DAFTAR ISI

SURAT PERMOHONAN BANTUAN DANA

A. Latar Belakang................................................................................1

B. Maksud dan Tujuan.........................................................................1

C.

D. Dasar Kegiatan................................................................................2

E. Sasaran Program.............................................................................2

F. Rancangan Bangun.........................................................................2

G. Rencana Anggaaran Biaya...............................................................2

H. Susunan Panitia..............................................................................2

I. Penutup...........................................................................................3

DOKUMENTASI KEGIATAN..................................................................4

i
ii
PANITIA PEMBANGUNAN
MASJID JAMI AR ROHMAAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis
Rt. 003 Rw. 001 Desa Pasuruan Kecamatan Pabedilan Kabupaten
Cirebon

Nomor : 001/PP-Masjid/DKM/XII/2022
Lampiran : 1 Bendel Proposal
Perihal : Permohonan Bantuan Dana

Kepada Yth Bapak/Ibu/Sdr


Donatur & Dermawan

Di Tempat
Assalamualaikum. Wr. Wb.
Salam ta'dzim kami haturkan semoga Bapak / Ibu / Sdr tetap dalam sehat
walafiyat serta sukses dalam menjalankan aktifitas sehari-hari. Berkaitan dengan
rencana pembangunan Masjid Jami Ar Rohman Desa Pasuruan Kec. Pabedilan
Kab.Cirebon, bersama ini kami selaku Panitia memohon dengan penuh hormat
kepada Bapak/Ibu/Sdr para donatur dan dermawan untuk berkenan berpatisipasi
dalam donasi/sumbangan dana. Adapun anggaran biaya pembangunan tersebut
sebesar : Rp. 2.067.656.000 ( Dua Milyar Enam Puluh tujuh Juta Enam Ratus Lima
Puluh Enam Ribu Rupiah ) bagi Masjid Desa Pasuruan Kecamatan Pabedilan
Kabupaten Cirebon :
Nama masjid : Masjid Jami Ar Roman
Alamat : Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis
Rt. 003 Rw. 001 Desa Pasuruan Kecamatan Pabedilan
Kabupaten Cirebon
Penyelenggara
: DKM Masjid Jami Ar Rohman

Bantuan serta donasi dapat disalurkan melalui


1. Rekening BJB dengan nomor rekening 0131048823100 a.n DKM AR
ROHMAN Desa Pasuruan Kecamatan Pabedilan.
2. Rekening BNI dengan nomor rekening 1585773737 a.n DKM AR
ROHMAN Desa Pasuruan Kecamatan Pabedilan.

Demikian surat permohonan ini kami sampaikan, atas perhatianya kami


haturkan terima kasih dan Jazaakumullah Ahsanal Jazaa.
Wallahul Muwaffiq Ila Aqwamitthoriq
Wassalamualaikum. Wr. Wb.
Pasuruan, 18 Desember 2022

KetuaPanitia Sekretaris

FAOJI IBNU HASAN

Mengetahui,
Ketua MUI Desa Pasuruan Kuwu Desa Pasuruan Ketua DKM Masjid Ar Rohman

1
NANANG KHOIRUL ANAM MUJA YUSUP
PANITIA PEMBANGUNAN
MASJID JAMI AR ROHMAAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis Rt. 003 Rw.
001 Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon

PROPOSAL PEMBANGUNAN MASJID AR ROHMAN


DESA PASURUAN KECAMATAN PABEDILAN
KABUPATEN CIREBON

A. LATAR BELAKANG

Puja dan puji syukur Alhamdulillah kami panjatkan kehadirat Allah


SWT, yang telah memberikan rahmat, taufik, hidayah serta inayahNya
sehingga kita bisa senantiasa menunaikan segala kewajiban beribadah dan
lancar dalam beraktifitas, sholawat serta salam senantiasa kita limpah dan
curahkan pada junjungan kita Nabi Muhammad SAW semoga kita termasuk ke
dalam golongan yang mendapatkan syafa’at di yaumul akhir kelak aamiin yaa
robbal ‘aalamiin.
Masjid adalah rumah Allah SWT dan masjid merupakan tempat ibadah
di mana setiap saat berkumpulnya umat islam dalam menunaikan kewajiban
melaksanakan ibadah sholat berjamaah dan ibadah-ibadah lainnya, dan
masjid juga merupakan sarana dan media dakwah, syi’ar islam di mana
melalui masjid pula umat bisa melakukan aktifitas ibadah dan syiar islam
yang lebih efektif dan efisien agar dapat di laksanakan dan senantiasa di
warnai sikap hidup yang berlandaskan kebersamaan yang islami utamanya.
Dalam hubungan dengan sesama manusia baik dalam rumah tangga ,
bermasyarakat, berbangsa dan bernegara dan yang paling utama adalah
hubungan manusia dengan sang pencipta Allah SWT’.
Jika di tilik dari manfaatnya masjid sangat besar pengaruhnya dalam
membentuk sikap dan pribadi yang senantiasa taqwa, sadar, sabar dan
beribadah serta mendekatkan diri pada Allah SWT. Masjid juga memberikan
pengaruh yang cukup besar peranannya dalam turut serta memberikan tata
nilai berkumpul dan bersama sama insan lainnya dalam kehidupan, keluarga,
bertetangga, bermasyarakat berbangsa dan bernegara serta kehidupan
menyeluruh bukan hanya urusan dunia saja melainkan tentang kehidupan
setelah mati kelak.
Seringnya umat berkumpul dan berinteraksi serta bertemu, bersatu
dalam wadah masjid demi tujuan yang sama menuju ketaqwaan pada Allah
SWT , akan membentuk persatuan di kalangan umat akan semakin kuat rasa
cinta kasih sayang dengan sesama akan semakin meningkat sehingga akan
membentuk jiwa jiwa yang mulia serta menciptakan ketentraman dan
kedamaian bukan hanya untuk umat islam sendiri melainkan untuk semua
manusia dimuka bumi ini.

