Anda di halaman 1dari 109

CV.

CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PALAPA RING MIDDLE PACKAGE OPERATIONAL ROOM PLAN
LOKASI : KEC.BETOAMBARI KOTA BAUBAU
T.A : 2017
VOLUME : 1(SATU)PAKET

JUMLAH HARGA
NO. URAIAN JENIS PEKERJAAN
(Rp)
1 2 3

I PEKERJAAN PERSIAPAN 80,080,052.66


II PEKERJAAN TANAH DAN PASIR 35,424,649.72
III PEKERJAAN BATU DAN PASANGAN 125,658,607.73
IV PEKERJAAN STRUKTUR BETON BERTULANG 145,588,567.03
V PEKERJAAN PLASTERAN DAN ACIAN 79,368,726.90
VI PEKERJAAN PASANGAN KERAMIK DAN RABAT LANTAI 67,165,308.25
VII PEKERJAAN KUSEN, PINTU, JENDELA DAN PERLENGKAPAN 49,754,169.03
VIII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 64,778,469.60
IX PEKERJAAN ALAT-ALAT GANTUNG 3,995,342.80
X PEKERJAAN INSTALASI LISTRIK 46,640,000.00
XI PEKERJAAN RANGKA PLAFOND DAN PLAFOND 25,306,352.50
XII PEKERJAAN SANITASI 39,125,391.45
XIII PEKERJAAN PENGECATAN DAN FINISHING 24,244,391.55
XIV PEKERJAAN ACESSORIES DAN PERLENGKAPAN 40,000,000.00

JUMLAH REAL COST = (I+II+III+IV+V+VI+VII+VIII+IX )………………………………………………………………….A 827,130,029.23


PPN (10% X A ) ……………………………………………………………………………………………………………………………B 82,713,002.92
IMB (10% X A ) ……………………………………………………………………………………………………………………………C 16,542,600.58
TOTAL JUMLAH = ( A + B + C ) 926,385,632.73
DIBULATKAN 926,385,000.00
###
TERBILANG : ###
Sembilan Ratus Dua Puluh Enam Juta Tiga Ratus Delapan Puluh Lima Ribu Rupiah ###
###
###
BAUBAU, JULI 2017
DISETUJUI/DIKETAHUI OLEH DIBUAT OLEH
CV. CITRAJAYA ABADI CV. CITRAJAYA ABADI

(RAFIUNDDIN, ST) (RIDWAN)


DIREKTUR STAF TEKNIK
CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

RENCANA ANGGARAN BIAYA(RAB)


PEKERJAAN : PALAPA RING MIDDLE PACKAGE OPERATIONAL ROOM PLAN
LOKASI : KEC.BETOAMBARI KOTA BAUBAU
T.A : 2017
VOLUME : 1(SATU)PAKET

HARGA SATUAN JUMLAH HARGA


NO. ANALISA URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7=(5 X 6 )

