PANJANG LUAS
NO. GAMBAR ALMT GBR PANJ (M) LEBAR (M) TINGGI (M) n VOLUME (M3) Kg
(M1) (M2)
GAMBAR DETAIL SLOOF , RING BALOK & KOLOM PRAKTIS PADA DINDING RUMAH
GAMBAR DETAIL SLOOF , RING BALOK & KOLOM PRAKTIS PADA DINDING PAGAR
SATUAN
m3
btg
m3
kg
m3
m3
m3 Rp 135.00 kg
kg
ltr
btg Rp 6,831.83 kg
btg Rp 7,621.62 kg 2.664
btg Rp 7,882.88 kg 7.4
kg 10.656
kg
kg
ltr
bh
m3
m3
Lembar
btg
m3
ANALISA SNI
1.4. Pengukuran dan pemasangan 1 m' Bouwplank
A TENAGA KERJA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02b OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Kayu balok utk bowplank,pagar dan kantor sementara M.79 m3 0.012
2 Paku M.175 kg 0.020
3 Kayu kamper (papan) M.63 m³ 0.007
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 1.500
2 Tukang Batu L.02a OH 0.750
3 Kepala Tukang L.03 OH 0.075
4 Mandor L.04 OH 0.075
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Batu belah M.05 m3 1.200
2 Portland cement M.483 kg 202.000
3 Pasir pasang muntilan (quarry - lokasi pekerjaan) M.29 m³ 0.485
A TENAGA KERJA
1 Pekerja L.01 OH 0.300
2 Mandor L.04 OH 0.010
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Pasir urug (quarry - lokasi pekerjaan) M.14 m³ 1.200
JUMLAH HARGA BAHAN
C PERALATAN
4.7. Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225) slump (12±2) cm w/c = 0,58
A TENAGA KERJA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02a OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Portland cement M.483 kg 371.0
2 Pasir beton M.11 kg 698.0
3 Kerikil beton M.28 kg 1047.0
4 Air M.02 liter 215.0
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.070
2 Tukang Besi L.02c OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Baja tulangan polos D-12 M.160 kg 10.50
2 Kawat beton M.174 kg 0.15
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.070
2 Tukang Besi L.02c OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Baja tulangan polos D-6 M.160 kg 10.50
2 Kawat beton M.174 kg 0.15
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02b OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Kayu Sengon (papan) M.88 m3 0.045
2 Paku M.175 kg 0.300
3 Minyak bekisting M.602 liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
6.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP
A TENAGA KERJA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02a OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
B BAHAN
1 Bata merah 5 x 11 x 22 cm M.04.c bh 140.000
2 Portland cement M.483 kg 32.950
3 Pasir pasang muntilan (quarry - lokasi pekerjaan) M.29 m³ 0.091
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.6 Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200) slump (12±2) cm w/c = 0,61
A TENAGA KERJA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02a OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Portland cement M.483 kg 352.0
2 Pasir beton M.11 kg 731.0
3 Kerikil beton M.28 kg 1031.0
4 Air M.02 liter 215.0
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.070
2 Tukang Besi L.02c OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Baja tulangan polos D-10 M.160 kg 10.50
2 Kawat beton M.174 kg 0.15