B. DASAR PEMIKIRAN

Sebagai tempat yang agung dan sangat mulia, maka masjid/ rumah
Allah SWT seharusnya memang tidak hanya berupa bangunan, namun lebih
dari itu masjid seyogyanya bisa menjadi pelindung dan menjadi ciri khas
( religius ) tempat beribadah umat islam khususnya bagi masyarakat islam
sekitarnya dan bisa menjadi kebanggaan tempat suci yang di idam idamkan
oleh seluruh umat islam, bahkan bisa menjadi tempat ternyaman dalam
melakukan aktifitas beribadah supaya lebih khusyuk, serta menunjang semua
kegiatan syiar islam di dalamnya, Hingga tujuan akhirnya semoga segala
kegiatan didalamnya akan menjadi ladang ibadah yang berkah dan penuh
ridho dariNya bagi kita semua umat islam aamiin.

2
C. TUJUAN

 Memberikan gairah semangat ibadah masyarakat baik sholat, sodaqoh,


ataupun yang lainnya
 Memberikan kenyamanan ibadah secara optimal
 Untuk meningkatkan keimanan dan ketaqwaan masyarakat
 Meningkatkan kekhusyukan dalam menjalankan ibadah
 Menjadikan Masjid sebagai pusat kegiatan keagamaan yang layak

D. DASAR KEGIATAN

Dasar kegiatan ini adalah;


a. Anggaran Dasar dan Anggaran Rumah Tangga DKM AR ROHMAN
b. Program Kerja Pengurus Dewan Kemakmuran Masjid (DKM) Ar Rohman
Kecamatan Pabedilan Kabupaten Cirebon
c. Rapat Kerja Panitia Pembangunan Masjid Jami Ar Rohman Desa Pasuruan
Kec.Pabedilan Kab. Cirebon

E. SASARAN PROGRAM

 Yang menjadi sasaran pembangunan ini adalah Masjd Jami’ Ar- Rohman Blok
Manis RT 03 RW 01 Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon
Jawa Barat Indonesia.
 Kayu penyangga plavon yang melapuk di makan usia sehingga di dalam area
utama masjid akan banjir akibat bocor efek dari rusaknya plavon tersebut.
 Kondisi genteng yang sudah rusak dan sudah tidak beraturan efek kayu usuk
yang rapuh
 Kubah masjid yang terbuat dari material alumunium sudah terlihat kusam
dan bentuknya yang sudah tidak lagi sempurna.
 Halaman masjid yang sudah jauh lebih rendah dari jalan utama provinsi di
depannya sehingga halaman akan tergenang air ketika hujan lebat turun.

F. Rancang Bangun
Terlampir

G. Rencana Anggaran Biaya (RAB)


Terlampir

H. Susunan Kepanitiaan
Terlampir

3
I. Penutup

Demikian proposal ini kami sampaikan dengan harapan dapat dijadikan


bahan acuan dan pertimbangan dalam memberikan bantuan dana demi
terwujudnya program serta pembangunan gedung NU Center di MWCNU
Kec.Pabedilan, Atas perhatian dan bantuan yang diberikan, kami ucapkan
terima kasih.

Pasuruan, 18 Desember 2022

KetuaPanitia Sekretaris

FAOJI IBNU HASAN

Mengetahui,
Ketua MUI Desa Pasuruan Kuwu Desa Pasuruan Ketua DKM Masjid Ar Rohman

NANANG KHOIRUL ANAM MUJA YUSUP

4
SURAT PENYATAAN TANGGUNGJAWAB

Yang bertandatangan dibawah ini;

Nama : YUSUP

Jabatan : Ketua DKM AR ROHMAN Desa Pasuruan Kec.Pabedilan


Kab.Cirebon

Alamat : Blok Manis RT 002 RW 001 Desa Pasuruan

Kec.Pabedilan Kab. Cirebon Jawa Barat

45193

No Handphone 085352024669

Dengan ini menyatakan bertanggung jawab terhadap pembangunan

Masjid Jami Ar Rohmaan Desa Pasuruan Kec.Pabedilan Kab. Cirebon

Jawa Barat dari segi fisik, administrasi dan keuangan yang terkait

dengan pembangunan tersebut.

Demikian surat pernyataan ini dibuat dengan sebenar benarnya agar

dapat digunakan sebagaimana mestinya.

