COBA
COBA
I PEKERJAAN AWAL
A Pembersihan
1 Pembersihan Lahan 228.00 m2 10,200.00 2,325,600.00
2 Pembersihan Paving block 40.00 m2 #VALUE! #VALUE!
B Pekerjaan Bongkaran
1 Bokaran Paving (145 m2) 145.00 m2 14,900.00 2,160,500.00
2 Biaya Penyelenggaraan K3 dan BPJS Ketenagakerjaan 1.00 Ls 1,000,000.00 1,000,000.00
JUMLAH I #VALUE!
II PEKERJAAN SOFTCASE
A Pekerjaan Penanaman dan Penataan Tanaman
1 Penanaman Anting Putri 2.00 Phn #N/A #N/A
2 Penanaman Bromelia Giant 2.00 Phn #N/A #N/A
3 Penanaman Bromelia Tricolour 4.00 m2 #N/A #N/A
4 Penanamnan Cemara Lilin 8.00 Phn #N/A #N/A
5 Ketapang Varigata 4.00 Phn #N/A #N/A
6 Beringin Hijau 2.00 Phn #N/A #N/A
7 Penanaman Miana 21.00 m2 #N/A #N/A
8 Penanaman Soka 15.20 m2 #N/A #N/A
9 Penanaman Legistrum Kuning 5.00 m2 #N/A #N/A
10 Penanamna Puring Cabe 10.00 m2 #N/A #N/A
11 Penanaman Rumput 89.52 m2 #N/A #N/A
12 Penanaman Begonia 11.10 m2 #N/A #N/A
13 Penanaman Kucai Mini 7.12 m2 #N/A #N/A
14 Lavender 1.40 m2 #N/A #N/A
B Pekerjaan Pembentukan Kontur Tanaman
1 Pengurugan Tanah untuk Pembentukan Kontur Tanaman 13.00 m3 #N/A #N/A
JUMLAH II #N/A
III PEKERJAAN HARDSCAPE
A Pekerjaan Pengecatan
1 Paving Block 40.00 #N/A #N/A
JUMLAH III #N/A
G. DIBULATKAN #N/A
G. DIBULATKAN #N/A
JENIS PEKERJAAN Penanaman Ketapang Varigata , T.1m
1.3
SATUAN PEMBAYARAN Phn
PERKIRAAN HARGA SATUAN JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS (Rp.) (Rp.)
A. TENAGA
1. Upah Petugas Penanaman O/H 0.2500 100,000.00 25,000.00
G. DIBULATKAN #N/A
G. DIBULATKAN #N/A
JENIS PEKERJAAN Penanaman Miana , T20 cm
SATUAN PEMBAYARAN m2
1.3
A. TENAGA
1. Upah Petugas Penanaman O/H 0.2500 100,000.00 25,000.00
3.
4.
JUMLAH HARGA TENAGA 51,000
B. BAHAN
1. Miana , T20 cm M030.029 #N/A 36.0000 #N/A #N/A
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
50
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #N/A
E. OVERHEAD 10.0% #N/A
D. HARGA SATUAN PEKERJAAN ( D + E ) #N/A
E. DIBULATKAN #N/A
A. TENAGA
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
1. Soka, T.20 M030.029Polybag 36.0000 14,000.00 504,000.00
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
1. Ligustrum T.20 cm M030.029Polybag 36.0000 7,500.00 270,000.00
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
1. Puring Cabe M030.029Polybag 36.0000 21,000.00 756,000.00
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. Upah Petugas Penanaman O/H 0.0780 100,000.00 7,800.00
B. BAHAN
1. Rumput Gajah Mini m2 M030.029 #N/A 1.0000 #N/A #N/A
3.
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. Upah Petugas Penanaman O/H 0.0780 100,000.00 7,800.00
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
1. Begonia, T.20 M030.029 m2 36.0000 47,000.00 1,692,000.00
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
Lili Paris Kucai / Kucai mini
1. (Chlorophytum sp), tinggi 10 cm, 3 s/d
M030.029 #N/A 36.0000 #N/A #N/A
5 btg/rpn
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
3.
4.
JUMLAH HARGA TENAGA 14,300
B. BAHAN
1. Lavender M030.029Polybag 36.0000 18,000.00 648,000.00
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
B. BAHAN
1. Rumput Gajah Mini m2 M030.029 #N/A 1.0000 #N/A #N/A
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. Pekerja / knek org/hr 0.1500 141,832.00 21,274.80
2. Mandor / pengawas LII.52.1.5
org/hr 0.0030 222,746.00 668
3.
