00
M2 2.83 Rp 49,182.05 Rp 139,185.20
Total Pekerjaan Rp 31,087,997.25

M2 304.67 Rp 248,198.75 Rp 75,618,713.16


M2 12.35 Rp 165,623.00 Rp 2,045,444.05
M1 201.57 Rp 31,803.25 Rp 6,410,581.10
M1 31.08 Rp 26,697.25 Rp 829,750.53
M2 340.28 Rp 49,182.05 Rp 16,735,667.97
Total Pekerjaan Rp 101,640,156.82

M2 275.14 Rp 273,265.30 Rp 75,186,214.64


M1 1.15 Rp 43,710.93 Rp 50,267.56
Total Pekerjaan Rp 75,236,482.21

M2 433.57 Rp 485,850.28 Rp 210,650,103.73


M2 447.03 Rp 150,536.64 Rp 67,294,395.46
M1 90.60 Rp 75,000.00 Rp 6,795,000.00
M2 45.42 Rp 324,500.00 Rp 14,738,790.00
M2 140.27 Rp 286,522.50 Rp 40,190,511.08
M1 47.24 Rp 223,403.93 Rp 10,553,601.59
M2 20.54 Rp 74,500.00 Rp 1,530,230.00
M1 12.28 Rp 93,000.00 Rp 1,142,040.00
M1 57.13 Rp 84,525.00 Rp 4,828,913.25
BH 5.00 Rp 365,000.00 Rp 1,825,000.00
1299.08 Rp 359,548,585.10 Rp 359,548,585.10

M3 0.45 Rp 883,722.80 Rp 397,675.26


KG 97.81 Rp 19,923.75 Rp 1,948,741.99
M2 7.07 Rp 514,176.50 Rp 3,635,227.86
M2 25.23 Rp 331,487.50 Rp 8,363,429.63
M2 30.39 Rp 308,389.75 Rp 9,371,964.50
M2 47.18 Rp 80,317.38 Rp 3,789,373.99
M2 64.06 Rp 75,051.30 Rp 4,807,786.28
M2 86.01 Rp 45,913.75 Rp 3,949,041.64
M2 86.01 Rp 49,182.05 Rp 4,230,148.12
M2 25.23 Rp 173,624.13 Rp 4,380,536.67
M2 10.31 Rp 166,129.00 Rp 1,712,789.99
M2 9.07 Rp 168,562.69 Rp 1,528,863.58
BH 2.00 Rp 582,015.00 Rp 1,164,030.00
M3 0.62 Rp 331,487.50 Rp 205,522.25
M3 0.70 Rp 254,725.00 Rp 178,307.50
M3 0.70 Rp 686,445.97 Rp 480,512.18
M3 0.25 Rp 686,445.97 Rp 171,611.49
BH 6.00 Rp 36,417.63 Rp 218,505.75
BH 4.00 Rp 56,465.00 Rp 225,860.00

M2 6.27 Rp 331,487.50 Rp 2,078,426.63


M2 7.07 Rp 308,389.75 Rp 2,180,315.53
M2 6.27 Rp 80,317.38 Rp 503,589.97
M2 7.07 Rp 75,051.30 Rp 530,612.69
M2 13.34 Rp 45,913.75 Rp 612,489.43
M2 13.34 Rp 49,182.05 Rp 656,088.55
M2 5.20 Rp 173,624.13 Rp 902,845.45
M2 1.70 Rp 166,129.00 Rp 282,419.30
M2 1.44 Rp 168,562.69 Rp 242,730.27
BH 1.00 Rp 582,015.00 Rp 582,015.00
M3 0.27 Rp 331,487.50 Rp 89,501.63
M3 0.70 Rp 254,725.00 Rp 178,307.50
M3 0.70 Rp 686,445.97 Rp 480,512.18
BH 1.00 Rp 36,417.63 Rp 36,417.63
BH 1.00 Rp 56,465.00 Rp 56,465.00
Total Pekerjaan Rp 60,172,665.41
Total Keseluruhan Pekerjaan Arsitek Lt.2 Rp 930,523,665.29
RENCANA ANGGARAN BIA
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