Pabedilan, 18 Desember

2022 Pembuat

Pernyataan

MATERAI
10.000

YUSUP

5
RANCANGAN BANGUNAN MASJID JAMI AR ROHMAN
DESA PASURUAN KEC.PABEDILAN KAB.CIREBON

6
PANITIA PEMBANGUNAN
MASJID JAMI AR ROHMAAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis Rt. 003 Rw. 001
Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon

REKAPITULASI

PROYEK : PEMBANGUNAN MASJID AR ROHMAN


LOKASI : Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon
OWNER : Panitia Pembangunan Mesjid AR Rohman

NO URAIAN PEKERJAAN HARGA SATUAN TOTAL HARGA


                 
I PEKERJAAN PERSIAPAN & BONGKARAN       47.562.500
                 
II PEKERJAAN PONDASI         287.490.737
                 
III PEKERJAAN KONSTRUKSI BETON       697.309.300
                 
IV PEKERJAAN DINDING DAN PELAPIS DINDING       250.471.000
                 
V PEKERJAAN LANTAI         153.186.250
                 
VI PEKERJAAN PINTU DAN JENDELA       59.900.000
                 
PEKERJAAN
VII ATAP           78.929.000
                 
VIII PEKERJAAN PLAFOND         71.034.500
                 
IX PEKERJAAN PENGECATAN         39.916.500
                 
X PEKERJAAN INSTALASI LISTRIK       24.435.000
                 
XI PEKERJAAN LAIN-LAIN         1.500.000
                 
  TOTAL           1.711.734.787
  DIBULATKAN           1.711.735.000
                 
  == Satu Milyar Tujuh Ratus Sebelas Juta Tujuh Ratus Tiga Puluh Lima Ribu Rupiah ==
                 

7
DETAIL RENCANA ANGGARAN BIAYA

: PEMBANGUNAN MESJID AR
PROYEK
ROHMAN
LOKASI : Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon
OWNER : Panitia Pembangunan Mesjid AR Rohman

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN TOTAL HARGA


                 
I PEKERJAAN PERSIAPAN & BONGKARAN         47.562.500
  Persiapan            
  1 Direksi keet / gudang     1,00 ls 3.500.000 3.500.000
  2 Pembersihan lapangan   512,50 m2 5.000 2.562.500
  3 Bouwplank     48,00 m1 50.000 2.400.000
  4 Air kerja     1,00 ls 2.000.000 2.000.000
  5 Listrik Kerja     1,00 ls 2.300.000 2.300.000
  6 Mobilisasi     1,00 ls 2.500.000 2.500.000
  7 Keamanan     1,00 ls 500.000 500.000
  8 Pemagaran Lokasi Proyek menggunakan seng 40,00 m1 245.000 9.800.000
  Bongkaran            
  1 Bongkar penutup atap     1,00 ls 3.500.000 3.500.000
  2 Bongkar Rangka atap     1,00 ls 3.500.000 3.500.000
  3 Bongkar Plafond     1,00 ls 1.500.000 1.500.000
  4 Bongkar Instalasi listrik     1,00 ls 500.000 500.000
  5 Bongkar Dinding     1,00 ls 4.500.000 4.500.000
  6 Bongkaran Kolom     1,00 ls 2.500.000 2.500.000
  7 Bongkaran Balok     1,00 ls 2.000.000 2.000.000
  8 Bongkar Pintu     5,00 unit 150.000 750.000
  9 Bongkar jendela     6,00 unit 150.000 900.000
1
 
0 Bongkar lantai untuk sisip Pondasi   1,00 ls 100.000 100.000
1
 
2 Bongkaran Pagar     1,00 ls 1.500.000 1.500.000
1
 
3 Bongkaran Canopy     1,00 ls 750.000 750.000
                 
II PEKERJAAN PONDASI           287.490.737
  1 Galian tanah Pondasi Foot Plat   86,36 m3 148.000 12.781.517
  2 Galian tanah Pondasi batu kali/ROLLAG dan sloof gantung 113,40 m3 148.000 16.783.200
  3 Urug kembali tanah pondasi & sloof   49,94 m3 50.000 2.497.020
  4 Tanah/puing urugan peningggian elavasi   292,60 m3 65.000 19.019.000
  5 Pondasi batu kali (batu kali)   49,00 m3 1.150.000 56.350.000
  6 Pondasi Foot Plat            
      F1 Beton 12,24 m3 1.350.000 16.524.000
        Besi 1.228,56 kg 25.000 30.713.900
        Bekisting 40,80 m2 150.000 6.120.000
      F2 Beton 1,60 m3 1.350.000 2.160.000
        Besi 186,90 kg 25.000 4.672.500
        Bekisting 8,00 m2 150.000 1.200.000
  7 Sloof 15/30 Beton 11,34 m3 1.350.000 15.309.000
        Besi 2.171,99 kg 25.000 54.299.700
        Bekisting 151,20 m2 150.000 22.680.000
  8 Urugan pasir            
    Bawah Pondasi     5,38 m3 450.000 2.421.000
    Bawah Lantai     41,80 m3 450.000 18.810.000
  9 Lantai Kerja Bawah pondasi   5,43 m3 700.000 3.802.400

