Backup data Hanggar Kanopi

Pintu Pemberangkatan Kanopi Terminal


CAD dimensi P
Galian Tanah pondasi 1.95 1.5
Galian Kerb 12.68 0.15 0.3
Galian Sloof 15 0.2 0.35
Timbunan Tanah Kembali 1.5 0.45 0.7
Urugan Pasir Pondasi 0.075 1.5
Cor Lantai Kerja 0.075 1.5
Footplate 1.5x1.5m 0.75 1.5
Pedestal 1.182 1.7
Cor Kerb 12.68 0.15 0.6
Timbunan Sirtu 1.69 0.26
Cor Lantai 3.522 0.04

Begesting Kerb P L VOL / UNIT


12.68 0.6 2

Pembesian Footplate F1 kg/m' m / bh Footplat / (bh)


Bentuk begel, D16 1.57824 3.96 16

panjang lebar Unit


Begisting Footplate F1 6 0.5 6

Pembesian Sloof 20 x 35 kg/m' m / bh


Begel D 8mm 0.39456 1.12 93
Tul D12 0.88776 10.6 2
Tul D16 1.57824 10.6 6

Begisting P L BH
15 0.35 2

Cor P L T
15 0.2 0.35

Pembesian Pedestal D16 kg/m' m / bh pedestal / (bh)


Bentuk begel D16 1.57824 4.16 9
Tul Dalam D16 1.57824 2.2 8
Tul Dalam D12 0.88776 2.2 16
Tul spaner Dalam D12 0.88776 1.48 9
panjang lebar Unit
Begisting Pedestal 4.2 1.7 6

Plesteran Dinding Pedestal 3.684 0.7 6


PlesteranPedestas atas 0.8227 6

Plesteran Kerb 12.68 0.3 6

Kanopi Dan Atap


Hanggar pemberangkatan P Bh Unit
Rangka Pipa 3" 2.76 2 6
Rangka Pipa 3" 3.66 2 6
Rangka Pipa 3" 2.22 2 6
Rangka Pipa 3" 2.89 2 6
Rangka Pipa 3" 2.4 1 6
Rangka Pipa 3" 0.9 3 6

Plat Skur 0.207 2 6

panjang lebar pedestal / (bh)


Base plat tebal 1cm 0.3 0.3 6
angkur Baut 16mm 4 3

Talang P / bh Jml / panel Unit Unit


Rangka TalangSiku 7x7x0.5 1.47 5 5

Lebar Panjang
Talang ACP 5mm 1.49 20 1

Pipa Drainase talang gip 3" Panjang unit


Dari Talang ke Bawah 4 4 16
Dari Bawah Ke got 3.5 4 14
30

Panjang Bh Total Panjang


Gording CNP 100X50X20X2,3mm 20 6 120
Spaner Besi D 12mm 4.25 24 102
0.88776

Atap Galvalium Panjang Lebar Bh


20 3.1 2

Listplank ACP 5mm Lebar Panjang


0.6 52.76 1

Pas. Kramik 60x60cm 2.7 6 16.2

Penecatan Dan Menie selimut Panjang Vol


0.0375 Pipa 3" 0.2355 168.96 39.79008
Canal C 0.34 120 40.8
Siku 7x7cm 0.28 36.75 10.29
Spaner 12mm 0.015 102 1.53
92.41008

Backup data Ruang Tunggu

P L T
Galian Tanah pondasi 1 1 1.3
Galian Kerb 28.3 0.15 0.2
Galian Sloof 6 0.15 0.07
Timbunan Tanah Kembali 1 0.25 0.86
Urugan Pasir Pondasi 1 1 0.05
Cor Lantai Kerja 1 1 0.05
Footplate 1.5x1.5m 1 1 0.3
Pedestal 1 0.5 1.06
Cor Kerb 28.3 0.15 0.4
Timbunan Sirtu 11.3 2.25 0.13
Cor Lantai 11.3 2.25 0.05

Pembesian Footplate F2 kg/m' m / bh Footplat / (bh)


Bentuk begel, D16 1.57824 2.56 14

panjang lebar Unit


Begisting Footplate F2 4 0.3 5

Pembesian Pedestal D16 kg/m' m / bh pedestal / (bh)