NO URAIAN PEKERJAAN
PEKERJAAN ELEKTRIKAL
I Pekerjaan Instalasi Listrik

Catatan : Pengadaan, pemasangan dan pungujian seluruh pekerjaan instalasi


penerangan dan stop kontak lengkap dengan saklar dan accessories lainnya
sesuai dengan gambar rencana dan spesifikasi teknis

Lantai 1
a. Pas. Instalasi Titik Lampu
b. Pas. Instalasi Stop Kontak
c. Pas. Instalasi Titik Stop Kontak AC
d. Pas. Lampu Downlight LED 18 W
e. Pas. Saklar Tunggal
f. Pas. Stop Kontak
g. Pas. Stop Kontak AC

Lantai 2
a. Pas. Instalasi Titik Lampu
b. Pas. Instalasi Stop Kontak
c. Pas. Instalasi Titik Stop Kontak AC
d. Pas. Lampu Downlight LED 18 W
e. Pas. Saklar Tunggal
f. Pas. Stop Kontak
g. Pas. Stop Kontak AC

Kabel Feeder

Catatan : Pengadaan dan pemasangan pekerjaan instalasi kabel distribusi


lengkap dengan material bantu dan accessories lainnya sesuai gambar rencana
dan spesifikasi teknis

a. Pas. Kabel dari SDP 1 ke MDP


b. Pas. Kabel dari SDP 2 ke MDP
c. Pas. Kabel dari SDP 3 ke MDP
d. Pas. Kabel dari SDP 4 ke MDP

Pek. Panel
Catatan : Pengadaan, pemasangan dan pengujian pekerjaan Panel Tegangan
Rendah lengkap dengan MCCB, MCB, relay-relay, grounding, dan accessories
lainnya sesuai dengan gambar rencana dan spesifikasi teknis

a. Pas. Panel MDP


b. Pas. Panel SDP 1
c. Pas. Panel SDP 2
d. Pas. Panel SDP 3
e. Pas. Panel SDP 4

Pas. Ground Panel

II PEKERJAAN MEKANIKAL

Catatan : Pengadaan dan pemasangan instalasi pekerjaan plumbing lengkap


dengan accessories dan material bantu lainnya sesuai dengan gambar rencana dan
spesifikasi teknis

1 Pek. Air Bersih Dalam Bangunan


Lantai 1
a. Pas. Pipa PVC Ø 3/4"
b. Pas. Pipa PVC Ø 1/2"
c. Pas. Floor Drain

2 Pek. Instalasi Air Bekas


a. Pek. Air Bekas Dalam Tanah
- Pas. Pipa PVC Ø 3"
b. Pek. Air Bekas Dalam Bangunan
Lantai 1
- Pas. Pipa PVC Ø 3"
Lantai 2
- Pas. Pipa PVC Ø 3"

3 Pek. Instalasi Air Kotor


a. Pek. Air Kotor Dalam Tanah
- Pas. Pipa PVC Ø 4"
b. Pek. Air Kotor Dalam Bangunan
lantai 1
- Pas. Pipa PVC Ø 4"
Lantai 2
- Pas. Pipa PVC Ø 4"

4 Pek. Instalasi Pipa Tegak


a. Pas. Pipa PVC Ø1"
b. Pas. Pipa PVC Ø4"
c. Pas. Pipa PVC Ø3"
d. Pas. Pipa PVC Ø2"
e. Pas. Vent Cup

5 Pek. SEPTICTANK

6 Pek. Roof Tank

7 Pek. Ground Tank

8 Pek. Pompa Transfer

9 Pek. Air Buangan AC


Lantai 1
a. Pipa PVC Ø3/4"
b. Pipa PVC Ø1/2"
Lantai 2
a. Pipa PVC Ø3/4"
b. Pipa PVC Ø1/2"
ANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


SAT. VOLUME
(Rp) (Rp) (Rp)

Titik 58.00 Rp 262,237.50 Rp 15,209,775.00


Titik 20.00 Rp 273,037.50 Rp 5,460,750.00
Titik 9.00 Rp 582,637.50 Rp 5,243,737.50
Bh 58.00 Rp 235,000.00 Rp 13,630,000.00
Bh 15.00 Rp 15,000.00 Rp 225,000.00
Bh 20.00 Rp 15,000.00 Rp 300,000.00
Bh 9.00 Rp 15,000.00 Rp 135,000.00
Jumlah Rp 40,204,262.50

