Anda di halaman 1dari 34

BADAN PENGELOLAAN KEUANGAN

DAN ASSET DAERAH

LAPORAN
HARGA SATUAN POKOK KEGIATAN
( HSPK )
TA 2023 – KOTA MAKASSAR
LAPORAN AKHIR
penyusunan
HSPK FISIK KONSTRUKSI

PEMERINTAH
KOTA MAKASSAR

TAHUN ANGGARAN
2023
DAFTAR ISI

BAB 1 PENDAHULUAN ................................................................ 1


1.1. LATAR BELAKANG ...................................................................................................... 1
1.2. TUJUAN DAN MANFAAT .......................................................................................... 2
1.3. REFERENSI PERATURAN .......................................................................................... 3

BAB 2 RUANG LINGKUP,OUTPUT,TAHAPAN .................................... 4


2.1. RUANG LINGKUP PEKERJAAN ................................................................................ 4
2.2. OUTPUT PEKERJAAN ................................................................................................. 5
2.3. TAHAPAN PEKERJAAN ............................................................................................... 5

BAB 3 KERANGKA KONSEPTUAL ................................................... 9


3.1. PERHITUNGAN HARGA SATUAN PEKERJAAN .................................................. 9
3.1.1 BAHAN.................................................................................................................... 9
3.1.2 ALAT ....................................................................................................................... 10
3.1.3 UPAH ....................................................................................................................... 11
3.2. PERHITUNGAN ANALISIS STANDAR BELANJA ................................................. 12

BAB 4 PENUTUP ........................................................................ 19


LAMPIRAN
BAB I
PENDAHULUAN

1.1 LATAR BELAKANG

Terwujudnya pemerintahan yang baik (good governance) merupakan tuntutan,


harapan dan cita - cita bagi pemerintahan. Menurut Osborne dan Gaebler (1992), salah satu
syarat terwujudnya good governance adalah adanya pemerintah yang kompetitif, yaitu
mengembangkan persaingan yang sehat, dalam upaya meningkatkan efisiensi dan efektifitas
penggunaan sumberdaya dan produktifitas. Dengan kata lain pemerintahan yang kompetitif
berusaha untuk menyuntikkan semangat kompetisi dalam pemberian layanan publik.
Kompetisi adalah satu - satunya cara untuk menghemat biaya sekaligus meningkatkan kualitas
pelayanan tanpa harus memperbesar biaya.

Syarat lainnya tentang kriteria pemerintah yang baik adalah adanya Effectiveness and
Efficiency yaitu memenuhi kebutuhan dengan cara terbaik dalam penggunaan sumberdaya.
Menurut Mardiasmo1 efisiensi adalah pencapaian output yang maksimum dengan input
tertentu atau penggunaan input yang terendah untuk mencapai output tertentu. Efisiensi
merupakan perbandingan output dengan input yang dikaitkan dengan standar kinerja atau
target yang telah ditetapkan. Sedangkaan efektivitas adalah tingkat pencapaian hasil program
dengan target yang ditetapkan. Secara sederhana efektivitas merupakan perbandingan
outcome dengan output.

Peraturan Pemerintah Republik Indonesia Nomor 12 Tahun 2019 tentang Pengelolaan


Keuangan Daerah, menginstruksikan kepada pemerintah daerah untuk menyusun suatu
pendekatan standarisasi harga satuan. Penyusunan standarisasi tersebut wajib berdasarkan
atas prinsip kewajaran beban kerja dan beban biaya, serta ditetapkan dengan peraturan kepala
daerah. Standarisasi ini nantinya akan digunakan sebagai acuan dalam perumusan
perencanaan kegiatan dan penyusunan anggaran belanja daerah, dengan disesuaikan
terhadap proyeksi perkiraan maju untuk tahun anggaran berikutnya. Kata standarisasi
menurut kamus besar bahasa indonesia berarti penyesuaian bentuk (ukuran, kualitas, dan
sebagainya) dengan pedoman yang ditetapkan atau pembakuan.
1.2 TUJUAN DAN MANFAAT PEKERJAAN

Secara umum tujuan dari pekerjaan ini adalah menyempurnakan komponen


standarisasi harga satuan eksisting, baik materi maupun proses penerimaan komponen;
dipersiapkan sebagai basis data untuk rencana anggaran tahun berikutnya. Untuk lebih
detilnya dijelaskan sebagai berikut:

1. Menyusun dan menyempurnakan data standarisasi komponen Harga Satuan Pokok


Pekerjaan; sehingga dapat terwujud keseragaman harga satuan pekerjaan fisik
konstruksi pada proses perencanaan dan penyusunan APBD di lingkungan Pemerintah
Kota Makassar.
2. Memberikan pemahaman kepada SKPD/UKPD tentang standarisasi Harga Satuan
Pokok Pekerjaan, dan tata cara pengambilan komponen dalam proses perencanaan
maupun peng-anggaran APBD.

Apabila tujuan kegiatan ini dapat tercapai, maka diharapkan memperoleh manfaat diantaranya
antara lain:

1. Adanya keseragaman biaya dalam kegiatan yang sama


2. Mempermudah Satuan Kerja Perangkat Daerah dalam menyusun rencana kegiatan
3. Mempermudah monitoring dan evaluasi kegiatan
4. Efisiensi dalam rencana dan pelaksanaan anggaran yang pada akhirnya akan
meningkatkan efsiensi dalam pengelolaan anggaran di Pemerintah Kota Makassar.

1.3 REFERENSI PERATURAN DAN PERUNDANGAN

Referensi dan peraturan perundangan yang dipakai sebagai acuan dalam pelaksanaan
pekerjaan standarisasi Harga Satuan Pokok Pekerjaan ini adalah:

1. Peraturan Kementerian Pekerjaan Umum Nomor 45 Tahun 2007 Tentang Standart


Harga Satuan Bangunan Gedung Negara;
2. Peraturan Kementerian Pekerjaan Umum Nomor 11 Tahun 2013 Tentang Pedoman
Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum;
3. Peraturan Kementerian Perhubungan Nomor 78 Tahun 2014 Tentang Standart Biaya
Dilingkungan Kementerian Perhubungan;
4. Peraturan Kementerian Pekerjaan Umum Nomor 28 Tahun 2016 Tentang Pedoman
Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum;

2
5. Peraturan Kementerian Pekerjaan Umum Nomor 22 Tahun 2018 Tentang
Pembangunan Bangunan Gedung Negara;
6. Peraturan Kementerian Pekerjaan Umum Nomor 1 Tahun 2022 Tentang Pedoman
Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan
Perumahan Rakyat;
7. Peraturan Pemerintah Nomor 12 Tahun 2019 Tentang Pengelolaan Keuangan Daerah;
8. Peraturan Menteri Dalam Negeri Nomor 90 Tahun 2019 tentang Klasifikasi, Kodefikasi,
dan Nomenklatur;
9. Keputusan Menteri Dalam Negeri Nomor 050-3708 Tahun 2020 tentang Hasil Verifikasi
dan Validasi Pemutakhiran Klasifikasi, Kodefikasi, & Nomenklatur Perencanaan
Pembangunan & Keuangan Daerah.

3
BAB II
RUANG LINGKUP, OUTPUT, &
TAHAPAN PEKERJAAN

2.1. RUANG LINGKUP PEKERJAAN

Secara umum lingkup pekerjaan standarisasi Harga Satuan Pokok Pekerjaan ini
adalah: Melakukan penyempurnaan dan pengelolaan data komponen standarisasi Harga
Satuan Pokok Pekerjaan bersama dengan Badan Pengelolaan Keuangan dan Pendapatan
Daerah; Penyempurnaan yang dimaksud adalah melakukan analisis dan evaluasi bersama
dengan SKPD/UKPD dilingkungan Pemerintah Kota Makassar dalam merumuskan penyusunan
standarisasi harga satuan pekerjaan fisik konstruksi.

2.2 OUTPUT PEKERJAAN

Dengan ruang lingkup pekerjaan tersebut diatas, keluaran yang diharapkan dari
pekerjaan Penyusunan standarisasi Harga Satuan Pokok Pekerjaan ini adalah:

1. Tersedianya standarisasi harga satuan pekerjaan konstruksi pada perencanaan dan


pelaksanaan untuk APBD Pemerintah Kota Makassar.

2.3. TAHAPAN PEKERJAAN

Untuk mencapai tujuan pekerjaan dan mendapatkan manfaat seperti yang telah
disebutkan di atas, tahapan kegiatan yang akan dilaksanakan pada pekerjaan penyusunan ini
adalah persiapan, pelaksanaan, dan pelaporan; dengan detil penjelasan sebagai berikut:

2.3.1 Persiapan
1. Observasi Pendahuluan

Pada tahap ini dilakukan upaya - upaya pemahaman terhadap pekerjaan secara
umum. Beberapa kegiatan yang dilakukan pada proses ini adalah:

• Identifikasi kelemahan dan kekurangan sistem penyusunan dan pembuatan


Harga Satuan Pokok Kegiatan yang sudah ada.
• Mengkaji ulang semua Standar Kegiatan dan komponen yang ada, khususnya
pekerjaan fisik baik konstruksi maupun non konstruksi; apakah semua kegiatan
yang diperlukan sudah terstandarisasi.

4
• Mengecek ulang apakah ada peraturan perundang - undangan yang baru
terkait dengan kegiatan yang akan disusun.
• Menyusun metode dan rencana kerja dan mempersiapkan SDM, fasilitas, serta
sarana penunjang yang dibutuhkan dalam pelaksanaan pekerjaan.
• Mempersiapkan literatur – literatur standarisasi yang akan digunakan sebagai
acuan.

Metode pelaksanaan pada tahapan observasi pendahuluan ini antara lain sebagai
berikut:

• Telaah Pustaka, mempelajari peraturan - peraturan dan pustaka/literatur yang


memiliki relevansi dengan standar satuan pokok kegiatan.
• Observasi, melakukan pengamatan langsung terhadap obyek penelitian guna
mendapatkan gambaran pekerjaan dan menganalisa gejala - gejala yang
terjadi.
• Wawancara, melakukan tanya jawab secara langsung dengan responden yang
dapat memberikan keterangan atau infomasi yang diperlukan dalam
pelaksanaan pekerjaan.
• Diskusi, melakukan tukar menukar pengetahuan dan pengalaman guna
menyamakan persepsi, mengidentifikasi dan menyusun alternatif pemecahan
masalah dengan semua pihak terkait.

2. Identifikasi kegiatan

Langkah awal yang dilakukan adalah melakukan evaluasi dan identifikasi masalah
terhadap kegiatan pekerjaan fisik konstruksi berdasarkan tugas pokok dan fungsi SKPD
yang terkait dengan pengelola pekerjaan fisik konstruksi. Kegiatan-kegiatan tersebut
perlu diidentifikasi dan dianalisis dari sisi jenis maupun kesesuaiannya dengan tupoksi
dan tujuan dari masing-masing SKPD. Dari identifikasi tersebut selanjutnya
dikembangkan dan dikonversikan sesuai dengan program dan kegiatan yang diatur
dalam Keputusan Menteri Dalam Negeri Nomor 50 Tahun 2020.

5
3. Pengumpulan data

Pengumpulan data ini dilakukan dengan meminta seluruh peran aktif dari Satuan Kerja
Pemerintah Daerah (SKPD) khususnya satuan kerja yang melakukan pekerjaan fisik
konstruksi, untuk menyerahkan data - data koreksi atau data tambahan usulan
kegiatan. Data yang dibutuhkan dalam penyempurnaan standarisasi harga satuan ini
meliputi jenis – jenis kegiatan rutin tahunan atau pekerjaan yang pernah dilaksanakan
sebelumnya, dan selanjutnya keseluruhan data tersebut dihimpun untuk dijadikan data
sekunder.

Data yang dikumpulkan berdasarkan sumbernya terdiri atas data primer dan sekunder.
Data primer adalah data yang didapatkan langsung dari sumber data, sedangkan data
sekunder adalah data yang bersumber dari laporan atau referensi. Teknik pengambilan
data dilaksanakan berdasarkan sumber data, yaitu:

• Data primer, menggunakan kuesioner, observasi dan diskusi;


• Data sekunder, dengan mencari standar kegiatan yang sejenis, referensi SNI
atau laporan – laporan lainnya.