Bentuk begel D16 1.57824 2.96 5
Tul Dalam D16 1.57824 1.3 21
Tul spaner Dalam D12 0.88776 1.04 5
panjang lebar Unit
Begisting Pedestal 3 1.06 5

Plesteran Kerb 28.3 0.32 1

Begisting Kerb 28.3 0.2 2

Pembesian Sloof 15 x 20 kg/m' m / bh


Begel D 8mm 0.39456 0.72 52.5
Tul D12 0.88776 10.6 6

Begisting P L BH
10.5 0.2 2

Cor P L T
10.5 0.15 0.2

Kanopi Dan Atap


Rangka Kanopi Ruang Tunggu P Bh Unit
Rangka Pipa 3" 3.68 1 5
Rangka Pipa 3" 2.78 1 5
Rangka Pipa 3" 2.36 1 5
Rangka Pipa 3" 1.536 1 5
Rangka Pipa 3" 1.17 1 5
Rangka Pipa 3" 1.06 1 5
Rangka Pipa 3" 2.2 1 5
Rangka Pipa 3" 0.45 5 1
Rangka Pipa 3" 0.45 8 1
Bangku Pipa 3" 10 4 1

panjang lebar pedestal / (bh)


Base plat tebal 1cm 0.3 0.3 4
angkur Baut 16mm 4 2

Panjang Bh Total Panjang


Gording CNP 100X50X20X2,3mm 12 4 48
Spaner Besi D 12mm 4.25 8 34
0.88776
Atap Galvalium Panjang Lebar Bh
12 4.1 1

Listplank ACP 5mm Lebar Panjang


0.6 32.2 1

Pas. Kramik 60x60cm 11.6 2.55 29.58

Penecatan Dan Menie selimut Panjang Vol


0.0375 Pipa 3" 0.2355 119.78 28.20819
Canal C 0.34 48 16.32
Spaner 12mm 0.015 34 0.51
45.03819

Backup data Papan Nama

P. atas L. bawah Tinggi


Galian Tanah pondasi 0.6 0.6 0.6
Lantai Kerja 0.6 0.6 0.05

Timbunan Tanah Kembali 0.2 0.2 0.35


Galian - Lt kerja - Fotplat - Kolom 0.448 M3

Pembesian footplat D12mm kg/m' m / bh Footplat / (bh)


0.88776 1.64 10

Begisting Footplat P L Vol


2.52 0.2 0.504

Cor Footplate P. atas L. bawah Tinggi


0.6 0.6 0.2

Pembesian Kolom 20x20cm kg/m' m / bh Kolom / (bh)


tinggi kolom 2,35m
Tul. D12mm 0.88776 2.45 8
Beugel. D8mm 0.39456 0.84 11.75

Pembesian Kolom 20x20cm kg/m' m / bh Kolom / (bh)


tinggi kolom 1,95m
Tul. D12mm 0.88776 2.05 8
Beugel. D8mm 0.39456 0.84 9.75

Casing Motif Serit kolom 1,95m 8 Bh


Casing Motif Serit kolom 2,35m 10 Bh
18 Bh

Mahkota pada pilar 4 Bh

Cor Kolom 0,20x0,20x2.35m P. atas L. bawah Tinggi


0.2 0.2 2.35

Cor Kolom 0,20x0,20x1,95m P. atas L. bawah Tinggi


0.2 0.2 1.95

Pembesian Sloof 15x20cm kg/m' m / bh Kolom / (bh)


Panjang 6,20m
Tul. D12mm 0.88776 6.1 6
Beugel. D8mm 0.39456 0.82 30.5

Begisting Sloof 15x20 P L BH


6.2 0.2 2

Cor Sloof 15x20 P L T


6.2 0.15 0.2

Pembesian Balok 15x20cm kg/m' m / bh Balok / (bh)


Panjang 1.25m
Tul. D12mm 0.88776 1.6 6
Beugel. D8mm 0.39456 0.82 8

Begisting Balok 15x20 P L BH


1.25 0.24 2

Cor Balok 15x20 P L T


1.25 0.15 0.2

Pembesian Balok 15x20cm kg/m' m / bh Balok / (bh)