Titik 63.00 Rp 262,237.50 Rp 16,520,962.50


Titik 22.00 Rp 273,037.50 Rp 6,006,825.00
Titik 12.00 Rp 582,637.50 Rp 6,991,650.00
Bh 63.00 Rp 235,000.00 Rp 14,805,000.00
Bh 17.00 Rp 15,000.00 Rp 255,000.00
Bh 22.00 Rp 15,000.00 Rp 330,000.00
Bh 12.00 Rp 15,000.00 Rp 180,000.00
Jumlah Rp 45,089,437.50

M1 8.00 Rp 145,437.50 Rp 1,163,500.00


M1 10.00 Rp 145,437.50 Rp 1,454,375.00
M1 16.00 Rp 145,437.50 Rp 2,327,000.00
M1 20.00 Rp 145,437.50 Rp 2,908,750.00
Jumlah Rp 7,853,625.00
Unit 1.00 Rp 9,760,300.00 Rp 9,760,300.00
Unit 1.00 Rp 4,289,800.00 Rp 4,289,800.00
Unit 1.00 Rp 4,522,800.00 Rp 4,522,800.00
Unit 1.00 Rp 4,366,800.00 Rp 4,366,800.00
Unit 1.00 Rp 4,792,800.00 Rp 4,792,800.00
Jumlah Rp 27,732,500.00

Unit 1.00 Rp 2,500,000.00 Rp 2,500,000.00


Jumlah Rp 2,500,000.00
Jumlah Sub-Total Elektrikal Rp 123,379,825.00

M1 50.00 Rp 555,254.50 Rp 27,762,725.00


M1 12.00 Rp 400,579.50 Rp 4,806,954.00
M1 4.00 Rp 56,465.00 Rp 225,860.00
Jumlah Rp 32,795,539.00

M! 5.00 Rp 2,815,332.25 Rp 14,076,661.25

M1 25.00 Rp 2,815,332.25 Rp 70,383,306.25

M1 28.00 Rp 2,815,332.25 Rp 78,829,303.00


Jumlah Rp 163,289,270.50

M1 7.00 Rp 3,124,682.25 Rp 21,872,775.75

M1 18.00 Rp 3,124,682.25 Rp 56,244,280.50


M1 23.00 Rp 3,124,682.25 Rp 71,867,691.75
Jumlah Rp 149,984,748.00

M1 8.00 Rp 709,929.50 Rp 5,679,436.00


M1 8.00 Rp 3,124,682.25 Rp 24,997,458.00
M1 8.00 Rp 2,815,332.25 Rp 22,522,658.00
M1 6.00 Rp 1,490,250.50 Rp 8,941,503.00
M1 2.00 Rp 1,490,250.50 Rp 2,980,501.00
Jumlah Rp 65,121,556.00

Unit 1.00 Rp 4,150,000.00 Rp 4,150,000.00


Jumlah Rp 4,150,000.00

Unit 1.00 Rp 3,200,000.00 Rp 3,200,000.00


Jumlah Rp 3,200,000.00

Unit 1.00 Rp 3,200,000.00 Rp 3,200,000.00


Jumlah Rp 3,200,000.00

Unit 1.00 Rp 2,500,000.00 Rp 2,500,000.00


Jumlah Rp 2,500,000.00

M1 25.00 Rp 555,254.50 Rp 13,881,362.50


M1 47.00 Rp 400,579.50 Rp 18,827,236.50

M1 27.00 Rp 555,254.50 Rp 14,991,871.50


M1 55.00 Rp 400,579.50 Rp 22,031,872.50
Jumlah Rp 69,732,343.00
Jumlah Sub-Total Mekanikal Rp 428,851,900.50
Jumlah ME Rp 552,231,725.50
RENCANA ANGGARAN BI
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

