Sarmi, 2022
Dibuat Oleh,
PEJABAT PEMBUAT KOMITMEN
DINAS PENDIDIKAN DAN KEBUDAYAAN
KABUPATEN SARMI
HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
( RP )
( RP )
a. b. c. d. e. f.
A. PEKERJAAN PERSIAPAN Rp 13,000,000.00
1 Papan nama proyek Ls 1.00 1,000,000.00 1,000,000.00
2 Barak kerja dan gudang Ls 1.00 7,000,000.00 7,000,000.00
3 Listrik dan air kerja Ls 1.00 5,000,000.00 5,000,000.00
43,234,769.13
II PEKERJAAN GALIAN DAN TIMBUNAN
1 Galian Tanah rolag batu karang keliling bangunan M3 17.28 102,338.25 1,768,404.96
2 Timbun Karang Kasar untuk rabat M3 49.00 530,402.25 25,989,710.25
27,758,115.21
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan rolag batu karang M2 34.58 1,363,660.83 47,155,391.33
2 Plesteran samping rabat M2 84.00 100,233.86 8,419,644.32
3 Acian samping rabat M2 84.00 56,070.15 4,709,892.60
4 Pasang keramik uk. 60x60 cm M2 325.60 426,313.04 138,808,888.40
5 Pasang keramik anti selip uk. 60x60 teras M2 170.61 448,004.60 76,432,092.73
275,525,909.38
IV PEKERJAAN BETON
1 Cor lantai kerja bawah lantai tebal 10 cm M3 54.51 1,977,458.37 107,800,905.76
107,800,905.76
V PEKERJAAN KAYU, KUZEN, PINTU DAN JENDELA
1 Pasang kusen pintu dan jendela kayu besi uk. 5x12 cm M3 2.78 8,598,483.50 23,923,388.67
2 Pasang jalusi kayu besi tebal 2 cm M2 33.37 574,169.85 19,161,196.23
3 Pasang daun pintu panel ky linggua M2 9.64 863,600.50 8,327,872.34
4 Pasang daun jendela kayu linggua + kaca riben tbl. 5 mm M2 19.83 917,493.12 18,191,686.49
5 Pasang tiang kayu besi 12x12 cm teras M3 0.64 8,069,500.00 5,199,469.35
6 pasang sopi-sopi kayu besi 2/20 m2 16.54 451,230.00 7,463,344.20
82,266,957.29
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasang Kunci pintu tanam 2 slug exlusive Bh 6.00 345,833.09 2,074,998.54
2 Pasang engsel pintu panil Bh 18.00 75,362.06 1,356,517.06
3 Pasang engsel jendela panil Bh 180.00 53,935.52 9,708,392.70
4 Pasang grendel jendela Bh 91.00 63,431.03 5,772,223.73
5 Pasang handle jendela Bh 90.00 74,211.03 6,678,992.70
6 Pasang kait angin jendela ungkit Bh 180.00 77,347.32 13,922,516.70
39,513,641.43
VII PEKERJAAN INSTALASI LISTRIK
1 Pasang lampu LED 10 Watt Bh 36.00 313,930.73 11,301,506.10
3 Pasang saklar ganda Bh 12.00 251,954.60 3,023,455.20
4 Pasang stop kontak tunggal Bh 9.00 248,621.60 2,237,594.40
5 MCB + Box Bh 2.00 425,798.60 851,597.20
17,414,152.90
VIII PEKERJAAN ATAP DAN PLAF0ND
1 Pasang Gording dan Nok kayu matoa 5/10 M3 4.62 7,702,926.60 35,599,845.57
2 Pasang atap zincalume warna merah tebal 0,3 M2 620.49 106,553.61 66,115,449.47
3 Pasang nok atap zincalume warna merah tebal 0,3 M' 67.77 96,901.92 6,567,042.78
4 Pasang listplank papan kayu besi 2 x 2/30 M' 70.78 90,187.95 6,383,503.10
5 Pasang rangka plafond kayu matoa (60 x 120) cm M2 526.91 135,613.71 71,456,219.94
6 Pasang plafond multipleks 6 mm M2 526.91 84,010.54 44,265,992.31
7 Pasang list plafond kayu matoa di profil M' 452.14 28,671.02 12,963,292.65
243,351,345.83
HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
( RP )
( RP )
a. b. c. d. e. f.
IX PEKERJAAN PENGECATAN
Pengecatan tembok baru (1 lapis plamur + 1 lapis cat dasar + 2
1 M2 793.16 42,484.57 33,697,062.73
lapis cat penutup)
2 Pengecatan plafond baru (1 lapis cat dasar + 2 lapis cat penutup) M2 495.43 30,707.41 15,213,354.80
Cat kilat kusen pintu, jendela, jalusi, list plafond, listplank dan tiang
3 M2 278.66 62,368.24 17,379,332.87
teras, sopi-sopi
66,289,750.40
11 Pemasangan 1 m2 dinding batu tela ukuran (9 x 18 x 27) cm tebal 1 bata, campuran spesi 1 SP : 2 PP
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Batu Tela Buah 17.00000 Rp 7,221.50 Rp 122,765.50
Semen Portland Kg 21.75000 Rp 2,666.40 Rp 57,994.20
Pasir Pasang M3 0.04000 Rp 520,375.00 Rp 20,815.00
Tenaga kerja Pekerja OH 0.30000 Rp 127,260.00 Rp 38,178.00
Tukang batu OH 0.10000 Rp 169,680.00 Rp 16,968.00
Kepala Tukang OH 0.01000 Rp 222,705.00 Rp 2,227.05
Mandor OH 0.01500 Rp 275,730.00 Rp 4,135.95
Jumlah harga per satuan pekerjaan Rp 263,083.70
12 Pemasangan 1 m2 dinding batu tela ukuran (9 x 18 x 27) cm tebal 1 bata, campuran spesi 1 SP : 4 PP
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Batu Tela Buah 17.00000 Rp 7,221.50 122,765.50
Semen Portland Kg 13.27500 Rp 2,666.40 35,396.46
Pasir Pasang M3 0.04650 Rp 520,375.00 24,197.44
Tenaga kerja Pekerja OH 0.30000 Rp 127,260.00 38,178.00
Tukang batu OH 0.10000 Rp 169,680.00 16,968.00
Kepala Tukang OH 0.01000 Rp 222,705.00 2,227.05
Mandor OH 0.01500 Rp 275,730.00 4,135.95
Jumlah harga per satuan pekerjaan Rp 243,868.40
33 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Papan kayu M3 0.02400 Rp 3,181,500.00 Rp 76,356.00
Kaca riben 5 mm M2 1.00000 Rp 257,619.72 Rp 257,619.72
Paku 5 cm - 7 cm Kg 0.30000 Rp 33,330.00 Rp 9,999.00
Tenaga kerja Pekerja OH 0.80000 Rp 127,260.00 Rp 101,808.00
Tukang kayu OH 2.40000 Rp 169,680.00 Rp 407,232.00
Kepala Tukang OH 0.24000 Rp 222,705.00 Rp 53,449.20
Mandor OH 0.04000 Rp 275,730.00 Rp 11,029.20
Jumlah harga per satuan pekerjaan Rp 917,493.12
53 Pemasangan 1 m' lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Papan kayu kelas 1 M3 0.01080 Rp 3,181,500.00 Rp 34,360.20
Paku 5 cm - 7 cm Kg 0.10000 Rp 33,330.00 Rp 3,333.00
Tenaga kerja Pekerja OH 0.10000 Rp 127,260.00 Rp 12,726.00
Tukang kayu OH 0.20000 Rp 169,680.00 Rp 33,936.00
Kepala Tukang OH 0.02000 Rp 222,705.00 Rp 4,454.10
Mandor OH 0.00500 Rp 275,730.00 Rp 1,378.65
Jumlah harga per satuan pekerjaan Rp 90,187.95
55 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm, dan 6 mm
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan multipleks 6 mm Lembar 0.37500 Rp 132,562.50 Rp 49,710.94
Paku Tripleks kg 0.03000 Rp 33,330.00 Rp 999.90
Tenaga kerja Pekerja OH 0.10000 Rp 127,260.00 Rp 12,726.00
Tukang kayu OH 0.10000 Rp 169,680.00 Rp 16,968.00
Kepala Tukang OH 0.01000 Rp 222,705.00 Rp 2,227.05
Mandor OH 0.00500 Rp 275,730.00 Rp 1,378.65
Jumlah harga per satuan pekerjaan Rp 84,010.54
56 Pemasangan 1m' list langit-langit kayu profil
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan List kayu matoa profil M' 1.05000 11,000.00 11,550.00
Paku biasa Kg 0.01000 33,330.00 333.30
Tenaga kerja Pekerja OH 0.05000 127,260.00 6,363.00
Tukang las OH 0.05000 169,680.00 8,484.00
Kepala Tukang OH 0.00500 222,705.00 1,113.53
Mandor OH 0.00300 275,730.00 827.19
Jumlah harga per satuan pekerjaan 28,671.02
57 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Cat meni Kg 0.20000 Rp 33,330.00 Rp 6,666.00
Plamur Kg 0.15000 Rp 55,550.00 Rp 8,332.50
Cat dasar Kg 0.17000 Rp 72,215.00 Rp 12,276.55
Cat penutup Kg 0.26000 Rp 72,215.00 Rp 18,775.90
Kuas Buah 0.01000 Rp 33,000.00 Rp 330.00
` Minyak Cat/Tinner Kg 0.03000 Rp 38,885.00 Rp 1,166.55
Kertas Amplas lbr 0.20000 Rp 11,110.00 Rp 2,222.00
Tenaga kerja Pekerja OH 0.07000 Rp 127,260.00 Rp 8,908.20
Tukang Cat OH 0.00900 Rp 169,680.00 Rp 1,527.12
Kepala Tukang OH 0.00600 Rp 222,705.00 Rp 1,336.23
Mandor OH 0.00300 Rp 275,730.00 Rp 827.19
Jumlah harga per satuan pekerjaan Rp 62,368.24
58 Pengecatan 1 m2 tembok Baru (1 lapis plamur + 1 lapis cat dasar + 2 lapis cat penutup )
Kebutuhan satuan Indeks Harga Satuan Jumlah
Bahan Plamur tembok Kg 0.10000 Rp 55,550.00 Rp 5,555.00
Cat dasar Kg 0.10000 Rp 14,443.00 Rp 1,444.30