8
1
 
0 Rabat Beton     1,93 m3 700.000 1.347.500
                 
                 
III PEKERJAAN KONSTRUKSI BETON         697.309.300
  Beton Lantai 1            
  1 Kolom Praktis 13/13   15,80 m1 185.000 2.923.000
  2 Kolom Struktur            
    K1 25/50 Beton 23,05 m3 1.350.000 31.117.500
        Besi 2.457,13 kg 25.000 61.428.250
        Bekisting 276,60 m2 225.000 62.235.000
    K2 15/35 Beton 6,39 m3 1.350.000 8.632.575
        Besi 952,96 kg 25.000 23.824.080
        Bekisting 121,80 m2 225.000 27.405.000
    K3 15/30 Beton 2,84 m3 1.350.000 3.839.400
        Besi 482,15 kg 25.000 12.053.820
        Bekisting 56,88 m2 225.000 12.798.000
    K4 15/25 Beton 1,78 m3 1.350.000 2.399.625
        Besi 352,37 kg 25.000 8.809.290
        Bekisting 37,92 m2 225.000 8.532.000
  3 Balok Beton            
    balok 25/80 Beton 18,40 m3 1.350.000 24.840.000
        Besi 1.826,29 kg 25.000 45.657.300
        Bekisting 147,20 m2 225.000 33.120.000
    balok 15/80 Beton 0,84 m3 1.350.000 1.134.000
        Besi 189,60 kg 25.000 4.740.060
        Bekisting 8,40 m2 225.000 1.890.000
    balok 20/45 Beton 23,76 m3 1.350.000 32.076.000
        Besi 3.079,44 kg 25.000 76.986.000
        Bekisting 216,00 m2 225.000 48.600.000
    balok 15/50 Beton 2,10 m3 1.350.000 2.835.000
        Besi 430,44 kg 25.000 10.761.000
        Bekisting 28,00 m2 225.000 6.300.000
    balok 15/30 Beton 0,81 m3 1.350.000 1.093.500
        Besi 102,08 kg 25.000 2.551.950
        Bekisting 10,80 m2 225.000 2.430.000
  Beton Atap            
  1 Plat Beton Atap/talang tebal 12 cm Beton 18,84 m3 1.350.000 25.434.000
        Besi 1.469,52 kg 25.000 36.738.000
        Bekisting 157,00 m2 300.000 47.100.000
  2 Ring Balk 15/20 Beton 0,81 m3 1.350.000 1.093.500
        Besi 102,08 kg 25.000 2.551.950
        Bekisting 10,80 m2 150.000 1.620.000
  3 Plat Beton Kubah tebal 15 cm Beton 1,41 m3 1.350.000 1.903.500
        Besi 89,20 kg 25.000 2.230.000
        Bekisting 9,42 m2 300.000 2.826.000
  Beton Lainnya            
  1 Balok praktis lintel     34,00 m1 185.000 6.290.000
  2 Profil beton     46,00 m1 185.000 8.510.000
                 
IV PEKERJAAN DINDING DAN PELAPIS DINDING       250.471.000
  1 Pasangan bata ringan     590,60 m2 175.000 103.355.000
  2 Plesteran (tebal 2 cm) + aci   1.109,80 m2 120.000 133.176.000
  3 Plesteran (tebal 2 cm) + tanpa aci   35,70 m2 80.000 2.856.000
  4 Tali air di atas plint     110,00 m1 22.000 2.420.000
  5 Pekerjaan Facade     228,00 m2 38.000 8.664.000

9
                 
V PEKERJAAN LANTAI           153.186.250
  Pelapis Lantai            
  1 Ruang Sholat - mimbar - Khotib   60,35 m2 420.000 25.347.000
  2 Ruang Sound     10,95 m2 420.000 4.599.000
  3 Teras     249,00 m2 420.000 104.580.000
  Pelapis Dinding            
  1 Ruang Sholat     26,50 m2 420.000 11.130.000
  Waterprofing            
  1 Dak Atap     115,85 m2 65.000 7.530.250
                 
VI PEKERJAAN PINTU DAN JENDELA         59.900.000
  1 Type P1     3,00 unit 6.000.000 18.000.000
      Kusen alumunium          
      Daun Pintu Kayu Solid        
      Finish melamic + Acessories        
  2 Type P2     2,00 unit 4.000.000 8.000.000
      Kusen alumunium          
      Daun Pintu Kayu Solid        
      Finish melamic + Acessories        
  3 Type J1     6,00 unit 2.500.000 15.000.000
      Kusen alumunium 3"          
      Daun jendela alumunium        
      Acessories          
  4 Type J2     6,00 unit 1.500.000 9.000.000
      Kusen alumunium 3"          
      Daun jendela alumunium        
      Acessories          
  5 Type BV     3,00 unit 500.000 1.500.000
  6 Roster     4,00 unit 2.100.000 8.400.000
                 
VII PEKERJAAN ATAP           78.929.000
  Rangka Atap            
  1 Konstruksi kuda-kuda baja ringan   278,00 m2 175.000 48.650.000
  2 Listplank double Fibre Cement 20 cm +10cm   73,60 m1 90.000 6.624.000
  Penutup atap            
hanya
  upah
1 Atap genteng eksisting   pasang 278,00 m2 60.000 16.680.000
  2 Nok standrt     31,00 m1 225.000 6.975.000
                 