I PEKERJAAN PERSIAPAN
1 Pekerjaan Keselamatan dan Kesehatan Kerja (K3) Ls 1.00 32,505,000.00 32,505,000.00
2 A.2.2.1.2 Pembuatan 1m2 pagar sementara dari seng gelombang tinggi M2 70.00 466,878.81 32,681,516.59
2 meter
3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00
4 Barak Kerja Ls 1.00 5,000,000.00 5,000,000.00
5 Penyediaan Air Bersih Ls 1.00 5,000,000.00 5,000,000.00
6 A.2.2.1.4 Pengukuran dan Pasangan Bowplank M1 50.00 90,870.72 4,543,536.08
Sub Total I 80,080,052.66
II PEKERJAAN TANAH DAN PASIR
1 A.2.3.1.2 Pek.Galian Tanah Biasa M3 48.30 94,702.50 4,573,775.62
2 A.2.3.1.9 Pek.Urugan Tanah Kembali M3 16.10 56,350.00 907,164.56
3 A.2.3.1.11_a Pek. Urugan Tanah Bawah Lantai M3 100.00 128,336.32 12,833,632.00
4 A.2.3.1.11 Pek.Pasir Urug Bawah Pondasi M3 3.30 513,820.00 1,695,477.55
5 A.2.3.1.11 Pek.Pasir Urug Bawah lantai M3 30.00 513,820.00 15,414,600.00
Sub Total II 35,424,649.72
III PEKERJAAN BATU DAN PASANGAN
1 A.3.2.1.9 Pek.Pasangan Batu Kosong Pondasi M3 8.70 793,983.00 6,907,056.61
2 A.3.2.1.2 Pek.Pasangan Batu Gunung Pondasi 1:4 M3 52.82 1,250,883.75 66,067,770.66
3 A.4.4.1.9 Pek.Pasangan Batu Bata 1/2 Batu 1:4 M2 317.26 166,060.00 52,683,780.45
Sub Total III 125,658,607.73
IV PEKERJAAN STRUKTUR BETON BERTULANG
1 A.4.1.1.28 Pek.Pondasi Peton Bertulang M3 2.13 7,240,137.43 15,425,112.78
2 A.4.1.1.29 Pek.Sloof Beton Bertulang M3 3.11 6,904,956.88 21,452,837.91
3 A.4.1.1.30 Pek.Kolom Beton Bertulang M3 3.52 8,823,177.25 31,075,230.28
4 A.4.1.1.31 Pek.Balok Beton Bertulang M3 3.11 10,377,853.34 32,242,693.09
5 A.4.1.1.34 Pek.Plat Lantai Beton Bertulang M3 4.56 9,897,793.70 45,133,939.26
6 A.4.1.1.4 Pek.Bonton Lantai kerja bawah poor plat M3 0.20 1,293,768.50 258,753.70
Sub Total IV 145,588,567.03
V PEKERJAAN PLASTERAN DAN ACIAN
1 A.4.4.2.4 Pek.Plasteran Dinding M2 634.52 75,996.60 48,220,982.65
2 A.4.4.2.4 Pek.Plasteran Pondasi M2 35.00 75,996.60 2,659,881.00
3 A.4.4.2.27 Pek.Acian Dinding M2 634.52 42,550.00 26,998,613.25
4 A.4.4.2.27 Pek.Acian Pondasi M2 35.00 42,550.00 1,489,250.00
Sub Total V 79,368,726.90
VI PEKERJAAN PASANGAN KERAMIK DAN RABAT LANTAI
1 A.4.4.3.4 Pek. Pasangan Keramik Ruangan 40x40 cm 1:5 M2 85.00 221,929.07 18,863,970.95
2 A.4.4.3.21 Pek. Pasangan Tegel Plint Keramik 10 x 40 cm 1:5 M2 165.70 49,700.65 8,235,398.37
3 A.4.4.3.6 Pek. Pasangan Tegel Anti Slip KM/WC 20x20 cm 1:5 M2 4.00 252,430.82 1,009,723.28
4 A.4.4.3.6 Pek. Pangan Tegel Keramik Dinding KM/WC 20x20 cm 1:5 M2 16.00 252,430.82 4,038,893.10
5 A.4.4.3.53 Pek. Pangan Batu Alam Tempel M2 40.00 682,985.00 27,319,400.00
6 A.4.1.1.4 Pek. Rabat Beton Lantai 1:3:5 M2 5.95 1,293,768.50 7,697,922.55
Sub Total VI 67,165,308.25
VII PEKERJAAN KUSEN, PINTU, JENDELA DAN PERLENGKAPAN
1 A.4.2.1.11 Pek. Kusen Pintu / Jendela & ventilasi Allumunium M1 81.27 276,382.95 22,461,642.35
2 A.4.6.1.5 Pek. Pintu Panil # 3 cm M2 9.21 793,884.27 7,313,658.86
3 A.4.2.1.12 Pek. Pintu Allumunium M2 3.38 3,720,532.90 12,556,798.54
4 A.4.2.1.8 Pek. Pintu Kamar Mandi M2 1.69 478,400.00 807,300.00