Cat penutup Kg 0.26000 Rp 77,000.00 Rp 20,020.00
Tenaga kerja Pekerja OH 0.02000 Rp 127,260.00 Rp 2,545.20
Tukang Cat OH 0.06300 Rp 169,680.00 Rp 10,689.84
Kepala Tukang OH 0.00630 Rp 222,705.00 Rp 1,403.04
Mandor OH 0.00300 Rp 275,730.00 Rp 827.19
Jumlah harga per satuan pekerjaan Rp 42,484.57
61 Membongkar 1 m3 Dinding
Kebutuhan satuan Indeks Harga Satuan Jumlah
Tenaga kerja Pekerja OH 2.00000 Rp 127,260.00 Rp 254,520.00
Mandor OH 0.09000 Rp 275,730.00 Rp 24,815.70
Jumlah harga per satuan pekerjaan Rp 279,335.70
WILAYAH/REGION II
A . UPAH KERJA
1 . Pekerja Org/Hr = Rp. 127,260.00
2 . Tukang Org/Hr = Rp. 169,680.00
3 . Kepala Tukang Org/Hr = Rp. 222,705.00
4 . Mandor Org/Hr = Rp. 275,730.00
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
I BAHAN BANGUNAN
A KELOMPOK TANAH, PASIR, DAN BATU
BAHAN BATU
1 Batu Tela (10x20x30) Bh Rp 6,565 7,221.50 7,549.75 8,534.50
2 Batu Merah Bh Rp - - - -
3 Batu Kali (Quarry) M3 Rp 272,700
4 Batu Belah (Quarry) M3 Rp 272,700
5 Batu Gunung (Quarry) M3 Rp 202,000
6 Batu Pecah Pakai Mesin Rp -
- Ukuran 1-2 (Quarry/Sentani) M3 Rp 555,500
- Ukuran 2-3 (Quarry/Sentani) M3 Rp 555,500
- Ukuran 3-5 (Quarry/Sentani)) M3 Rp 555,500
- Ukuran 5-7 (Quarry/Sentani) M3 Rp 555,500
BAHAN ASPAL Rp -
1 Aspal (Jayapura) kg Rp 13,130
2 Minyak Aspal Ltr Rp 11,615
BAHAN KERIKIL Rp - (Ket : Harga Satuan Berdasarkan Harga Quarry,
1 Kerikil Kasar (Quarry) M3 Rp 449,450 untuk Harga Satuan per Wilayah Dihitung
2 Kerikil Halus Beton (Quarry) M3 Rp 449,450 berdasarkan Hitungan Analisa Harga Satuan)
3 Kerikil Galian Gunung (Quarry) M3 Rp 449,450
4 Pasir Pasang (Quarry) M3 Rp 252,500
5 Pasir Urug (Quarry) M3 Rp 252,500
6 Pasir Beton (Quarry) M3 Rp 272,700
7 Sirtu (Quarry) M3 Rp 141,400
BAHAN TANAH TIMBUNAN Rp -
1 Timbunan Biasa/Tanah (setempat) M3 Rp 80,800
2 Timbunan Pilihan/karang cokelat (Quarry) M3 Rp 131,300
BAHAN KARANG Rp -
a Karang Kasar/Karang Timbun M3 Rp 131,300
b Karang Halus/Cor M3 Rp 252,500
Rp -
BAHAN SEMEN Rp -
a Semen Tiga Roda (50 kg) Zak Rp 121,200 133,320.00 139,380.00 157,560.00
b Semen Tonasa (50 kg) Zak Rp 121,200 133,320.00 139,380.00 157,560.00
c Semen Tonasa (1 kg) Zak Rp 2,424 2,666.40 2,787.60 3,151.20
d Semen Tonasa (1 kg) Zak Rp 2,424 2,666.40 2,787.60 3,151.20
e Semen Putih (1 kg) Kg Rp 14,645 16,109.50 16,841.75 19,038.50
f Semen Warna (1 kg) Kg Rp 19,190 21,109.00 22,068.50 24,947.00
Rp -
BAHAN LANTAI Rp -
a Ubin Mozaik DN (30x30) Bh Rp 21,210 23,331.00 24,391.50 27,573.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
b Ubin Porselin DN (11x11) Bh Rp 15,150 16,665.00 17,422.50 19,695.00
Ubin Porselin DN (10x15) Bh Rp 15,150 16,665.00 17,422.50 19,695.00
Ubin Porselin DN (15x15) Bh Rp 18,180 19,998.00 20,907.00 23,634.00
Ubin Porselin DN (20x20) Bh Rp 20,200 22,220.00 23,230.00 26,260.00
c Ubin Wafel DN (15x15) Bh Rp 5,050 5,555.00 5,807.50 6,565.00
Ubin Wafel DN (20x20) Bh Rp 5,050 5,555.00 5,807.50 6,565.00
d Ubin Keramik Polos Rp -
Ubin Keramik DN (10x10) dos Rp 75,750 83,325.00 87,112.50 98,475.00
Ubin Keramik DN (10x20) dos Rp 121,200 133,320.00 139,380.00 157,560.00
Ubin Keramik DN (20x20) dos Rp 111,100 122,210.00 127,765.00 144,430.00
Ubin Keramik DN (30x30) dos Rp 121,200 133,320.00 139,380.00 157,560.00
e Ubin Plin PCDN (10x20) dos Rp 84,537 92,990.70 97,217.55 109,898.10
Ubin Plin Berwarna (20x20) dos Rp 74,033 81,436.30 85,137.95 96,242.90
Ubin Plin Berwarna (15x20) bh Rp 15,150 16,665.00 17,422.50 19,695.00
Ubin Plin Abu-abu I (15x20) bh Rp 12,625 13,887.50 14,518.75 16,412.50
f Karpet Wol M1 Rp 52,823 58,105.30 60,746.45 68,669.90
g Karpet Plastik M1 Rp 50,500 55,550.00 58,075.00 65,650.00
Tipe Vinyl Polos M2 Rp 50,500 55,550.00 58,075.00 65,650.00
Tipe Vinyl Bergambar M2 Rp 50,500 55,550.00 58,075.00 65,650.00
h Granit M2 Rp 193,718 213,089.80 222,775.70 251,833.40
i Paving Blok Buah Rp 14,645 15,377.25 16,109.50 29,290.00
Rp -
BAHAN KAYU Rp -
a Kayu Besi (Sejenis) Rp -
Balok Ukuran (10x10) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
Balok Ukuran (5x10) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
Balok Ukuran (5x5) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
Papan Ukuran (2 x 20 x 400) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
Papan Ukuran (2.5 x 20 x 400) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
Papan Ukuran (3 x 20 x 400) M3 Rp 3,030,000 3,181,500.00 3,333,000.00 3,484,500.00
b Kayu Matoa/Campuran Rp -
Balok Ukuran (10x10) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Balok Ukuran (5x10) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Balok Ukuran (5x5) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Balok Ukuran (5.5 x 20 ) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Papan Ukuran (2.5 x 20) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Papan Ukuran (1.5x20) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
c Kayu Putih/Campuran (untuk bekesting) Rp -
Balok Ukuran (5x10) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Balok Ukuran (2.5x20) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Balok Ukuran (5-10 cm) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
Papan Ukuran (2.5x20) M3 Rp 2,424,000 2,545,200.00 2,666,400.00 2,787,600.00
d Kayu Lat: Rp -
Lat Kayu Besi 1,0/3,0 M Rp 10,100 10,605.00 11,110.00 11,615.00
Lat Kayu Matoa 1,0/3,0 M Rp 10,100 10,605.00 11,110.00 11,615.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
e Triplex 3 mm Ibr Rp 75,750 79,537.50 83,325.00 87,112.50
Triplex 4 mm Ibr Rp 95,950 100,747.50 105,545.00 110,342.50
Triplex 5 mm Ibr Rp 111,100 116,655.00 122,210.00 127,765.00
f Multiplex 6 mm Ibr Rp 126,250 132,562.50 138,875.00 145,187.50
Multiplex 9 mm Ibr Rp 207,050 217,402.50 227,755.00 238,107.50
Multiplex 10 mm Ibr Rp 192,910 202,555.50 212,201.00 221,846.50
Multiplex 12 mm Ibr Rp 252,500 265,125.00 277,750.00 290,375.00
Multiplex 15 mm Ibr Rp 303,000 318,150.00 333,300.00 348,450.00
Multiplex 18 mm Ibr Rp 363,600 381,780.00 399,960.00 418,140.00
g Teak Wood 122 x 2,44 Ibr Rp 126,250 132,562.50 138,875.00 145,187.50
Teak Wood 122 x 0,92 Ibr Rp 101,000 106,050.00 111,100.00 116,150.00
h Jabarwood Bergaris Ibr Rp 109,080 114,534.00 119,988.00 125,442.00
Jabarwood uk 122 x 0,92 Ibr Rp 83,931 88,127.55 92,324.10 96,520.65
i Plywood 122 x 2,44 Ibr Rp 141,400 148,470.00 155,540.00 162,610.00
j Formika polos Ibr Rp 131,300 137,865.00 144,430.00 150,995.00
Formika Kembang Ibr Rp 126,250 132,562.50 138,875.00 145,187.50
Melamine Ibr Rp 111,100 116,655.00 122,210.00 127,765.00
Rp -
BAHAN ATAP Rp -
a Seng Gel (BJLS 20) Ibr Rp 60,600 66,660.00 69,690.00 78,780.00
Seng Gel (BJLS 25) Ibr Rp 75,750 83,325.00 87,112.50 98,475.00
Seng Gel (BJLS 30) Ibr Rp 75,750 83,325.00 87,112.50 98,475.00
b Seng Plat (BJLS 20) mtr Rp 45,450 49,995.00 52,267.50 59,085.00
Seng Plat (BJLS 30) mtr Rp 35,350 38,885.00 40,652.50 45,955.00
Seng Talang (BJLS 30) mtr Rp 30,300 33,330.00 34,845.00 39,390.00
c Seng Galvanis uk: Rp -
Kecil (40x60) ibr Rp 55,550 61,105.00 63,882.50 72,215.00
Sedang (60x100) Ibr Rp 65,650 72,215.00 75,497.50 85,345.00
Besar (100x80) Ibr Rp 79,285 87,213.50 91,177.75 103,070.50
d Seng Aluminum uk : Rp -
Kecil (0,25 cm) Ibr Rp 75,750 83,325.00 87,112.50 98,475.00