2.3.2 Pelaksanaan
1. Pembahasan dan Diskusi

Setelah tersusun draft awal standar standarisasi harga fisik yang merupakan
penyempurnaan awal dari standar standarisasi harga fisik yang lalu, maka langkah
selanjutnya adalah melakukan diskusi dengan pihak terkait di lingkungan Pemerintah
Kota Makassar. Diskusi merupakan kegiatan bertukar pikiran antara dua pihak atau
lebih mengenai suatu masalah. Diskusi dilakukan untuk memperoleh masukan dari
satuan kerja teknis dan berbagai pihak yang berkepentingan guna menyempurnakan
draft standar harga satuan tersebut.

2. Analisa Data

Analisa data merupakan hasil telaah dan penguraian data yang nantinya akan
menghasilkan kesimpulan. Analisa data dilakukan setelah data di lapangan
dikumpulkan. Kegiatan analisa data ini mencakup:

• Bersama dengan Badan Pengelolaan Keuangan dan Pendapatan Daerah


melakukan pengecekan komponen eksisting pada tahun sebelumnya.

6
• Melakukan pengecekan terhadap aturan – aturan pemerintah terbaru yang
berkaitan dengan standarisasi harga satuan.
• Melakukan pengecekan ulang jika ada updating terhadap penyusuan
standarisasi harga fisik pada tahun sebelumnya.
• Bersama dengan SKPD melakukan analisa dan membuatkan analisa kegiatan
bagi kegiatan-kegiatan baru yang belum tercantum di dalam standarisasi harga
fisik tahun sebelumnya sesuai dengan mekanisme alur flowchart yang telah
ditentukan sebelumnya.

3. Pendampingan dan Sosialisasi


Setelah dokumen standarisasi ditetapkan dengan Peraturan Bupati dan sudah
distandarkan, selanjutnya dilakukan pendampingan kepada SKPD di lingkungan
Pemerintah Kota Makassar. Pendampingan diperlukan agar standarisasi harga dapat
digunakan secara optimal oleh setiap SKPD sehingga Standar Harga Satuan Pokok dan
berbagai perbaikan dalam perencanaan kegiatan, pengelolaan keuangan daerah dapat
dilakukan.

2.3.3 Pelaporan
Mekanisme laporan pada pekerjaan Penyusunan standarisasi Harga Satuan Pokok
Pekerjaan ini terdiri dari:
1. Laporan Akhir

7
BAB III
KERANGKA KONSEPTUAL

Dasar perhitungan standarisasi membahas tata cara perhitungan yang dilakukan untuk
mendapatkan indeks atau koefisien yang merupakan dasar untuk menghitung analisa biaya
kegiatan. Dasar acuan yang digunakan dalam analisa perhitungan adalah referensi yang
merupakan hasil penelitian di lapangan, pendapat ahli, dan data histori. Beberapa hal yang
dibahas dalam analisa perhitungan meliputi tata cara perhitungan indeks bahan, upah dan
peralatan bidang pekerjaan fisik konstruksi dan non konstruksi.
A. Penyusunan dan penyempurnaan komponen harga satuan
3.1 Perhitungan Harga Satuan Pekerjaan
Harga satuan setiap mata pembayaran yang merupakan keluaran (output) diperoleh
melalui proses perhitungan dari masukan - masukan (input). Dalam hal ini, masukan yang
dimaksud antara lain berupa harga satuan dasar untuk bahan, alat, upah tenaga kerja.
Berdasarkan masukan tersebut dilakukan perhitungan untuk menentukan koefisien bahan,
upah tenaga kerja dan peralatan setelah terlebih dahulu menentukan asumsi - asumsi dan
faktor - faktor serta prosedur kerjanya. Jumlah dari seluruh hasil perkalian koefisien tersebut
dengan harga satuan dasar ditambah dengan biaya umum dan laba akan menghasilkan harga
satuan setiap mata pembayaran. Selanjutnya Harga Satuan Setiap Mata Pembayaran
dikalikan dengan Volume Pekerjaan menghasilkan Harga Pekerjaan Setiap Mata
Pembayaran. Adapun jumlah Harga Pekerjaan Seluruh Mata Pembayaran yang dikalikan
dengan PPN 11 % merupakan Perkiraan (Estimasi) Biaya Proyek (EE/OE).

3.1.1 Bahan
Bahan yang dimaksud adalah bahan/material yang memenuhi ketentuan/persyaratan
yang tercantum dalam dokumen kontrak buku 3 Spesifikasi, baik mengenai jenis, kuantitas
maupun komposisinya bila merupakan suatu produk campuran. Perhitungan yang dilakukan
adalah untuk mendapatkan kuantitas komponen bahan dalam satuannya masing - masing,
misalnya aspal dalam kg, semen dalam kg atau zak, dan sebagainya untuk memperoleh satu
satuan produk/hasil pekerjaan yang bersangkutan. Apabila di dalam dokumen lelang tidak
dicantumkan volume kebutuhan bahan untuk tiap - tiap mata pembayaran maka penyusun
harus mengadakan perhitungan bahan sesuai dengan spesifikasi teknis dalam dokumen lelang
dan metode kerja yang dipergunakan. Apabila kebutuhan kuantitas bahan ' untuk setiap mata

8
pembayaran dicantumkan dalam dokumen lelang yang bertujuan untuk memudahkan evaluasi
maka penyusun harus menggunakan kuantitas tersebut sebagai dasar perhitungan.
Perhitungan dilakukan berdasarkan:
1. Faktor kembang dan faktor kehilangan bahan
Analisa perhitungan harga satuan pekerjaan wajib menyertakan prediksi
kembang susut bahan dan faktor loss (kehilangan bahan)
2. Kuantitas (diperoleh dari Spesifikasi Teknis)
Untuk mata pembayaran yang mempunyai produk terdiri atas beberapa
macam bahan/material seperti Asphalt Treated Base (ATB), Hot Rolled Sheet
(HRS), Asphalt Concrete (AC) dan lain - lain, komposisi campuran bahan -
bahan tersebut harus mengikuti ketentuan yang tercantum dalam Spesifkasi
Teknis. Kuantitas bahan adalah volume setiap jenis bahan dalam satuannya
masing - masing (zak, kg, dsb.) yang diperlukan dalam suatu mata
pembayaran dengan memperhatikan satuan produk mata pembayaran yang
bersangkutan, misalkan ATB dalam satuan M3, HRS dan AC dalam satuan M', dan
lain - lain.
3. Harga Satuan Dasar Bahan
Bahan yang dimaksud dapat berupa:
 Bahan Dasar seperti semen, aspal, baja tulangan, pasir, dan lain - lain.
 Bahan Olahan seperti agregat base dan beton

3.1.2 Alat
Perhitungan dilakukan untuk mendapatkan kuantitas jam kerja suatu jenis alat yaitu
waktu yang dibutuhkan oleh alat tersebut untuk menghasilkan satu satuan produk
mata pembayaran yang bersangkutan. Perhitungan komponen alat pada umumnya
berdasarkan:
• Jenis
Jenis alat yang diperlukan ini disesuaikan dengan ketentuan yang tercantum
dalam spesifikasi - spesifikasi tertentu.
• Kapasitas
Kapasitas alat yang akan digunakan harus sesual dengan besarnya
pekerjaan yang akan dilaksanakan dan ketentuan yang tercantum dalam
spesifikasi (bila ada), sebagai misal dalam mata pembayaran HRS untuk
penggilasan awal diperlukan Tandem Roller dengan kapasitas 6 - 8 ton dan
untuk penggilasan antara diperlukan Pneumatic Tyre Roller kapasitas 8 - 10

9
ton. Untuk alat utama seperti Asphalt Mixing Plant (AMP) dan Stone Crusher,
kapasitasnya tergantung dari volume dan lamanya waktu yang diperlukan
untuk pekerjaan yang berhubungan dengan alat tersebut.
• Faktor Efisiensi Produksi
Menentukan beberapa faktor seperti:
Ev = Faktor konversi material
Ea = Faktor efisiensi kerja alat
Eb = Faktor bucket untuk Shovel & Loader
Eb = Faktor bucket untuk Excavator
Ep = Faktor posisi untuk Excavator
Es = Faktor sudu untuk Bulldozer.
• Waktu siklus kerja (Cycle Time)
• Hasil Produksi/Satuan Waktu
Hasil produksi alat diukur dalam satuan produk per jam. Dalam menaksir produksi
(out put) peralatan perlu mempertimbangkan hal - hal sebagai berikut: Kinerja
peralatan yang diberikan oleh pabrik dan Faktor efisiensi, operator, kondisi
lapangan, material.
• Kuantitas Jam Kerja
Kuantitas jam kerja adalah angka yang menunjukkan lamanya pemakaian alat
dalam mengerjakan satu satuan produk suatu mata pembayaran.
• Harga Satuan Dasar Alat
Harga satuan dasar alat yang cliperlukan dalam proses perhitungan analisa harga
satuan pekerjaan yaitu berupa keluaran dari analisa alat yang meliputi biaya pasti
serta biaya operasi dan pemeliharaan.

3.1.3 Upah
Perhitungan upah tenaga kerja adalah berdasarkan:
1. Kualifikasi
Ada beberapa kualifikasi tenaga kerja yang dapat digunakan untuk menyelesaikan
suatu jenis mata pembayaran pekerjaan, antara lain mandor, pekerja, tukang,
sopir, operator, dan lain - lain.
2. Jumlah
Jumlah tenaga kerja yang digunakan sebagai faktor utama dalam proses produksi
(misalnya pembesian, galian yang menggunakan tenaga manusia, pasangan bate
bats, plesteran dan lain sebagainya) dihitung dengan cara di taksir. Jumlah tenaga

10
kerja yang digunakan sebagai pendukung peralatan dihitung atas dasar
produktifitas peralatan yang paling menentukan dibagi dengan jumlah clan
klasifikasi tenaga kerja yang digunakan sesuai dengan uraian metode
kerja. Sebagai panduan dan cara terbaik untuk menaksir jumlah/produktifitas
tenaga kerja dapat dilakukan dengan mempertimbangkan hal - hal sebagai
berikut. Produktifitas sebelumnya untuk pekerjaan yang memiliki sifat serupa
Berdasarkan hasil uji coba di daerah masing - masing.
3. Kuantitas Jam Kerja
Kuantitas jam kerja adalah angka yang menunjukkan lamanya pemakaian tenaga
kerja dalam mengerjakan satu satuan produk suatu mata pembayaran.
4. Harga Satuan Dasar Tenaga Kerja
Biaya harga satuan dasar pengupahan mengikuti regulasi daerah setempat yg
diatur baik melalui perwal, perbup, atau pergub.

3.2 Sosialisasi dan pendam pingan kepada SK PD/ UK PD


Sosialisasi adalah proses penanaman atau transfer kebiasaan atau nilai dan aturan dari
satu generasi ke generasi lainnya dalam sebuah kelompok atau masyarakat. Sejumlah sosiolog
menyebut sosialisasi sebagai teori mengenai peranan (role theory). Karena dalam proses
sosialisasi diajarkan peran-peran yang harus dijalankan oleh individu.
Setiap kelompok masyarakat mempunyai standar dan nilai yang berbeda. contoh, standar
'apakah seseorang itu baik atau tidak' di sekolah dengan di kelompok sepermainan tentu
berbeda. Di sekolah, misalnya, seseorang disebut baik apabila nilai ulangannya di atas tujuh
atau tidak pernah terlambat masuk sekolah. Sementara di kelompok sepermainan, seseorang
disebut baik apabila solider dengan teman atau saling membantu. Perbedaan standar dan nilai
pun tidak terlepas dari tipe sosialisasi yang ada. Ada dua tipe sosialisasi. Kedua tipe sosialisasi
tersebut adalah sebagai berikut:
1. Formal
Sosialisasi tipe ini terjadi melalui lembaga-lembaga yang berwenang menurut
ketentuan yang berlaku dalam negara, seperti pendidikan di sekolah dan pendidikan
militer.
2. Informal
Sosialisasi tipe ini terdapat di masyarakat atau dalam pergaulan yang bersifat
kekeluargaan, seperti antara teman, sahabat, sesama anggota klub, dan kelompok-
kelompok sosial yang ada di dalam masyarakat.