HARGA SATUAN JUMLAH HARGA
NO. ANALISA URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7=(5 X 6 )
5 Pek.
A.4.2.1.12
Daun Jendela Allumunium M2 1.42 3,720,532.90 5,281,668.50
6 A.4.6.2.17 Pek. Pasangan Kaca Polos 5mm M2 6.80 196,101.91 1,333,100.78
Sub Total VII 49,754,169.03
VIII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Skh.4.5.2.3 Pek. Kuda-Kuda Baja Ringan M3 102.00 558,430.80 56,959,941.60
2 Skh.4.5.2.1 Pek. Atap Zincallume M2 102.00 69,092.00 7,047,384.00
3 A.4.5.2.36 Pek. Pas. Nok Zincalume M1 12.00 64,262.00 771,144.00
Sub Total VIII 64,778,469.60
IX PEKERJAAN ALAT-ALAT GANTUNG
1 A.4.6.2.2 Pas. Kunci Tanam 2 x Slaag Bh 10.00 163,790.27 1,637,902.68
2 A.4.6.2.5 Pas. Engsel Pintu Kuningan Bh 24.00 53,976.02 1,295,424.51
3 A.4.6.2.11 Pas. Grendel Pintu Bh 10.00 50,404.50 504,045.00
4 A.4.6.2.11 Pas. Grendel Jendela Bh 4.00 50,404.50 201,618.00
5 A.4.6.2.6 Pas. Enggsel Jendela Bh 4.00 24,703.61 98,814.44
6 A.4.6.2.9 Pas. Kait Anggin Bh 8.00 32,192.27 257,538.18
Sub Total IX 3,995,342.80
X PEKERJAAN INSTALASI LISTRIK
1 Pas. Titik Instalasi Listrik Bh 12.00 350,000.00 4,200,000.00
2 Pas.. Lampu Philips 20 Watt Bh 8.00 50,000.00 400,000.00
3 Pas.. Lampu Philips 40 Watt (neon) Bh 4.00 150,000.00 600,000.00
4 Pas.Saklar Ganda Bh 4.00 50,000.00 200,000.00
5 Pas. Saklar Tunggal Bh 2.00 45,000.00 90,000.00
6 Pas. Stop Kontak Bh 8.00 50,000.00 400,000.00
7 Pas. AC indor Bh 4.00 10,000,000.00 40,000,000.00
8 Pas. Box Sekring (MCB) Bh 1.00 750,000.00 750,000.00
Sub Total X 46,640,000.00
XI PEKERJAAN RANGKA PLAFOND DAN PLAFOND
1 A.4.2.1.20 Pek.Pasangan Rangka Plafond Hollow 1x40.40.2mm M2 85.00 184,218.50 15,658,572.50
2 A.4.5.1.7 Pek. Pasangan Plafond Gypsum board M2 85.00 64,768.00 5,505,280.00
3 Pek.Pasangan List Plafond Gypsum M2 165.70 25,000.00 4,142,500.00
Sub Total XI 25,306,352.50
XII PEKERJAAN SANITASI
1 A.5.1.1.1 Pemasangan Klosed Duduk Buah 1.00 4,035,120.00 4,035,120.00
2 A.5.1.1.23 Pipa GI Dia 3" M' 25.00 175,817.75 4,395,443.75
3 A.5.1.1.14 Floor Drain Buah 1.00 34,500.00 34,500.00
4 A.5.1.1.5 Wastafel Buah 1.00 1,619,660.00 1,619,660.00
5 A.5.1.1.12 Bak Cuci Buah 1.00 684,250.00 684,250.00
6 A.5.1.1.31 Pipa PVC (saluran air kotor) dia 3" M' 36.00 68,689.50 2,472,822.00
7 A.5.1.1.25 Pipa PVC (saluran air bersig) dia1/2" M' 52.00 23,828.00 1,239,056.00
8 Pek.Saluran Drainase Pasangan Batu M' 23.51 523,816.84 12,314,933.79
9 Tower air Bersih 2000L Buah 1.00 3,500,000.00 3,500,000.00
10 Septictank + Resapan Unit 1.00 8,829,605.91 8,829,605.91
Sub Total XII 39,125,391.45
XIII PEKERJAAN PENGECATAN DAN FINISHING
1 A.4.7.1.10 Pek. Cat/Plamur Dinding Tembok M2 634.52 33,695.46 21,380,277.14
2 A.4.7.1.10 Pek. Cat Plafond Gypsum M2 85.00 33,695.46 2,864,114.41
Sub Total XIII 24,244,391.55
XIV PEKERJAAN ACESSORIES DAN PERLENGKAPAN
1 Pas.Trali pagar galvanis M1 7.00 2,500,000.00 17,500,000.00
2 Pas.Pintu pagar Galvanis M2 3.00 2,500,000.00 7,500,000.00
3 Pas.Papan Nama Kantor Bh 1.00 15,000,000.00 15,000,000.00
Sub Total XIV 40,000,000.00