Sedang (60 cm) Ibr Rp 151,500 166,650.00 174,225.00 196,950.00
Besar (0,8 mm) Ibr Rp 202,000 222,200.00 232,300.00 262,600.00
Plat Aluminium Ibr Rp 101,000 111,100.00 116,150.00 131,300.00
e Seng Plastik Gel Besar Ibr Rp 75,750 83,325.00 87,112.50 98,475.00
Senq Plastik Gel Kecil Ibr Rp 55,550 61,105.00 63,882.50 72,215.00
Ardex Gel Kecil Ibr Rp 70,700 77,770.00 81,305.00 91,910.00
Ardex Gel Besar Ibr Rp 70,700 77,770.00 81,305.00 91,910.00
Rp -
BAHAN PLAFON Rp -
Gypsumboard (4 mm) Ibr Rp 121,200 133,320.00 139,380.00 157,560.00
Triplex (6 mm) Ibr Rp 95,950 105,545.00 110,342.50 124,735.00
Multiplex Ibr Rp 126,250 138,875.00 145,187.50 164,125.00
Rp -
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
BAHAN KACA Rp -
Ukuran 122x152 Rp -
a Kaca bening (3 mm) Ibr Rp 282,800 311,080.00 325,220.00 367,640.00
Kaca bening (5 mm) Ibr Rp 434,300 477,730.00 499,445.00 564,590.00
b Kaca buram (3 mm) Ibr Rp 323,200 355,520.00 371,680.00 420,160.00
Kaca buram (4 mm) Ibr Rp 383,800 422,180.00 441,370.00 498,940.00
Kaca buram (5 mm) Ibr Rp 404,000 444,400.00 464,600.00 525,200.00
c Kaca rayben (5 mm) Ibr Rp 434,300 477,730.00 499,445.00 564,590.00
d Kaca cermin (3 mm) Ibr Rp 101,000 111,100.00 116,150.00 131,300.00
Rp -
BAHAN JENDELA LOVER Rp -
a Lover/nako tanpa trali Rp -
4 klip zet Rp 70,700 77,770.00 81,305.00 91,910.00
5 klip zet Rp 75,750 83,325.00 87,112.50 98,475.00
6 klip zet Rp 90,900 99,990.00 104,535.00 118,170.00
7 klip zet Rp 121,200 133,320.00 139,380.00 157,560.00
8 klip zet Rp 151,500 166,650.00 174,225.00 196,950.00
9 klip zet Rp 161,600 177,760.00 185,840.00 210,080.00
b Lover/nako+ trali Rp -
4 klip zet Rp 131,300 144,430.00 150,995.00 170,690.00
5 klip zet Rp 149,480 164,428.00 171,902.00 194,324.00
6 klip zet Rp 190,890 209,979.00 219,523.50 248,157.00
7 klip zet Rp 190,890 209,979.00 219,523.50 248,157.00
8 klip zet Rp 126,250 138,875.00 145,187.50 164,125.00
9 klip zet Rp -
10 klip zet Rp -
c Stang Lovers/Klip Rp -
5 klip pas Rp 148,874 163,761.40 171,205.10 193,536.20
6 klip pas Rp 158,368 174,204.80 182,123.20 205,878.40
7 klip pas Rp 141,400 155,540.00 162,610.00 183,820.00
8 klip pas Rp 161,600 177,760.00 185,840.00 210,080.00
9 klip pas Rp 190,890 209,979.00 219,523.50 248,157.00
10 klip pas Rp 196,647 216,311.70 226,144.05 255,641.10
d Besi Tralis Nako bh Rp 30,300 33,330.00 34,845.00 39,390.00
e Kaca Lovers Bening Ibr Rp 18,180 19,998.00 20,907.00 23,634.00
f Kaca Lovers Buram Ibr Rp 18,180 19,998.00 20,907.00 23,634.00
g Kaca Lovers Rayben Ibr Rp 21,210 23,331.00 24,391.50 27,573.00
Rp -
BAHAN PENGUNCl / PENGGANTUNG Rp -
a Kunci Tanam Rp -
Union (1 slag) bh Rp 75,750 83,325.00 87,112.50 98,475.00
Union (2 Slag) bh Rp 151,500 166,650.00 174,225.00 196,950.00
Kuda Terbang (1 slag) bh Rp 74,740 82,214.00 85,951.00 97,162.00
Kuda Terbang (2 Slag) bh Rp 70,700 77,770.00 81,305.00 91,910.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Yale DN Rp 75,750 83,325.00 87,112.50 98,475.00
Yale (2 Slag) bh Rp 196,950 216,645.00 226,492.50 256,035.00
Royal Besar Rp 202,000 222,200.00 232,300.00 262,600.00
Roral Kecil Rp 85,850 94,435.00 98,727.50 111,605.00
Etema Rp 106,050 116,655.00 121,957.50 137,865.00
Kunci-kunci lokal bh Rp 35,350 38,885.00 40,652.50 45,955.00
b Engsel Rp -
Engsel Lokal pas Rp 30,300 33,330.00 34,845.00 39,390.00
Engsel H Jendela pas Rp 30,300 33,330.00 34,845.00 39,390.00
Engsel H Pintu pas Rp 40,400 44,440.00 46,460.00 52,520.00
Engsel Kupu-kupu Ring Nilon pintu pas Rp 35,350 38,885.00 40,652.50 45,955.00
Engsel Kupu-kupu Ring Nilon jendela pas Rp 30,300 33,330.00 34,845.00 39,390.00
Engsel Kupu-kupu Ring Nilon pas Rp 42,420 46,662.00 48,783.00 55,146.00
Hak Angin Biasa pas Rp 30,300 33,330.00 34,845.00 39,390.00
Hak Angin Lipat pas Rp 40,400 44,440.00 46,460.00 52,520.00
Kunci Gembok bh Rp 30,300 33,330.00 34,845.00 39,390.00
Kunci Royal bh Rp 151,500 166,650.00 174,225.00 196,950.00
Grendel Jendela (Klip) bh Rp 20,200 22,220.00 23,230.00 26,260.00
Grendel Lokal bh Rp 22,220 24,442.00 25,553.00 28,886.00
Grendel Kecil bh Rp 20,200 22,220.00 23,230.00 26,260.00
Grendel Sedang bh Rp 25,250 27,775.00 29,037.50 32,825.00
Grendel Besar bh Rp 30,300 33,330.00 34,845.00 39,390.00
Rp -
BAHAN SANITAIR Rp -
a Kloset duduk porselin warna/putih bh Rp 2,020,000 2,222,000.00 2,323,000.00 2,626,000.00
Kloset duduk keramik KIA bh Rp 2,272,500 2,499,750.00 2,613,375.00 2,954,250.00
Kloset Monobok Lokal KIA bh Rp 1,818,000 1,999,800.00 2,090,700.00 2,363,400.00
b Kloset Jongkok porselin warna/putih bh Rp 323,200 355,520.00 371,680.00 420,160.00
Kloset Jongkok Teraso bh Rp 323,200 355,520.00 371,680.00 420,160.00
Kloset Jongkok Keramik bh Rp 323,200 355,520.00 371,680.00 420,160.00
Kloset Jongkok KIA bh Rp 873,650 961,015.00 1,004,697.50 1,135,745.00
c Urinoir porselin putih/warna bh Rp 1,166,550 1,283,205.00 1,341,532.50 1,516,515.00
Urinoir KIA bh Rp 651,551 716,706.10 749,283.65 847,016.30
Urinoir Keramik bh Rp 318,655 350,520.50 366,453.25 414,251.50
d Wastafel (komplit) unit Rp 555,500 611,050.00 638,825.00 722,150.00
Keramik bh Rp 414,100 455,510.00 476,215.00 538,330.00
Porselin bh Rp 670,842 737,926.20 771,468.30 872,094.60
Porselin KIA bh Rp 739,522 813,474.20 850,450.30 961,378.60
e Wastafel/Vas + Cermin bh Rp 1,818,000 1,999,800.00 2,090,700.00 2,363,400.00
f Wash bak/bak cuci bak porselin bh Rp 909,000 999,900.00 1,045,350.00 1,181,700.00
Wash bak/bak cuci bak logam bh Rp 677,912 745,703.20 779,598.80 881,285.60
Wash bak / 2 bak bh Rp 909,000 999,900.00 1,045,350.00 1,181,700.00
Stainless Steel 1 lobang bh Rp 353,500 388,850.00 406,525.00 459,550.00
g Bak Air Fiber Glas (750 Ltr) bh Rp 1,818,000 1,999,800.00 2,090,700.00 2,363,400.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Bak Air Fiber Glas (200-300 Ltr) bh Rp 1,166,550 1,283,205.00 1,341,532.50 1,516,515.00
h Reservoir Fiber G ( 1 m3) Rp -
Kapasitas (800 Ltr) bh Rp 1,313,000 1,444,300.00 1,509,950.00 1,706,900.00
Kapasitas (1000 Ltr) bh Rp 2,525,000 2,777,500.00 2,903,750.00 3,282,500.00
i Pompa Dragon bh Rp 628,927 691,819.70 723,266.05 817,605.10
j Pompa Air Sanyo (Kecil) bh Rp 767,600 844,360.00 882,740.00 997,880.00
k Pompa Air Sanyo (Besar) bh Rp 2,020,000 2,222,000.00 2,323,000.00 2,626,000.00
l Pompa Air Honda 3.5 PK bh Rp 4,201,600 4,621,760.00 4,831,840.00 5,462,080.00
Rp -
BAHAN PAKU / BAUT Rp -
Paku Tripleks kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku Persegi kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku (1/4 - 1/2) kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku (3/4 - 3.0) kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku (1/2 - 3.0) kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku (2.1/2 - 7.0) kg Rp 30,300 33,330.00 34,845.00 39,390.00
Paku Seng Gelombang kg Rp 50,500 55,550.00 58,075.00 65,650.00
Paku Ardex kg Rp 40,400 44,440.00 46,460.00 52,520.00
Paku Asbes kg Rp 23,533 25,886.30 27,062.95 30,592.90
Paku Seng kg Rp 45,450 49,995.00 52,267.50 59,085.00
Paku Tembok/Bet (7 cm) biji Rp 3,030 3,333.00 3,484.50 3,939.00
Paku Tembok/Bet (10 cm) biji Rp 5,050 5,555.00 5,807.50 6,565.00
Paku Jembatan kg Rp 35,350 38,885.00 40,652.50 45,955.00
Paku Sekrup (1"x6) Dos Rp 10,100 11,110.00 11,615.00 13,130.00
