HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOL. TOTAL HARGA
(Rp)
A PEKERJAAN PERSIAPAN
JUMLAH A 4,979,895.18
B PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Biasa m3 14.66 99,000.00 1,450,944.00
3 Urugan tanah kembali bekas galian m3 4.89 32,670.00 159,603.84
5 Urugan Pasir m3 1.83 237,600.00 435,283.20
JUMLAH B 2,045,831.04
C PEKERJAAN PONDASI
JUMLAH C 7,026,263.19
D PEKERJAAN DINDING PAGAR DAN PINTU SLIDING
JUMLAH D 336,258,539.75