Panjang 2.75m
Tul. D12mm 0.88776 2.85 6
Beugel. D8mm 0.39456 0.82 13.75

Begisting Balok 15x20 P L BH


2.75 0.24 2

Cor Balok 15x20 P L T


2.75 0.15 0.2

Pembesian Balok 15x20cm 30.7401696 Kg


Begisting Balok 15x20 1.92 M2
Cor Balok 15x20 0.12 M3

Pembesian Plat 10 x 60cm kg/m' m / bh Plat / (bh)


Panjang 2,75m
Beugel. D8mm 0.39456 1.44 13.75
Tul. D12mm 0.88776 2.85 10

Begisting Plat 10x60 P L BH


2.75 0.78 1

Cor Plat 10x60 P L T


2.75 0.6 0.1

Pas. Batu tela papan nama t= 1,6 P L Vol


2.75 1.6 4.4

Pas. Batu tela papan nama t= 1,1 P L Vol


1.25 1.1 1.375
5.775

Panjang Lebar Unit


Plesteran Biasa (kanan kiri) 1.25 3.25 2
Plesteran Biasa (Tengah) 2.75 5.14 1

Plesteran Ciprat 0.86 0.14 6

Sponengan 1.5 5
2.75 1
Profil Ban 2.75 2

Pas. Lembaran ACP dinding Depan 2.75 1.5 1

Acian Dinding

Cat Dinding

Cat minyak pada profil Kolom 1 2.35 2


1 1.95 2

Backup Data Pagar Type A

P. atas L. bawah Tinggi


Galian Tanah pondasi 0.6 0.6 0.6
Lantai Kerja 0.6 0.6 0.05

Timbunan Tanah Kembali 0.2 0.2 0.35


diatas fotplate 0.6 0.6 0.35

Pembesian footplat D12mm kg/m' m / bh Footplat / (bh)


0.88776 1.64 10

Begisting Footplat P L Vol


2.4 0.2 0.48

Cor Footplate P. atas L. bawah Tinggi


0.6 0.6 0.2

Pembesian Kolom 20x20cm kg/m' m / bh Kolom / (bh)


tinggi kolom 1,95m
Tul. D12mm 0.88776 2.25 8
Beugel. D8mm 0.39456 0.84 9.75

Casing Motif Serit kolom 1,95m 4 Bh

Mahkota pada pilar 1 Bh


Cor Kolom 0,20x0,20x1,95m P. atas L. bawah Tinggi
0.2 0.2 1.95

Cat minyak pada profil Kolom 1 1.95 2

Pembesian Sloof 15x20cm kg/m' m / bh Kolom / (bh)


Panjang 2,75m
Tul. D12mm 0.88776 3.1 6
Beugel. D8mm 0.39456 0.82 15.5

Begisting Sloof 15x20 P L BH


2.75 0.2 2

Cor Sloof 15x20 P L T


2.75 0.15 0.2

Plesteran Pada sloof 2.75 0.5 1

Acian Pada Sloof

Cat Dinding Pada Sloof

Panel Pagar Besi 4x4 P BH Vol /Panel


Besi 4x4 2.75 4 11
Besi 4x4 1.2 2 2.4
Besi 4x4 0.1 2 0.2
Besi 2x4 0.74 20 14.8
28.4
5.91666666666667

Luas Panel Pagar Besi Hollow 4x4 2.75 1.1 3.025

Backup Data Pagar Type B


Luas CAD L. bawah Tinggi
Galian Tanah pondasi 0.55 0.6
Pas. Pondasi 0.255
Timbunan Tanah Kembali
Pembesian Kolom 20x20cm kg/m' m / bh Kolom / (bh)
tinggi kolom 1,95m
Tul. D12mm 0.88776 1.7 8
Beugel. D8mm 0.39456 0.84 8

Casing Motif Serit kolom 1,95m 4 Bh

Mahkota pada pilar 1 Bh

Cor Kolom 0,20x0,20x1,95m P. atas L. bawah Tinggi


0.2 0.2 1.6

Cat minyak pada profil Kolom 1 1.6 2

Pembesian Sloof 15x20cm kg/m' m / bh Kolom / (bh)