Paku Sekrup (1"x7) bh Rp 2,020 2,222.00 2,323.00 2,626.00
Timah Solder Batang roll Rp 30,300 33,330.00 34,845.00 39,390.00
Baut + Mur (0 3/8"17,5 7") bh Rp 5,050 5,555.00 5,807.50 6,565.00
Baut + Mur (0 3/8"15 6") bh Rp 5,050 5,555.00 5,807.50 6,565.00
Baut + Mur (0 3/8"20 8") bh Rp 5,050 5,555.00 5,807.50 6,565.00
Baut + Mur (0 3/8"35 14") bh Rp 5,050 5,555.00 5,807.50 6,565.00
Baut (1/2) bh Rp 6,565 7,221.50 7,549.75 8,534.50
Baut Mur (12x10") bh Rp 7,070 7,777.00 8,130.50 9,191.00
Baugel Besi Strap ( 40,4 (sambungan kayu)) bh Rp 9,090 9,999.00 10,453.50 11,817.00
Baut Mur diameter 1/2 (10-30 mm) bh Rp 5,050 5,555.00 5,807.50 6,565.00
Rp -
BAHAN KAWAT BETON BAJA Rp -
Kawat Bronjong (4 mm) kg Rp 45,450 49,995.00 52,267.50 59,085.00
Kawat Ikat kg Rp 35,350 38,885.00 40,652.50 45,955.00
Kawat Duri roll Rp 222,200 244,420.00 255,530.00 288,860.00
Kawat Ram M1 Rp 40,400 44,440.00 46,460.00 52,520.00
Kawat Harmonika M1 Rp 50,500 55,550.00 58,075.00 65,650.00
Kawat Nyamuk Plastik M1 Rp 35,350 38,885.00 40,652.50 45,955.00
Kawat Nyamuk Besi M1 Rp 40,400 44,440.00 46,460.00 52,520.00
Kawat Ayakan M1 Rp 45,450 49,995.00 52,267.50 59,085.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Kawat Las Dos Rp 202,000 222,200.00 232,300.00 262,600.00
Rp -
BAHAN BESI BETON / BAJA Rp -
a Besi Beton Bulat Rp -
Diameter 6 mm (11 m) btg Rp 45,450 49,995.00 52,267.50 59,085.00
Diameter 8 mm (11 m) btg Rp 69,690 76,659.00 80,143.50 90,597.00
Diameter 10 mm (11 m) btg Rp 101,000 111,100.00 116,150.00 131,300.00
Diameter 12 mm (11 m) btg Rp 141,400 155,540.00 162,610.00 183,820.00
Diameter 16 mm (11 m) btg Rp 237,350 261,085.00 272,952.50 308,555.00
Diameter 18 mm (11 m) btg Rp 242,400 266,640.00 278,760.00 315,120.00
Diameter 22 mm (11 m) btg Rp 327,240 359,964.00 376,326.00 425,412.00
Diameter 25 mm (11 m) btg Rp 368,145 404,959.50 423,366.75 478,588.50
Besi Strip 30,3 m btg Rp 58,580 64,438.00 67,367.00 76,154.00
Besi Strip 50,5 m btg Rp 101,000 111,100.00 116,150.00 131,300.00
Besi Strip 40,4 m btg Rp 19,190 21,109.00 22,068.50 24,947.00
Besi Strip 40,3 m btg Rp 78,780 86,658.00 90,597.00 102,414.00
Besi Strip 20,2 m btg Rp 39,390 43,329.00 45,298.50 51,207.00
b Besi Plat Tebal Rp -
Besi Plat Tebal (1 mm) lbr Rp 308,151 338,966.10 354,373.65 400,596.30
Besi Plat Tebal (1,2 mm) lbr Rp 385,719 424,290.90 443,576.85 501,434.70
Besi Plat Tebal (2 mm) Ibr Rp 570,246 627,270.60 655,782.90 741,319.80
Besi Plat Tebal (3 mm) lbr Rp 830,119 913,130.90 954,636.85 1,079,154.70
Besi Plat Tebal (4 mm) lbr Rp 1,106,859 1,217,544.90 1,272,887.85 1,438,916.70
Besi Plat Tebal (5 mm) lbr Rp 1,106,859 1,217,544.90 1,272,887.85 1,438,916.70
Besi Plat Tebal (9 mm) lbr Rp 1,271,691 1,398,860.10 1,462,444.65 1,653,198.30
Besi Plat Tebal (6 mm) lbr Rp 1,173,923 1,291,315.30 1,350,011.45 1,526,099.90
c Besi Siku 20.20 (36 mm) btg Rp 146,248 160,872.80 168,185.20 190,122.40
Besi Siku 30.30 (3,6 mm) btg Rp 202,000 222,200.00 232,300.00 262,600.00
Besi Siku 40.40 (4,6 mm) btg Rp 252,500 277,750.00 290,375.00 328,250.00
Besi Siku 50.50 (4,6 mm) btg Rp 303,000 333,300.00 348,450.00 393,900.00
Besi Siku 60.60 (6,6 mm) btg Rp 367,640 404,404.00 422,786.00 477,932.00
Besi Siku 100.100 (106 mm) btg Rp 1,034,240 1,137,664.00 1,189,376.00 1,344,512.00
d Aluminium Siku Rp 15,857 17,442.70 18,235.55 20,614.10
Rp -
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
BAHAN PIPA KHUSUS UTK PEKERJAAAN
Rp -
BANGUNAN
a Pipa PVC Rp -
Diameter 1/2" (4 m) btg Rp 35,350 38,885.00 40,652.50 45,955.00
Diameter 3/4" (4 m) btg Rp 50,500 55,550.00 58,075.00 65,650.00
Diameter 1" (4 m) btg Rp 70,700 77,770.00 81,305.00 91,910.00
Diameter 2" (4 m) btg Rp 95,950 105,545.00 110,342.50 124,735.00
Diameter 3" (4 m) btg Rp 176,750 194,425.00 203,262.50 229,775.00
Diameter 4" (4 m) btg Rp 202,000 222,200.00 232,300.00 262,600.00
Diameter 5" (4 m) btg Rp 191,900 211,090.00 220,685.00 249,470.00
Diameter 6" (4 m) btg Rp 252,500 277,750.00 290,375.00 328,250.00
b Kopling PVC/Bag & Keni Rp -
Diameter 2" - 3" bh Rp 16,160 17,776.00 18,584.00 21,008.00
Diameter 4" - 5" bh Rp 18,180 19,998.00 20,907.00 23,634.00
c Pipa (Galvanis) GIP Rp -
Diameter 1/2" (6 m) btg Rp 101,000 111,100.00 116,150.00 131,300.00
Diameter 1" (6 m) btg Rp 176,750 194,425.00 203,262.50 229,775.00
Diameter 1 1/2" (6 m) btg Rp 252,500 277,750.00 290,375.00 328,250.00
Diameter 2" (6 m) btg Rp 303,000 333,300.00 348,450.00 393,900.00
d Kopling GIP / Bog & Knee GIP Rp -
Diameter 1/2" - 3" bh Rp 267,650 294,415.00 307,797.50 347,945.00
Diameter 3" - 4" bh Rp 258,560 284,416.00 297,344.00 336,128.00
Diameter 1/2'T1 bh Rp 267,650 294,415.00 307,797.50 347,945.00
e Stop Kran Kopling GIP 1/2 1 bh Rp 43,430 47,773.00 49,944.50 56,459.00
f Talang Plastik (PV46") btg Rp 151,500 166,650.00 174,225.00 196,950.00
Talang Plastik ( PV48") btg Rp 121,200 133,320.00 139,380.00 157,560.00
g Pipa Listrik Besi 0.5/8 btg Rp 25,250 27,775.00 29,037.50 32,825.00
Pipa Plastik 0,3" btg Rp 20,200 22,220.00 23,230.00 26,260.00
h Les Aluminium 1/2 (6 m) btg Rp 67,670 74,437.00 77,820.50 87,971.00
Les Aluminium 1/2 (6 m) btg Rp 25,250 27,775.00 29,037.50 32,825.00
Les Aluminium 2 (6 m) btg Rp 35,249 38,773.90 40,536.35 45,823.70
Rp -
BAHAN CAT Rp -
a Cat Tembok Rp -
Cat Tembok (5 Kg) kg Rp 65,650 72,215.00 75,497.50 85,345.00
Cat Tembok (20 Kg) kg Rp 202,000 222,200.00 232,300.00 262,600.00
b Cat Kayu : Rp -
Cat Kilat Kayu kg Rp 65,650 72,215.00 75,497.50 85,345.00
Cat Kayu Dasar kg Rp 65,650 72,215.00 75,497.50 85,345.00
c Cat Aluminium kg Rp 65,650 72,215.00 75,497.50 85,345.00
d Cat Besi kg Rp 65,650 72,215.00 75,497.50 85,345.00
Cat Besi Crom kg Rp 55,550 61,105.00 63,882.50 72,215.00
Cat Menie kg Rp 50,500 55,550.00 58,075.00 65,650.00
e Cat Atap Hardek (5 ltr) kg Rp 171,700 188,870.00 197,455.00 223,210.00
f Lain-lain Rp -
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Plamur Besi kg Rp 40,400 44,440.00 46,460.00 52,520.00
Plamur Tembok kg Rp 50,500 55,550.00 58,075.00 65,650.00
Plamur Kayu kg Rp 40,400 44,440.00 46,460.00 52,520.00
Dempul Besi kg Rp 50,500 55,550.00 58,075.00 65,650.00
Dempul Kayu kg Rp 50,500 55,550.00 58,075.00 65,650.00
Residu Itr Rp 50,500 55,550.00 58,075.00 65,650.00
Menie Besi Itr Rp 42,420 46,662.00 48,783.00 55,146.00
Menie Kayu kg Rp 30,300 33,330.00 34,845.00 39,390.00
Politur/Teak Oil Itr Rp 65,650 72,215.00 75,497.50 85,345.00
Minyak Cat Itr Rp 58,580 64,438.00 67,367.00 76,154.00
Amplas Kayu Itr Rp 10,100 11,110.00 11,615.00 13,130.00
Amplas Besi Ibr Rp 10,100 11,110.00 11,615.00 13,130.00
Thinner klg Rp 35,350 38,885.00 40,652.50 45,955.00
Lem kayu klg Rp 35,350 38,885.00 40,652.50 45,955.00
Lem Aibon klq Rp 45,450 49,995.00 52,267.50 59,085.00
Rp -
BAHAN BAKAR Rp -
Minyak Tanah Itr Rp 10,100 11,110.00 11,615.00 13,130.00
Minyak Solar Itr Rp 10,100 11,110.00 11,615.00 13,130.00
Minyak Pelumas Itr Rp 40,400 44,440.00 46,460.00 52,520.00
Premium Itr Rp 12,120 13,332.00 13,938.00 15,756.00
Rp -
BAHAN INSTALASI LISTRIK Rp -
a Lampu TL Lengkap Rp -
20 watt bh Rp 60,600 66,660.00 69,690.00 78,780.00
2 x 200 watt bh Rp 151,500 166,650.00 174,225.00 196,950.00
1 x 40 watt bh Rp 74,740 82,214.00 85,951.00 97,162.00