11
Baik sosialisasi formal maupun sosialisasi informal tetap mengarah kepada pertumbuhan
pribadi anak agar sesuai dengan nilai dan norma yang berlaku di lingkungannya. Dalam
lingkungan formal seperti di sekolah, seorang siswa bergaul dengan teman sekolahnya dan
berinteraksi dengan guru dan karyawan sekolahnya. Dalam interaksi tersebut, ia mengalami
proses sosialisasi. dengan adanya proses sosialisasi tersebut, siswa akan disadarkan tentang
peranan apa yang harus ia lakukan. Siswa juga diharapkan mempunyai kesadaran dalam
dirinya untuk menilai dirinya sendiri. Misalnya, apakah saya ini termasuk anak yang baik dan
disukai teman atau tidak? Apakah perliaku saya sudah pantas atau tidak?

Meskipun proses sosialisasi dipisahkan secara formal dan informal, namun hasilnya sangat
suluit untuk dipisah-pisahkan karena individu biasanya mendapat sosialisasi formal dan
informal sekaligus.

12
BAB IV
PELAKSANAAN PEKERJAAN

A. Penyusunan Format Desain HSPK


Tahapan Pelaksanaan Pekerjaan Menurut Wiestra, (2014:12) ” Usaha-usaha yang
dilakukan untuk melaksanakan semua rencana dan kebijakan yang telah dirumuskan dan
ditetapkan dengan melengkapi segala kebutuhan alat-alat yang diperlukan, siapa yang akan
melaksanakan, dimana tempat pelaksananaannya dan kapan waktu dimulainya”.
Pada tahapan ini akan dijelaskan tentang desain format penyusunan HSPK Kegiatan Fisik
Konstruksi. Desain format tersebut merujuk pada Peraturan Kementerian PUPR Nomor 1
Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang
Pekerjaan Umum dan Perumahan Rakyat. Permen PUPR No.1 Tahun 2022 mengatur tentang
Analisis Harga satuan Pekerjaan Konstruksi dan Permen PUPR No.22 Tahun 2018 mengatur
tentang Pembangunan Bangunan Gedung Negara. Berikut adalah desain format HSPK
Kegiatan Fisik Konstruksi :
Table 1.
Desain Format Analisa HSPK Kegiatan Konstruksi

Sumber data: https://s.id/pemenuhanHSDfisikmakassar2023

Dari table diatas bisa dijelaskan untuk Nama Komponen merujuk kepada peraturan yang
berlaku dan sudah disesuaikan dengan karakteristik kegiatan di pemerintah daerah. Rincian
analisa kebutuhan didalam pekerjaan tersebut di dapatkan dari peraturan yang berlaku dan
dari perhitungan teknis. Unsur di dalam rincian komponen tersebut sudah dijelaskan pada Bab
sebelum nya, adalah terdiri dari Harga Satuan Dasar ( Upah ; Bahan ; Alat ).

13
B. Kebijkan Di Dalam Komponen
Sebelum menyusun kertas kerja HSPK ada perihal yang harus disepakati bersama dengan
sector terkait mengenai Kebijakan Kesepahaman dalam implementasi komponen tersebut di
dalam penganggaran. Berikut perihal nya :
1. Bahwa Komponen HSPK adalah bersifat pendekatan biaya
2. Asumsi factor penambah biaya ( PPN ; O/h+Profit ; SMKK ) di dalam analisa HSPK
3. Penggunaan HSD ( Upah ; Bahan ; Alat ) yang sudah melalui survey di tahun berkenaan
dalam analisa HSPK
4. Penggunaan Kode Rekening Belanja di dalam Analisa HSPK

C. Proses Penyusunan HSPK


Di tahapan berikut ini kami bekerja melalui platform yaitu “ Google Drive “ untuk
mempermudah proses pengerjaan nya, dengan membuat Link Google Drive “
https://s.id/pemenuhanHSDfisikmakassar2023 “ yang kami bagikan kepada OPD terkait dalam

penyusunan. Tugas dari OPD adalah melakukan pemenuhan HSD yang format isian nya sudah
kami siapkan di dalam Link tersebut. Dari proses pemenuhan HSD tersebut akan ditindak
lanjuti dengan membuat Berita Acara Kesepakatan.

D. Mekanisme Pengusulan Komponen HSPK


Di tahapan berikut ini kami bekerja melalui platform yaitu “ Google Form “ untuk
mempermudah proses pengerjaan nya, dengan membuat Link Google Form “
https://s.id/formulirusulankomponenfisikmakassar-udn “ yang kami bagikan kepada OPD
terkait dalam pengusulan komponen. Tugas dari OPD adalah melakukan usulan komponen
yang format isian nya sudah kami siapkan di dalam Link tersebut. Dari proses usulan
komponen tersebut akan ditindak lanjuti dengan verifikasi dan pembahasan.

14
LAMPIRAN - LAMPIRAN

15
HASIL PEMENUHAN KOMPONEN
HSPK / ASB FISIK KONSTRUKSI TA 2023
OLEH SATKER PUPR KOTA MAKASSAR

KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM


SURVEY (PPN+INFLASI)
Ssh_1 Air Tawar Liter 500 650
Ssh_253 Klem Uk. 3 X 40 X 450 Mm Buah 600 780
Ssh_42 Bata Ringan E X . Citicon M3 867 1,127
Ssh_41 Bata Merah Kelas 1 Buah 900 1,170
Ssh_459 Semen Pc 40 Kg Kg 1,450 1,885
Ssh_422 Plint Keramik Uk. 10 X 20 Cm Buah 1,500 1,950
Ssh_127 Dynabolt Dia. 10 Buah 3,500 4,550
Ssh_461 Seng Gelombang Bjls 30 Uk. 80 Cm X 210 Cm Lembar 3,570 4,641
Ssh_452 Seal Tape Untuk Pipa Unit 3,645 4,739
Ssh_215 Kawat Berduri Uk. 2,1 Mm Meter 4,550 6,500
Ssh_172 Kabel Nya Uk. 1 X 2.5 Mm Meter 5,000 6,500
Ssh_305 Mangkok Listrik Uk. 7x7x4,5 Cm Buah 5,500 7,150
Ssh_8 Amplas Halus Lembar 5,600 7,280
Ssh_169 Isolasi Uk. 7 Mils X 3/4 Inch X 20 M Buah 6,000 7,800
Ssh_24 Bahan Bakar Minyak Pertalite Liter 7,850 10,205
Ssh_62 Baut Screw Driver Buah 8,200 10,660
Ssh_9 Amplas Kasar Lembar 9,120 11,856
Ssh_336 Mur Baut Uk. 10 Mm Buah 9,800 12,740
Ssh_161 Grendel Pintu Tanam Buah 10,000 13,000
Ssh_202 Kait Angin Untuk Pintu Set 10,000 13,000
Ssh_180 Kabel Nym Uk. 2 X 2.5 Mm Meter 11,500 14,950
Ssh_460 Semen Warna/nat Kg 12,667 16,467
Ssh_527 Tulangan Besi Beton Type U - 24 Kg 13,032 16,942
Ssh_74 Besi Beton Ulir Dia. 12 Mm, 12 Meter Kg 14,000 18,200
Ssh_83 Besi Plat Strip Uk. 4 X 30 Mm X 6 Meter Kg 14,000 18,200
Ssh_73 Besi Beton Polos Dia. 12 Mm, 12 Meter Kg 14,041 18,253
Ssh_303 List Gypsum Profil Uk. 5 Cm Meter 14,200 18,460
Ssh_263 Kuas Cat Uk. 3 Inch Buah 14,250 18,525
Sbu_9 Biaya Jasa Set Terminal Kabel Buah 14,300 14,300
Ssh_22 Aspal Panas Ac 60/70 Kg 15,000 19,500
Ssh_122 Dolken Kayu Dia. 8 - 10 X 400 Cm Batang 15,000 19,500
Ssh_21 Aspal Emulsi Curah Kg 15,300 19,890
Ssh_208 Kapi Cat Rrt Uk. 2 Inch Buah 17,000 22,100
Ssh_25 Bahan Bakar Minyak Solar Industri Liter 17,600 22,880
Ssh_450 Saklar Tunggal Buah 18,900 24,570
Ssh_339 Nok Genteng Metal Buah 19,200 24,960
Ssh_139 Floor Drain Accessories Buah 20,000 26,000
Ssh_308 Mata Bor Besi Bosch Hss - G - 10.0 Mm Buah 20,000 26,000
Ssh_352 Paku Biasa Uk. 2 Inch - 5 Inch Kg 20,000 26,000
Ssh_483 Tali Ijuk Kg 20,000 26,000
Ssh_345 Paku Uk. 4 - 7 Cm Kg 20,300 26,390
Ssh_171 Kabel Antena Roll 22,000 28,600
Ssh_218 Kawat Ikat (bendrat) Besi Uk. 0,1 Cm X 25 Kg Kg 22,000 28,600
Ssh_264 Kuas Cat Uk. 4 Inch Buah 22,230 28,899
Ssh_36 Bambu Bongkotan Batang 25,000 32,500
Ssh_211 Karet Uk 3 X 10 Mm Tube 25,000 32,500
Ssh_333 Minyak Cat Biasa Kaleng 25,000 32,500
Ssh_332 Bahan Bakar Minyak Minyak Bekisting Liter 26,400 34,320
Ssh_462 Seng Gelombang Bjls 30 Uk. 80 Cm X 240 Cm Lembar 26,500 34,450
Ssh_469 Slot Pintu Tanam Set 27,000 35,100
Ssh_129 Engsel Dior 3 Kuning Stel 27,500 35,750
Ssh_131 Engsel Jendela Stel 27,500 35,750
Ssh_438 Residu 1 Liter Liter 30,000 39,000
Ssh_449 Saklar Ganda Buah 30,000 39,000
Ssh_463 Seng Gelombang Bjls 30 Uk. 80 Cm X 300 Cm Lembar 30,500 39,650
Ssh_132 Engsel Pintu Set 31,000 40,300
Ssh_134 Engsel Biasa Uk. 4 Inch Buah 31,000 40,300
Ssh_205 Kanstain Uk. 35 X 15 X 50 Cm Profil Meter 31,000 40,300
Ssh_499 Thinner B Kg 31,900 41,470
Ssh_137 Fitting Broco Plafon Buah 33,900 44,070
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_154 Geotextile Woven Uk. 0,8 Mm, 200 Gr (3,2 X 200) M2 35,000 45,500

Ssh_262 Kuas Roll Besar Buah 35,000 45,500


Ssh_167 Hollow Plafond Galvalum Tebal 0,35 Mm, 4 X 4 X 400 Cm Batang 36,000 46,800

Ssh_466 Seng Plat Bjls 30 Uk. 90 Cm Lembar 36,653 47,649


Ssh_166 Handle Pintu Type Hre 75.01 E X Cisa Buah 37,000 48,100
Ssh_121 Dempul Kayu Kg 39,334 51,134
Ssh_415 Plamir Kayu Pelapis Kayu Kg 39,334 51,134
Ssh_276 Lampu Essential Philips Kap. 18 Watt Buah 39,600 51,480
Ssh_204 Kanstain Uk. 25 X 15 X 40 Cm Meter 41,300 53,690
Ssh_465 Seng Plat Bjls 30 Uk. 3 Inch X 6 Inch Lembar 42,750 55,575
Ssh_266 Kunci Pintu Silinder Buah 43,500 56,550
Ssh_26 Bahan Bakar Minyak Minyak Pelumas Liter 44,000 57,200
Ssh_261 Kran Air Uk. 0,5 Inch Buah 45,300 58,890
Ssh_411 Pipa Pvc D Uk. 2 Inch X 4 M Batang 45,300 58,890
Ssh_275 Lampu Down Light + Fitting Buah 49,000 63,700
Ssh_125 Door Stoper Uk. 8 Cm Buah 50,000 65,000
Ssh_136 Fitting Stop Valve & Support Buah 50,000 65,000
Ssh_344 Outlet Untuk Tv Unit 50,000 65,000
Ssh_103 Cat Meni Besi Kg 50,539 65,701
Ssh_277 Lampu Essential Philips Kap. 23 Watt Buah 50,900 66,170
Ssh_477 Stop Kontak Tunggal Buah 53,800 69,940
Ssh_259 Kran Dinding Buah 54,500 70,850
Ssh_347 Paku Payung Kg 56,600 73,580
Ssh_96 Cat Kayu Kg 58,000 75,400
Ssh_98 Cat Kayu Dasar Kg 58,000 75,400
Ssh_445 Roster Uk. 20x20 Cm Merah Buah 58,900 76,570
Ssh_250 Keramik Lantai Terang, Polos Uk. 30 X 30 Cm M2 60,000 78,000

