444.13 4.01
0.4 0.6
0.8
0.6
1
0.8
1.2
1
1.4
1.2
1.6
1.4
1.8
1.6 2
1.8 2.2
kedalaman
2 2.4
2.2 2.6
Kedalaman
2.4 2.8
2.6 3
2.8 3.2
3 3.4
3.6
3.2
3.8
3.4
4
3.6
4.2
3.8
4.4
4
4.6
4.2 4.8
4.4 5
4.4
4
4.6
4.2 4.8
4.4 5
4.6
4.8
5
hubugan antara total hambatan pelekat degan
anankonus(qc) degan kedalaman(m)
an(m)
otal
300
(tf)) 400 500 600 0
0 50 100 150 200 250 300 350 400 450
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
kedalaman
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
4
4.2
4.4
4.6
4.8
5
4.4
4.6
4.8
5
Sampel - I II
Ring/Container Number - 1 2
Weight Ring (1) gram 29 39.6
Weight of Container (2) gram 84 64.2
Weight Ring + Container + Wet Soil (3) gram 208 187
Weight of Wet Soil (4) = (3)-(2)-(1) gram 95 83.2
Volume of Soil (5) cm3 58.20 57.3
Weight of Ring + Container + DrySoil (6) gram 192 159.5
Weight of Dry Soil (7) = (6)-(1)-(2) gram 79 55.7
Weight of Water (8) = (4)-(7) gram 16 27.5
Spesific Gravity, Gs - 2.33 2.68
Volume of Dry Soil (9) = (7)/Gs cm3 34.0 20.8
Volume of Pore (10) = (5)-(9) cm3 24.2 36.5
Wet Density, ywet = (4)/(5) gr/cm3 1.63 1.5
Water Content, w = (8)/(7)*100% % 20.3 49.4
Dry Density, gdry =ywet/(1+w) gr/cm3 1.36 0.97
Porosity, n = (10)/(5)*100% % 41.66 63.73
Degree of Saturation, Sr = (8)/(10)*100% % 65.98 75.31
*
Tabel Pemeriksaan Batas Cair
No Test Satuan 1 2 3
Jumlah Pukulan - 45 30 24
No. Container - I II III
Berat Tanah Basah + Container, W1 gram 42.4 53 52
40.00
KADAR AIR
30.00
20.00
10.00
0.00
1 10 100
JUMLAH PUKULAN
No x y ln(x) ln(x)^2
1 45 30.83 3.81 14.49
2 30 33.33 3.40 11.57
3 24 41.67 3.18 10.10
4 10 57.14 2.30 5.30
Jumlah 109 162.98 12.69 41.46
161.00
b = n. (Σln(x).y)-(Σln(x)).Σy)
n. (Σ(ln(x))^2)-(Σln(x))^2
= 4.(494,74)-(12,69)(162,98)
4.(41,46)-(161,00)
= -88.96
= -18.36
4.84
a = y'-bx
y' = Σy 162.98
=
n 4
a = y'-bx
= 28,57-(--20,85 . 3,17)
= 98.99
y = b.ln(x)+a
= 39.89
Tabel Pemeriksaan Batas Plastis
4 No Test Satuan 1 2
10 109 No. Container - I II
IV Berat Tanah Basah + Container, W1 gram 37 37
46 Berat Tanah Kering + Container, W2 gram 33 33
98.9888874428763
100
ln(x)*y
117.37
113.37
132.42
131.58
494.74
= 40.74
= 3.17
Tabel Pemeriksaan Batas Susut
No Test Satuan 1 2
Berat Mould, W1 gram 3.1 3.9
Berat Mould + Tanah Basah, W2 gram 25.9 20.6
Berat Mould + Tanah Kering, W3 gram 14.9 13.1
D10
26.6
17 15.8
2.40000000000001
0.1 0.01
meter Saringan (mm)
Tabel Pengujian Sand Cone Test
Kelompok 2
Satuan I
Gram 683.2
Gram 7489
gram 3750
gram 147
gram 3260.9
Cm3 135.5
% 41
gram/cm3 1.7
gram/cm3 1.54
% 106.9
Ywet = Wwet/V
= 24.1
B.TK.+B.T.BOX = 65 GRAM
B.Tk
= 41 %
Tabel Pengujian Kompaksi
Kelompok 2
No. Mould - 1 2 3
Berat Mould gram 1758 1758 1758
Berat Tanah basah + Mould gram 3117 3245 3246
Berat tanah basah, Wwet gram 1359 1487 1488
Volume Mould cm3 928 928 928
Berat Volume Basah
gr/cm3 1.46 1.60 1.60
ywet = Wwet/Vmould
Kadar Air (Wate
Kel
GRAFIK KOMPAKSI
2.0
1.8
1.4
r/cm3)
1.2
2.0
1.8
1.4
1.0
0.8
f(x) = − 0.00545706146425209 x + 0.932882736860585
0.6
0.4
0.2
0.0
20 25 30 35 40