NO URAIAN PEKERJAAN

A PEKERJAAN DINDING
1 Lantai 1
a. Pas. Batu Bata 1 : 2 (1/2 Bata)
b. Pas. Batu Bata 1 : 4 (1/2 Bata)
c. Plesteran 1 : 2
d. Plesteran 1 : 4
e. Acian Plesteran 1 : 2
f. Acian Plesteran 1 : 4
g. Profil Beton T : 10
h. Cat Dinding Batu Bata
i. Pekerjaan Balok Lathe 13 x 15 Lev. +2.93
- Beton K.175
- Pembesian
- Bekisting
j. Pekerjaan Kolom Praktis 13 x13
- Beton K.175
- Pembesian
- Bekisting
k. Pekerjaan Kolom Praktis 15 x 15
- Beton K.175
- Pembesian
- Bekisting
- Afwerking
- Pengecatan
L. Pekerjaan Plat Pet Lev. +2.93
- Beton K.175
- Pembesian
- Bekisting
- Afwerking
- Pengecatan

B PEKERJAAN KUSEN, PINTU & JENDELA


1 Lantai 1
a. 1 Type PJ1 (1 Buah)
-Kusen Alumunium
-Pas. Jendela Kaca Mati Tebal 5mm
-Pas. Pintu Fremles Tempered Tebal 12 mm
-Engsel Pintu Tanam
-Kunci Pintu
-Hendel Pintu Stenlis Stil

b. Tipe P1 (2 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Pintu Kaca Clear tebal 5mm + Rangka Alumunium
-Engsel Pintu
-Kunci Pintu
-Grendel Pintu

c. Tipe P3 (2 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Pintu Dobelteak Wood Lapis Sungkaifin.Melamik + Kaca
-Engsel Pintu
-Kunci Pintu

d. Tipe P4 (2 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati Tebal 5 mm
-Pas. Pintu Dobelteak Wood Lapis Sungkaifin.Melamik + Kaca
-Engsel Pintu
-Kunci Pintu

e. Tipe P5 (2 Unit)
-Kusen Alumunium
-Pas. Pintu Dobel teak Wood lapis Sungkaifin. Melamik + PP Plastik
-Engsel Pintu
-Kunci Pintu

f. Tipe J1 (6 Unit)
- Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
-Engsel Nyelon
-Grendel Jendela Alumunium

g. Tipe J2 (2 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
-Engsel Nyelon
-Grendel Jendela Alumunium

h. Tipe J3 (3 Unit)
-Kusen Alumunium
-Pas. Ventilasi Kaca Mati tebal 5 mm
-Pas. Jendela Kaca Tebal 5 mm + Rangka Alumunium
-Engsel Jendela
-Engsel Nyelon
-Grendel Jendela Alumunium

i. Tipe Ventilasi BV2 (7 Unit)


-Kusen Alumunium
-Pas. Ventilasi Kaca Selisih tebal 5 mm

C PEKERJAAN DINDING PARTISI


1 Lantai 1
a. Tipe PR1 (5 Unit)
-Rangka Metal Stud + Dobel partisi gypsum Board T. 9mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum Board T. 9 mm Warna Terang + Gelap
-Cat Kayu Plin

b. Tipe PR 2 (1 Unit)
-Rangka Metal Stud + Dobel partisi gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Papan Kayu Plin 1/12
-cat Partisi Gypsum Board T. 9 mm Warna Terang + Gelap
-Cat Kayu Plin

c. Tipe PR3 (3 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum Board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin

d. Tipe PR4 (2 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
- Cat Kayu Plin

e. Tipe PR5 (2 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
- Papan Kayu Plin 1/12
-Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin

f. Tipe PR6 (1 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Jendela
1). Kusen Alumunium
2). Pas. Kaca Mati Tebal 5 mm
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin

g. Tipe PR7 (1 Unit)


-Rangka Metal Stud + Double Partisi Gypsum Board T. 9mm
-Pintu
1). Kusen Alumunium
2). Pas. Pintu Dobel Teak Wood Lapis Sungkaifin Melamik + Kaca
3). Engsel Pintu
4). Kunci Pintu
-Papan Kayu Plin 1/12
-Cat Partisi Gypsum Board T. 9 mm Warna Gelap + Terang
-Cat Kayu Plin

D PEKERJAAN PLAFOND
1 Lantai 1
a. Plafon Gypsum Plat T=9mm + Rangka Metal Furing
b. Plafond GRC T=4mm + Rangka Metal Furing
c. Lis Gypsum T=12cm
d. Lis GRC
d. Cat Plafond Gypsum T=9mm dan GRC T=4mm

E PEKERJAAN LANTAI
1 Lantai 1
a. Tanah urug (Timbunan Lantai)
b. Urugan Pasir tebal 10 cm
c. Lantai Kerja K.100 Tebal 7cm
d. Keramik 40x40 cm
e. Anti Slip (Stok Norsing)