Ssh_400 Pipa Pvc Aw Uk. 0,5 Inch X 6 M Batang 60,000 78,000


Ssh_302 Linggis Uk. 1 Inch X 40 Cm Buah 62,300 80,990
Ssh_351 Paku Asbes Buah 62,300 80,990
Ssh_470 Slot Pintu Tanam Pintu Doble Set 64,000 83,200
Ssh_553 Vernis 1 Liter Botol 64,500 83,850
Ssh_416 Plamir Tembok Pelapis Tembok Kg 65,000 84,500
Ssh_68 Besi Wire Mesh kg 65,500 85,150
Ssh_97 Cat Besi Warna Hitam Kg 65,500 85,150
Ssh_437 Reng Galvalum Uk. 35 X 40 Mm - 6 Meter Batang 65,500 85,150
Ssh_248 Keramik Lantai Polos Uk. 20 X 20 Cm M2 65,700 85,410
Ssh_404 Pipa Pvc Aw Uk. 3 Inch X 6 M Batang 67,600 87,880
Ssh_366 Paving Stone Bata Tebal. 6 Cm, Abu - Abu (k 300) M2 67,900 88,270

Ssh_522 Triplek Uk. 120 Cm X 240 Cm X 4 Mm Lembar 67,900 88,270

Ssh_524 Triplek Uk. 122 Cm X 244 Cm X 4 Mm Lembar 67,900 88,270

Ssh_85 Besi Siku L Uk. 30 X 30 X 3 Cm Batang 69,000 89,700


Ssh_311 Mcb Kap. 6 Amper Buah 69,000 89,700
Ssh_566 Fleshing Seng Plat M 70,000 91,000
Ssh_558 Water Proofing Membrane M2 70,000 91,000
Ssh_458 Selinder Cisa Type 08510 Ex Cisa Buah 70,500 91,650
Ssh_99 Cat Kayu Penutup 2 Kali Kg 70,750 91,975
Ssh_247 Keramik Lantai Motif Uk. 40 X 40 Cm M2 73,600 95,680
Ssh_160 Grendel Pintu Biasa (besar) Buah 74,700 97,110
Ssh_300 Lem Silicone Rubber Sealant Tube 75,000 97,500
Ssh_495 Tempat Sabun Bahan Keramik Buah 75,000 97,500
Ssh_565 Roof Drain Uk. 4 Inch Buah 76,000 98,800
Ssh_478 Stop Kran Dia. 3/4 Inch Buah 77,000 100,100
Ssh_310 Mcb Kap. 4 Amper Buah 77,500 100,750
Ssh_256 Klep Diameter Uk. 3/4 Inch Buah 79,000 102,700
Ssh_412 Pipa Pvc D Uk. 3 Inch X 4 M Batang 79,300 103,090
Ssh_297 Lem Pipa Pvc Uk. 400 G Buah 82,100 106,730
Ssh_164 Gypsum Board Tebal, 9 Mm, Uk. 120 X 240 Lembar 84,900 110,370
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_289 Lampu Tl Kap. 1 X 18 Watt Set 85,000 110,500
Ssh_244 Keramik Dinding Motif Uk. 20 X 25 Cm M2 85,500 111,150
Ssh_368 Paving Stone Bata Tebal. 8 Cm, Abu - Abu (k 300) M2 87,500 113,750

Ssh_334 Multipleks Uk. 120 X 240 Cm X 9 Mm Lembar 90,000 117,000


Ssh_371 Paving Stone Segi Enam Tebal. 6 Cm, Abu - Abu (k 300) M2 90,000 117,000

Ssh_525 Triplek Uk. 122 Cm X 244 Cm X 6 Mm Lembar 90,600 117,780

Ssh_399 Pipa Pvc Aw Uk. 1 Inch X 6 M Batang 99,000 128,700


Ssh_155 Gergaji Besi Uk. 12 Inch X 1,1 Mm Buah 99,600 129,480
Ssh_245 Keramik Lantai Motif Uk. 20 X 20 Cm M2 99,700 129,610
Ssh_496 Tepung Gypsum Zak 101,000 131,300
Ssh_203 Kalsiboard Uk. 240 X 120 X 4,5 Mm E X Lembar 103,100 134,030
Eternit Gresik
Ssh_373 Paving Stone Segi Enam Tebal. 8 Cm, Abu - Abu (k 300) M2 106,500 138,450

Ssh_467 Shower Set Stainless Steel Unit 113,000 146,900


Ssh_28 Baja Ringan Kanal Galvalum Uk. C 75 Mm Batang 115,000 149,500
Ssh_78 Besi Canai Dingin C. 75 Kg 115,000 149,500
Ssh_433 Rangka Pintu Alumunium Uk. 4 Inch Pc Batang 115,000 149,500
Ssh_82 Besi Plat Strip Uk. 3 X 30 Mm X 6 Meter Batang 115,500 150,150
Ssh_249 Keramik Lantai Polos Uk. 40 X 40 Cm M2 121,200 157,560
Ssh_413 Pipa Pvc D Uk. 4 Inch X 4 M Batang 124,600 161,980
Ssh_476 Stop Kontak Ganda Buah 124,600 161,980
Ssh_95 Cat Tembok Dasar (alkali) Kg 126,667 164,667
Ssh_123 Door Closer Uk. 210 X 85 Cm Buah 127,500 165,750
Ssh_269 Kunci Pintu Tanam Kamar Mandi Buah 127,500 165,750
Ssh_335 Multipleks Uk. 122 Cm X 244 Cm X 12 Mm Lembar 130,000 169,000

Ssh_365 Paving Stone Uskup M2 130,000 169,000


Ssh_480 T Dos Pvc Sb Buah 130,000 169,000
Ssh_479 Stop Kran Dia. 1 Inch Buah 130,200 169,260
Ssh_481 Talang Jurai Canai Dingin Meter 130,200 169,260
Ssh_273 Kusen Alumunium Uk. 3 Inch Pc Batang 132,000 171,600
Ssh_27 Baja Ringan Canai Dingin Uk. C 75 Mm Meter 133,950 174,135
Ssh_290 Lampu Tl Kap. 1 X 36 Watt Set 135,000 175,500
Ssh_364 Pasir Urug M3 135,714 176,428
Ssh_488 Tanah Urug M3 136,250 177,125
Ssh_455 Sekrup Mata Tutup Rrt Uk. 1 Set 137,000 178,100
Ssh_6 Alumunium Standart Uk. 3 Inch Ca Batang 137,500 178,750
Ssh_271 Kusen Aluminium Uk. 3 Inch Coklat Batang 137,500 178,750
Ssh_29 Baja Ringan Kanal Galvalum Uk. C 80 X 75 Mm - 6 Meter Batang 140,000 182,000
Ssh_260 Kran Zink Buah 142,000 184,600
Sbu_66 Tenaga Pekerja 7 Jam / Hari Hari 143,200 143,200
Ssh_198 Kaca Polos Bening Uk. 5 Mm M2 148,000 192,400
Ssh_197 Kaca Polos Bening Uk. 3 Mm M2 150,000 195,000
Ssh_246 Keramik Lantai Motif Uk. 30 X 30 Cm M2 150,000 195,000
Ssh_93 Box Panel Pvc Isi 4 Mcb Buah 155,000 201,500
Ssh_101 Cat Meni A Kg 155,200 201,760
Ssh_102 Cat Meni B Kg 155,200 201,760
Ssh_201 Kaca Rayben Uk. 5 Mm M2 158,600 206,180
Ssh_367 Paving Stone Bata Tebal. 6 Cm, Berwarna (k 300) M2 160,600 208,780

Ssh_298 Lem Kayu Uk. 1 Kg Kg 164,200 213,460


Ssh_159 Granito Uk. 60 X 60 Cm, Type Salsa M2 165,000 214,500
Polished
Ssh_410 Pipa Pvc C Uk. 5/8 Inch X 4 Cm Batang 169,000 219,700
Ssh_265 Kunci Pintu Selot Set 169,900 220,870
Ssh_268 Kunci Pintu Tanam Biasa Buah 169,900 220,870
Ssh_491 Teakwood Tebal 4 Mm Lembar 169,900 220,870
Ssh_492 Teakwood Uk. 120 Cm X 240 Cm X 4 Mm Lembar 169,900 220,870

Sbu_69 Tenaga Tukang 7 Jam / Hari Hari 179,000 179,000


KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_79 Besi Hollow Uk. 40 X 40 Tebal 1,2 Mm Batang 181,200 235,560
Ssh_94 Cat Tembok Galon 182,500 237,250
Sbu_63 Tenaga Kepala Tukang 7 Jam / Hari Hari 193,300 193,300
Ssh_4 Aluminium Strip Lebar 8 Cm Meter 194,000 252,200
Ssh_435 Rel Pintu Dorong Buah 195,000 253,500
Ssh_349 Paku Sekrup Dus 198,200 257,660
Ssh_381 Pipa Galvanis Dia. 0,5 Inch X 6 Meter Medium Batang 198,200 257,660
A
Sbu_64 Tenaga Mandor 7 Jam / Hari Hari 214,800 214,800
Ssh_53 Batu Pecah Mesin Screen 0 - 37,5 Mm M3 218,750 284,375
Ssh_55 Batu Pecah Mesin Agregat Pecah Kasar M3 218,750 284,375
Ssh_58 Batu Pecah Mesin Uk. 2 - 3 Cm M3 218,750 284,375
Ssh_425 Plywood Tebal 4 Mm Lembar 220,000 286,000
Ssh_7 Alumunium Standart Uk. 4 Inch Ca Rangka Daun Batang 231,000 300,300
Pintu
Ssh_272 Kusen Aluminium Uk. 4 Inch Coklat Batang 231,000 300,300
Ssh_13 Angkur Dia. 25 Mm Buah 249,000 323,700
Ssh_386 Pipa Galvanis Dia. 3/4 Inch X 6 Meter Batang 249,200 323,960
Medium A
Ssh_51 Batu Kerikil Beton Uk. 10 X 20 Mm M3 250,000 325,000
Ssh_54 Batu Pecah Mesin Agregat Pecah Halus M3 250,000 325,000
Ssh_270 Kusen & Pintu Pvc Toilet Unit 251,500 326,950
Ssh_199 Kaca Polos Bening Uk. 6 Mm M2 277,500 360,750
Ssh_50 Batu Kali Uk. 15 - 20 Cm M3 280,000 364,000
Ssh_403 Pipa Pvc Aw Uk. 2 Inch X 6 M Batang 281,500 365,950
Ssh_104 Cat Tembok Eksterior Uk. 2,5 Liter Galon 285,000 370,500
Ssh_108 Closet Jongkok Porselin Warna Putih Buah 285,500 371,150
Ssh_363 Pasir Sirtu M3 294,500 382,850
Ssh_539 U-ditch Uk. 400 X 500 X 1200 Mm Buah 296,800 385,840
Ssh_362 Pasir Pasang M3 300,000 390,000
Ssh_361 Pasir Beton M3 305,000 396,500
Ssh_59 Batu Pecah Mesin Uk. 3 - 5 Cm M3 310,000 403,000
Ssh_555 Wastafel Bahan Keramik Set 315,000 409,500
Ssh_267 Kunci Pintu Tanam Antik Buah 331,500 430,950
Ssh_554 Wall Paper Lebar, 50 Cm Roll 339,900 441,870
Ssh_380 Pipa Galvanis Dia. 1 Inch X 6 Meter Medium Batang 385,200 500,760
A
Ssh_60 Batu Split Pecah Mesin Uk. 0,5 Inch M3 396,500 515,450
Ssh_109 Closet Jongkok Teraso Buah 396,500 515,450
Ssh_406 Pipa Pvc Aw Uk. 4 Inch X 4 M Batang 408,000 530,400
Sbu_60 Sewa Water Tanker Kap. 500 Liter Jam 420,000 546,000
Ssh_200 Kaca Polos Bening Uk. 8 Mm M2 429,000 557,700
Sbu_24 Sewa Blending Equipment Kap. 30 Ton Jam 431,364 560,773
Ssh_376 Pintu Besi Lipat M2 450,000 585,000
Ssh_405 Pipa Pvc Aw Uk. 3/4 Inch X 6 M Batang 451,767 587,297
Ssh_5 Alumunium Gelombang Tebal 0.3 Cm Lembar 470,000 611,000
Ssh_31 Bak Mandi Fiberglass Buah 495,000 643,500
Ssh_540 U-ditch Uk. 400 X 600 X 1200 Mm Buah 521,300 677,690
Ssh_407 Pipa Pvc Aw Uk. 4 Inch X 6 M Batang 554,467 720,807
Ssh_382 Pipa Galvanis Dia. 1,5 Inch X 6 Meter Medium Batang 566,500 736,450
A
Sbu_23 Sewa Batching Plant Kap. 63 M3 Jam 568,897 739,566
Ssh_542 U-ditch Uk. 500 X 600 X 1200 Mm Buah 569,300 740,090
Ssh_544 U-ditch Uk. 600 X 600 X 1200 Mm Buah 579,600 753,480
Sbu_58 Sewa Vibro Roller Kap. 10 Ton Jam 645,951 839,736
Sbu_50 Sewa Pneumatic Tyre Roller Kap. 10-12 Ton Jam 648,932 843,612