4.
JUMLAH HARGA TENAGA 21,943
B. BAHAN
1. amar M030.029 #N/A 0.1000 #N/A #N/A
2.
3.
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
1.
2.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
JENIS PEKERJAAN Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
SATUAN PEMBAYARAN m2
A. TENAGA
1. Pekerja / knek org/hr 0.0280 141,832.00 3,971.30
1. Tukang Cat / Pelitur org/hr 0.0420 154,679.00 6,496.52
3. Kepala Tukang Cat / Pelitur org/hr 0.0040 197,997.00 791.99
4. Mandor / pengawas org/hr 0.0030 222,746.00 668.24
5.
3. Cat Tembok (Ext. & Int.) Setara Nippon #N/A 0.1000 #N/A #N/A
Paint - Matex (1 kg)
5. Cat dasar
Cat Tembok (Exterior) ICI/Dulux
3. WeatherShield - A918 Warna Khusus #N/A 0.2500 #N/A #N/A
2,5 Ltr
Cat penutup 2 x
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1.0000 -
JUMLAH HARGA UPAH -
NO JENIS TANAMAN
1 Pekerja / knek
2 Tukang
3 Kepala Tukang Batu
4 Tukang Batu
5 Tukang Cat / Pelitur
6 Upah Petugas Penanaman
7 Upah Petugas Pemelihara Tanaman
8 Mandor / pengawas
Kepala Tukang Cat / Pelitur
HARGA SATUAN UPAH PE
A B
org/hr 141,832 Pekerja / knek
org/hr 177,288 Tukang
org/hr 177,288 Kepala Tukang Batu
org/hr 165,473 Tukang Batu
org/hr 154,679 Tukang Cat / Pelitur
O/H 100,000 Upah Petugas Penanaman
O/B 1,300,000 Upah Petugas Pemelihara Tanaman
org/hr 222,746 Mandor / pengawas
org/hr 197,997 Kepala Tukang Cat / Pelitur
HARGA SATUAN UPAH PERBUB
C D
org/hr 141,832
org/hr 177,288
org/hr 177,288
org/hr 165,473
org/hr 154,679
O/H 100,000
O/B 1,300,000
org/hr 222,746
org/hr 197,997
KETERANGAN
e
HARGA SATUAN BARANG
A B C D
a #N/A #N/A
0 Unit 5,500,000
0 #N/A 15,000
0 #N/A 300,000
Bromedia Giant T.60 Phn 275,000
Soka, T.20 Polybag 14,000
Ligustrum T.20 cm Polybag 7,500
0 #N/A
Ketapang Varigata , T.1m Phn 250,000
Beringin Hijau Phn 560,000
Begonia, T.20 m2 47,000
0 #N/A #N/A
0 #N/A #N/A
0 #N/A #N/A
0 #N/A #N/A
0 #N/A #N/A
0 #N/A 45,800
0 #N/A #N/A
Lavender Polybag 18,000
Puring Cabe Polybag 21,000
0 #N/A #N/A
0 #N/A 21,000
0 #N/A #N/A
0 #N/A #N/A
0 #N/A #N/A
HARGA SATUAN BARANG
A B C
Miana Merah, T20 cm Polybag
Miana Kuning, T20 cm Polybag
Anting Putri T.100 cm Phn
Bromedia Giant T.60 Phn
Soka Merah T.20 Polybag
Ligustrum T.20 cm Polybag
Ketapang Varigata Putih, T 1m Phn
Ketapang Varigata (hijau), T.1m Phn
Rumput Gajah Mini m2 m2
Landep, tinggi 5 cm Polybag
Cemara Lilin, tinggi 100 cm, Ø Btg 3 cm Polybag
Landep, tinggi 5 cm Polybag
HARGA SATUAN (Rp)
D
15,000
11,250
300,000
275,000
17,000
7,500
275,000
250,000
45,000
3,900
452,200
3,900
Err:522
1.1.7.01.01.08.002.02153 Rumput
1.1.7.01.01.08.002.02152 Rumput
1.1.7.01.01.08.002.02151 Rumput
1.1.7.01.01.08.002.02154 Rumput