VIII PEKERJAAN PLAFOND           71.034.500
  1 Plafond gypsum Board 9 mm + rangka hollow        
    Area Sholat     103,90 m2 175.000 18.182.500
    Area Mimbar - Khotib     22,34 m2 175.000 3.909.500
    Area sound     10,94 m2 175.000 1.914.500
    Area Teras     241,16 m2 175.000 42.203.000
  2 List plafond gypsum            
    Area Sholat     46,20 m1 25.000 1.155.000
    Area Mimbar - Khotib     21,50 m1 25.000 537.500
    Area sound     13,50 m1 25.000 337.500
    Area Teras     111,80 m1 25.000 2.795.000
                 
IX PEKERJAAN PENGECATAN         39.916.500
  1 Cat Dinding Luar Dulux          
      Tampak Depan   86,68 m2 35.000 3.033.800
      Tampak Samping kanan 71,65 m2 35.000 2.507.750
      Tampak Samping Kiri   71,65 m2 35.000 2.507.750

10
      Tampak Belakang   101,70 m2 35.000 3.559.500
  2 Cat Dinding Dalam Catylac/Vinilex   554,90 m2 28.000 15.537.200
  3 Cat Plafond / List profil          
    Area Sholat     103,90 m2 25.000 2.597.500
    Area Mimbar - Khotib     22,34 m 2
25.000 558.500
    Area sound     10,94 m 2
25.000 273.500
    Area Teras     241,16 m 2
25.000 6.029.000
  4 Cat Listplank     73,60 m1 45.000 3.312.000
                 
X PEKERJAAN INSTALASI LISTRIK         24.435.000
  1 Instalasi titik lampu     25,00 ttk 265.000 6.625.000
  2 Instalasi Stop Kontak     16,00 ttk 265.000 4.240.000
  3 Instalasi Stop Kontak AC   4,00 ttk 265.000 1.060.000
  4 Saklar Tunggal     8,00 ttk 75.000 600.000
  5 Saklar Ganda/seri     5,00 ttk 75.000 375.000
  6 Stop Kontak     16,00 ttk 75.000 1.200.000
  7 Stop Kontak AC     4,00 ttk 75.000 300.000
  8 KWH Meter     1,00 bh 1.500.000 1.500.000
  9 box Panel Pembagi     1,00 bh 400.000 400.000
1
 
0 Lampu LED strip       ttk   0
1
 
1 Lampu down light/baret   24,00 ttk 140.000 3.360.000
1
 
2 Lamputempel pilar     6,00 ttk 300.000 1.800.000
1
 
3 Lampu tsorot taman     4,00 ttk 200.000 800.000
1
 
4 Lampu Hias (hanya upah pasang- material lampu by owner) 1,00 ttk 75.000 75.000
1
 
5 MCB     6,00 pcs 150.000 900.000
1
 
6 Arde Pentanahan + Instalasi   1,00 unit 1.200.000 1.200.000
                 
XI PEKERJAAN LAIN-LAIN           1.500.000
                 
  1 Pembersihan Akhir     1,00 ls 1.500.000 1.500.000
                 
  TOTAL           1.711.734.787
  DIBULATKAN           1.711.735.000
                 
  == Satu Milyar Tujuh Ratus Sebelas Juta Tujuh Ratus Tiga Puluh Lima Ribu Rupiah ==
                 

11
REKAPITULASI
: PEMBANGUNAN AREA WUDHU MASJID AR
PROYEK
ROHMAN
: Desa Pasuruan Kecamatan Pabedilan Kabupaten
LOKASI
Cirebon
OWNER : Panitia Pembangunan Mesjid AR Rohman

NO URAIAN PEKERJAAN HARGA SATUAN TOTAL HARGA


                 
I PEKERJAAN PERSIAPAN         5.430.000
                 
II PEKERJAAN PONDASI         56.662.440
                 
III PEKERJAAN KONSTRUKSI BETON       73.043.253
                 
IV PEKERJAAN DINDING DAN PELAPIS DINDING     71.546.500
                 
V PEKERJAAN LANTAI         44.817.000
                 
VI PEKERJAAN PINTU DAN JENDELA       7.000.000
                 
VII PEKERJAAN ATAP         36.793.250
                 
VIII PEKERJAAN PLAFOND         12.474.000
                 
IX PEKERJAAN PENGECATAN         12.600.340
                 
X PEKERJAAN INSTALASI LISTRIK       9.760.000
                 
XI PEKERJAAN INSTALASI AIR         20.909.000
                 
XII PEKERJAAN ACCESSORIES SANITARI       3.385.000
                 
XIII PEKERJAAN LAIN-LAIN         1.500.000
                 
  TOTAL           355.920.783
  DIBULATKAN           355.921.000
                 
  == Tiga Ratus Lima Puluh Lima Juta Sembilan Ratus Dua Puluh Satu Ribu Rupiah ==
                 

12
DETAIL RENCANA ANGGARAN BIAYA
: PEMBANGUNAN AREA WUDHU MESJID AR
PROYEK
ROHMAN
LOKASI : Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon
OWNE
: Panitia Pembangunan Mesjid AR Rohman
R