Panjang 2,75m
Tul. D12mm 0.88776 3.1 6
Beugel. D8mm 0.39456 0.82 15.5

Begisting Sloof 15x20 P L BH


2.75 0.2 2

Cor Sloof 15x20 P L T


2.75 0.15 0.2

Pembesian Balok 7x22cm kg/m' m / bh Kolom / (bh)


Panjang 2,75m
Tul. D12mm 0.88776 3.1 4
Beugel. D8mm 0.39456 0.54 15.5

Begisting Balok 7x22cm P L BH


2.75 0.36 1

Cor Balok 7x22cm P L T


2.75 0.22 0.07

Pas. Dinding Batu Tela P L BH


Brutto 2.75 1.1 1
Lobang Dinding /roster 0.8 0.15 3
Netto
Plesteran Pada sloof 2.75 0.45 1
Plesteran Pada Dinding
Plesteran Pada Balok 2.75 0.61 1

Acian Pada Sloof

Cat Dinding Pada Sloof

PLAT JEMBATAN PINTU MASUK (pelebaran)

Pembesian Plat 20 x 120 X 300cm kg/m' m / bh Plat / (bh)

Beugel. D16mm 1.57824 2.84 16


Tul. D12mm 0.88776 3.04 14

Begisting Plat 10x60 P L BH


3 1.6 1

Cor Plat 10x60 P L T


3 1.2 0.2

PLAT PENUTUP DRAINASE (BETON PRA CETAK)

t l p
Pembongkaran untuk levelIng 0.15 0.2 0.6

Pembesian Plat 15 x 60 X 90cm kg/m' m / bh Plat / (bh)

Beugel. D12mm 1.57824 2.1 4


Tul. D12mm 0.88776 0.6 5.5

Begisting Plat 10x60 P L BH


1.2 0.9 1

Cor Plat 10x60 P L T


0.9 0.6 0.15
COR JALAN MASUK (pelebaran)

t l p

Pembesian Plat 15 x 350 X1200CM kg/m' m / bh Plat / (bh)


perhitungan per 12 m'
Beugel. D12mm 0.88776 7.2 61
Tul. D12mm 0.88776 12 19

Begisting Plat 10x60 P L t


12 7 0.1

Cor Plat 3,5 x 12 P L T


12 3.5 0.1

PLAT Beton pelebaran depan hanggar (pelebaran)

t l p

Pembesian Plat 15 x 350 X1200CM kg/m' m / bh Plat / (bh)


perhitungan per 12 m'
Beugel. D12mm 0.88776 5.24 61
Tul. D12mm 0.88776 12 19

Begisting Plat 10x60 P L t


12 7 0.1

Cor Plat 3,5 x 12 P L T


12 3.5 0.1
i

Unit Vol
6 17.55 m3
6 3.4236 m3
1 1.05 m3
12 5.67 m3
6 0.675 m3
6 0.675 m3
6 6.75 m3 6.75
6 12.0564 m3
6 6.8472 m3
6 2.6364 m3
6 0.84528 m3

BH VOL
6 91.296 m2

Unit Vol
6 599.98372 Kg

18 m2

41.09737
18.820512 Kg
100.37606
160.29395 Kg

10.5 M2

1.05 M3

Unit Vol
6 354.53583 Kg
6 166.66214 Kg
6 187.49491 Kg
6 70.949779 Kg
779.64267 Kg
42.84 m2

15.4728 m3
4.9362 m3
20.409 m3

22.824 m3

Vol Ket
33.12 Miring
43.92 R1
26.64 R2
34.68 Tegak 1
14.4 Tegak 2
16.2 Datar
168.96 m

2.484 m2

Unit Vol
6 3.24 m2
6 72 Bh

36.75 m1

Bahan
29.8 m2

m1
m1
m1

(m) (Kg)