1.1.7.01.01.08.002.02156 Rumput
1.1.7.01.01.08.002.02149 Rumput
1.1.7.01.01.08.002.02150 Rumput
1.1.7.01.01.08.002.02145 Rumput
1.1.7.01.01.08.002.02254 Rumput
1.1.7.01.01.08.002.02254 Rumput
1.1.7.01.01.08.002.02251 Rumput
1.1.7.01.01.08.002.02247 Rumput
1.1.7.01.01.08.002.02281 Rumput
Pasir Pasang m³
Planter Box
Pucuk Merah (Syzgium busy flash), tinggi 60-80 cm, Ø batang 3 cm Polybag
Pupuk Kandang isi 5 kg/karung matang pcs
Pupuk Kandang isi 5 kg/karung matang Buah
Pupuk kandang. uk kecil/karung pcs
Pupuk kandang. uk kecil/karung Buah
Rumput Gajah Mini m2 m2
Rumput Gajah mini Per M2 m2
Santorium, tinggi ? 500 = 600 cm, Ø btg 10 cm
Sikas (Cycas sp.), Ø tajuk daun ≤ 100 cm, Ø Btg 10 cm Phn
Sikas (Cycas sp.), Ø tajuk daun ≤ 100 cm, Ø Btg 10 cm Polybag
Sikas Antik/Pakis Haji Halus (Cycas revoluta), tinggi ≤ 100 cm, Ø Btg 7.5
Phn
cm
Sikas Antik/Pakis Haji Halus (Cycas revoluta), tinggi ≤ 100 cm, Ø Btg 7.5 cm Polybag
Sikas Halus (Cycas revoluta), tinggi 100 cm, Kondisi optimal polybag
Sikas/Pakis Haji Kasar (Cycas rumpii), tinggi ˃ 50 ≤ 100 cm, Ø Btg 7.5 cm Polybag
Sikas/Pakis Haji Kasar (Cycas rumpii), tinggi ≤ 50 cm Phn
Sikas/Pakis Haji Kasar (Cycas rumpii), tinggi ≤ 50 cm Polybag
Soka Jepang Bunga Orange (Ixora sp), tinggi 20 cm, 1 btg/pot Polybag
Soka Singapura (Ixora cocineae) bunga putih pink, merah, tinggi 30 cm, 1 btg/pot Polybag
Sphatofilum Bangkok (60-70 cm) Polybag
Stepping Stone motif dia 30cm pcs
Syngonium, tinggi 20 cm, 3-4 btg/rumpun Polybag
Soka Jambon Polybag
Anthurium, ukuran XL Polybag
Anthurium, ukuran L Polybag
Anthurium, ukuran M Polybag
Anthurium, ukuran S Polybag
9700 #VALUE!
9700 #VALUE!
18100 #VALUE!
2500000 #VALUE!
6700000 #VALUE!
76800 #VALUE!
27,000 #VALUE!
37800
#VALUE!
37,800
#VALUE!
360500 #VALUE!
#VALUE!
173300 #VALUE!
30,100 #VALUE!
34,000 #VALUE!
24,100 #VALUE!
27,300 #VALUE!
53,600 #VALUE!
53,600 #VALUE!
744700 #VALUE!
414,000 #VALUE!
430,100 #VALUE!
923,200
#VALUE!
496,500
#VALUE!
515,800
#VALUE!
784,600
#VALUE!
367,500
#VALUE!
506,100 #VALUE!
525,700 #VALUE!
471,800
#VALUE!
252,400 #VALUE!
242,900 #VALUE!
252,400 #VALUE!
24,700 #VALUE!
14700 #VALUE!
250,000 #VALUE!
78000 #VALUE!
26400 #VALUE!
23000 #VALUE!
58500 #VALUE!
41000 #VALUE!
23400 #VALUE!
17600 #VALUE!
#VALUE!
329300 #VALUE!
129500 #VALUE!
247900 #VALUE!
76500 #VALUE!
66200 #VALUE!
55400 #VALUE!
64400 #VALUE!
39400 #VALUE!
22900 #VALUE!
19900 #VALUE!
1204 #VALUE!
130000 #VALUE!
126,800 #VALUE!
99,200 #VALUE!
31,200 #VALUE!
12,800 #VALUE!
56,823 #VALUE!
37,882 #VALUE!
110,429 #VALUE!
132,092 #VALUE!
9,000 #VALUE!
3,900 #VALUE!
452,200 #VALUE!
14,000 #VALUE!
24,000 #VALUE!
180,000 #VALUE!