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN TOTAL HARGA


                 
I PEKERJAAN PERSIAPAN           5.430.000
  1 Pembersihan lapangan   66,00 m2 5.000 330.000
  2 Bouwplank     42,00 m1 50.000 2.100.000
  3 Air kerja     1,00 ls 1.500.000 1.500.000
  4 Listrik Kerja     1,00 ls 1.000.000 1.000.000
  5 Mobilisasi     1,00 ls 500.000 500.000
                 
II PEKERJAAN PONDASI           56.662.440
  1 Galian tanah Pondasi batu kali/ROLLAG dan sloof gantung 55,08 m3 148.000 8.151.840
  2 Urug kembali tanah pondasi & sloof   13,77 m3 50.000 688.500
  3 Tanah/puing urugan peningggian elavasi   12,70 m3 65.000 825.500
  4 Pondasi batu kali (batu kali)   23,80 m3 1.150.000 27.370.000
  5 Sloof 15/20 Beton 1,92 m3 1.350.000 2.592.000
337,9
        Besi kg 25.000 8.449.600
8
        Bekisting 25,60 m2 150.000 3.840.000
  6 Urugan pasir            
    Bawah Pondasi     2,55 m3 450.000 1.147.500
    Bawah Lantai     2,55 m3 450.000 1.147.500
  7 Lantai Kerja Bawah pondasi   2,55 m3 700.000 1.785.000
  8 Rabat Beton     0,95 m3 700.000 665.000
                 
III PEKERJAAN KONSTRUKSI BETON         73.043.253
  1 Kolom Praktis 13/13   98,80 m1 185.000 18.278.000
  2 Kolom 15/35            
        Beton 3,23 m3 1.350.000 4.365.900
361,3
        Besi kg 25.000 9.033.640
5
        Bekisting 43,00 m2
225.000 9.675.000
  3 Ring balk 15/30          
        Beton 2,88 m3 1.350.000 3.888.000
362,9
        Besi kg 25.000 9.073.600
4
        Bekisting 38,40 m2 225.000 8.640.000
  4 Sloof 15/30          
        Beton 0,65 m3 1.350.000 880.875
        Besi 82,23 kg 25.000 2.055.738
        Bekisting 8,70 m2 225.000 1.957.500
  5 Plat lantai area wudhu tebal 10 cm          
        Beton 0,75 m3 1.350.000 1.012.500
        Besi 70,20 kg 25.000 1.755.000
        Bekisting 7,50 m2 225.000 1.687.500
  6 Balok praktis lintel     4,00 m1 185.000 740.000
                 
IV PEKERJAAN DINDING DAN PELAPIS DINDING       71.546.500
169,6
  1 Pasangan bata ringan     m2 175.000 29.690.500
6

13
311,0
  2 Plesteran (tebal 2 cm) + aci   m2 120.000 37.322.400
2
  3Plesteran (tebal 2 cm) + tanpa aci   28,30 m2 80.000 2.264.000
  4Tali air di atas plint     54,30 m1 32.000 1.737.600
  5Pekerjaan Facade     14,00 m2 38.000 532.000
                 
V PEKERJAAN LANTAI           44.817.000
  Pelapis Lantai            
  1 Area Wudhu     45,60 m2 350.000 15.960.000
  2 Area KM/WC     7,80 m2 350.000 2.730.000
  Pelapis Dinding            
  1 Area Wudhu     34,50 m2 350.000 12.075.000
  2 Area KM/WC     38,96 m2 350.000 13.636.000
  Waterprofing            
    Kolam Wudhu     6,40 m2 65.000 416.000
                 
VI PEKERJAAN PINTU DAN JENDELA         7.000.000
                 
uni
  P1 KM/WC     4,00 1.500.000 6.000.000
t
                 
B uni
  KM/WC     4,00 250.000 1.000.000
V t
                 
uni
  Roster 1     2,00 1.400.000 2.800.000
t
uni
  Roster 2     4,00 800.000 3.200.000
t
                 
VII PEKERJAAN ATAP           36.793.250
  Rangka Atap            
  1 Konstruksi kuda-kuda baja ringan   92,75 m2 175.000 16.231.250
  2 Listplank double Fibre Cement 20 cm +10cm   39,80 m1 90.000 3.582.000
  Penutup atap            
  1 Atap genteng     92,75 m2 120.000 11.130.000
  2 Nok standrt     26,00 m1 225.000 5.850.000
                 
VIII PEKERJAAN PLAFOND           12.474.000
  Plafond gypsum Board 9 mm + rangka hollow          
  1 Area Wudhu     52,80 m2 175.000 9.240.000
  2 KM/WC     7,28 m2 175.000 1.274.000
  List plafond gypsum            
  1 Area Wudhu     56,80 m1 25.000 1.420.000
  2 KM/WC     21,60 m1 25.000 540.000
                 
IX PEKERJAAN PENGECATAN         12.600.340
  1 Cat Dinding Luar Dulux          
      Tampak Depan   18,20 m2 35.000 637.000
      Tampak Samping kanan 18,37 m2 35.000 642.950
      Tampak Samping Kiri   18,37 m2 35.000 642.950
      Tampak Belakang   30,60 m2 35.000 1.071.000
225,4
  2 Cat Dinding Dalam Catylac/Vinilex   m2 28.000 6.313.440
8
  3 Cat Plafond / List profil          
    Area Wudhu     52,80 m2 25.000 1.320.000
    KM/WC     7,28 m2 25.000 182.000
  4 Cat Listplank     39,80 m1 45.000 1.791.000
                 