90.55152

Total Luas
124 m2

Bahan
31.656 m2

m2

m2

Unit Vol
5 6.5 m3
1 0.849 m3
1 0.063 m3
10 2.15 m3
5 0.25 m3
5 0.25 m3
5 1.5 m3
5 2.65 m3
1 1.698 m3
1 3.30525 m3
1 1.27125 m3

Unit Vol
5 282.82061 Kg

6 m2

Unit Vol
5 116.78976 Kg
5 215.42976 Kg
5 23.08176 Kg
355.30128 Kg
15.9 m2

9.056 m2

11.32 m2

14.914368
56.461536 Kg
71.375904 Kg

4.2 M2

0.315 M3

Vol Ket
18.4 Miring
13.9 R1
11.8 R2
7.68 R3
5.85 R4
5.3 R5
11 Tegak 1
2.25 Tegak 2
3.6 Tegak 3
40 Datar
119.78 m 23.956

Unit Vol
5 1.8 m2
5 40 Bh

(m) (Kg)

30.18384
Total Luas
49.2 m2

Bahan
19.32 m2

m2

m2

Vol /unit Unit Vol Total


0.216 4 0.864 M3
0.018 4 0.072 M3

0.014 4 0.056 M3

Unit Vol
4 58.237056 Kg

M2

Vol /unit Unit Vol Total


0.072 4 0.288 M3

Unit Vol

2 34.800192
2 7.7886144

Unit Vol
2 29.118528
2 6.4628928
78.170227 Kg

Vol /unit Unit Vol Total


0.094 2 0.188 M3

Vol /unit Unit Vol Total


0.078 2 0.156 M3
0.344 M3

Unit Vol

1 32.492016 Kg
1 9.8679456 Kg
42.359962 Kg

2.48 M2

BH
1 0.186 M3

Unit Vol

1 8.522496 Kg
1 2.5883136 Kg
11.11081 Kg

0.6 M2

BH
1 0.0375 M2

Unit Vol
1 15.180696 Kg
1 4.448664 Kg
19.62936 Kg

1.32 M2

BH
1 0.0825 M3

Unit Vol

1 7.812288 Kg
1 25.30116 Kg
33.113448 Kg

Vol
2.145 M2

BH Vol
1 0.165 M3

M2

M2
M2

Vol
8.125 m2
14.135 m2
22.26 m2

0.7224 m2

7.5 m1
2.75 m1
10.25 m1
5.5 m1

4.125 m2

22.26 m2

22.9824 m2

4.7 m2
3.9 m2
8.6 m2

Vol /unit Unit Vol Total


0.216 1 0.216 M3
0.018 1 0.018 M3

0.014 1 0.014 M3
0.126 1 0.126 M3
0.014 M3

Unit Vol
1 14.559264 Kg

M2

Vol /unit Unit Vol Total


0.072 1 0.072 M3

Unit Vol

1 15.97968
1 3.2314464
19.211126 Kg
Vol /unit Unit Vol Total
0.078 1 0.078 M3

3.9 m2

Unit Vol

1 16.512336 Kg
1 5.0148576 Kg
21.527194 Kg

1.1 M2

BH
1 0.0825 M3

1.375 m2

1.375 m2

1.375 m2

Keliling Vol
M1 0.16 1.76 M2
M1 0.16 0.384 M2
M1 0.16 0.032 M2 13.6
M1 0.12 1.776 M2
M1 3.952 M2
bt

m2

Panjang Vol Total


3 0.99 M3
3 0.765 M3
0.225 M3
Unit Vol

1 12.073536
1 2.6514432
14.724979 Kg

Vol /unit Unit Vol Total


0.064 1 0.064 M3

3.2 m2

Unit Vol

1 16.512336 Kg
1 5.0148576 Kg
21.527194 Kg

1.1 M2

BH
1 0.0825 M3

Unit Vol

1 11.008224 Kg
1 3.3024672 Kg
14.310691 Kg

0.99 M2

BH
1 0.04235 M3

3.025 M2
0.36 M2
2.665 M2
1.2375 m2
5.33 m2
1.6775 m2
8.245 m2

8.245 m2

8.245 m2

lebaran)