F PEKERJAAN TOILET (WC) DAN ACCESSORIES


1 Lantai 1
a. Toilet Tipe A 1
-Kolom Praktis 13x13 cm (K-175)
1). Beton K-175
2). Pembesian
3). Bekisting
-Pas. Batu Bata 1:2 (1/2 Bata)
-Pas. Batu Bata 1:4 (1/2 Bata)
-Plesteran 1:2
-Plesteran 1:4
-Acian
-Cat Dinding Batu Bata
-Keramik Dinding 25x40 cm + Plink Keramik
-Keramik Lantai Teksture 25x25 cm
- Kloset Jongkok (Setara TOTO)
-Pas. Batu Bata 1:2 (1/2 Bata) Peninggian Closet
-Urugan Pasir Peninggian Closet
-Beton K-100 Peninggian Closet
- Cor Beton K-100 Pijakan Kaki Tempat Wudhu
-Kran Air
-Floor Drain

G PEKERJAAN TANGGA
1 Finishing Tangga
a. Keramik 30x30 cm (Anak Tangga)
b. Keramik 40x40 cm Bordes
c. StopNosing
d. Railling Tangga Besi Hollo
d. Tangan Tangan Tangga Besi Hollo
ANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


SAT. VOLUME
(Rp) (Rp) (Rp)

M2 40.74 Rp 331,487.50 Rp 13,504,800.75


M2 139.75 Rp 308,389.75 Rp 43,097,467.56
M2 81.48 Rp 80,317.38 Rp 6,544,260.12
M2 299.02 Rp 75,051.30 Rp 22,441,839.73
M2 81.48 Rp 45,913.75 Rp 3,741,052.35
M2 299.02 Rp 45,913.75 Rp 13,729,129.53
M1 16.22 Rp 50,000.00 Rp 811,000.00
M2 380.50 Rp 49,182.05 Rp 18,713,770.03

M3 0.94 Rp 883,722.80 Rp 830,699.44


KG 175.62 Rp 19,923.75 Rp 3,499,008.98
M2 15.99 Rp 532,461.50 Rp 8,514,059.39

M3 0.70 Rp 883,722.80 Rp 618,605.96


KG 147.76 Rp 19,923.75 Rp 2,943,933.30
M2 10.92 Rp 514,176.50 Rp 5,614,807.38

M3 0.31 Rp 883,722.80 Rp 273,954.07


KG 52.13 Rp 19,923.75 Rp 1,038,625.09
M2 4.20 Rp 514,176.50 Rp 2,159,541.30
M2 3.96 Rp 66,993.48 Rp 265,294.18
M2 3.84 Rp 49,182.05 Rp 188,859.07

M3 2.15 Rp 883,722.80 Rp 1,900,004.03


KG 357.08 Rp 19,923.75 Rp 7,114,372.65
M2 31.43 Rp 679,776.50 Rp 21,365,375.40
M2 57.47 Rp 66,993.48 Rp 3,850,115.30
M2 57.47 Rp 49,182.05 Rp 2,826,492.41
2260.18 Total Pekerjaan Rp 185,587,067.99

M1 18.48 Rp 185,736.50 Rp 3,432,410.52


M2 4.67 Rp 126,878.35 Rp 592,521.89
M2 3.36 Rp 1,052,093.60 Rp 3,535,034.50
BH 2.00 Rp 255,000.00 Rp 510,000.00
BH 2.00 Rp 163,254.00 Rp 326,508.00
BH 4.00 Rp 185,886.00 Rp 743,544.00

M1 16.48 Rp 185,736.50 Rp 3,060,937.52


M2 1.45 Rp 126,878.35 Rp 183,973.61
M2 5.88 Rp 802,705.75 Rp 4,719,909.81
BH 12.00 Rp 44,020.85 Rp 528,250.20
BH 2.00 Rp 163,254.00 Rp 326,508.00
BH 8.00 Rp 50,922.00 Rp 407,376.00

M1 14.08 Rp 185,736.50 Rp 2,615,169.92


M2 0.83 Rp 126,878.35 Rp 105,309.03
M2 3.36 Rp 756,470.00 Rp 2,541,739.20
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 13.68 Rp 185,736.50 Rp 2,540,875.32