14
X PEKERJAAN INSTALASI LISTRIK         9.760.000
  1 Instalasi titik lampu     12,00 ttk 265.000 3.180.000
  2 Saklar Tunggal     6,00 ttk 75.000 450.000
  3 Saklar Ganda/seri     2,00 ttk 75.000 150.000
  4 KWH Meter     1,00 bh 1.500.000 1.500.000
  5 box Panel Pembagi     1,00 bh 400.000 400.000
  6 Lampu down light/baret   12,00 ttk 140.000 1.680.000
  7 Lamputempel pilar     2,00 ttk 300.000 600.000
  8 MCB     4,00 bh 150.000 600.000
uni
  9 Arde Pentanahan + Instalasi   1,00 1.200.000 1.200.000
t
                 
XI PEKERJAAN INSTALASI AIR         20.909.000
  1 Instalasi Air Bersih Pipa dia. 1"   6,00 m1 50.000 300.000
  2 Instalasi Air Bersih Pipa dia. 3/4"   43,00 m1 38.000 1.634.000
  3 Instalasi Air Bersih Pipa dia. 1/2"   22,50 m1 30.000 675.000
  4 Saluran Air Bekas Pipa dia. 4" AW   40,00 m1 205.000 8.200.000
  5 Saluran Air Bekas Pipa dia. 3" D   6,00 m1 100.000 600.000
  6 Saluran Air Kotor Pipa dia. 4" ( fecalin/sawage ) AW 20,00 m1 205.000 4.100.000
  7 Saluran Air Kotor Pipa dia. 3" ( fecalin/sawage ) AW 2,00 m1 100.000 200.000
  8 Saluran Pipa Vent dia. 1.5" D   20,00 m1 60.000 1.200.000
  9 Septictank     1,00 bh 4.000.000 4.000.000
                 
XII PEKERJAAN ACCESSORIES SANITARI         3.385.000
  Area Wudhu            
acessorie
  1 kran   s by 26,00 bh 25.000 650.000
owner
acessorie
  2 Floor Drain   s by 6,00 bh 75.000 450.000
owner
acessorie
  3 Whastafle   s by 1,00 bh 125.000 125.000
owner
  KM/WC            
acessorie
  1 kran   s by 4,00 bh 25.000 100.000
owner
acessorie
  2 Closet duduk   s by 4,00 bh 275.000 1.100.000
owner
acessorie
  3 Shower spray with stop valve s by 4,00 bh 65.000 260.000
owner
acessorie
  4 Shower   s by 4,00 bh 75.000 300.000
owner
acessorie
  5 Gantungan Handuk   s by 4,00 bh 25.000 100.000
owner
acessorie
  6 Floor Drain   s by 4,00 bh 75.000 300.000
owner
                 
XIII PEKERJAAN LAIN-LAIN           1.500.000
                 
  1 Pembersihan Akhir     1,00 ls 1.500.000 1.500.000
                 
  TOTAL           355.920.783
  DIBULATKAN           355.921.000
                 
  == Tiga Ratus Lima Puluh Lima Juta Sembilan Ratus Dua Puluh Satu Ribu Rupiah ==
                 

15
DEWAN KEMAKMURAN MASJID (DKM)
MASJID JAMI AR ROHMAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis Rt. 003 Rw. 001
Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon Kode Pos 45193
Telp. / HP : 082311125978

KEPUTUSAN DEWAN KEMAKMURAN MASJID (DKM)


MASJID JAMI AR ROHMAN
Nomor : 06 / DKM Ar Rohman / XI / 2022

TENTANG

PEMBENTUKAN PANITIA PEMBANGUNAN MASJID JAMI AR ROHMAN


DESA PASURUAN KECAMATAN PABEDILAN
KABUPATEN CIREBON

DENGAN RAHMAT TUHAN YANG MAHA ESA


DKM MASJID JAMI AR ROHMAN

Menimbang : 1. Bahwa masjid tidak hanya berperan sebagai tempat ibadah


ritual umat islam (maddah) saja, tetapi juga sebagai tempat
peningkatan kualitas ibadah sosial yang lebih luas seperti di
bidang ekonomi, pendidikan, sosial budaya dan lainnya;

2. bahwa dalam mewujudkan fungsi Masjid Jami’ Ar Rohman


sebagaimana peran ideal sebuah masjid, maka perlu dibentuk
dan ditetapkan kepngurusannya.

Mengingat : 1. Penetapan Presiden Republik Indonesia Nomor 1 / PNPS tahun


1965 tentang pencehan dan penyalahgunaan dan / atau
penodaan Agama;

2. Keputusan Menteri Agama Nomor 394 Tahun 2004 tentang


Penetapan Status Masjid Wilayah;

3. Peraturan bersama menteri Agama dan Menteri Dalam Negeri


Nomor 9 dan Nomor 8 Tahun 2006 tentang Pedoman
Pelaksanaan Tugas Kepala Daerah / Wakil Kepala Daerah
dalam pemeliharaan kerukunan umat beraga, pemberdayaan
forum umat beragama dan masjid tempat ibadah;

4. Undang Undang Nomor 23 Tahun2014 tentang Pemerintahan


Daerah;

5. Keputusan Direktur Jenderal Bimbingan Masyarakat Islam


Nomor D.J.II / 802 Tahun 2014 tentang Standar Pembinaan
Manajemen Masjid.