2 x 40 watt bh Rp 116,150 127,765.00 133,572.50 150,995.00
Lampu Pijar 1 x 60 watt bh Rp 15,150 16,665.00 17,422.50 19,695.00
Lampu Pijar 1 x 100 watt bh Rp 20,200 22,220.00 23,230.00 26,260.00
Lampu SL 25 watt bh Rp 92,920 102,212.00 106,858.00 120,796.00
Lampu SL 40 watt bh Rp 178,770 196,647.00 205,585.50 232,401.00
Lampu SL 75 watt bh Rp 117,463 129,209.30 135,082.45 152,701.90
Lampu SL 100 watt bh Rp 125,846 138,430.60 144,722.90 163,599.80
Mercuri Lengkap bh Rp 191,900 211,090.00 220,685.00 249,470.00
b Sekring Khas bh Rp 30,300 33,330.00 34,845.00 39,390.00
Sekring Otomatis bh Rp 74,740 82,214.00 85,951.00 97,162.00
Sekring Box bh Rp 75,750 83,325.00 87,112.50 98,475.00
Kabel NYM (1 x 2,5 mm) roll Rp 505,000 555,500.00 580,750.00 656,500.00
Kabel NYM (2.5 x 2 mm) roll Rp 656,500 722,150.00 754,975.00 853,450.00
Kabel roll Rp 151,500 166,650.00 174,225.00 196,950.00
c Saklar Tunggal bh Rp 32,320 35,552.00 37,168.00 42,016.00
Saklar Ganda bh Rp 33,330 36,663.00 38,329.50 43,329.00
Stop Kontak bh Rp 30,300 33,330.00 34,845.00 39,390.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Fitting Lampu bh Rp 20,200 22,220.00 23,230.00 26,260.00
MCB ex. Merlin Gerin bh Rp 75,750 83,325.00 87,112.50 98,475.00
HARGA SATUAN PER WILAYAH
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
No. URAIAN BAHAN DAN UPAH SATUAN Sarmi, Sarmi Pantai Timur, Pantai Barat,
Bonggo, Bonggo
Timur, Sarmi Pantai Timur Apawer Hulu,
Timur
Selatan Barat TOR Atas
1 2 3 4 5 6 7
Rp -
II UPAH KERJA Rp -
1 Mandor Hari/Org Rp 262,600 275,730.00 288,860.00 315,120.00
2 Kepala Tukang Hari/Org Rp 212,100 222,705.00 233,310.00 254,520.00
3 Tukang Hari/Org Rp 161,600 169,680.00 177,760.00 193,920.00
4 Pekerja Hari/Org Rp 121,200 127,260.00 133,320.00 145,440.00
5 Operator Hari/Org Rp 212,100 222,705.00 233,310.00 254,520.00
6 Pembantu Operator Hari/Org Rp 161,600 169,680.00 177,760.00 193,920.00
7 Supir Hari/Org Rp 161,600 169,680.00 177,760.00 193,920.00
8 Pembantu Supir Hari/Org Rp 111,100 116,655.00 122,210.00 133,320.00
9 Makanik Hari/Org Rp 161,600 169,680.00 177,760.00 193,920.00
10 Pembantu Makanik Hari/Org Rp 111,100 116,655.00 122,210.00 133,320.00
DESKRIPSI RESIKO PENILAIAN TINGKAT RESIKO PENILAIAN SISA RESIKO
PERSYARATAN
PENGENDALIAN NILAI TINGAT PENGENDALIAN NILAI TINGAT KETERANG
NO IDENTIFIKASI BAHAYA JENIS BAHAYA (Tipe PEMENUHAN KEMUNG KEPARAH KEMUNG KEPARA
URAIAN PEKERJAAN AWAL RESIKO RESIKO LANJUTAN RESIKO RESIKO AN
(Skenario Bahaya) Kecelakaan) PERATURAN KINAN (F) AN (A) KINAN (F) HAN (A)
(FXA) (TR) (FXA) (TR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SOP K3 &
TERTUSUK BENDA MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
1 Papan nama proyek TAJAM,TERSANDUNG,T SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
ERTIMPA MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERTUSUK BENDA MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
2 Pengukuran dan pasang bouwplank TAJAM,TERSANDUNG,T TIDAK AMAN
SERTIFIKAT
& MEMAKAI APD 1 3 3 RENDAH
& MEMAKAI APD
N/A N/A N/A N/A N/A
ERTIMPA MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERTUSUK BENDA MEMILIKI
Barak kerja+direksi keet+pagar PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
3 TAJAM,TERSANDUNG,T SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
pengaman TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
ERTIMPA MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERTUSUK PAKU,
MEMILIKI
TERTIMPA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
4 Barak kerja dan gudang SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
MATERIAL,TERLUKA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KARENA ALAT KERJA
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
5 Listrik dan air kerja LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT
MEMILIKI
KERJA, TERTIMPA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
6 Galian tanah u pondasi foot plat SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
MATERIAL BATU TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KARANG
KERJA
SOP K3 &
TERLUKA KARENA ALAT
MEMILIKI
Galian tanah u pondasi pasangan KERJA, TERTIMPA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
7 SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
batu karang MATERIAL BATU TIDAK AMAN & MEMAKAI APD
KOMPETENSI
KARANG
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Urugan tanah kembali bekas PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
8 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
lubang galian TIDAK AMAN & MEMAKAI APD
MATERIAL TIMBUNAN KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Urugan pasir bawah pondasi foot PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
9 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
plat TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Urugan pasir bawah pondasi PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
10 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
pasangan batu karang TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
11 Urugan pasir bawah lantai KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Timbunan karang kasar/karang PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
12 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
timbun peninggian lantai TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL TIMBUNAN KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT
MEMILIKI
Pasangan batu KERJA, TERTIMPA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
13 SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
kosong/aanstamping MATERIAL BATU TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KARANG
KERJA
SOP K3 &
TERLUKA KARENA ALAT
MEMILIKI
Pasangan pondasi batu karang, KERJA, TERTIMPA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
14 SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
spesi 1:4 MATERIAL BATU TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KARANG
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Pasang dinding batu tela, spesi 1 PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
15 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
PC : 4 PP TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BATU TELA KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
16 Plesteran dinding spesi 1:4 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL PLESTERAN KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
17 Plesteran kolom spesi 1:2 KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL PLESTERAN KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
18 Acian kolom dan dinding KERJA, TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL ACIAN KOMPETENSI
KERJA
TERLUKA KARNA ALAT SOP K3 &
KERJA, PECAHAN MEMILIKI
Pasang keramik lantai uk. 50x50 PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
19 KERAMIK, DAN SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
cm TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
TERTIMPA MATERIAL KOMPETENSI
KARAMIK KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Cor lantai kerja bawah pondasi foot PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
22 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