Ssh_343 Outlet Exhausefan Unit 650,000 845,000


Sbu_55 Sewa Tandem Roller Kap. 2 - 12 Ton Jam 667,947 868,331
Ssh_543 U-ditch Uk. 500 X 700 X 1200 Mm Buah 671,100 872,430
Sbu_40 Sewa Genset Kap. 1000 Kva Jam 675,461 878,099
Ssh_330 Mesin Pompa Kap. 150 Watt Buah 685,000 890,500
Ssh_179 Kabel Nym Uk. 2 X 2,5 Mm2 Roll 687,500 893,750
Sbu_38 Sewa Flat Bed Truck Kap. 3 Ton Jam 705,181 916,735
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Sbu_61 Sewa Wheel Loader Kap. 202 Hp Jam 717,634 932,924
Ssh_84 Besi Profil Uk. C 100 Mm S/d 150 Mm Kg 750,000 975,000
Ssh_546 U-ditch Uk. 600 X 800 X 1200 Mm Buah 775,100 1,007,630
Sbu_36 Sewa Dump Truck Kap. 10 Ton Jam 782,165 1,016,815
Sbu_37 Sewa Excavator Kap. 138 Ton Jam 827,217 1,075,382
Ssh_490 Tangki Air Kap. 500 Liter Buah 849,700 1,104,610
Ssh_545 U-ditch Uk. 600 X 700 X 1200 Mm Buah 940,900 1,223,170
Sbu_57 Sewa Truck Mixer Kap. 7 M3 Jam 949,409 1,234,232
Sbu_47 Sewa Motor Grader Kap. 135 Hp Jam 950,178 1,235,231
Sbu_25 Sewa Bulldozer Kap. 160 Hp Jam 1,063,067 1,381,987
Ssh_547 U-ditch Uk. 800 X 1000 X 1200 Mm Buah 1,158,100 1,505,530
Sbu_19 Sewa Asphalt Finisher Kap. 72,4 Hp Jam 1,179,434 1,533,264
Ssh_548 U-ditch Uk. 800 X 800 X 1200 Mm Buah 1,236,000 1,606,800
Ssh_489 Tangki Air Kap. 1000 Liter Buah 1,250,000 1,625,000
Ssh_385 Pipa Galvanis Dia. 3 Inch X 6 Meter Medium Batang 1,302,900 1,693,770
A
Ssh_535 U-ditch Uk. 1000 X 1000 X 1200 Mm Buah 1,447,400 1,881,620
Ssh_551 Urinoir Uk. 80 Cm Set 1,586,200 2,062,060
Ssh_252 Kitchenzink Stainless Steel Buah 1,600,000 2,080,000
Ssh_329 Mesin Jet Pump Kap. 250 Watt Buah 1,725,000 2,242,500
Ssh_536 U-ditch Uk. 1000 X 1200 X 1200 Mm Buah 1,909,300 2,482,090
Sbu_27 Sewa Cold Milling Kap. 0,5 M Jam 1,928,883 2,507,548
Ssh_387 Pipa Galvanis Dia. 4 Inch X 6 Meter Medium Batang 2,039,400 2,651,220
A
Ssh_107 Closet Duduk Komplit Buah 2,200,000 2,860,000
Sbu_2 Biaya Jasa Penyambungan Pln Unit 2,412,600 2,412,600
Ssh_225 Kayu Perancah M3 2,500,000 3,250,000
Ssh_482 Talang Galvalum 90 Tebal 0,3 Mm Meter 2,500,000 3,250,000
Ssh_517 Tiang Pancang Beton Bertulang Uk. 25 X 25 Cm Meter 2,700,000 3,510,000

Ssh_564 Kayu Papan Kelas 3 M3 2,800,000 3,640,000


Ssh_561 Kayu Balok Kelas 2 M3 3,000,000 3,900,000
Ssh_563 Kayu Balok Kelas 3 M3 3,000,000 3,900,000
Ssh_562 Kayu Papan Kelas 2 M3 3,100,000 4,030,000
Ssh_518 Tiang Pancang Beton Bertulang Uk. 30 X 30 Cm Meter 3,200,000 4,160,000

Ssh_519 Tiang Pancang Beton Bertulang Uk. 40 X 40 Cm Meter 3,900,000 5,070,000

Sbu_5 Biaya Jasa Pemasangan Dan Akomodasi Set 5,500,000 5,500,000

Sbu_21 Sewa Asphalt Mixing Plant Kap. 10-15 Ton Jam 11,730,010 15,249,013
Ssh_559 Kayu Balok Kelas 1 M3 12,750,000 16,575,000
Ssh_560 Kayu Papan Kelas 1 M3 16,500,000 21,450,000
Ssh_15 Asbes Gelombang Kecil Tebal 5 Mm 2,5 X 0,92 Lembar # #VALUE! 66,000
Ssh_16 Asbes Semen Tebal 4 Mm Lembar # #VALUE! 76,500
Ssh_17 Asbes Semen Tebal 6 Mm Lembar # #VALUE! 109,000
Ssh_18 Asbes Wuwung Stel Gelombang Tebal 0,92 Mm Lembar # #VALUE! 43,450

Ssh_19 Asbes Wuwung Stel Gelombang Tebal 1,05 Mm Lembar # #VALUE! 47,500

Ssh_20 Asbes Wuwung Stel Gelombang Tebal 1,08 Mm Lembar # #VALUE! 59,100

Ssh_23 Bahan Bakar Minyak Pertamax Liter # #VALUE! 12,750


Ssh_331 Bahan Bakar Minyak Minyak Bakar Liter # #VALUE! 14,300
Ssh_30 Bak Cuci Stainless Steel Buah # #VALUE! 410,000
Ssh_32 Bak Mandi Teraso Buah # #VALUE! 196,000
Ssh_37 Bambu Ajir Uk. 2 Meter Batang # #VALUE! 2,000
Ssh_38 Bambu Ori Dia. 6 - 10 Cm. Panjang 6 Meter Batang # #VALUE! 52,150

Ssh_44 Batu Ampyang Multi Warna Zak # #VALUE! 85,000


Ssh_45 Batu Candi Polos Uk. 20 X 20 M2 # #VALUE! 185,000
Ssh_46 Batu Gilang Ex . Cirebon Acak M2 # #VALUE! 195,000
Ssh_47 Batu Gilang Ex . Cirebon Beraturan M2 # #VALUE! 195,000
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_48 Batu Gilang Ex . Jember Profil Beraturan M2 # #VALUE! 198,000

Ssh_49 Batu Gilang Ex . Jember Profil Tak Beraturan M2 # #VALUE! 195,000

Ssh_52 Batu Palimanan Uk. 20 X 20 Cm M2 # #VALUE! 191,300


Ssh_56 Batu Pecah Mesin Uk. 0,5 - 1 Cm M3 # #VALUE! 480,000
Ssh_67 Besi Wf Kg # #VALUE! 20,800
Ssh_69 Besi Profil Meter # #VALUE! 23,500
Ssh_81 Besi Plat Rata2 Lembar # #VALUE! 665,000
Ssh_86 Besi Strip Uk. 0,2 X 2 Cm Kg # #VALUE! 19,000
Ssh_87 Besi Tempa Untuk Pagar M2 # #VALUE! 357,000
Ssh_88 Bibit Bakau Tinggi 1.50 Merah Batang # #VALUE! 15,000
Ssh_92 Box Panel Mcb / Trafo Buah # #VALUE! 652,150
Ssh_100 Cat Kayu Besi Kg # #VALUE! 66,100
Ssh_113 Curing Membran Uk. 77 % Aspal + 33 % Kerosene Liter # #VALUE! 17,350

Ssh_124 Door Holder Uk. 30 X 7,5 Cm Buah # #VALUE! 30,000


Ssh_126 Dynabol Dia. 12 X 120 Mm Buah # #VALUE! 12,500
Ssh_128 End Cap Untuk Jalan Set # #VALUE! 126,000
Ssh_130 Engsel Hidrolis Pintu Aluminium Stel # #VALUE! 35,000
Ssh_133 Engsel Angin Kuningan Uk. 2 Inch Stel # #VALUE! 23,000
Ssh_135 Filler Campuran Cat Kg # #VALUE! 40,000
Ssh_567 Formika Uk. 120 X 240 Cm Lembar # #VALUE! 199,000
Ssh_140 Gebalan Rumput Uk. 25 X 25 Cm M2 # #VALUE! 15,000
Ssh_141 Gedek Guling Uk. 100 X 300 Cm Lembar # #VALUE! 75,000
Ssh_142 Gedek Guling Uk. 200 X 300 Cm Lembar # #VALUE! 135,000
Ssh_143 Genteng Beton Garuda Buah # #VALUE! 4,300
Ssh_144 Genteng Glazur Kamuri Buah # #VALUE! 12,000
Ssh_145 Genteng Karang Pilang Bambe Buah # #VALUE! 6,050
Ssh_146 Genteng Karang Pilang Bisma Buah # #VALUE! 6,050
Ssh_147 Genteng Karang Pilang Good Year Buah # #VALUE! 8,000
Ssh_148 Genteng Karang Pilang Nglayur Buah # #VALUE! 4,200
Ssh_149 Genteng Metal/galvalume Lembar # #VALUE! 62,500
Ssh_150 Genteng Wuwung Beton Buah # #VALUE! 38,500
Ssh_151 Genteng Wuwung Karang Pilang Ngalyur Buah # #VALUE! 26,050
Ex Trenggalek
Ssh_152 Genteng Wuwung Plentong Buah # #VALUE! 12,000
Ssh_153 Genteng Wuwung Keramik Glazzur Buah # #VALUE! 16,500
Ssh_156 Gergaji Sherlock Uk. 14 Inch/350 Mm Buah # #VALUE! 150,000
Ssh_158 Granit Aurora Uk. 60 X 60 Cm M2 # #VALUE! 365,200
Ssh_163 Gunting Pangkas Tanaman Uk. 7 Inch Hari # #VALUE! 65,000
Ssh_165 Handle Pintu Kp Ex Alpha + Kunci Buah # #VALUE! 260,800
Ssh_168 Imidacloprid 200 Gr Liter # #VALUE! 86,000
Ssh_170 Jaring Uk. 10 Cm Set # #VALUE! 150,000
Ssh_181 Kabel Nym Uk. 3 X 2,5 Mm Meter # #VALUE! 10,120
Ssh_193 Kaca Fitrase M2 # #VALUE! 60,000
Ssh_194 Kaca Krepyak M2 # #VALUE! 146,000
Ssh_195 Kaca Vertical Blind M2 # #VALUE! 301,000
Ssh_196 Kaca Sun Screen Alumunium M2 # #VALUE! 264,000
Ssh_206 Kantong Plastik Uk. 12 X 24 Cm Lembar # #VALUE! 30,000
Ssh_209 Kapur Gamping Kg # #VALUE! 12,000
Ssh_210 Kapur Pasang Kg # #VALUE! 11,700
Ssh_212 Karpet Uk. 92 X 92 Cm M2 # #VALUE! 200,000
Ssh_213 Karpet Foam Lapisan Karpet M2 # #VALUE! 60,500
Ssh_214 Karung Uk. 50 Kg Buah # #VALUE! 3,600
Ssh_217 Kawat Bronjong Uk. 2 X 1 X 0,5 M, Lubang 8 X M3 # #VALUE! 308,000
10 Cm
Ssh_219 Kawat Jaring Harmonika M2 # #VALUE! 52,700
Ssh_220 Kawat Las Uk. 3 Mm Kg # #VALUE! 50,000
Ssh_216 Kawat Nyamuk Kasa Aluminium Uk. 0,5 Mm M2 # #VALUE! 70,200