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02b OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Kayu Sengon (papan) M.88 m3 0.040
2 Paku M.175 kg 0.400
3 Minyak bekisting M.602 liter 0.200
4 Kayu kelapa M.68 m³ 0.018
5 Multiplek tebal 0,9 cm M.100 lembar 0.350
6 Dolken kayu galam Ø 8-10 cm, pjg 3 m M.75 batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.400
2 Tukang Batu L.02a OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.022
A TENAGA KERJA
1 Pekerja L.01 OH 0.750
2 Mandor L.04 OH 0.025
JUMLAH HARGA TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.6 Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200) slump (12±2) cm w/c = 0,61
A TENAGA KERJA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02a OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Portland cement M.483 kg 352.0
2 Pasir beton M.11 kg 731.0
3 Kerikil beton M.28 kg 1031.0
4 Air M.02 liter 215.0
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA KERJA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02b OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Kayu Sengon (papan) M.88 m3 0.040
2 Paku M.175 kg 0.400
3 Minyak bekisting M.602 liter 0.200
4 Kayu kelapa M.68 m³ 0.015
5 Multiplek tebal 0,9 cm M.100 lembar 0.350
6 Dolken kayu galam Ø 8-10 cm, pjg 3 m M.75 batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
6.9 Pemasangan 1m2 dinding bata merah (8x8x15) cm tebal ½ batu campuran 1SP :4PP
A TENAGA KERJA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02a OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
JUMLAH HARGA TENAGA KERJA
B BAHAN
1 Bata merah 8 x 8 x 15 cm M.04.c bh 66.00
2 Portland cement M.483 kg 10.48
3 Pasir pasang muntilan (quarry - lokasi pekerjaan) M.29 m³ 0.034
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.260
2 Tukang Batu L.02a OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.013
6.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
A TENAGA KERJA
1 Pekerja L.01 OH 0.600
2 Tukang Batu L.02a OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah 5 x 11 x 22 cm M.04.c bh 140.000
2 Portland cement M.483 kg 26.550
3 Pasir pasang muntilan (quarry - lokasi pekerjaan) M.29 m³ 0.093
120,000.00 12,000.00
150,000.00 15,000.00
160,000.00 1,600.00
180,000.00 900.00
29,500.00
1,350,000.00 16,200.00
22,000.00 440.00
1,350,000.00 9,450.00
26,090.00
55,590.00
5,559.00
61,149.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 180,000.00
150,000.00 112,500.00
160,000.00 12,000.00
180,000.00 13,500.00
318,000.00
385,000.00 462,000.00
1,250.00 252,500.00
105,000.00 50,925.00
765,425.00
-
1,083,425.00
108,342.50
1,191,767.50
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 36,000.00
180,000.00 1,800.00
37,800.00
90,000.00 108,000.00
108,000.00
-
145,800.00
14,580.00
160,380.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 198,000.00
150,000.00 41,250.00
160,000.00 4,480.00
180,000.00 14,940.00
258,670.00
1,250.00 463,750.00
135.00 94,230.00
450,000.00 471,150,000.00
36.00 7,740.00
471,715,720.00
471,974,390.00
47,197,439.00
519,171,829.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 8,400.00
150,000.00 10,500.00
160,000.00 1,120.00
180,000.00 720.00
20,740.00