Unit Vol

1 71.715226 Kg
1 37.783066 Kg
109.49829 Kg

Vol
4.8 M2

BH Vol
1 0.72 M3

A CETAK)

bh vol
1 0.018 m3

Unit Vol

1 13.257216 Kg
1 2.929608 Kg
16.186824 Kg

Vol
1.08 M2

BH Vol
1 0.081 M3
n)

bh vol

Unit Vol

1 389.90419 Kg
1 202.40928 Kg 12.4
592.31347 Kg

Vol
8.4 M2

BH Vol
1 4.2 M3

(pelebaran)

bh vol

Unit Vol

1 283.76361 Kg
1 202.40928 Kg 12.4
486.17289 Kg

Vol
8.4 M2

BH Vol
1 4.2 M3
BACK UP DATA VOLUME
DIVISI : PEKERJAAN PERSIAPAN
ITEM PEKERJAAN : Pas Bouwplank
SATUAN : M'
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT

Panjang (P) Jumlah Volume (V)


NO Rumus Volume SKETSA
(M) (M2)

V = P x L1 x T 8 0.1 2 1.600
7 0.1 2 1.400
3.000

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Galian Tanah Pondasi
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = P x L1 x T

Vertikal 19 1 19.000
Horisontal 21.5 1 21.500

Pjg Pondasi 40.500

40.500 0.45 0.5 9.113

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Galian tanah Pondasi rabat
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = P x L1 x T 5.5 0.2 0.2 0.220


4.5 0.2 0.2 0.180
0.400

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Timbunan Pasir Bawah Pondasi
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = P x L1 x T 19 0.5 0.05 0.475


21.5 0.5 0.05 0.538
1.013
BACK UP DATA VOLUME
DIVISI : PEKERJAAN STRUKTUR DAN DINDING
ITEM PEKERJAAN : Pasangan Pondasi Batu Karang 1Pc:4Ps
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = ((L1+L2)/2) x T x P 21.500 0.5 0.3 0.42 3.612


19.000 0.5 0.3 0.42 3.192
6.804

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : PondasPasang Pondasi Rabat Batu Tela 1Pc:4Ps
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = ((L1+L2)/2) x T x P 5.5 0.3 1.650


4.5 0.3 1.350
3.000

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Timbunan Tanah Kembali Bekas Galian
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar Bawah (L1) Lebar Atas (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M) (M3)

V = P x L1 x L2 x T x 2 21.5 0.375 0.2 0.2 0.645


19 0.375 0.2 0.2 0.570
1.2150

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Timbunan Tanah Peninggian Lantai
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah (J) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (Bh) (M) (M3)

V= PxT
37.725 1 0.4 15.090
5.46 1 0.35 1.911
D 17.001
35
Galian Tanah Pondasi A 2.531

14.470
BACK UP DATA VOLUME

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Timbunan Sirtu Peninggian Lantai
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah (J) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (Bh) (M) (M3)

V= PxT
37.725 1 0.07 2.641
5.46 1 0.05 0.273
2.914

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Pasang Tiang Kayu 10/10 Kayu Kelas I
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Jumlah (Jml) Lebar 1 (L1) Lebar 2 (L2) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(Bh) (M) (M) (M) (M3)

V = Jml x L1 x L2 x T 16 0.1 0.1 2.9 0.464

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Pasang Mirplat 5/10 Kayu Kelas I
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar (L) Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M3)

V= PxLxT 48.000 0.05 0.1 0.240

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Pasang Kosen 5/10 Kayu Kelas I
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
lebar (L) Jumlah Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (Bh) (M) (Bh) (M)

Kusen P1 = 2 0.8 2 2.65 2 13.800


Kusen J1 = 2 0.8 3 1.75 2 11.800
Kusen J2 = 3 1.25 3 1.75 4 32.250
Boven 1 = 1 0.6 2 0.55 2 2.300
Boven 2 = 1 1.35 2 0.45 3 4.050
Kupingan = 32 0.1 3.200
67.400

Volume kusen Kayu 5/10 kelas I 0.337 M3


BACK UP DATA VOLUME

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Pasang Dinding Batu Tela 1Pc:4Ps
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Luasan (A) Jumlah Tinggi(T) Volume (V)
NO Rumus Volume SKETSA
(M) (M2) (Bh) (M) (M3)
A
V= PxT