BAUBAU, JULI 2017


DISETUJUI/DIKETAHUI OLEH DIBUAT OLEH
CV. CITRAJAYA ABADI CV. CITRAJAYA ABADI
HARGA SATUAN JUMLAH HARGA
NO. ANALISA URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7=(5 X 6 )

(RAFIUNDDIN, ST) (RIDWAN)


DIREKTUR STAF TEKNIK
CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

RENCANA ANGGARAN BIAYA


KESELAMATAN DAN KESEHATAN KERJA (K3)
PEKERJAAN GEDUNG

PEKERJAAN : PALAPA RING MIDDLE PACKAGE OPERATIONAL ROOM PLAN


LOKASI : KEC.BETOAMBARI KOTA BAUBAU
T.A : 2017
VOLUME : 1(SATU)PAKET
JANGKA WAKTU : 6(ENAM)BULAN

NO. URAIAN SAT. Q'ty WAKTU HARGA SATUAN TOTAL HARGA KET

1 Penyiapan RK3K terdiri atas :


a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Set 1.00 1.00 2,000,000.00 2,000,000.00
Kerja Dan
b Pembuatan Kartu Identitas Pekerja(KIP); Org 15.00 1.00 7,000.00 105,000.00

2 Sosialisasi dan Promosi K3 terdiri atas:


a Induksi K3 (Safety Induction); khusus untuk pekerja Org 15.00 1.00 7,500.00 112,500.00
baru
b Pengarahan K3 (safety briefing) : Org 15.00 180.00 - -
Pertemuan Keselamatan (Safety Talk dan/atau Tool
Box Meeting); setiap hari
c Pelatihan K3;
Bekerja di Ketinggian Org - 1.00 7,500.00 -
K3 Peralatan Konstruksi & Penggunaan Bahan Org - 1.00 7,500.00 -
Kimia (MSDS)
Analysis Keselamatan Pekerjaan Org 15.00 1.00 7,500.00 112,500.00
Perilaku Berbasis Keselamatan (Budaya K3) Org 15.00 1.00 7,500.00 112,500.00
P3K Org 1.00 1.00 1,750,000.00 1,750,000.00
d Simulasi K3 Org 15.00 1.00 7,500.00 112,500.00
e Spanduk (banner); Lbr 5.00 1.00 150,000.00 750,000.00
f Poster Lbr 5.00 1.00 50,000.00 250,000.00
g Papan Informasi K3 Buah 2.00 1.00 500,000.00 1,000,000.00
3 Alat Pelindung Kerja terdiri atas:
a Jaring pengaman (Safety Net); Ls - - 5,000,000.00 - sesuai kebutuhan
b Tali Keselamatan (Life Line); Ls - 1.00 1,000,000.00 - sesuai kebutuhan
c Penahan jatuh (Safety Deck); Ls - - 5,000,000.00 - sesuai kebutuhan
d Pagar Pengaman (Guard Railling); Ls - 1.00 3,000,000.00 - sesuai kebutuhan
e Pembatas Area (Restricted Area). Ls - 1.00 3,000,000.00 - sesuai kebutuhan
4 Alat Pelindung Diri terdiri atas:
a Topi Pelindung (Safety Helmet); Buah 15.00 1.00 50,000.00 750,000.00 Staf & Tamu
b Pelindung Mata (Goggles, Spectacies); Psg 15.00 1.00 50,000.00 750,000.00
c Tameng Muka (Face Shield); Buah - 1.00 75,000.00 -
d Masker Selam (Breathing Apparatus); Buah - - 100,000.00 -
e Pelindung Telinga (Ear Plug, Ear Muff); Psg - - 50,000.00 -
f Pelindung Pernafasan Dan Mulut (Masker); Buah 40.00 1.00 10,000.00 400,000.00
g Sarung Tangan (Safety Gloves); Psg 25.00 1.00 20,000.00 500,000.00
h Sepatu Keselamatan (Safety Shoes); untuk staf Psg 15.00 1.00 350,000.00 5,250,000.00
h Sepatu Keselamatan (Rubber Safety Shoes_and Toe Psg 25.00 1.00 145,000.00 3,625,000.00
Cap)
-
i Penunjang Seluruh Tubuh (Full Body Harness); Buah - 1.00 750,000.00 -
j Jaket Pelampung (Life Vest); Buah - - 100,000.00 -
k Rompi Keselamatan (Safety Vest); Buah 30.00 1.00 75,000.00 2,250,000.00
l Clemek (Apron/Coverall); Buah - 1.00 40,000.00 -
m Pelindung Jatuh (Fall Arrester); Buah - 1.00 100,000.00 -
5 Asuransi Dan Perijinan terdiri atas: -
a BPJS Ketenagakerjaan Dan Kesehatan Kerja ; Ls - 1.00 13,943,000.00 - >5M
(BERDASARKAN KEPMENAKER NOMOR :
KEP-196/MEN/1999, untuk tenaga harian proyek)