7,882.88 82,770.27
20,000.00 3,000.00
85,770.27
106,510.27
10,651.03
1,065.10
11,716.13
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 8,400.00
150,000.00 10,500.00
160,000.00 1,120.00
180,000.00 720.00
20,740.00
6,831.83 71,734.23
20,000.00 3,000.00
74,734.23
95,474.23
9,547.42
954.74
10,502.17
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 62,400.00
150,000.00 39,000.00
160,000.00 4,160.00
180,000.00 4,680.00
110,240.00
1,350,000.00 60,750.00
22,000.00 6,600.00
11,000.00 1,100.00
68,450.00
178,690.00
17,869.00
196,559.00
120,000.00 72,000.00
150,000.00 30,000.00
160,000.00 3,200.00
180,000.00 5,400.00
110,600.00
650.00 91,000.00
1,250.00 41,187.50
105,000.00 9,555.00
141,742.50
-
252,342.50
25,234.25
277,576.75
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 90,750.00
150,000.00 19,250.00
160,000.00 2,240.00
180,000.00 6,640.00
118,880.00
1,250.00 519,200.00
135.00 145,260.14
450,000.00 168,014.81
36.00 4,300.00
836,774.96
955,654.96
95,565.50
1,051,220.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 8,400.00
150,000.00 10,500.00
160,000.00 1,120.00
180,000.00 720.00
20,740.00
7,621.62 80,027.03
20,000.00 3,000.00
83,027.03
-
103,767.03
10,376.70
1,037.67
11,414.37
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 79,200.00
150,000.00 49,500.00
160,000.00 5,280.00
180,000.00 5,940.00
139,920.00
1,350,000.00 54,000.00
22,000.00 8,800.00
11,000.00 2,200.00
1,900,000.00 34,200.00
140,000.00 49,000.00
12,000.00 24,000.00
172,200.00
-
312,120.00
31,212.00
343,332.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 48,000.00
150,000.00 30,000.00
160,000.00 3,200.00
180,000.00 3,960.00
85,160.00
1,250.00 8,640.00
105,000.00 3,675.00
12,315.00
-
97,475.00
9,747.50
107,222.50
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 90,000.00
180,000.00 4,500.00
94,500.00
94,500.00
9,450.00
103,950.00
34650.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 198,000.00
150,000.00 41,250.00
160,000.00 4,480.00
180,000.00 14,940.00
258,670.00
1,250.00 440,000.00
135.00 98,685.00
450,000.00 463,950,000.00
36.00 7,740.00
464,496,425.00
-
464,755,095.00
46,475,509.50
511,230,604.50
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 79,200.00
150,000.00 49,500.00
160,000.00 5,280.00
180,000.00 5,940.00
139,920.00
1,350,000.00 54,000.00
22,000.00 8,800.00
11,000.00 2,200.00
1,900,000.00 28,500.00
140,000.00 49,000.00
12,000.00 24,000.00
166,500.00
-
306,420.00
30,642.00
337,062.00
an 1SP :4PP
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 36,000.00
150,000.00 15,000.00
160,000.00 1,600.00
180,000.00 2,700.00
55,300.00
650.00 42,900.00
1,250.00 13,100.00
105,000.00 3,570.00
59,570.00
114,870.00
11,487.00
126,357.00
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 31,200.00
150,000.00 30,000.00
160,000.00 3,200.00
180,000.00 2,340.00
66,740.00
1,250.00 12,960.00
105,000.00 3,255.00
16,215.00
-
82,955.00
8,295.50
91,250.50
an 1SP : 4PP
Jumlah
Harga Satuan Harga
(Rp) (Rp)
120,000.00 72,000.00
150,000.00 30,000.00
160,000.00 3,200.00
180,000.00 5,400.00
110,600.00
650.00 91,000.00
1,250.00 33,187.50
105,000.00 9,765.00
133,952.50
-
238,888.00
23,888.80
