NAMA PEKERJAAN : RENCANA ANGGARAN BIAYA PEMASANGAN AIR CONDITIONER
RUANGAN WORKSHOP ALAT BERAT
LOKASI : WORKSHOP AHMAD YANI KOTA CIREBON PPK : OPERASI DAN PEMELIHARAAN SUMBER DAYA AIR I SATUAN KERJA : OPERASI DAN PEMELIHARAAN
No. U R A I A N SATUAN KUANTITAS HARGA SATUAN JUMLAH HARGA KET.
( RP. ) ( RP. )
I ALAT DAN BAHAN :
1 Bracket AC Indoor Unit 1 Rp 150.000,00 Rp 150.000,00
2 Bracket AC Outdoor Unit 1 Rp 150.000,00 Rp 150.000,00 3 Pipa Tembaga Meter 3 Rp 120.000,00 Rp 360.000,00 4 Selang Drain ( Buang ) Meter 3 Rp 40.000,00 Rp 120.000,00 5 Kabel Ties Pack 1 Rp 50.000,00 Rp 50.000,00 6 Pipa Pvc ¾ʺ Meter 2 Rp 50.000,00 Rp 100.000,00 7 Fisher/Dinabol Unit 8 Rp 30.000,00 Rp 240.000,00
II JASA :
1 Instalasi Pemasangan Titik 1 Rp 300.000,00 Rp 300.000,00
( Penambahan Freon )
TOTAL KESELURUHAN Rp 1.470.000,00
CIREBON, 21 FEBRUARI 2023
YANG MENGAJUKAN : MEKANIK ELECTRICAL O & P SUMBER DAYA AIR I CIMANUK CISANGGARUNG