b Surat Ijin Kelaikan Alat; Alat/Kend. - 1.00 8,500,000.00 - sesuai kebutuhan


NO. URAIAN SAT. Q'ty WAKTU HARGA SATUAN TOTAL HARGA KET

c Surat Ijin Operator; Lbr/Alat - 1.00 6,500,000.00 - sesuai kebutuhan


d Surat Ijin Pengesahan Panitia Pembina Keselamatan Ls - 1.00 500,000.00 -
Kerja (P2K3)
6 Personil K3 terdiri atas :
a Ahli K3 OB - 1.00 7,000,000.00 - risiko K3 Tinggi
b Petugas K3 OB 1.00 1.00 1,500,000.00 1,500,000.00 risiko K3 Sdg/Kecil
c Petugas Tanggap Darurat; OB 1.00 - 3,000,000.00 -
d Petugas P3K; OB 1.00 - 3,000,000.00 -
e Ass Petugas K3/Safety Man/Pengatur Lalu Lintas OB 1.00 1.00 1,000,000.00 1,000,000.00
(flagman);
f Petugas Medis. OB 1.00 - 3,000,000.00 -
7 Fasilitas sarana kesehatan;
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Ls 1.00 1.00 3,500,000.00 3,500,000.00
Obat Luka, Perban, dll);
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Ls 1.00 1.00 1,500,000.00 1,500,000.00
Timbangan Berat badan, Tensi Meter, dll)
c Peralatan Pengasapan (Fogging); Buah - 1.00 1,500,000.00 -
d Obat Pengasapan. Kali 3.00 6.00 15,000.00 270,000.00
8 Rambu-Rambu terdiri atas :
a Rambu Petunjuk; Buah 5.00 1.00 75,000.00 375,000.00 sesuai kebutuhan
b Rambu Larangan; Buah 5.00 1.00 75,000.00 375,000.00 sesuai kebutuhan
c Rambu Peringatan; Buah 5.00 1.00 75,000.00 375,000.00 sesuai kebutuhan
d Rambu Kewajiban; Buah 5.00 1.00 75,000.00 375,000.00 sesuai kebutuhan
e Rambu Informasi; Buah 5.00 1.00 75,000.00 375,000.00 sesuai kebutuhan
f Rambu Pekerjaan Sementara; Buah - 1.00 75,000.00 - sesuai kebutuhan
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick); Buah - 1.00 50,000.00 - sesuai kebutuhan
sesuai kebutuhan
h Kerucut Lalu Lintas (Traffic Cone); Buah - 1.00 100,000.00 - sesuai kebutuhan
i Lampu putar (Rotary lamp); Buah - 1.00 100,000.00 - sesuai kebutuhan
j Lampu Selang Lalu Lintas. Ls - 1.00 1,000,000.00 - sesuai kebutuhan
9 Lain-Lain Terkait Pengendalian Risiko K3
a Alat Pemadam Api Ringan (APAR); 10Kg Buah 1.00 1.00 550,000.00 550,000.00
b Sirine; Buah 1.00 1.00 100,000.00 100,000.00
c Bendera K3; Buah 2.00 1.00 50,000.00 100,000.00
d Jalur Evakuasi (Escape Route); Ls 1.00 1.00 500,000.00 500,000.00
e Lampu Darurat (Emergency Lamp); Buah 4.00 1.00 70,000.00 280,000.00
f Program Inspeksi Dan Audit Internal; Org 1.00 1.00 1,000,000.00 1,000,000.00
g Pelaporan dan Penyelidikan Internal. Ls 1.00 1.00 500,000.00 500,000.00
JUMLAH TOTAL (1+2+3+4+5+6+7+8+9) 32,505,000.00