M2 0.72 Rp 126,878.35 Rp 91,352.41
M2 2.94 Rp 756,470.00 Rp 2,224,021.80
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 9.80 Rp 185,736.50 Rp 1,820,217.70


M2 2.94 Rp 756,470.00 Rp 2,224,021.80
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 103.20 Rp 185,736.50 Rp 19,168,006.80


M2 17.89 Rp 126,878.35 Rp 2,269,853.68
M2 9.15 Rp 802,705.75 Rp 7,344,757.61
BH 24.00 Rp 31,067.25 Rp 745,614.00
BH 24.00 Rp 40,365.00 Rp 968,760.00
BH 12.00 Rp 44,597.00 Rp 535,164.00

M1 18.96 Rp 185,736.50 Rp 3,521,564.04


M2 2.98 Rp 126,878.35 Rp 378,097.48
M2 1.52 Rp 802,705.75 Rp 1,220,112.74
BH 4.00 Rp 31,067.25 Rp 124,269.00
BH 4.00 Rp 40,365.00 Rp 161,460.00
BH 2.00 Rp 44,597.00 Rp 89,194.00
M1 34.98 Rp 185,736.50 Rp 6,497,062.77
M2 4.36 Rp 126,878.35 Rp 553,189.61
M 4.36 Rp 802,705.75 Rp 3,499,797.07
BH 12.00 Rp 31,067.25 Rp 372,807.00
BH 12.00 Rp 40,365.00 Rp 484,380.00
BH 6.00 Rp 44,597.00 Rp 267,582.00

M1 19.18 Rp 185,736.50 Rp 3,562,426.07


M2 8.40 Rp 126,878.35 Rp 1,065,778.14
Total Pekerjaan Rp 87,131,456.54

M2 74.88 Rp 248,198.75 Rp 18,585,122.40


M1 93.6 Rp 30,000.00 Rp 2,808,000.00
M2 138.52 Rp 49,182.05 Rp 6,812,697.57
M2 11.23 Rp 49,182.05 Rp 552,314.42

M2 2.96 Rp 248,198.75 Rp 734,668.30

M1 5.10 Rp 185,736.50 Rp 947,256.15


M2 1.68 Rp 756,470.00 Rp 1,270,869.60
BH 3.00 Rp 44,020.85 Rp 132,062.55
BH 1.00 Rp 163,254.00 Rp 163,254.00
M1 2.52 Rp 30,000.00 Rp 75,600.00
M2 5.61 Rp 49,182.05 Rp 275,911.30
M2 0.30 Rp 49,182.05 Rp 14,754.62

M1 19.54 Rp 248,198.75 Rp 4,849,803.58

M1 35.11 Rp 185,736.50 Rp 6,521,208.52


M2 10.29 Rp 126,878.35 Rp 1,305,578.22
M1 38.40 Rp 30,000.00 Rp 1,152,000.00
M2 34.48 Rp 49,182.05 Rp 1,695,797.08
M2 4.60 Rp 49,182.05 Rp 226,237.43

M2 12.30 Rp 248,198.75 Rp 3,052,844.63

M1 10.20 Rp 185,736.50 Rp 1,894,512.30


M2 3.36 Rp 756,470.00 Rp 2,541,739.20
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00
M1 10.72 Rp 185,736.50 Rp 1,991,095.28
M2 3.44 Rp 126,878.35 Rp 436,461.52
M1 18.40 Rp 30,000.00 Rp 552,000.00
M2 22.40 Rp 49,182.05 Rp 1,101,677.92
M2 2.20 Rp 49,182.05 Rp 108,200.51

M2 11.07 Rp 248,198.75 Rp 2,747,560.16

M1 10.20 Rp 185,736.50 Rp 1,894,512.30


M2 3.36 Rp 756,470.00 Rp 2,541,739.20
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00

M1 15.18 Rp 185,736.50 Rp 2,819,480.07


M2 4.74 Rp 126,878.35 Rp 601,403.38
M1 18.40 Rp 30,000.00 Rp 552,000.00
M2 19.94 Rp 49,182.05 Rp 980,690.08
M2 2.20 Rp 49,182.05 Rp 108,200.51