Ssh_227 Kayu Atap Sirap Uk 0,5 X 8 X 60 Cm Lembar # #VALUE! 150,000


Ssh_239 Kayu List Plafon Profil Uk. 2 M Meter # #VALUE! 40,000
Ssh_224 Kayu Parquety Jati Uk. 5 X 1,2 X 20 Cm M2 # #VALUE! 601,700
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_251 Keranjang Plastik Buah # #VALUE! 34,000
Ssh_255 Klem Pvc Uk. Kecil Buah # #VALUE! 15,000
Ssh_288 Lampu Pijar Kap. 25 Watt Buah # #VALUE! 31,600
Ssh_295 Lem Dextone Silicone Rubber Tube # #VALUE! 48,000
Sealant
Ssh_299 Lem Pipa Uk. 300 Gram Buah # #VALUE! 39,100
Ssh_306 Marmer Ex. Lampung Uk. 30 X 60 Cm M2 # #VALUE! 450,000
Ssh_307 Marmer Ex. Tulungagung Uk. 30 X 60 Cm M2 # #VALUE! 450,000
Ssh_313 Mcb Schneider Mg Domae 1 Kap. 4 Amper Buah # #VALUE! 85,000
Phase 4.5 Ka
Ssh_314 Mcb Schneider Mg Domae 1 Kap. 6 Amper Buah # #VALUE! 95,000
Phase 4.5 Ka
Ssh_328 Meni Zincromate Altex 1 Kg Kg # #VALUE! 45,000
Ssh_340 Nok Stel Seng Uk. 105 Cm Buah # #VALUE! 32,150
Ssh_341 Nok Stel Seng Uk. 92 Cm Buah # #VALUE! 35,000
Ssh_342 Obat Hama Untuk Tanaman Liter # #VALUE! 146,300
Ssh_346 Paku Pancing Buah # #VALUE! 1,365
Ssh_350 Paku Triplek Kg # #VALUE! 26,100
Ssh_353 Paku Hak Panjang Uk. 15 Cm Kg # #VALUE! 21,700
Ssh_354 Paku Jalan Bentuk Bulat Set # #VALUE! 310,000
Ssh_357 Panel Pagar Brc Uk. 120 Hd, 6 Mm Unit # #VALUE! 450,000
Ssh_369 Paving Stone Persegi Tebal. 6 Cm, Abu - Abu (k 175) M2 # #VALUE! 98,500

Ssh_370 Paving Stone Persegi Tebal. 6 Cm, Abu - Abu (k 200) M2 # #VALUE! 115,000

Ssh_372 Paving Stone Segi Enam Tebal. 6 Cm, Berwarna (k 300) M2 # #VALUE! 128,500

Sbu_70 Petugas Operator Alat Berat 7 Jam / Hari Hari # #VALUE! 250,000

Sbu_71 Petugas Operator Pompa 7 Jam / Hari Hari # #VALUE! 165,000


Sbu_72 Petugas Sopir 7 Jam / Hari Hari # #VALUE! 153,000
Ssh_377 Pintu Rolling Door Aluminium Uk. 1 Mm M2 # #VALUE! 600,000

Ssh_378 Pintu Rolling Door Besi Uk. 0,4 Mm M2 # #VALUE! 320,000


Ssh_379 Pintu Swing Ganda Brc/pmg Uk. 1.2 X 3.00 M2 Unit # #VALUE! 1,475,000

Ssh_391 Pipa Gip Dia. 150 Mm Meter # #VALUE! 358,333


Ssh_392 Pipa Gip Dia. 200 Mm Meter # #VALUE! 270,331
Ssh_393 Pipa Gip Dia. 250 Mm Meter # #VALUE! 297,000
Ssh_395 Pipa Pvc Dia. 150 Mm Batang # #VALUE! 725,000
Ssh_396 Pipa Pvc Dia. 200 Mm Batang # #VALUE! 1,637,460
Ssh_397 Pipa Pvc Dia. 250 Mm Batang # #VALUE! 1,898,100
Ssh_398 Pipa Pvc Aw Uk. 1,5 Inch X 6 M Batang # #VALUE! 100,200
Ssh_401 Pipa Pvc Aw Uk. 12 Inch X 4 M Batang # #VALUE! 1,692,750
Ssh_402 Pipa Pvc Aw Uk. 2,5 Inch X 6 M Batang # #VALUE! 139,500
Ssh_408 Pipa Pvc Aw Uk. 6 Inch X 4 M Batang # #VALUE! 1,041,300
Ssh_409 Pipa Pvc Aw Uk. 8 Inch X 4 M Batang # #VALUE! 1,623,500
Ssh_414 Pipa Stainless Dia. 2 Inch @ 6 Meter (heinse Meter # #VALUE! 500,000
Merah)
Ssh_417 Plat Tebal. 3 Mm Lembar # #VALUE! 1,478,250
Ssh_421 Plint Keramik Uk. 10 X 10 Cm Dus # #VALUE! 50,000
Ssh_423 Plint Keramik Uk. 5 X 20 Cm Buah # #VALUE! 4,750
Ssh_424 Plint Marmer Uk. 10 Cm M2 # #VALUE! 42,500
Ssh_426 Politur Pelapis Kayu Liter # #VALUE! 58,650
Ssh_427 Politur Jadi Pelapis Kayu Liter # #VALUE! 65,000
Ssh_428 Polycarbonate Twinlite L. 2,1 M X P.11,8 M X T.6 Mm M2 # #VALUE! 4,347,800

Ssh_429 Profil Alumunium T Uk. 30 X 30 Cm Batang # #VALUE! 186,000


Ssh_430 Pupuk Kandang Untuk Tanaman Kg # #VALUE! 15,000
Ssh_431 Pupuk Npk Untuk Tanaman Kg # #VALUE! 24,000
Ssh_436 Reng Canai Dingin Uk. C 0,75 Meter # #VALUE! 45,000
Ssh_444 Roof Light Fibergalass Lembar # #VALUE! 100,200
Ssh_446 Rumput Lamur (embun) / Polytrias M2 # #VALUE! 25,000
Amaura
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_447 Rumput Manila Tandur / Zoysea M2 # #VALUE! 50,000
Mayrella
Ssh_448 Sabun Batangan 80 Gram Buah # #VALUE! 10,000
Ssh_451 Sapu Lidi Uk. Besar Buah # #VALUE! 55,000
Ssh_454 Sekrop Sampah Plastik Buah # #VALUE! 40,000
Ssh_456 Sekrup Mata Tutup Rrt Uk. 3 Dus # #VALUE! 17,500
Ssh_457 Sekrup Mata Tutup Rrt Uk. 4 Set # #VALUE! 65,000
Ssh_464 Seng Plat Bjls 28 Uk. 3 Inch X 6 Inch Lembar # #VALUE! 100,000
Sbu_12 Sewa Alat Mud Pumping Machine Jam # #VALUE! 141,000
Sbu_15 Sewa Alat Bantu Strouss Pile Dia. 1 Meter Jam # #VALUE! 55,600

Sbu_16 Sewa Alat Pengangkat Kayu Pemikul Dan Tampar Unit # #VALUE! 15,500
Sbu_17 Sewa Alat Pengukur Waterpass Hari # #VALUE! 200,000
Sbu_18 Sewa Asphalt Distributor Kap. 5000 Liter Jam # #VALUE! 427,092
Sbu_20 Sewa Asphalt Liquid Mixer Kap. 20.000 Liter Jam # #VALUE! 138,829
Sbu_22 Sewa Asphalt Sprayer Kap. 1000 Liter Jam # #VALUE! 89,500
Sbu_26 Sewa Chainsaw Kap. Bar 16 Inch Hari # #VALUE! 79,725
Sbu_28 Sewa Compressor Kap. 2 Pk Jam # #VALUE! 195,000
Sbu_29 Sewa Concrete Mixer Kap. 500 Liter Jam # #VALUE! 106,327
Sbu_30 Sewa Concrete Paver Kap. Speed Rpm 3600 Jam # #VALUE! 154,925
Sbu_31 Sewa Concrete Vibrator Kap. 5,5 Hp Jam # #VALUE! 62,488
Sbu_33 Sewa Crane Kap. 10 - 15 Ton Hari # #VALUE! 600,000
Sbu_35 Sewa Crane On Track Kap. 75 - 100 Ton Jam # #VALUE! 1,142,895
Sbu_39 Sewa Fulvi Mixer Kap. 7.5 Hp Jam # #VALUE! 262,000
Sbu_41 Sewa Jack Hammer Kap. 1750 Watt Jam # #VALUE! 54,587
Sbu_42 Sewa Kendaraan Mobil Pick Up Dalam Kota Hari # #VALUE! 150,000
Sbu_43 Sewa Kendaraan Hari # #VALUE! 500,000
Sbu_44 Sewa Kendaraan Pengangkut Hari # #VALUE! 300,000
Sbu_45 Sewa Kendaraan Angkut Apung Rakit Hari # #VALUE! 250,000

Sbu_46 Sewa Mesin Pemotong Rumput (chainsaw) Hari # #VALUE! 295,000


Gendong
Sbu_48 Sewa Pedestrian Roller Kap. 6,8 Hp Jam # #VALUE! 240,500
Sbu_49 Sewa Pile Driver + Hammer Kap. 13 Ton Jam # #VALUE! 195,000
Sbu_51 Sewa Sewa Alat Pengelasan / 1200 Watt Jam # #VALUE! 90,800
Welding Set
Sbu_52 Sewa Sewa Alat Ukur Theodolit Hari # #VALUE! 250,000
Sbu_53 Sewa Sewa Tripot/tackel & Kap. 2 Ton Hari # #VALUE! 395,000
Handle Crane
Sbu_54 Sewa Stamper Kap. 4,0 Hp Jam # #VALUE! 75,000
Sbu_56 Sewa Three Wheel Roller Kap. 6-8 Ton Jam # #VALUE! 290,000
Sbu_59 Sewa Water Pump Kap. 70 - 100 Ml Jam # #VALUE! 60,207
Ssh_471 Soda Api Kepadatan 2,13 G/cm³ Kg # #VALUE! 29,000
Ssh_473 Speed Bump Uk. 50 X 35 X 5 Cm Pcs # #VALUE! 175,000
Ssh_474 Spring Knip Uk. 5,5 X 4 Cm Buah # #VALUE! 53,000
Ssh_484 Tali Rafia Uk. 1 Kg Buah # #VALUE! 15,000
Ssh_485 Tanah Liat M3 # #VALUE! 125,000
Ssh_487 Tanah Taman M3 # #VALUE! 95,650
Ssh_493 Teer Bahan Pelabur Kayu Liter # #VALUE! 25,000
Ssh_494 Tegel Trotoar Uk. 30x30 Cm M2 # #VALUE! 80,000
Sbu_62 Tenaga Juru Ukur 7 Jam / Hari Hari # #VALUE! 150,000
Sbu_65 Tenaga Mekanik 7 Jam / Hari Hari # #VALUE! 161,000
Sbu_67 Tenaga Pembantu Juru Ukur 7 Jam / Hari Hari # #VALUE! 120,000

Sbu_68 Tenaga Pembantu Mekanik 7 Jam / Hari Hari # #VALUE! 120,580


Ssh_523 Triplek Uk. 122 Cm X 244 Cm X 3 Mm Lembar # #VALUE! 63,000

Ssh_526 Triplek Alumunium Uk. 4 Mm Lembar # #VALUE! 167,000


Ssh_537 U-ditch Uk. 1200 X 1200 X 1200 Mm Buah # #VALUE! 3,000,000
Ssh_538 U-ditch Uk. 400 X 400 X 1200 Mm Buah # #VALUE! 473,000
Ssh_541 U-ditch Uk. 500 X 500 X 1200 Mm Buah # #VALUE! 700,000
Ssh_549 U-ditch Gandar 5 T U Uk. 120.100.120.10 Cm Buah # #VALUE! 2,150,000
Ssh_550 U-ditch Gandar 5 T U Uk. 80.90.120.10 Cm Buah # #VALUE! 1,450,000
Ssh_552 Valev Pvc Uk. 3/4 Inch Buah # #VALUE! 35,000
KODE URAIAN KOMPONEN SPESIFIKASI SATUAN HARGA INCLUDE REKOM
SURVEY (PPN+INFLASI)
Ssh_556 Water Drain Bahan Pvc + Accessories Set # #VALUE! 45,000
Ssh_557 Water Proofing Coating Kg # #VALUE! 65,000
FORMULIR
MEKANISME USULAN KOMPONEN FISIK KONSTRUKSI
TA 2023
KOTA MAKASSAR