1B 2A 2B 3A 3B 4A 4B 5A 5B
37 35 41 35.0 39 46 42 38 37
31 29 33 28 32 36 33 30 29
6 6 8 7 7 10 9 8 8
11 11 11 11 11 11 11 11 11
20 18 22 17 21 25 22 19 18
30.00 33.33 36.36 41.18 33.33 40.00 40.91 42.11 44.44
28.16 34.85 37.25 40.45 43.27
n x y
1 28.16 1.39
2 34.85 1.51
3 37.25 1.50
4 40.45 1.57
5 43.27 1.74
D= 100.9 mm Σn 5 183.99 7.72
t= 116.1 mm
r= 50.45
V= 927864 mm3 x
= 928 cm3 5 183.99 6904.49
183.99 6904.49 263601.25
6904.49 6904.49 10215205.94
5.62 5.62
RAFIK KOMPAKSI
5706146425209 x + 0.932882736860585
35 40 45 50 55
x2 y2 x3 x.y x4 x2.y
792.87 1.95 22325.47 39.28 628638.14 1105.98
1214.42 2.29 42320.59 52.69 1474808.40 1836.07
1387.93 2.25 51707.11 55.84 1926343.36 2080.18
1636.57 2.48 66206.71 63.70 2678362.18 2576.76
1872.71 3.01 81041.38 75.14 3507053.87 3251.72
6904.49 11.97 263601.25 286.64 10215205.94 10850.70
y
7.72
286.64
10850.70
7.72
286.64
10850.70
x + 2.3794
y= 1.42 gr/cm3
dan berat isi kering 0,0026 gr/cm³
( 10 x Tumbukan)
Densitas
Berat tanah basah + mold gram 7674
Berat mold gram 4157.6
Berat tanah basah gram 3516.4
Isi cetakan (V) cm 3
2186.54
Berat volume basah (𝛾wet) gram/cm3 1.61
Berat volume kering (𝛾dry) gram/cm3 1.28
Kadar air
No. cawan - 1A 1B
Berat tanah basah + cawan gram 59.30 60.50
Berat tanah kering + cawan gram 49.60 50.60
Berat air gram 9.70 9.90
Berat cawan gram 12.50 12.20
Berat tanah kering gram 37.10 38.40
Kadar air (w) % 26.15 25.78
Kadar air rata-rata % 25.96
10 Tumbukan
750.00
650.00
f(x) = − 4.41616173021715 x² + 103.654486649701 x + 59.4426305912575
550.00
)
10 Tumbukan
750.00
650.00
f(x) = − 4.41616173021715 x² + 103.654486649701 x + 59.4426305912575
550.00
Beban (lbs)
450.00
350.00
250.00
150.00
50.00
0 2 4 6 8 10 12 14
Penurunan (mm)
Penurunan (x)
Beban (lbs) CBR (%)
(mm)
2.54 95.42 3.18
5.08 89.29 1.98
Nilai CBR rata-rata: 2.58
n (ΣLn(x)y) - (ΣLn(x).Σy)
b=
n (Σ (Ln(x))² - (Σ Ln (x))²
10 6021.11 - 10.11 3770.62
b=
10 23.17 - 102.14
22102.78
b=
129.52
b= 170.65
a = y' - bx'
y' = Σy a= 377.06 - 170.65
n a= 377.06 - 172.47
y' = 3770.62 a= 204.59
10
y' = 377.06
y= -4,4162x2 + 103,65x + 59,443
x' = Σ ln(x) y= -8.832 x +
n = 95.42
x' = 10.11 = 89.29
10
x' = 1.01
( 25 x Tumbukan)
Densitas
Berat tanah basah + mold gram
Berat mold gram
Berat tanah basah gram
Isi cetakan (V) cm3
Berat volume basah (𝛾wet) gram/cm3
Berat volume kering (𝛾dry) gram/cm3
Kadar air
No. cawan -
Berat tanah basah + cawan gram
Berat tanah kering + cawan gram
Berat air gram
Berat cawan gram
Berat tanah kering gram
Kadar air (w) %
Kadar air rata-rata %
25 Tumbukan
290.00
250.00
210.00 f(x) = − 0.55784864950763 x² + 25.1858859475061 x + 2.96948791037727
)
25 Tumbukan
290.00
250.00
210.00 f(x) = − 0.55784864950763 x² + 25.1858859475061 x + 2.96948791037727
Beban (lbs)
170.00
130.00
90.00
50.00
10.00
0 2 4 6 8 10 12 14
Penurunan (mm)
No. x y ln(x)
1 0.33 16.1 -1.11
2 0.64 25.7 -0.45
3 1.27 32.1 0.24
4 1.91 41.8 0.64
5 2.54 61.0 0.93
6 3.81 86.8 1.34
7 5.08 122.1 1.63
8 7.62 163.9 2.03
9 10.16 202.4 2.32
10 12.70 231.3 2.54
