NO URAIAN PEKERJAAN JUMLAH HARGA (RP.

A PEKERJAAN PENDAHULUAN Rp27,000,000


B PEKERJAAN PONDASI Rp55,000,000
C PEKERJAAN STRUKTUR Rp100,000,000
D PEKERJAAN DINDING BATA Rp40,000,000
E PEK KUSEN, PINTU, JENDELA DAN AKSESORIS Rp30,000,000
F PEKERJAAN INSTALASI LISTRIK Rp15,000,000
G PEKERJAAN SANITAIR Rp15,000,000
H PEKERJAAN ATAP BETON Rp55,000,000
I PEKERJAAN FINISHING Rp20,000,000
JUMLAH Rp357,000,000
RENCANA PROGRES MINGGUAN (%) =
RENCANA PROGRES KUMULATIF (%) =
BOBOT (%) MARET 2022 APR
1 2 3 4 1
7.56 3.78 3.78
15.41 5.14 5.14 5.14
28.01 7.00
11.20
8.40
4.20
4.20
15.41
5.60
100.00
0.00 3.78 3.78 5.14 5.14 12.14
0.00 3.78 7.56 12.70 17.83 29.97
WAKTU PELAKSANAAN PEKERJAAN = 4 BULAN
APRIL 2022 MEI 2022
2 3 4 1 2

7.00 7.00 7.00


2.80 2.80 2.80 2.80
1.40 1.40 1.40 1.40 1.40
0.60 0.60 0.60
0.53 0.53 0.53
3.08 3.08

11.20 11.20 12.33 8.41 5.61


41.18 52.38 64.71 73.12 78.73
MEI 2022 JUNI 2022
3 4 1 2 3

1.40
0.60 0.60 0.60 0.60
0.53 0.53 0.53 0.53 0.53
3.08 3.08 3.08
1.12 1.12 1.12 1.12

5.61 5.33 5.33 2.25 1.65


84.33 89.66 94.99 97.23 98.88
4

1.12

1.12
100.00