KODE REKENING DATA PENDUKUNG JENIS DATA


Timestamp Type Usulan NAMA SKPD NAMA KOMPONEN SPESIFIKASI SATUAN HARGA STATUS KETERANGAN tahapan
BELANJA HARGA PENDUKUNG

5.1.02.03.01.0029 -
Belanja Pemeliharaan ANALISA
7/13/2022 10:45:11 ASB dinas lingkungan hidup 1 M2 Pemeliharaan Taman Kota dan Median Asumsi 74.874 M2 ; 700M2/org M2 8,700 ok sudah upload https://drive.googl
Tanah-Lapangan- PENYEDIA
Tanah untuk Taman
5.1.02.03.01.0029 -
Belanja Pemeliharaan ANALISA
7/13/2022 10:43:33 ASB dinas lingkungan hidup 1 M2 Pemeliharaan Taman Kota dan Median Asumsi 74.874 M2 ; 700M2/org M2 8,400 ok sudah upload https://drive.googl
Tanah-Lapangan- PENYEDIA
Tanah untuk Taman
7/6/2022 17:47:23 HSPK Sekretariat Daerah PEMELIHARAAN KENDARAAN RODA DUA Kendaraan Roda 2 (Dua) 1000 CC unit 31,064,100 ok sudah upload Option 47 https://drive.googl RAB
7/6/2022 17:45:19 HSPK Sekretariat Daerah Pemeliharaan Kendaraan Roda Dua Kendaraan Roda 2 (Dua) 500 CC unit 29,664,100 ok sudah upload Option 47 https://drive.googl RAB
5.1.02.03.01.0029 -
Belanja Pemeliharaan ANALISA
6/30/2022 13:50:55 ASB dinas lingkungan hidup 1 M2 PEMELIHARAAN TAMAN KOTA DAN MEDIAN Asumsi 71.798 M2 ; 700M2/org M2 71,798 ok sudah upload https://drive.googl
Tanah-Lapangan- PENYEDIA
Tanah untuk Taman
5.1.02.03.03.0053-
belanja pemeliharaan
Pengelolaan Cagar Budaya Peringkat Pemeliharaan Bangunan dan Situs monumen - candi/
6/15/2022 11:25:46 ASB dinas kebudayaan M2 1,500,000 ok sudah upload https://drive.googl RAB
Kab/Kota Bersejarah tugu
peringatan/prasasti
bangunan
5.1.02.03.03.0053-
belanja pemeliharaan
Pemeliharaan Bangunan dan Situs monumen - candi/
6/15/2022 11:15:59 ASB dinas kebudayaan Pemeliharaan Bunker Amanagappa M2 1,500,000 ok sudah upload https://drive.googl RAB
Bersejarah tugu
peringatan/prasasti
bangunan
5.1.02.03.03.0053-
belanja pemeliharaan
Rehabilitas makam, bangunan dan situs pemeliharaan makam raja bone ke-12 monumen - candi/
6/15/2022 11:14:07 ASB dinas kebudayaan M2 1,754,521 ok sudah upload https://drive.googl RAB
bersejarah (Makam Tenri Pale) tugu
peringatan/prasasti
bangunan
5.1.02.03.03.0053-
belanja pemeliharaan
Rehabilitasi makam, bangunan dan situs Pemeliharaan makam raj bone ke-12 (Makam monumen - candi/
6/15/2022 11:10:03 ASB dinas kebudayaan M2 2 ok sudah upload https://drive.googl RAB
bersejarah Tenri Pale) tugu
peringatan/prasasti
bangunan
5.1.02.03.03.0053-
belanja pemeliharaan
Pemeliharaan Monumen-Candi/Tugu Pemeliharaan Bangunan dan Situs monumen - candi/
6/15/2022 10:50:19 ASB dinas kebudayaan M2 200,000,000 ok sudah upload https://drive.googl RAB
Peringatan/Prasasti-Bangunan Peninggalan Bersejarah tugu
peringatan/prasasti
bangunan
KODE REKENING DATA PENDUKUNG JENIS DATA
Timestamp Type Usulan NAMA SKPD NAMA KOMPONEN SPESIFIKASI SATUAN HARGA STATUS KETERANGAN tahapan
BELANJA HARGA PENDUKUNG

5.1.02.03.03.0053-
belanja pemeliharaan
Rehabilitasi makam, bangunan dan situs Pemeliharaan makam tuan karaeng (Syekh monumen - candi/
6/15/2022 10:31:02 ASB dinas kebudayaan M2 150,000,000 ok sudah upload https://drive.googl RAB
bersejarah rivai bin muthalib) tugu
peringatan/prasasti
bangunan
5.2.04.01.01.0004 -
Homogeneous Tile, Plat Beton, Tree Grate TAS,
6/13/2022 9:27:04 ASB dinas pu Pekerjaan Trotoar/Pedestrian M2 1,380,472 ok sudah upload Belanja Modal Jalan https://drive.googl RAB
Kansteen Pedestrian
Kota
5.2.04.01.01.0004 -
6/13/2022 8:56:36 ASB dinas pariwisata Lorong Wisata Pekerjaan Paving Blok +Granit M2 731 ok sudah upload Belanja Modal Jalan https://drive.googl RAB
Kota
5.2.03.01.01.0032 -
Belanja Modal
5/29/2022 19:29:47 ASB bapenda 1 Unit Pengadaan dan Pemasangan Videotron ukuran 4 m x 6 m unit 939,346,200 ok sudah upload https://drive.googl RAB
Bangunan Fasilitas
Umum
5.2.03.01.01.0032 -
Belanja Modal
5/29/2022 17:23:47 ASB damkar PK RONG ( Pengendalian Kebakaran Lorong ) Instalasi Pemadam Kebakaran unit 90,295,000 ok sudah upload https://drive.googl RAB
Bangunan Fasilitas
Umum
5.2.03.04.01.0003 -
Papan Informasi Penunjang Fungsi Hunian Belanja Modal
5/27/2022 22:05:12 ASB perkim Tiang Pipa memakai pondasi BUAH 20,000,000 ok sudah upload https://drive.googl RAB
PSU Pilar/Tugu/Tanda
Lainnya
5.2.03.04.01.0003 -
Belanja Modal
5/27/2022 16:34:34 ASB perkim papan bicara papan pengumuman BUAH 18,689,369 ok sudah upload https://drive.googl RAB
Pilar/Tugu/Tanda
Lainnya
5.2.03.04.01.0005 -
Belanja Modal
5/27/2022 16:31:59 ASB perkim tugu/tanda batas Pekerjaan Patok tanda batas tanah BUAH 1,636,861 ok sudah upload https://drive.googl RAB
Tugu/Tanda Batas
Lainnya
5.2.04.02.01.0008 -
Galian Tanah, Pasangan Batu, Pelesteran,
Pembangunan dan Rehabilitasi Drainase Harga menyesuaikan Belanja Modal ANALISA
5/25/2022 17:27:38 ASB Bekisting, Pembesian, Cor Beton K225 M3 ok sudah upload https://drive.googl
Perkotaan dengan survey lokasi Bangunan Air Irigasi PERMEN PU
(Penutupan Plat)
Lainnya
5.2.04.02.01.0008 -
Galian Tanah,Pasangan
Pembangunan dan Rehabilitasi Saluran Belanja Modal ANALISA
5/25/2022 17:06:57 ASB Batu,Plesteran,Bikesting,Pembesian dan Cor M3 Sesuai Survey Lokasi ok sudah upload https://drive.googl
Drainase Perkotaan Bangunan Air Irigasi PERMEN PU
Plat Beton
Lainnya
Pembayaran Rekening Listrik Penerangan Pembayaran Tagihan Rekening Listrik PJU di
5/11/2022 14:04:16 ASB dishub Option 9 45.000.000.000,00 ok sudah upload Option 89 https://drive.googl RAB
Jalan Umum Kota Makassar selama 1 Tahun
5/11/2022 13:56:01 ASB dishub Lampu Taman Lampu Kanal LED 10Watt Jarak 40M unit 13.403.250,00 ok sudah upload Option 89 https://drive.googl RAB
5/11/2022 13:54:32 ASB dishub Lampu Kanal Lampu Kanal LED 10Watt Jarak 40M unit 10.878.000,00 ok sudah upload Option 89 https://drive.googl RAB
5/11/2022 13:53:14 ASB dishub Lampu Lorong Lampu Lorong LED 10Watt Jarak 20M unit 10.461.750,00 ok sudah upload Option 89 https://drive.googl RAB
5/11/2022 13:51:58 ASB dishub Lampu Pedestarian Lampu Pedestarian unit 21.098.800,00 ok sudah upload Option 89 https://drive.googl RAB
Lampu Jalan Tiang Galvanis 11M Lampu LED Tiang Galvanis 11M Double Lampu LED 150Watt
5/11/2022 13:47:55 ASB dishub unit 39.127.500,00 ok sudah upload Option 89 https://drive.googl RAB
150W Double Jarak 40Meter
Lampu Jalan Tiang Galvanis 11M Lampu LED Tiang Galvanis 11M Single Lampu LED 150Watt
5/11/2022 13:45:01 ASB dishub unit 30.247.500,00 ok sudah upload Option 89 https://drive.googl RAB
150W Single Jarak 40Meter
Lampu Jalan Tiang Galvanis 9M Lampu LED Tiang Galvanis 9M Double Lampu LED 120Watt
5/11/2022 13:42:02 ASB dishub unit 35.242.500,00 ok sudah upload Option 89 https://drive.googl RAB
120W Double Jarak 40Meter
Lampu Jalan Tiang Galvanis 9M Lampu LED Tiang Galvanis 9M Single Lampu LED 120Watt
5/11/2022 13:40:14 ASB dishub unit 26.362.500,00 ok sudah upload Option 89 https://drive.googl RAB
120W Single Jarak 40Meter
PJU di Tiang Beton PLN Lampu LED 90Watt
5/11/2022 13:36:35 ASB dishub Lampu Jalan Tiang PLN Lampu LED 90W unit 7.215.000,00 ok sudah upload Option 89 https://drive.googl RAB
Jarak 40Meter
PJU di Tiang Beton PLN Lampu LED 40Watt
5/11/2022 13:35:39 ASB dishub Lampu Jalan Tiang PLN Lampu LED 40W unit 6.105.000,00 ok sudah upload Option 89 https://drive.googl RAB
Jarak 40Meter
Tiang Beton PLN Lampu LED 90Watt Jarak
5/11/2022 13:32:49 ASB dishub Lampu Jalan Tiang PLN Lampu LED 90W unit 7.215.000,00 ok sudah upload Option 89 https://drive.googl RAB
40Meter
KODE REKENING DATA PENDUKUNG JENIS DATA
Timestamp Type Usulan NAMA SKPD NAMA KOMPONEN SPESIFIKASI SATUAN HARGA STATUS KETERANGAN tahapan
BELANJA HARGA PENDUKUNG