plat TIDAK AMAN & MEMAKAI APD
MATERIAL COR KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
23 Cor lantai kerja bawah lantai KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
MATERIAL COR KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
24 Pondasi Foot Plat KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
25 Leher Pondasi Uk. 30 x 30 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
26 Kolom Beton Uk. 30 x 30 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
27 Kolom Beton Uk. 12 x 12 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
28 Sloof Beton Uk. 30 x 40 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang kusen kayu besi uk. 5 x 10 PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
29 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
cm TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
30 Pasang daun pintu panel ky linggua KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
Pasang daun pintu panel ky besi TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
31 lapis seng plat sisi dalam untuk KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
toilet MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang daun jendela kayu linggua PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
32 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
+ kaca riben tbl. 5 mm TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
33 Pasang Jalusi Kayu Besi KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang Cerucuk Kayu Besi 10 x 10 PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
34 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
cm, panjang 4 meter TIDAK AMAN & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
Pasang Kunci pintu tanam 2 slug TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
35 SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
exlusive KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
36 Pasang engsel pintu panil SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
37 Pasang engsel jendela panil SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
38 Pasang grendel jendela SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
39 Pasang handle jendela SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERLUKA KARNA ALAT PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
40 Pasang kait angin jendela ungkit SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
KERJA TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
41 Pasang lampu LED 10 Watt LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
42 Pasang lampu LED 7 Watt LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
43 Pasang Saklar tunggal LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
44 Pasang saklar ganda LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
45 Pasang stop kontak tunggal LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
TERKENA ALIRAN MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
46 MCB LISTRIK, TERLUKA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KARENA ALAT KERJA KOMPETENSI
KERJA
SOP K3 &
Pengecatan tembok baru (1 lapis TERLUKA KARENA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
47 plamur + 1 lapis cat dasar + 2 lapis KERJA, MENGHIRUP SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
cat penutup) AROMA CAT KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARENA ALAT MEMILIKI
Cat kilat kusen pintu, daun pintu PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
48 KERJA, MENGHIRUP SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
panil, dan jendela panil TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
AROMA CAT KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
49 Balok Utama Uk. 30 x 40 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
50 Balok Anak Uk. 20 x 30 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
51 Plat Lantai Beton Tebal 12 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
52 Kolom Beton Uk. 30 x 30 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
53 Ring Balk Uk. 30 x 30 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
54 Ring Balk Uk. 70 x 10 cm KERJA, TERTIMPA SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL BETON KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
55 Pasang kuda-kuda kayu besi 5/10 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang Gording dan nok kayu PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
56 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
matoa 5/10 TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang atap soka ceria atau PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
57 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
sejenis TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL ATAP KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang nok atap soka ceria atau PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
58 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
sejenis TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL ATAP KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
Pasang listplank papan kayu besi 3 PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
59 KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
x 20 TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
60 Meja siswa Tunggal KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
61 Kursi Siswa Tunggal KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH & MEMAKAI APD N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
62 Meja Guru KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
63 Kursi Guru KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
64 Papan Tulis KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
65 Lemari Buku KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERLUKA KARNA ALAT MEMILIKI
PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
66 Kotak Sampah KERJA,TERTIMPA SERTIFIKAT 1 2 2 RENDAH N/A N/A N/A N/A N/A
TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
MATERIAL KAYU KOMPETENSI
KERJA
SOP K3 &
TERTUSUK BENDA MEMILIKI
Foto Dokumentasi+laporan+as built TAJAM,TERSANDUNG,T PERILAKU DAN KONDISI SERTIFIKAT
MENAATI SOP K3
RENDAH
MENAATI SOP K3
N/A N/A N/A N/A N/A
67 TIDAK AMAN & MEMAKAI APD 1 3 3 & MEMAKAI APD
drawings ERTIMPA MATERIAL KOMPETENSI
KERJA
SOP K3 &
MEMILIKI
TERTUSUK BENDA PERILAKU DAN KONDISI MENAATI SOP K3 MENAATI SOP K3
68 Pembersihan Akhir SERTIFIKAT 1 3 3 RENDAH N/A N/A N/A N/A N/A
TAJAM,TERSANDUNG TIDAK AMAN & MEMAKAI APD & MEMAKAI APD
KOMPETENSI
KERJA
SASARAN PROGRAM
PENGENDALIAN
NO JENIS TIPE RESIKO (SESUAI JADWAL BENTUK INDIKATOR PENANGGUNG
URAIAN TOLAK UKUR URAIAN KEGIATAN SUMBER DAYA
PEKERJA/TUKANGAN KOLOM TABEL 6 PELAKSANAAN MONITORING PENCAPAIAN JAWAB
IBPRP)
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN MEMASANG PELAKSANA/
1 Papan nama proyek APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD PAPAN NAMA SAFETY OFFICER
PROYEK MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Pengukuran dan MENAATI SOP K3 & MEMASTIKAN MEMBUAT BARAK PELAKSANA/
2 APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
pasang bouwplank MEMAKAI APD KESIAPAN APD KERJA DAN SAFETY OFFICER