16
6. Peraturan Daerah Kabupaten Cirebon Nomor 3 Tahun 2018
tentang Perubahan atas Peraturan daerah Kabupaten Cirebon
Nomor 1 Tahun 2013 tentang Pedoman Pembentukan Lembaga
Kemasyarakatan di Desa dan Kelurahan.

Memperhatikan : Hasil Musyawarah tanggal 09 November 2022 tentang


Pembentukan Panitia Pembangunan Masjid Jami Ar
Rohman Desa Pasuruan Kecamatan Pabedilan Kabupaten
Cirebon.

MEMUTUSKAN

Menetapkan :

PERTAMA : Mengesahkan Nama nama yang tercantum pada lampiran


keputusan ini dan dianggap mampu dalam menjalankan amanat
sebagai Panitia Pembangunan Masjid Jami Ar Rohman Desa
Pasuruan Kecamatan Pabedilan Kabupaten Cirebon.

KEDUA : Keputusan ini ditetapkan dengan ketentuan akan diadakan


perubahan dan perbaikan sebagaimana mestinya apabila
dipandang perlu.

Ditetapkan di : Pasuruan

Pada tanggal : 11 November 2022

Ketua DKM Masjid Jami Ar Rohman

YUSUP

Mengetahui,

Ketua MUI Desa Pasuruan Kuwu Desa Pasuruan

NANANG KHOIRUL ANAM MUJA

Tembusan disampaikan kepada :

1. Yth. Kuwu Desa Pasuruan;

1. Yth. Pengurus Majelis Ulama Indonesia Desa Pasuruan;

17
2. Yth. Panitia Pembanguna Masjid Jami Ar Rohman;

3. Arsip

Lampiran : KEPUTUSAN DEWAN KEMAKMURAN MASJID (DKM) MASJID JAMI’ AR


ROHMAN DESA PASURUAN

Nomor : 06 / DKM Ar Rohman / XI / 2022

Tanggal : 11 November 2022

Tentang : PEMBENTUKAN PANITA PEMBANGUNAN MASJID JAMI AR


ROHMAN DESA PASURUAN KECAMATAN PABEDILAN KABUPATEN
CIREBON

SUSUNAN PANITIA
PEMBANGUNAN MASJID JAMI AR ROHMAN
DESA PASURUAN KECAMATAN PABEDILAN
KABUPATEN CIREBON

1 Pelindung : MUJA ( Kuwu Desa Pasuruan )

: Ketua MUI Desa Pasuruan Kec. Pabedilan

2 Dewan Penasehat : Kyai Basuni

: Kyai Sholehudin

: Kyai Wasmunudin

3 Ketua : H. Faoji

5 Sekretaris : Ibnu Hasan

6 Bendahara : Yunus

7 : Marto
Seksi Bidang : Kadori
Rancang Bangun
dan Pengawasan

8 Seksi Bidang

Penggalangan Dana : BLOK MANIS : Nur Hidayat

Intern

BLOK PAHING : Turiman Lanang

BLOK PON : Urniasih

BLOK WAGE : Carsan

BLOK KLIWON : Kuswanti

18
9 Ekstern : Bapa Kuwu MUJA
H. Bachrudin
H. Ibnu Hajar
H. Jahuri Kail
H. Mujahidin
Ust. Nanang KA
Ust. Agus Salim
Ust. Iskandar Mubarok
Bapak Sutarso
Bapak Mung Aziz
Ahmad Khaerudin
Seksi Kemanan : Dulyani
10
: Abdul Hadi

Seksi Publikasi dan : Akhmad Khaerudin


11
Dokumentasi
: Saefudin

Ditetapkan di : Pasuruan
Tanggal : 11 November 2022 M
12 Robiul Akhir 1444 H

Ketua DKM Masjid Jami Ar Rohman

YUSUP

Mengetahui,
Ketua MUI Desa Pasuruan Kuwu Desa Pasuruan

NANANG KHOIRUL ANAM MUJA

19
PANITIA PEMBANGUNAN
MASJID JAMI AR ROHMAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis Rt.
003 Rw. 001
Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon Kode Pos
45193

BUKU REKENING BJB DKM AR ROHMAN

0131048823100
REKENING BANK BNI DKM AR ROHMAN

1585773737
PANITIA PEMBANGUNAN
MASJID JAMI AR ROHMAN
DESA PASURUAN KEC. PABEDILAN KAB. CIREBON
Sekretariat : Jl. Raya Jendral Gatot Subroto No. 156 Blok Manis Rt. 003 Rw. 001
Desa Pasuruan Kecamatan Pabedilan Kabupaten Cirebon Kode Pos 45193

KTP PANITIA
PEMBANGUNAN MASJID JAMI AR ROHMAN DESA PASURUAN
KEC.PABEDILAN KAB.CIREBON

Ketua

Sekretaris

Bendahara