Tiang Besi 7Meter Lampu LED 90Watt Jarak


5/11/2022 13:31:38 ASB dishub Lampu Jalan Tiang Besi 7M Lampu LED 90W unit 10.156.500,00 ok sudah upload Option 89 https://drive.googl RAB
40Meter
belanja modal rambu
5/11/2022 9:07:00 ASB dishub Zona Selamat Sekolah DUA JALUR Option 9 225,000,000 ok sudah upload https://drive.googl RAB
bersuar
belanja modal rambu
5/11/2022 8:53:30 ASB dishub Pelican Crossing Lampu Aspek 30 cm, tiang lengkung Option 9 172,500,000 ok sudah upload https://drive.googl RAB
bersuar
belanja modal rambu
5/11/2022 8:36:20 ASB dishub Pengadaan ATCS Simpang 3 Option 9 976,000,000 ok sudah upload https://drive.googl RAB
bersuar
Penyediaan Perlengkapan Jalan di Jalan belanja modal rambu
5/11/2022 8:32:38 ASB dishub ATCS simpang 4 set 1,086,339,000 ok sudah upload https://drive.googl RAB
Kabupaten/Kota bersuar
5.2.04.03.02.000 -
Dinas Pekerjaan Belanja Modal ANALISA
5/5/2022 21:41:01 HSPK Pengetesan 1 m pipa diameter 110 mm - M1 1887,04 ok sudah upload https://drive.googl
Umum Instalasi Air Buangan PERMEN PU
Domestik
5.2.04.04.01.0004 -
Dinas Pekerjaan Belanja Modal
5/5/2022 21:22:08 HSPK 1 Buah Pemasangan Tee PVC AW 3" x 3" - BUAH 93,339 ok sudah upload https://drive.googl Option 7
Umum Jaringan Sambungan
ke Rumah
5.2.04.04.01.0004 -
Dinas Pekerjaan Belanja Modal
5/5/2022 21:20:54 HSPK 1 Buah Pemasangan Tee Y - BUAH 100,059 ok sudah upload https://drive.googl Option 7
Umum Jaringan Sambungan
ke Rumah
5.2.04.04.01.0004 -
Dinas Pekerjaan Belanja Modal
5/5/2022 21:19:21 HSPK 1 Buah Pemasangan Bend 45° dia. 110 mm - BUAH 84824,80 ok sudah upload https://drive.googl Option 7
Umum Jaringan Sambungan
ke Rumah
5.2.04.04.01.0004 -
Dinas Pekerjaan Belanja Modal ANALISA
5/5/2022 21:17:49 HSPK Pemasangan 1 m pipa PVC diameter 110 mm - M1 137779,13 ok sudah upload https://drive.googl
Umum Jaringan Sambungan PERMEN PU
ke Rumah
5.1.05.05.03.0001-
Belanja Hibah Uang
Dinas Pekerjaan kepada Badan dan
5/5/2022 21:04:24 HSPK 1 Unit Pemasangan bak resapan - unit 375514,50 ok sudah upload https://drive.googl Option 7
Umum Lembaga Nirlaba,
Sukarela Bersifat
Sosial
5.1.05.05.03.0001-
Belanja Hibah Uang
Dinas Pekerjaan kepada Badan dan
5/5/2022 21:02:15 HSPK 1 Buah Pemasangan Bend 90° dia. 75 mm - BUAH 82564,80 ok sudah upload https://drive.googl Option 7
Umum Lembaga Nirlaba,
Sukarela Bersifat
Sosial
5.1.05.05.03.0001-
Belanja Hibah Uang
Dinas Pekerjaan kepada Badan dan
5/5/2022 20:52:58 ASB Pembangunan Tangki Septik Individual Tangki Septik Biofilter Kapasitas 0,8 M3 unit 10,859,000 ok sudah upload https://drive.googl RAB
Umum Lembaga Nirlaba,
Sukarela Bersifat
Sosial
5.1.05.05.03.0001-
Belanja Hibah Uang
Dinas Pekerjaan kepada Badan dan
5/5/2022 20:48:42 ASB Pembangunan Tangki Septik Komunal Tangki Septik Biofilter Kapasitas 4 M3 TITIK 9,905,000 ok sudah upload https://drive.googl RAB
Umum Lembaga Nirlaba,
Sukarela Bersifat
Sosial
5.2.04.03.02.000 -
Dinas Pekerjaan Belanja Modal
5/5/2022 20:04:43 ASB Pembangunan IPAL Komunal Tangki IPAL Biofilter 40 m3 TITIK 17,938,000 ok sudah upload https://drive.googl RAB
Umum Instalasi Air Buangan
Domestik
KODE REKENING DATA PENDUKUNG JENIS DATA
Timestamp Type Usulan NAMA SKPD NAMA KOMPONEN SPESIFIKASI SATUAN HARGA STATUS KETERANGAN tahapan
BELANJA HARGA PENDUKUNG

5.2.04.03.02.000 -
Dinas Pekerjaan Rehabilitasi Sarana dan Prasarana IPAL Belanja Modal
5/5/2022 19:58:11 ASB - TITIK 371,727,000 ok sudah upload https://drive.googl RAB
Umum Komunal Instalasi Air Buangan
Domestik
5.2.04.04.01.0004 -
Dinas Pekerjaan Pekerjaan Jaringan Perpipaan Sambungan Belanja Modal
5/5/2022 19:49:17 ASB - TITIK 8,678,000 ok sudah upload https://drive.googl RAB
Umum Rumah IPAL Losari Jaringan Sambungan
ke Rumah
5.2.04.03.01.0005 -
Dinas Pekerjaan PENGELOLAAN DAN PENGEMBANGAN SISTEM Belanja Modal
5/4/2022 22:02:40 ASB Pembangunan Sumur Dalam unit Rp. 1.000.000.000 ok sudah upload https://drive.googl RAB
Umum Kota Makassar PENYEDIAAN AIR MINUM Instalasi Air
BErsih/Air Baku
5.1.02.03.01.0029 -
Analisa Material Pemeliharaan dan Jasa Belanja Pemeliharaan ANALISA
7/13/2022 10:21:37 ASB dinas lingkungan hidup 1 M2 Pemeliharaan Taman Kota dan Median M2 8,400 tolak https://drive.googl
Pemeliharaan Tanah-Lapangan- PENYEDIA
Tanah untuk Taman
5.2.04.02.01.0008 -
dinas pekerjaan umum Belanja Modal ANALISA
5/4/2022 10:10:22 ASB PEMBANGUNAN SALURAN DRAINASE PERKOTAAN HSPK M3 BERVARIASI tolak harga tidak jelas https://drive.googl
kota makassar Bangunan Air Irigasi PERMEN PU
Lainnya
5.2.03.01.01.0032 -
DINAS KOPERASI DAN Belanja Modal
4/28/2022 12:02:33 ASB PEMBANGUNAN SMART KANRERONG KAREBOSI PEMBANGUNAN SMART KANRERONG KAREBOSI M2 15,000,000,000 tolak Perbaikan DPH https://drive.googl RAB
UKM KOTA MAKASSAR Bangunan Fasilitas
Penyelenggaraan Bangunan Gedung di Umum
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:17:01 ASB Pagar Samping Rumah Negara M1 1,560,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan
Penyelenggaraan GedungGedung di
Bangunan
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:16:01 ASB Pagar Belakang Rumah Negara M1 1,770,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan Gedung
Penyelenggaraan Bangunan Gedung di
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:14:57 ASB Pagar Depan Rumah Negara M1 2,770,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan Gedung
Penyelenggaraan Bangunan Gedung di
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:13:45 ASB Pagar Samping Gedung Negara M1 2,480,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan Gedung
Penyelenggaraan Bangunan Gedung di
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:12:38 ASB Pagar Belakang Gedung Negara M1 2,640,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan Gedung
Penyelenggaraan Bangunan Gedung di
5.2.03.01.01.0033 -
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian
4/27/2022 14:11:24 ASB Pagar Depan Gedung Negara M1 3,000,000 tolak sudah ada di SIPD Belanja Modal https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat
Bangunan Parkir
Laik Fungsi Bangunan
Penyelenggaraan GedungGedung di
Bangunan
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian 5.2.03.04.01.0004 -
4/27/2022 14:09:35 ASB Pagar Gedung Negara Depan M2 3,000,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Belanja Modal Pagar
Laik Fungsi Bangunan
Penyelenggaraan GedungGedung di
Bangunan
5.2.03.01.02.0003 -
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian
4/27/2022 14:06:45 ASB Rumah Negara Tipe C M2 5,020,000 tolak sudah ada di SIPD Belanja Modal Rumah https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat
Negara Golongan III
Laik Fungsi Bangunan
Penyelenggaraan GedungGedung di
Bangunan
5.2.03.01.02.0002 -
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian
4/27/2022 14:05:29 ASB Rumah Negara Tipe B M2 6,680,000 tolak sudah ada di SIPD Belanja Modal Rumah https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat
Negara Golongan II
Laik Fungsi Bangunan
Penyelenggaraan GedungGedung di
Bangunan
5.2.03.01.02.0001 -
Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian
4/27/2022 14:04:15 ASB Rumah Negara Tipe A M2 6,780,000 tolak sudah ada di SIPD Belanja Modal Rumah https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat
Negara Golongan I
Laik Fungsi Bangunan Gedung
KODE REKENING DATA PENDUKUNG JENIS DATA
Timestamp Type Usulan NAMA SKPD NAMA KOMPONEN SPESIFIKASI SATUAN HARGA STATUS KETERANGAN tahapan
BELANJA HARGA PENDUKUNG

Penyelenggaraan Bangunan Gedung di 5.2.03.01.01.0001 -


Dinas Pekerjaan Wilayah Daerah Kabupaten/Kota, Pemberian Belanja Modal
4/27/2022 13:56:02 ASB Gedung Sederhana M2 5,470,000 tolak sudah ada di SIPD https://drive.googl Option 7
Umum Izin Mendirikan Bangunan (IMB) dan Sertifikat Bangunan Gedung
Laik Fungsi Bangunan Gedung
Penyelenggaraan Bangunan Gedung di Kantor
5.2.03.01.01.0001 -
Wilayah Daerah Kabupaten/Kota, Pemberian Belanja Modal
4/27/2022 13:53:34 ASB DINAS PEKERJAAN UMUM Gedung Tidak Sederhana M2 6,860,000 tolak sudah ada di SIPD https://drive.googl Option 7
Izin Mendirikan Bangunan (IMB) dan Sertifikat Bangunan Gedung
Laik Fungsi Bangunan Gedung Kantor
5.2.04.01.01.0004 -
Dinas Pekerjaan Pekerjaan Jalan Khusus Pejalan Kaki
4/27/2022 10:59:26 ASB Penyelenggaraan Jalan Kabupaten/Kota M2 1,126,100 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum (Trotoar) 4 Meter
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan Pekerjaan Jalan Khusus Pejalan Kaki
4/27/2022 10:56:37 ASB Penyelenggaraan jalan kabupaten/Kota M2 833,200 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum (Trotoar) 3 Meter
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan Pekerjan Jalan Khusus Pejalan kaki (Trotoar)
4/27/2022 10:54:16 ASB Penyelenggaran Jalan Kabupaten/Kota M2 540,300 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum 2 Meter
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan
4/27/2022 10:45:53 ASB Penyelenggaraan Jalan Kabupaten/Kota Pekerjaan Jembatan pada Jalan Kota Kolektor M2 49,481,000 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan Beton Semen (K-350) Tebal 20 cm, LC (K-125)
4/27/2022 10:41:30 ASB Penyelenggaraan Jalan Kabupaten/Kota M2 813,500 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum Tebal 10 cm
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan
4/27/2022 10:27:00 ASB Penyelenggaraan Jalan Kabupaten/Kota Pekerjaan Aspal (Hotmix) M2 657,400 tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum
Kota
5.2.04.01.01.0004 -
Dinas Pekerjaan
4/27/2022 10:22:11 ASB Penyelenggaraan Jalan Kabupaten/Kota Pekerjaan Paving M2 517,000 Tolak sudah ada di sipd Belanja Modal Jalan https://drive.googl RAB
Umum
Kota
5.2.04.02.01.0008 -
Pasir,Besi Beton,Batu Kali,Batu
Dinas Pekerjaan Belanja Modal Pembangunan dan Rehabilitasi Menyesuaikan Hasil Belanja Modal
4/27/2022 1:53:09 HSPK Pecah,Multipleks,Seman dan Berbagai Macam M3 Tolak komponen tidak jelas https://drive.googl RAB
Umum Kota Makassar Saluran Drainase Survey Toko Bangunan Air Irigasi
Bahan Konstruksi Lainnya
Lainnya
10/31/2022 14:34:25 1 M1 Saluran Drainase Perkotaan Pasangan Batu Kali uk. 80/80 + Plat Penutup M1 2,207,100 5.2.04.02.07.0006 https://drive.googl RAB murni 2023
10/31/2022 14:33:39 1 M1 Saluran Drainase Perkotaan Pasangan Batu Kali uk. 50/60 + Plat Penutup M1 1,673,400 5.2.04.02.07.0006 https://drive.googl RAB murni 2023
10/31/2022 14:32:41 1 M1 Saluran Drainase Perkotaan Pasangan Batu Kali uk. 40/50 + Plat Penutup M1 1,470,000 5.2.04.02.07.0006 https://drive.googl RAB murni 2023
Bangunan pintu air yang terdiri dari pintu air
10/27/2022 9:08:22 1 Bangunan Peningkatan Pintu Air TITIK 200,788,500 5.2.04.02.07.0006 https://drive.googl RAB murni 2023
dan power house
1 M1 Pembuatan Tanggul Sungai Sheet pile perubahan
10/27/2022 9:04:42 dengan existing pohon M1 14,848,500 5.2.04.02.07.0006 https://drive.googl RAB
kedalaman 10 meter 2022