M2 7.38 Rp 248,198.75 Rp 1,831,706.78

M1 5.10 Rp 185,736.50 Rp 947,256.15


M2 1.68 Rp 756,470.00 Rp 1,270,869.60
BH 3.00 Rp 44,020.85 Rp 132,062.55
BH 1.00 Rp 163,254.00 Rp 163,254.00

M1 2.53 Rp 185,736.50 Rp 469,913.35


M2 0.79 Rp 126,878.35 Rp 100,233.90
M1 9.20 Rp 30,000.00 Rp 276,000.00
M2 13.66 Rp 49,182.05 Rp 671,826.80
M2 1.10 Rp 49,182.05 Rp 54,100.26

M2 6.37 Rp 248,198.75 Rp 1,581,026.04

M1 10.20 Rp 185,736.50 Rp 1,894,512.30


M2 3.36 Rp 756,470.00 Rp 2,541,739.20
BH 6.00 Rp 44,020.85 Rp 264,125.10
BH 2.00 Rp 163,254.00 Rp 326,508.00
M1 5.60 Rp 30,000.00 Rp 168,000.00
M2 12.06 Rp 49,182.05 Rp 593,135.52
M2 0.67 Rp 49,182.05 Rp 32,951.97
Total Pekerjaan Rp 86,547,740.49
M2 272.41 Rp 248,198.75 Rp 67,611,821.49
M2 10.77 Rp 165,623.00 Rp 1,783,759.71
M1 218.42 Rp 31,803.25 Rp 6,946,465.87
M1 25.78 Rp 26,697.25 Rp 688,255.11
M2 311.96 Rp 49,182.05 Rp 15,342,832.32
Total Pekerjaan Rp 92,373,134.49

M3 107.01 Rp 210,220.00 Rp 22,495,642.20


M3 32.19 Rp 254,725.00 Rp 8,199,597.75
M3 22.53 Rp 686,445.97 Rp 15,465,627.76
M2 307.53 Rp 273,265.30 Rp 84,037,277.71
M1 15.74 Rp 43,710.93 Rp 688,009.96
Total Pekerjaan Rp 130,886,155.37

M3 0.47 Rp 883,722.80 Rp 415,349.72


KG 101.04 Rp 19,923.75 Rp 2,013,095.70
M2 7.28 Rp 514,176.50 Rp 3,743,204.92
M2 25.23 Rp 331,487.50 Rp 8,363,429.63
M2 32.30 Rp 308,389.75 Rp 9,960,988.93
M2 47.18 Rp 80,317.38 Rp 3,789,373.99
M2 67.89 Rp 75,051.30 Rp 5,095,232.76
M2 89.85 Rp 45,913.75 Rp 4,125,350.44
M2 89.85 Rp 49,182.05 Rp 4,419,007.19
M2 25.23 Rp 173,624.13 Rp 4,380,536.67
M2 9.07 Rp 168,562.69 Rp 1,528,863.58
BH 2.00 Rp 582,015.00 Rp 1,164,030.00
M3 0.62 Rp 331,487.50 Rp 205,522.25
M3 0.70 Rp 254,725.00 Rp 178,307.50
M3 0.75 Rp 686,445.97 Rp 514,834.48
M3 0.25 Rp 686,445.97 Rp 171,611.49
BH 6.00 Rp 36,417.63 Rp 218,505.75
BH 4.00 Rp 56,465.00 Rp 225,860.00
Total Pekerjaan Rp 50,513,104.99

M2 10.58 Rp 179,010.15 Rp 1,893,927.39


M2 4.00 Rp 273,265.30 Rp 1,093,061.20
M1 25.20 Rp 43,710.93 Rp 1,101,515.31
M1 8.07 Rp 745,775.00 Rp 6,018,404.25
M1 13.52 Rp 450,000.00 Rp 6,084,000.00
Total Pekerjaan Rp 16,190,908.15
Total Keseluruhan Pekerjaan Arsitektur Lt. 1 Rp 649,229,568.02
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