21.5 2.9 62.350


19 2.9 55.100
Pjg dinding 117.450

Kolom 0.1 16 2.900 4.640

Luasan Bukaan Pintu dan Jalusi 2.385 2 4.770


2.385 2 4.770
1.72 1 1.720
1.225 2 2.450
2.3625 3 7.087
0.385 1 0.385
0.7425 1 0.743
B 21.925

A-B-C 90.885

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Plesteran Dinding 1Pc:4Ps
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Alas (a) Luasan (A) Jumlah Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M2) (Bh) (M) (M3)

Luasan Dinding yg ada x 2 90.885 2 181.770

DIVISI : PEKERJAAN STRUKTUR DAN DINDING


ITEM PEKERJAAN : Acian Dinding
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Alas (a) Luasan (A) Jumlah Tinggi (T) Volume (V)
NO Rumus Volume SKETSA
(M) (M2) (Bh) (M) (M3)

90.885 2 181.770
Plesteran 2 Bh Kolom Teras
BACK UP DATA VOLUME

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Kuda Kuda 5/10 Kayu Kelas I
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah Jumlah Kuda-kuda Volume (V)
NO Rumus Volume SKETSA
(M) (bh) (Bh) (M3)

Kuda-Kuda 1 0.005
Tiang Raja 2.3 1 3 0.035
Kuda-Kuda 8 2 3 0.240
Balok Jepit 2.6 2 3 0.078
Balok Sokong 8 2 3 0.240
Balok Tarik 4.47 1 3 0.067
0.6596

Kuda-Kuda 1 0.005
Tiang Raja 1.37565 1 2 0.014
Kuda-Kuda 5.4 2 2 0.108
Balok Jepit 0 2 2 -
Balok Sokong 2.21 2 2 0.044
Balok Tarik 3.03 2 2 0.061
0.2266

Total 0.886

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Skur Kuda kuda 5/10 Kayu Kelas II
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah Jumlah Kuda-kuda Luasan Volume (V)
NO Rumus Volume SKETSA
(M) (bh) (Bh) (M2) (M3)

4 2 2 0.005 0.080

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Gording 5/10 Kayu Kelas II
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah Jumlah Kuda-kuda Luasan Volume (V)
NO Rumus Volume SKETSA
(M) (bh) (Bh) (M2) (M3)

8 9 0.005 0.360

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pas. Atap Seng BJLS K20
SATUAN : M2
KEGIATAN : PEMBANGUNAN RUMAH LAYAK HUNI
LOKASI : DISTRIK PULAU KURUDU
PELAKSANA : CV. SALAHUTU
Panjang (P) Lebar (L) Volume (V)
NO Rumus Volume SKETSA
(M) (bh) (M2)

V= PxL 8.94 8.75 78.225


6.06 1.5 9.090
87.315
BACK UP DATA VOLUME

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pas. Atap Nok Seng K20
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar (L) Volume (V)
NO Rumus Volume SKETSA
(M) (bh) (M2)

V= PxL 8.75 1 8.750


3 1 3.000
11.750

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Lisplank 2/20 Kayu Kelas I
SATUAN : M1
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Pengali Volume (V)
NO Rumus Volume SKETSA
(M) (M2)

V= PxL 8.75 2.0 17.500


4.47 2.0 8.940
4.47 2.0 8.940

35.380

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Rangka Plafond 5/5 Kayu Kelas II
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luasan (A) Panjang (P) Lebar (L) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M2) (M) (M) (M) (M2)

V= PxLxJ 37.725 37.725


5.46 5.460

43.185

DIVISI : PEKERJAAN ATAP DAN PLAFON


ITEM PEKERJAAN : Pasang Plafond Triplek 3mm
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar (L) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M2)

V= PxLxJ 37.725 37.725


5.46 5.460

43.185
BACK UP DATA VOLUME
DIVISI : PEKERJAAN INSTALASI LISTRIK DAN PLAFOND
ITEM PEKERJAAN : Pasang List Profil Plafon Kayu Kelas II
SATUAN : M'
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar (L) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M')