BAUBAU, JULI 2017


DISETUJUI/DIKETAHUI OLEH DIBUAT OLEH
CV. CITRAJAYA ABADI CV. CITRAJAYA ABADI

(RAFIUNDDIN, ST) (RIDWAN)


DIREKTUR STAF TEKNIK
CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

ANALISA SEPTICTANG DAN PERESAPAN


HARGA SATUAN JUMLAH HARGA
NO. ANALISA URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7=(5 X 6 )

I PEKERJAAN TANAH DAN PASIR


1 A.2.3.1.11_a Pekerjaan Tanah Urugan M3 - 128,336.32 -
2 A.2.3.1.11 Pekerjaan Urgan Pasir M3 0.47 513,820.00 241,495.40
3 A.2.3.1.14 Pekerjaan Sirtu Padat M3 - 51,259.77 -
4 A.2.3.1.13 Pekerjaan Pasangan Ijuk M2 2.14 706,905.00 1,515,604.32

Sub Total I 1,757,099.72


II PEKERJAAN BATU DAN PASANGAN
1 A.3.2.1.9 Pekerjaan Batu Kosong M3 - 793,983.00 -
2 A.3.2.1.1 Pekerjaan Pasangan Batu 1:3 M3 1.73 1,308,556.25 2,263,802.31
3 A.4.4.1.8 Pekerjaan Batu Bata 1/2 Batu M3 2.74 170,133.30 466,165.24

Sub Total I 2,729,967.55


III PEKERJAAN BETON BERTULANG
1 A.4.1.1.33 Pekerjaan Beton Bertulang M3 0.34 8,654,405.55 2,933,843.48

Sub Total II 2,933,843.48


IV PEKERJAAN PLASTERAN
1 A.4.4.2.3 Pekerjaan Plasteran 1:3 M2 14.13 78,420.34 1,108,079.40
2 A.4.4.2.26 Pekerjaan Plasteran Siar Mata Sapi M2 - 71,350.60 -
3 A.4.4.2.27 Pekerjaan Acian M2 7.07 42,550.00 300,615.75

Sub Total III 1,408,695.15


V PEKERJAAN PENGECATAN
1 A.4.7.1.10 Pengecatan Tembok baru M2 - 33,695.46 -
Sub Total IV -
JUMLAH TOTAL=(I+II+III+IV) 8,829,605.91
Rp 30,000,000.00
Tiga Puluh Juta Rupiah

30,000,000.00 30000000 000 0 0 0 0 000


30000000 30000 000 0 Ribu 0 0 0 000
30000 30 30 30 Juta 0 3 Tiga Puluh 0 Juta Tiga Puluh Juta
00 0 0 Milyar 0 0 0 000
00 0 0 trilyun 0 0 0 000
Rupiah Rupiah
1M' ANALISA SALURAN DRAINASE
HARGA SATUAN JUMLAH HARGA
NO. ANALISA URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
1 2 3 4 5 6 7=(5 X 6 )