NO URAIAN PEKERJAAN

1 PEKERJAAN PENDAHULUAN

2 PEKERJAAN PONDASI

3 PEKERJAAN BETON BERTULANG

4 PEKERJAAN DINDING

5 PEKERJAAN KUSEN, PINTU & JENDELA

6 PEKERJAAN DINDING PARTISI

7 PEKERJAAN PLAFOND

8 PEKERJAAN LANTAI

9 PEKERJAAN RANGKA + PENUTUP ATAP

10 PEKERJAAN TOILET (WC) & ACCESSORIES

11 PEKERJAAN TANGGA

12 PEKERJAAN TANGGA LUAR BANGUNAN

13 PEKERJAAN FINISHING LUAR BANGUNAN

14 PEKERJAAN MEKANIKAL ELEKTRIKAL

JUMLAH

PPN 10%

TOTAL HARGA

TERBILANG : Tiga Milyar Sembilan Ratus Sembilan Puluh Lima Juta Sembilan Ratus Tiga Puluh dua Ribu Enam
Puluh Tiga Rupiah
BIAYA

JUMLAH HARGA
(Rp)

Rp 10,251,215.00

Rp 163,879,682.34

Rp 1,264,623,077.30

Rp 397,729,127.02

Rp 177,827,176.02

Rp 117,635,737.75

Rp 194,013,291.30

Rp 206,122,637.58

Rp 359,548,585.10

Rp 110,685,770.40

Rp 16,190,908.15

Rp 50,708,051.39

Rp 11,219,036.80

Rp 552,231,725.50

Rp 3,632,666,021.64

Rp 363,266,602.16

Rp 3,995,932,623.81

tus Tiga Puluh dua Ribu Enam Ratus Dua


RENCANA ANGGARAN BI
PROYEK : PEMBANGUNAN KANTOR CAMAT KABUPATEN BASO
TAHUN : 2022
PROGRAM : PEMBANGUNAN SARANA PRASARANA GEDUNG NEGARA

NO URAIAN PEKERJAAN

A PEKERJAAN TERAS DAN RABAT


1 Teras Keliling Bangunan
a.Pasangan Batu Bata Keliling Bangunan
b. Plesteran
c. Acian
d. Tanah Urugan (Timbunan Lantai)
e. Urugan Pasir Tebal 7 cm
f. Cor Lantai K-100 tebal 7 cm
g. Keramik Teksture 40x40 cm

2 Tangga Teras Depan


a. Pasangan Batu Bata 1:2
b. Plesteran Batu Bata 1:2
c. Urugan Tanah
d. urugan Pasir Tebal 7 cm
e. Cor Lantai K-100 tebal 7 cm
f. Keramik Teksture 40x40 Tangga teras
g. Keramik Teksture 40x40 cm Teras

B PEKERJAAN ORNAMEN LUAR BANGUNAN


a. Pas Kisi Kisi Besi Holo Enteren + Finishing Cat
b. Les Profil Beton Depan + Finishing Cat
c. Merek dan Logo Kantor Camat Baso Dari Stenlis
ANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


SAT. VOLUME
(Rp) (Rp) (Rp)

M2 30.79 Rp 331,487.50 Rp 10,206,500.13


M2 23.09 Rp 80,317.38 Rp 1,854,528.30
M2 23.09 Rp 45,913.75 Rp 1,060,148.49
M3 28.20 Rp 210,220.00 Rp 5,928,204.00
M3 5.11 Rp 254,725.00 Rp 1,301,644.75
M3 3.65 Rp 686,445.97 Rp 2,505,527.80
M2 73.14 Rp 273,265.30 Rp 19,986,624.04
Jumlah Pekerjaan Rp 42,843,177.51

M2 2.95 Rp 331,487.50 Rp 977,888.13


M2 2.95 Rp 80,317.38 Rp 236,936.27
M3 0.89 Rp 210,220.00 Rp 187,095.80
M3 0.49 Rp 254,725.00 Rp 124,815.25
M3 0.34 Rp 686,445.97 Rp 233,391.63
M2 10.82 Rp 273,265.30 Rp 2,956,730.55
M2 11.52 Rp 273,265.30 Rp 3,148,016.26
Jumlah Pekerjaan Rp 7,864,873.88

M1 70.40 Rp 48,679.50 Rp 3,427,036.80


M1 6.00 Rp 167,000.00 Rp 1,002,000.00
Ls 1.00 Rp 6,790,000.00 Rp 6,790,000.00
Jumlah Pekerjaan Rp 11,219,036.80
Jumlah Keseluruhan Rp 61,927,088.19