46.05 983.2 10.11
n (ΣLn(x)y) - (ΣLn(x).Σy)
b=
n (Σ (Ln(x))² - (Σ Ln (x))²
10 1766.61 -
b=
10 23.17 -
7729.06
b=
129.52
b= 59.67
a = y' - bx'
1.01 y' = Σy a= 98.32
n a= 98.32
y' = 983.22 a= 38.01
10
y' = 98.32
y= -0,5578x2 + 25,186x + 2,96
103.65 x' = Σ ln(x) = -1.116
n = 24.15
x' = 10.11 = 23.37
10
x' = 1.01
5 x Tumbukan)
Densitas
8027 Berat tanah basah + mold
4329 Berat mold
3698 Berat tanah basah
2186.54 Isi cetakan (V)
1.69 Berat volume basah (𝛾wet)
1.25 Berat volume kering (𝛾dry)
Kadar air
2A 2B No. cawan
51.80 58.60 Berat tanah basah + cawan
42.30 46.60 Berat tanah kering + cawan
9.50 12.00 Berat air
15.70 13.00 Berat cawan
26.60 33.60 Berat tanah kering
35.71 35.71 Kadar air (w)
35.71 Kadar air rata-rata
60 Tum
1230.00
59475061 x + 2.96948791037727 f(x) = − 10.9986612024668 x
1030.00
60 Tum
1230.00
59475061 x + 2.96948791037727 f(x) = − 10.9986612024668 x
1030.00
830.00
Beban (lbs)
630.00
430.00
230.00
10 12 14 30.00
0 2 4
Penu
Penurunan (x)
(mm)
2.54
5.08
Nilai CBR rata-rata:
b=
10.11 983.22
b=
102.14
b=
b=
y' =
-0,5578x2 + 25,186x + 2,9695
x + 25.186 x' =
x' =
x' =
( 60 x Tumbukan)
n - 3A 3B
ah basah + cawan gram 70.00 73.40
ah kering + cawan gram 54.70 57.30
gram 15.30 16.10
wan gram 12.40 12.90
ah kering gram 42.30 44.40
r (w) % 36.17 36.26
r rata-rata % 36.22
in devisi lb
0 0 0.00
0.330 1.2 38.56
0.635 3 96.39
1.27 8.1 260.26
1.905 13.2 424.13
2.54 18.9 607.28
3.81 24 771.15
5.08 28.1 902.89
7.62 32 1028.20
10.16 35 1124.60
12.7 37.2 1195.29
60 Tumbukan
1230.00
f(x) = − 10.9986612024668 x² + 228.795146669203 x + 3.49481200157248
1030.00
60 Tumbukan
1230.00
f(x) = − 10.9986612024668 x² + 228.795146669203 x + 3.49481200157248
1030.00
830.00
630.00
430.00
230.00
30.00
0 2 4 6 8 10 12 14
Penurunan (mm)
208.29 6.94
193.05 4.29
BR rata-rata: 5.62
n (ΣLn(x)y) - (ΣLn(x).Σy)
n (Σ (Ln(x))² - (Σ Ln (x))²
10 11047.45 - 10.11 6448.77
10 23.17 - 102.14
45299.08
129.52
349.74
a = y' - bx'
Σy a= 644.88 - 349.74 1.01
n a= 644.88 - 353.47
6448.77 a= 291.41
10
644.88
y= -10,999x2 + 228,8x + 3,4948
Σ ln(x) y= -22.00 x + 228.80
n = 208.29
10.11 = 193.05
10
1.01
Tabel Pemeriksa
Kelompok
Penetrasi (D) Penetrasi (D) Kumulatif
Tumbukan
(cm) (mm) Tumbukan Penetrasi (cm)
0 0 0 0 5 2
1 5 2 20 10 4
2 5 2 20 15 6
3 5 6 60 20 12
4 5 9 90 25 21
5 5 11 110 30 32
6 5 14 140 35 46
7 5 15 150 40 61
8 5 13 130 45 74
9 5 11 110 50 85
10 5 9 90 55 94
11 5 6 60 60 100
980
120 100
105.44
105 90
80
90
60
60 50
45 40
30
30 24.92
14.63 20
11.24 9.03 8.19 7.48
15 7.48 10
0 2
0 0
0 0.5 1 1.5 2 2.5 3 3.5 0 1
DCP (cm/tumbukan)
Tabel Pemeriksaan DCP
Kelompok 2
DCP DCP CBR
(cm/Tumbukan) (mm/Tumbukan) Konus 60° D*CBR*1/3 CBR DESAIN
0 0 0
0.4 4 105.44 18.90
0.4 4 105.44 18.90
1.2 12 24.92 35.05
1.8 18 14.63 44.03
2.2 22 11.24 49.29
14.63
2.8 28 8.19 56.44
3 30 7.48 58.68
2.6 26 9.03 54.14
2.2 22 11.24 49.29
1.8 18 14.63 44.03
1.2 12 7.48 428.73
7.48
100 94
90 85
80 74
Kumulatif Penetrasi (cm)
70
61
60
50 46
40 32
30
21
20 12
10 4 6
2
0
0 10 20 30 40 50 60
Kumulatif Tumbukan