GUDANG MASKER, SARUNG
TANGAN
PEKERJA/TUKANG
MEMBUAT BAK ALAT KELISTRIKAN,
PENAMPUNG AIR HELM, SEPATU
PELAKSANA/
3 Barak kerja+direksi MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI DAN TEKNISI SAFETY, KACA HARIAN CHECK LIST DAFTAR ABSENSI SAFETY OFFICER/
keet+pagar pengaman MEMAKAI APD KESIAPAN APD LISTRIK MATA, ROMPI, TEKNISI LISTRIK
MENYALURKAN MASKER, SARUNG
LISTRIK DI BARAK TANGAN
DAN GUDANG
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
4 Barak kerja dan MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBONGKAR MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
gudang MEMAKAI APD KESIAPAN APD SAFETY OFFICER
ATAP YANG RUSAK MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
SAFETY, KACA
5 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBONGKAR MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
Listrik dan air kerja MEMAKAI APD KESIAPAN APD GORDING YANG SAFETY OFFICER
MASKER, SARUNG
RUSAK TANGAN
HELM, SEPATU
PEKERJA/TUKANG
SAFETY, KACA
6 Galian tanah u pondasi MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBONGKAR MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
foot plat MEMAKAI APD KESIAPAN APD PLAFOND YANG SAFETY OFFICER
MASKER, SARUNG
RUSAK TANGAN
HELM, SEPATU
PEKERJA/TUKANG
MENAATI SOP K3 & MEMASTIKAN MEMBONGKAR SAFETY, KACA PELAKSANA/
7 Galian tanah u pondasi APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
pasangan batu karang MEMAKAI APD KESIAPAN APD KUSEN YANG SAFETY OFFICER
MASKER, SARUNG
RUSAK TANGAN
HELM, SEPATU
PEKERJA/TUKANG
MENAATI SOP K3 & MEMASTIKAN MEMBONGKAR SAFETY, KACA PELAKSANA/
8 Urugan tanah kembali APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
bekas lubang galian MEMAKAI APD KESIAPAN APD LANTAI YANG SAFETY OFFICER
MASKER, SARUNG
RUSAK TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
9 Urugan pasir bawah APD TERPAKAI MENGERUK CAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
pondasi foot plat MEMAKAI APD KESIAPAN APD SAFETY OFFICER
LAMA MASKER, SARUNG
TANGAN
HELM, SEPATU
Urugan pasir bawah PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
10 pondasi pasangan batu APD TERPAKAI MENGGALI TANAH MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
karang UNTUK PONDASI MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
MENAATI SOP K3 & MEMASTIKAN MENIMBUN SAFETY, KACA PELAKSANA/
11 Urugan pasir bawah APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
lantai MEMAKAI APD KESIAPAN APD TANAH UNTUK SAFETY OFFICER
RABAT MASKER, SARUNG
TANGAN
HELM, SEPATU
Timbunan karang PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
12 kasar/karang timbun APD TERPAKAI MEMASANG PAS. MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
peninggian lantai BATU KARANG MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Pasangan batu MENAATI SOP K3 & MEMASTIKAN MENGERJAKAN PELAKSANA/
13 APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
kosong/aanstamping MEMAKAI APD KESIAPAN APD PLESTERAN SAFETY OFFICER
SAMPING RABAT MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Pasangan pondasi MENAATI SOP K3 & MEMASTIKAN MENGEJARKAN PELAKSANA/
14 APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
batu karang, spesi 1:4 MEMAKAI APD KESIAPAN APD ACIAN SAMPING SAFETY OFFICER
RABAT MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
15 Pasang dinding batu MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
MEMAKAI APD KESIAPAN APD MEMASANG MATA, ROMPI, SAFETY OFFICER
tela, spesi 1 PC : 4 PP KERAMIK MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
16 Plesteran dinding spesi MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
MEMAKAI APD KESIAPAN APD MEMASANG MATA, ROMPI, SAFETY OFFICER
1:4 KERAMIK ANTI SLIP MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
SAFETY, KACA
17 Plesteran kolom spesi MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MENGERJAKAN HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
MEMAKAI APD KESIAPAN APD PENGECORAN MATA, ROMPI, SAFETY OFFICER
1:2 MASKER, SARUNG
LANTAI
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
SAFETY, KACA
18 Acian kolom dan MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBUAT KUSEN HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
MEMAKAI APD KESIAPAN APD PINTU DAN MATA, ROMPI, SAFETY OFFICER
dinding MASKER, SARUNG
JENDELA
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
19 Pasang keramik lantai MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBUAT JALUSI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
uk. 50x50 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
KAYU MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
20 Pasang lantai keramik MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBUAT DAUN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
anti selip 50x50 teras MEMAKAI APD KESIAPAN APD SAFETY OFFICER
PINTU PANEL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
22 Cor lantai kerja bawah MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
pondasi foot plat MEMAKAI APD KESIAPAN APD SAFETY OFFICER
TIANG KAYU BESI MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
23 Cor lantai kerja bawah APD TERPAKAI MEMASANG SOPI- MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
lantai MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SOPI MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
MENAATI SOP K3 & MEMASTIKAN MEMASANG SAFETY, KACA PELAKSANA/
24 Pondasi Foot Plat APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD KUNCI PINTU SAFETY OFFICER
MASKER, SARUNG
TANAM TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
25 Leher Pondasi Uk. 30 x APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
30 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
ENGSEL PINTU MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
26 Kolom Beton Uk. 30 x APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
30 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
ENGSEL JENDELA MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
27 Kolom Beton Uk. 12 x APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
12 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
GRENDEL JENDELA MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Sloof Beton Uk. 30 x MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
28 APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
40 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
HANDLE JENDELA MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Pasang kusen kayu MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
29 APD TERPAKAI MEMASANG KAIT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
besi uk. 5 x 10 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
ANGIN MASKER, SARUNG
TANGAN
HELM, SEPATU
TUKANG LISTRIK SAFETY, KACA PELAKSANA/
Pasang daun pintu MENAATI SOP K3 & MEMASTIKAN SAFETY
30 APD TERPAKAI MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
panel ky linggua MEMAKAI APD KESIAPAN APD OFFICER/TEKNISI
LAMPU MASKER, SARUNG LISTRIK
TANGAN
Pasang daun pintu HELM, SEPATU PELAKSANA/
TUKANG LISTRIK SAFETY, KACA
31 panel ky besi lapis MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI SAFETY
MEMAKAI APD KESIAPAN APD MEMASANG MATA, ROMPI, OFFICER/TEKNISI