Dalam ruangan 49.29 1 49.290


Teras 10.6 1 10.600

59.890

DIVISI : PEKERJAAN LANTAI


ITEM PEKERJAAN : Cor Lantai 1Pc:3Ps:5Kr
SATUAN : M3
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luasan (A) Jumlah Luasan Total (At) Tebal (T) Volume (V)
NO Rumus Volume SKETSA
(M2) (M2) (M) (M3)

V= PxT
37.725 1 37.725 0.03 1.132
5.46 1 5.46 0.03 0.164

1.296

DIVISI : PEKERJAAN LANTAI


ITEM PEKERJAAN : Acian Lantai
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luasan (A) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M2) (M2)

V= PxT
35.765 1 35.765
1.96 1 1.960
5.46 1 5.460
43.185

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Daun Pintu Panil Kayu Kelas I
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
lebar (L) Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (M) (Bh) (M)

V= LxT
Daun Pintu Panil P1 0.8 2.1 2 3.360
Daun Pintu Panil P2 0.8 2.1 2 3.360
6.720
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pasang Daun Pintu Tripleks 3mm Ganda, Lapis Seng Plat (WC)
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
lebar (L) Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (M) (Bh) (M)

V= LxT
Daun Pintu Panil P3 0.7 2.1 1 1.470

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Daun Jendela Panil Kaca, Kayu Kelas I
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luas (L) Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (M) (Bh) (M)

V= LxT
Jendela 1 0.69 4 2.760
Jendela 2 0.69 6 4.140

6.900

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Jalusi Kayu Kelas II
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luas (L) Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (M) (Bh) (M)

V= LxT
Jalusi 0.36 4 1.440
0.48 8 3.840
0.27 9 2.430

7.710
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pas. Engsel Pintu
SATUAN : Bh
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Jumlah Engsel Jumlah Pintu Pjng Total (P)
NO Rumus Volume SKETSA
(M) (Bh) (M)

V= LxT
Daun Pintu 2 3 6.00

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Engsel Jendela
SATUAN : Bh
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Jumlah Engsel Jumlah Jendela Pjng Total (P)
NO Rumus Volume SKETSA
(M) (Bh) (M)

V= LxT
Daun Jendela 2 10 20.00

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Kunci Pintu dua Slag
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Kebutuhan tiap Pintu Jumlah Kunci Pjng Total (P)
NO Rumus Volume SKETSA
(Bh) (Bh) (M)

V= LxT
Kunci Pintu 1 3 3.00

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Kait Angin Jendela
SATUAN : Bh
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Kebutuhan tiap Pintu Jumlah Jendela Pjng Total (P)
NO Rumus Volume SKETSA
(Bh) (Bh) (M)

V= LxT
2 10 20.00

DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG


ITEM PEKERJAAN : Pasang Grendel Jendela
SATUAN : Bh
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Kebutuhan tiap Jendela Jumlah Jendela Pjng Total (P)
NO Rumus Volume SKETSA
(Bh) (Bh) (M)

V= LxT
Grendel Jendela 1 10 10.00
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pas. Handel Jendela
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Kebutuhan tiap Jendela Jumlah Jendela Pjng Total (P)
NO Rumus Volume SKETSA
(Bh) (Bh) (M)

V= LxT
handel Jendela 1 10 10.00

DIVISI : PEKERJAAN PENGECATAN


ITEM PEKERJAAN : Cat Dinding
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luasan (A) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M2) (Bh) (M3)

2 x Luasan Dinding 90.885 2 181.770

181.770

DIVISI : PEKERJAAN PENGECATAN


ITEM PEKERJAAN : Cat Kilat Kayu
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M) (Bh) (M3)

Listplank 35.380 0.2 7.076


Kusen 0.337 0.05 0.1 0.25 16.850
Jalusi 7.710 0.4 3.084

27.010

DIVISI : PEKERJAAN PENGECATAN


ITEM PEKERJAAN : Politur
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Luasan (A) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M2) (Bh) (M3)

Pintu 2.940 2 5.880


Jendela 6.900 2 0.2 2.760

8.640