Book 3
Book 3
Begisting P L BH
15 0.35 2
Cor P L T
15 0.2 0.35
Lebar Panjang
Talang ACP 5mm 1.49 20 1
P L T
Galian Tanah pondasi 1 1 1.3
Galian Kerb 28.3 0.15 0.2
Galian Sloof 6 0.15 0.07
Timbunan Tanah Kembali 1 0.25 0.86
Urugan Pasir Pondasi 1 1 0.05
Cor Lantai Kerja 1 1 0.05
Footplate 1.5x1.5m 1 1 0.3
Pedestal 1 0.5 1.06
Cor Kerb 28.3 0.15 0.4
Timbunan Sirtu 11.3 2.25 0.13
Cor Lantai 11.3 2.25 0.05
Begisting P L BH
10.5 0.2 2
Cor P L T
10.5 0.15 0.2
Sponengan 1.5 5
2.75 1
Profil Ban 2.75 2
Acian Dinding
Cat Dinding
t l p
Pembongkaran untuk levelIng 0.15 0.2 0.6
t l p
t l p
Unit Vol
6 17.55 m3
6 3.4236 m3
1 1.05 m3
12 5.67 m3
6 0.675 m3
6 0.675 m3
6 6.75 m3 6.75
6 12.0564 m3
6 6.8472 m3
6 2.6364 m3
6 0.84528 m3
BH VOL
6 91.296 m2
Unit Vol
6 599.98372 Kg
18 m2
41.09737
18.820512 Kg
100.37606
160.29395 Kg
10.5 M2
1.05 M3
Unit Vol
6 354.53583 Kg
6 166.66214 Kg
6 187.49491 Kg
6 70.949779 Kg
779.64267 Kg
42.84 m2
15.4728 m3
4.9362 m3
20.409 m3
22.824 m3
Vol Ket
33.12 Miring
43.92 R1
26.64 R2
34.68 Tegak 1
14.4 Tegak 2
16.2 Datar
168.96 m
2.484 m2
Unit Vol
6 3.24 m2
6 72 Bh
36.75 m1
Bahan
29.8 m2
m1
m1
m1
(m) (Kg)
90.55152
Total Luas
124 m2
Bahan
31.656 m2
m2
m2
Unit Vol
5 6.5 m3
1 0.849 m3
1 0.063 m3
10 2.15 m3
5 0.25 m3
5 0.25 m3
5 1.5 m3
5 2.65 m3
1 1.698 m3
1 3.30525 m3
1 1.27125 m3
Unit Vol
5 282.82061 Kg
6 m2
Unit Vol
5 116.78976 Kg
5 215.42976 Kg
5 23.08176 Kg
355.30128 Kg
15.9 m2
9.056 m2
11.32 m2
14.914368
56.461536 Kg
71.375904 Kg
4.2 M2
0.315 M3
Vol Ket
18.4 Miring
13.9 R1
11.8 R2
7.68 R3
5.85 R4
5.3 R5
11 Tegak 1
2.25 Tegak 2
3.6 Tegak 3
40 Datar
119.78 m 23.956
Unit Vol
5 1.8 m2
5 40 Bh
(m) (Kg)
30.18384
Total Luas
49.2 m2
Bahan
19.32 m2
m2
m2
0.014 4 0.056 M3
Unit Vol
4 58.237056 Kg
M2
Unit Vol
2 34.800192
2 7.7886144
Unit Vol
2 29.118528
2 6.4628928
78.170227 Kg
Unit Vol
1 32.492016 Kg
1 9.8679456 Kg
42.359962 Kg
2.48 M2
BH
1 0.186 M3
Unit Vol
1 8.522496 Kg
1 2.5883136 Kg
11.11081 Kg
0.6 M2
BH
1 0.0375 M2
Unit Vol
1 15.180696 Kg
1 4.448664 Kg
19.62936 Kg
1.32 M2
BH
1 0.0825 M3
Unit Vol
1 7.812288 Kg
1 25.30116 Kg
33.113448 Kg
Vol
2.145 M2
BH Vol
1 0.165 M3
M2
M2
M2
Vol
8.125 m2
14.135 m2
22.26 m2
0.7224 m2
7.5 m1
2.75 m1
10.25 m1
5.5 m1
4.125 m2
22.26 m2
22.9824 m2
4.7 m2
3.9 m2
8.6 m2
0.014 1 0.014 M3
0.126 1 0.126 M3
0.014 M3
Unit Vol
1 14.559264 Kg
M2
Unit Vol
1 15.97968
1 3.2314464
19.211126 Kg
Vol /unit Unit Vol Total
0.078 1 0.078 M3
3.9 m2
Unit Vol
1 16.512336 Kg
1 5.0148576 Kg
21.527194 Kg
1.1 M2
BH
1 0.0825 M3
1.375 m2
1.375 m2
1.375 m2
Keliling Vol
M1 0.16 1.76 M2
M1 0.16 0.384 M2
M1 0.16 0.032 M2 13.6
M1 0.12 1.776 M2
M1 3.952 M2
bt
m2
1 12.073536
1 2.6514432
14.724979 Kg
3.2 m2
Unit Vol
1 16.512336 Kg
1 5.0148576 Kg
21.527194 Kg
1.1 M2
BH
1 0.0825 M3
Unit Vol
1 11.008224 Kg
1 3.3024672 Kg
14.310691 Kg
0.99 M2
BH
1 0.04235 M3
3.025 M2
0.36 M2
2.665 M2
1.2375 m2
5.33 m2
1.6775 m2
8.245 m2
8.245 m2
8.245 m2
lebaran)
Unit Vol