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Pucuk Merah (Syzgium busy flash), tinggi 60-80 cm, Ø batang 3 cm
Hanjuang ( 50-60cm)
semen
9.1.2.26.03.01.001.00001 Honorarium Non PNS Lainnya
Operator Teknis/Surveyor/Operator
9.1.2.26.03.01.001.00288 Pemotretan Pendidikan D1
Pengalaman 0 - 3 Tahun
Operator Teknis/Surveyor/Operator
9.1.2.26.03.01.001.00289 Pemotretan Pendidikan D1
Pengalaman > 3 Tahun
Operator Teknis/Surveyor/Operator
9.1.2.26.03.01.001.00290 Pemotretan Pendidikan D3
Pengalaman 0 - 3 Tahun
Operator Teknis/Surveyor/Operator
9.1.2.26.03.01.001.00291 Pemotretan Pendidikan D3
Pengalaman > 3 Tahun
Koordinator Pendidikan S1
9.1.2.26.03.01.001.00292
Pengalaman 0 - 3 Tahun
Koordinator Pendidikan S1
9.1.2.26.03.01.001.00293
Pengalaman 4 - 6 Tahun
Koordinator Pendidikan S1
9.1.2.26.03.01.001.00294
Pengalaman > 6 Tahun
Ketua Tim Pelaksana Pendidikan S1
9.1.2.26.03.01.001.00295
Pengalaman 0 - 5 Tahun
Ketua Tim Pelaksana Pendidikan S1
9.1.2.26.03.01.001.00296
Pengalaman > 5 Tahun
Receiver GPS Tipe Geodetik dan
9.1.2.26.03.01.001.00297
Operator
9.1.2.26.03.01.001.00298 Receiver GPS Tipe Navigasi
Gravity Meter (Gravimeter) dan
9.1.2.26.03.01.001.00299
Operator
9.1.2.26.03.01.001.00300 Total Station dan Operator
Sipat Datar Teliti Digital dan
9.1.2.26.03.01.001.00301
Operator
Alat Pasang Surut Digital dan
9.1.2.26.03.01.001.00302
Operator
Alat Batimetri Single Beam dan
9.1.2.26.03.01.001.00303
Operator
Layanan Data Center PLN (Premium)
9.1.2.26.03.01.001.00304
2 jalur, UPS, Genset :
2. Layanan simpul jaringan data
9.1.2.26.03.01.001.00305
spasial virtual :
9.1.2.26.03.01.001.00306 b. Penambahan storage 10 GB
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00307
teknologi photogrammetry
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00308
teknologi photogrammetry
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00309
teknologi photogrammetry
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00310
teknologi photogrammetry
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00311
teknologi photogrammetry
Jasa pemetaan wilayah dengan
9.1.2.26.03.01.001.00312
teknologi photogrammetry
9.1.2.26.03.01.001.00326 Pemboran
Orang/
Tenaga data penghapusan biodata penduduk 300 0%
Bulaniodata
Honor
Orang/Hari 150,000 0%
Survey/Monitoring/Pendataan/Pengawasan
org/hari 433,939 0%
org/hari 570,976 0%
org/hari 662,330 0%
org/hari 753,684 0%
org/hari 1,039,172 0%
org/hari 1,119,111 0%
org/hari 1,290,404 0%
org/hari 1,450,282 0%
org/hari 1,564,477 0%
org/hari 1,678,672 0%
org/hari 1,792,867 0%
hari 856,464 0%
hari 57,097 0%
hari 1,598,733 0%
hari 685,171 0%
hari 685,171 0%
hari 856,464 0%
hari 1,427,440 0%
9.1.2.26.03.01.001.01389 Kernet
9.1.2.26.03.01.001.01388 Pengemudi
9.1.2.26.03.01.001.01384 Dapodik
9.1.2.26.03.01.001.01369 Perpustakaan
9.1.2.26.03.01.001.01344 Kernet
9.1.2.26.03.01.001.01343 Pengemudi
9.1.2.26.03.01.001.01339 Dapodik
9.1.2.26.03.01.001.01324 Perpustakaan
1.2.26.03.01.001 Honorarium
Non PNS Lainnya
Advokat/Pengacara O/K 500,000 0%
Bilal/Muadzin OK 1,500,000 0%
Bilal/Muadzin OK 1,500,000 0%
Honor
Orang/Hari 150,000 0%
Survey/Monitoring/Pendataan/Pengawasan
Honor
Orang/Hari 150,000 0%
Survey/Monitoring/Pendataan/Pengawasan
Honorariaum Pengajar yang berasal dari luar
OJP 300,000 0%
OPD penyelenggara
Honorariaum Pengajar yang berasal dari luar
OJP 300,000 0%
OPD penyelenggara
Imam OK 2,000,000 0%
Imam OK 2,000,000 0%
Khatib OK 3,000,000 0%
Khatib OK 3,000,000 0%
Qori OK 2,500,000 0%
Qori OK 2,500,000 0%