262,776.80
HARGA SATUAN PEKERJAAN
ANALISA HARGA SATUAN PEKERJAAN PONDASI DAN DINDING R
NO. JENIS PEKERJAAN KODE HARSAT (Rp)
1 Pengukuran & Bouwplank 1.4. Rp 61,149.00
2 Pondasi Pas Batu Kali 1:3 3.1. Rp 1,191,767.50
3 Pasir Urug 2.11. Rp 160,380.00
4 Sloof 15x20 (1:2:3)
Beton 1:2:3 4.7. Rp 519,171,829.00
Besi tul dia.12 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.21 Rp 196,559.00
5 Pas Ddg Batu Bata 1:3 6.2. Rp 277,576.75
6 Ring Balok 8x15 (1:2:3)
Beton (1:2:3) 4.7. Rp 519,171,829.00
Besi tul dia.10 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.23 Rp 343,332.00
7 Plesteran 1:5 ; tbl 2 cm 7.16. Rp 107,222.50
8 Galian Tanah 2.1. Rp 103,950.00
9 Tanah urug kembali 2.9. Rp 34,650.00
10 Kolom Praktis 1:1,5:2,5 (8x10)
Beton 1:1,5:2,5 4.6 Rp 511,230,604.50
Besi tul dia.10 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.22 Rp 337,062.00
ANALISA HARGA SATUAN PEKERJAAN PONDASI DAN DINDING
1 Pondasi Pas Bata 1:4 6.9 Rp 126,357.00
2 Pasir Urug 2.11. Rp 160,380.00
3 Sloof 15x20 ; 1:2:3
Beton; 1:2:3 4.7. Rp 519,171,829.00
Besi tul dia.12 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.21 Rp 196,559.00
4 Pas Ddg Batu Bata 1:4 6.9 Rp 126,357.00
5 Ring Balok 8x15 (1:2:3)
Beton (1:2:3) 4.7. Rp 519,171,829.00
Besi tul dia.10 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.23 Rp 343,332.00
6 Plesteran 1:3 ; tbl 2 cm 7.14. Rp 91,250.50
7 Galian Tanah 2.1. Rp 103,950.00
8 Tanah urug kembali 2.9. Rp 34,650.00
9 Kolom Praktis 1:1,5:2,5 (8x10)
Beton 1:1,5:2,5 4.6 Rp 511,230,604.50
Besi tul dia.10 mm - tul pokok 4.17 Rp 11,716.13
Besi tul dia.6 mm - tul sengkang 4.17 Rp 10,502.17
Bekisting 4.22 Rp 337,062.00
ERJAAN
DASI DAN DINDING RUMAH
SAT. KETERANGAN
m1
m3
m3
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
m3
m3
kg
kg
m2
DASI DAN DINDING PAGAR
m3
m3
m3
kg
kg
m3
m2
m3
kg
kg
m2
m2
m3
m3
m3
kg
kg
m2
BILL OF QUANTITY
Rp 61,149.00 Rp 4,158,132.00
Rp 1,191,767.50 Rp 17,018,439.90
Rp 160,380.00 Rp 667,982.70
Rp 519,171,829.00 Rp 926,721,714.77
Rp 11,716.13 Rp 2,723,747.09
Rp 10,502.17 Rp 602,058.29
Rp 196,559.00 Rp 4,678,104.20
Rp 277,576.75 Rp 60,282,730.68
Rp 519,171,829.00 Rp 370,688,685.91
Rp 11,716.13 Rp 1,891,491.04
Rp 10,502.17 Rp 446,688.41
Rp 343,332.00 Rp 6,128,476.20
Rp 107,222.50 Rp 1,913,921.63
Rp 103,950.00 Rp 47,006,190.00
Rp 34,650.00 Rp 371,101.50
Rp 511,230,604.50 Rp 328,414,540.33
Rp 11,716.13 Rp 2,797,499.35
Rp 10,502.17 Rp 603,200.71
Rp 337,062.00 Rp 5,413,215.72
JUMLAH SUB I Rp 1,782,527,920.41
Rp 126,357.00 Rp 1,165,643.33
Rp 160,380.00 Rp 295,901.10
Rp 519,171,829.00 Rp 638,581,349.67
Rp 11,716.13 Rp 1,876,867.75
Rp 10,502.17 Rp 414,863.69
Rp 196,559.00 Rp 3,223,567.60
Rp 126,357.00 Rp 11,138,369.55
Rp 519,171,829.00 Rp 255,432,539.87
Rp 11,716.13 Rp 1,303,380.38
Rp 10,502.17 Rp 281,036.70
Rp 343,332.00 Rp 4,222,983.60
Rp 91,250.50 Rp 17,209,844.30
Rp 103,950.00 Rp 958,938.75
Rp 34,650.00 Rp 85,239.00
Rp 511,230,604.50 Rp 123,104,329.56
Rp 11,716.13 Rp 1,112,641.79
Rp 10,502.17 Rp 239,909.37
Rp 337,062.00 Rp 2,029,113.24
JUMLAH SUB II Rp 1,062,676,519.24
REKAPITULASI SNI
TERBILANG
DUA RATUS DUA PULUH LIMA JUTA DELAPAN RATUS TUJUH SEMBILAN RIBU RU