seng plat sisi dalam SAKLAR GANDA MASKER, SARUNG
untuk toilet LISTRIK
TANGAN
HELM, SEPATU
PELAKSANA/
Pasang daun jendela TUKANG LISTRIK SAFETY, KACA
32 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI SAFETY
kayu linggua + kaca MEMAKAI APD KESIAPAN APD MEMASANG STOP MATA, ROMPI, OFFICER/TEKNISI
riben tbl. 5 mm KONTAK TUNGGAL MASKER, SARUNG
LISTRIK
TANGAN
HELM, SEPATU
PELAKSANA/
TUKANG LISTRIK SAFETY, KACA
33 Pasang Jalusi Kayu MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI SAFETY
MEMAKAI APD KESIAPAN APD MEMASANG MCB MATA, ROMPI, OFFICER/TEKNISI
Besi + BOX MASKER, SARUNG
LISTRIK
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
Pasang Cerucuk Kayu SAFETY, KACA
34 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI KAYU MEMASANG HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
Besi 10 x 10 cm, MEMAKAI APD KESIAPAN APD GORDING DAN MATA, ROMPI, SAFETY OFFICER
panjang 4 meter MASKER, SARUNG
NOK
TANGAN
HELM, SEPATU
SAFETY, KACA
35 Pasang Kunci pintu MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI PEKERJA/TUKANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
tanam 2 slug exlusive MEMAKAI APD KESIAPAN APD MEMASANG ATAP SAFETY OFFICER
MASKER, SARUNG
TANGAN
HELM, SEPATU
SAFETY, KACA
36 Pasang engsel pintu MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI PEKERJA/TUKANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
panil MEMAKAI APD KESIAPAN APD MEMASANG NOK SAFETY OFFICER
MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
37 Pasang engsel jendela MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI KAYU MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
panil MEMAKAI APD KESIAPAN APD SAFETY OFFICER
LISTPLANK MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
38 Pasang grendel MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI KAYU MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
jendela MEMAKAI APD KESIAPAN APD SAFETY OFFICER
RANGKA PLAFOND MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG
MENAATI SOP K3 & MEMASTIKAN KAYU MEMASANG SAFETY, KACA PELAKSANA/
39 Pasang handle jendela APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD PLAFOND SAFETY OFFICER
MASKER, SARUNG
MULTIPLEKS TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
40 Pasang kait angin APD TERPAKAI KAYU MEMASANG MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
jendela ungkit MEMAKAI APD KESIAPAN APD SAFETY OFFICER
LIST PLAFOND MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
41 Pasang lampu LED 10 APD TERPAKAI MENGECET MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
Watt MEMAKAI APD KESIAPAN APD SAFETY OFFICER
TEMBOK MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
42 Pasang lampu LED 7 APD TERPAKAI MENGECET MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
Watt MEMAKAI APD KESIAPAN APD SAFETY OFFICER
PLAFOND MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
43 Pasang Saklar tunggal APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD MENGECET KUSEN SAFETY OFFICER
MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
44 Pasang saklar ganda APD TERPAKAI KAYU MEMBUAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
MEJA MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Pasang stop kontak MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
45 APD TERPAKAI KAYU MEMBUAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
tunggal MEMAKAI APD KESIAPAN APD SAFETY OFFICER
KURSI MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
46 MCB APD TERPAKAI KAYU MEMBUAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
MEJA MASKER, SARUNG
TANGAN
Pengecatan tembok HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
47 baru (1 lapis plamur + MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
MEMAKAI APD KESIAPAN APD KAYU MEMBUAT MATA, ROMPI, SAFETY OFFICER
1 lapis cat dasar + 2 KURSI MASKER, SARUNG
lapis cat penutup) TANGAN
HELM, SEPATU
Cat kilat kusen pintu, PEKERJA/TUKANG SAFETY, KACA
48 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
daun pintu panil, dan MEMAKAI APD KESIAPAN APD KAYU MEMBUAT MATA, ROMPI, SAFETY OFFICER
jendela panil PAPAN TULIS MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
Balok Utama Uk. 30 x MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
49 APD TERPAKAI KAYU MEMBUAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
40 cm MEMAKAI APD KESIAPAN APD LEMARI BUKU MASKER, SARUNG SAFETY OFFICER
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
50 Balok Anak Uk. 20 x 30 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI KAYU MEMBUAT MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
KOTAK SAMPAH MASKER, SARUNG
TANGAN
PELAKSANA/
MANDOR
HELM, SEPATU
MENGAMBIL SAFETY, KACA
Plat Lantai Beton Tebal MENAATI SOP K3 & MEMASTIKAN DOKUMENTASI PELAKSANA/
51 APD TERPAKAI MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
12 cm MEMAKAI APD KESIAPAN APD PEKERJAAN MASKER, SARUNG SAFETY OFFICER
UNTUK
TANGAN
PEMBUATAN
LAPORAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
52 Kolom Beton Uk. 30 x MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
30 cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
53 Ring Balk Uk. 30 x 30 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
54 Ring Balk Uk. 70 x 10 MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
cm MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
55 Pasang kuda-kuda MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
kayu besi 5/10 MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
56 Pasang Gording dan MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
nok kayu matoa 5/10 MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
57 Pasang atap soka MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
ceria atau sejenis MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
58 Pasang nok atap soka MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
ceria atau sejenis MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
59 Pasang listplank papan MENAATI SOP K3 & MEMASTIKAN APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI PELAKSANA/
kayu besi 3 x 20 MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
60 Meja siswa Tunggal APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
61 Kursi Siswa Tunggal APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
62 Meja Guru APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
63 Kursi Guru APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
64 Papan Tulis APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
65 Lemari Buku APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
MENAATI SOP K3 & MEMASTIKAN PEKERJA/TUKANG SAFETY, KACA PELAKSANA/
66 Kotak Sampah APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
Foto PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
67 Dokumentasi+laporan+ APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
as built drawings SISA MATERIAL MASKER, SARUNG
TANGAN
HELM, SEPATU
PEKERJA/TUKANG SAFETY, KACA
MENAATI SOP K3 & MEMASTIKAN PELAKSANA/
68 Pembersihan Akhir APD TERPAKAI MEMBERSIHKAN MATA, ROMPI, HARIAN CHECK LIST DAFTAR ABSENSI
MEMAKAI APD KESIAPAN APD SAFETY OFFICER
SISA MATERIAL MASKER, SARUNG
TANGAN