1 71.715226 Kg
1 37.783066 Kg
109.49829 Kg
Vol
4.8 M2
BH Vol
1 0.72 M3
A CETAK)
bh vol
1 0.018 m3
Unit Vol
1 13.257216 Kg
1 2.929608 Kg
16.186824 Kg
Vol
1.08 M2
BH Vol
1 0.081 M3
n)
bh vol
Unit Vol
1 389.90419 Kg
1 202.40928 Kg 12.4
592.31347 Kg
Vol
8.4 M2
BH Vol
1 4.2 M3
(pelebaran)
bh vol
Unit Vol
1 283.76361 Kg
1 202.40928 Kg 12.4
486.17289 Kg
Vol
8.4 M2
BH Vol
1 4.2 M3
BACK UP DATA VOLUME
DIVISI : PEKERJAAN PERSIAPAN
ITEM PEKERJAAN : Pas Bouwplank
SATUAN : M'
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
V = P x L1 x T 8 0.1 2 1.600
7 0.1 2 1.400
3.000
V = P x L1 x T
Vertikal 19 1 19.000
Horisontal 21.5 1 21.500
V= PxT
37.725 1 0.4 15.090
5.46 1 0.35 1.911
D 17.001
35
Galian Tanah Pondasi A 2.531
14.470
BACK UP DATA VOLUME
V= PxT
37.725 1 0.07 2.641
5.46 1 0.05 0.273
2.914
A-B-C 90.885
90.885 2 181.770
Plesteran 2 Bh Kolom Teras
BACK UP DATA VOLUME
Kuda-Kuda 1 0.005
Tiang Raja 2.3 1 3 0.035
Kuda-Kuda 8 2 3 0.240
Balok Jepit 2.6 2 3 0.078
Balok Sokong 8 2 3 0.240
Balok Tarik 4.47 1 3 0.067
0.6596
Kuda-Kuda 1 0.005
Tiang Raja 1.37565 1 2 0.014
Kuda-Kuda 5.4 2 2 0.108
Balok Jepit 0 2 2 -
Balok Sokong 2.21 2 2 0.044
Balok Tarik 3.03 2 2 0.061
0.2266
Total 0.886
4 2 2 0.005 0.080
8 9 0.005 0.360
35.380
43.185
43.185
BACK UP DATA VOLUME
DIVISI : PEKERJAAN INSTALASI LISTRIK DAN PLAFOND
ITEM PEKERJAAN : Pasang List Profil Plafon Kayu Kelas II
SATUAN : M'
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Panjang (P) Lebar (L) Jumlah Volume (V)
NO Rumus Volume SKETSA
(M) (M) (M) (M')
59.890
V= PxT
37.725 1 37.725 0.03 1.132
5.46 1 5.46 0.03 0.164
1.296
V= PxT
35.765 1 35.765
1.96 1 1.960
5.46 1 5.460
43.185
V= LxT
Daun Pintu Panil P1 0.8 2.1 2 3.360
Daun Pintu Panil P2 0.8 2.1 2 3.360
6.720
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pasang Daun Pintu Tripleks 3mm Ganda, Lapis Seng Plat (WC)
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
lebar (L) Tinggi (T) Jumlah Pjng Total (P)
NO Rumus Volume SKETSA
(M) (M) (Bh) (M)
V= LxT
Daun Pintu Panil P3 0.7 2.1 1 1.470
V= LxT
Jendela 1 0.69 4 2.760
Jendela 2 0.69 6 4.140
6.900
V= LxT
Jalusi 0.36 4 1.440
0.48 8 3.840
0.27 9 2.430
7.710
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pas. Engsel Pintu
SATUAN : Bh
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Jumlah Engsel Jumlah Pintu Pjng Total (P)
NO Rumus Volume SKETSA
(M) (Bh) (M)
V= LxT
Daun Pintu 2 3 6.00
V= LxT
Daun Jendela 2 10 20.00
V= LxT
Kunci Pintu 1 3 3.00
V= LxT
2 10 20.00
V= LxT
Grendel Jendela 1 10 10.00
BACK UP DATA VOLUME
DIVISI : PEKERJAAN DAUN PINTU JENDELA DAN PENGGANTUNG
ITEM PEKERJAAN : Pas. Handel Jendela
SATUAN : M2
KEGIATAN : PEMBANGUNAN 1 (SATU) UNIT RUMAH DINAS GURU SD YPK MARIAROTU
LOKASI : KAMPUNG MARIAROTU, DISTRIK KOSIWO, KAB. KEP. YAPEN
PELAKSANA : CV. BERKAT
Kebutuhan tiap Jendela Jumlah Jendela Pjng Total (P)
NO Rumus Volume SKETSA
(Bh) (Bh) (M)
V= LxT
handel Jendela 1 10 10.00
181.770
27.010
8.640