I PEKERJAAN TANAH DAN PASIR


1 A.2.3.1.1 Pekerjaan Galian Tanah Biasa sedalam 1m M3 0.79 77,050.00 60,676.88
2 A.2.3.1.9 Pekerjaan Urugan Kembali Bekas Galian M3 0.47 56,350.00 26,484.50

Sub Total I 87,161.38


II PEKERJAAN BATU DAN PASANGAN
1 A.3.2.1.9 Pekerjaan Batu Kosong M3 - 793,983.00 -
2 A.3.2.1.1 Pekerjaan Pasangan Batu 1:3 M3 - 1,308,556.25 -
3 A.4.4.1.8 Pekerjaan Batu Bata 1/2 Batu M3 1.50 170,133.30 255,199.95

Sub Total I 255,199.95


III PEKERJAAN BETON BERTULANG
1 A.4.1.1.33 Pekerjaan Beton Bertulang M3 - 8,654,405.55 -

Sub Total II -
IV PEKERJAAN PLASTERAN
1 A.4.4.2.3 Pekerjaan Plasteran 1:3 M2 1.50 78,420.34 117,630.51
2 A.4.4.2.26 Pekerjaan Plasteran Siar Mata Sapi M2 - 71,350.60 -
3 A.4.4.2.27 Pekerjaan Acian M2 1.50 42,550.00 63,825.00

Sub Total III 181,455.51


V PEKERJAAN PENGECATAN
1 A.4.7.1.10 Pengecatan Tembok baru M2 - 33,695.46 -
Sub Total IV -
JUMLAH TOTAL=(I+II+III+IV) 523,816.84
CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

Harga dasar satuan upah


No Jenis Kode Satuan Harga (Rp)

1 Pekerja L.01 OH 85,000.00


2 Tukang Batu L.02 OH 120,000.00
3 Tukang Besi L.02 OH 120,000.00
4 Tukang Kayu L.02 OH 120,000.00
5 Tukang Cat L.02 OH 120,000.00
6 Tukang Las L.02 OH 120,000.00
7 Tukang Pipa L.02 OH 120,000.00
8 Tukang Khusus Allumunium L.02 OH 120,000.00
9 Kepala Tukang L.03 OH 150,000.00
10 Mandor L.04 OH 130,000.00

BAUBAU, JULI 2017


DIBUAT OLEH
CV. CITRAJAYA ABADI

(RIDWAN)
STAF TEKNIK
No Jenis Kode Satuan Harga (Rp)

CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

Harga dasar satuan bahan


No Jenis Kode Satuan Harga (Rp)

1 Pasir Beton M3 350,000.00


2 Pasir Pasang M 3
350,000.00
3 Pasir Urug M 3
350,000.00
4 Sirtu M 3
107,923.20
5 Pasir Beton Kg 250.00
6 Batu Gunung Belah M 3
346,000.00
7 Batu Gunung Pecah 5-7cm M 3
434,350.00
8 Kerikil M 3
504,926.40
9 Kerikil Kg 374.02
10 Koral Beton M3 146,000.00
11 Kapur Padam M3 150,000.00
12 Kapur M 3
150,000.00
13 Tanah Timbunan Batu Kapur M 3
70,664.00
14 Tanah Liat M 3
35,000.00
15 Batu Bata Merah Bh 1,000.00
16 Batu Batako Bh 3,800.00
17 Paving Block Natural M 2
50,000.00
18 Kayu Balok Kelas I M 3
4,496,887.50
19 Kayu Papan Kelas I M 3
4,595,853.75
20 Kayu Balok Kelas II.A M 3
3,281,512.50
21 Kayu Papan Kelas II.A M 3
3,342,281.25
22 Kayu Balok Kelas II M3 3,281,512.50
23 Kayu Papan Kelas II M 3
3,342,281.25
24 Kayu 2/3 Kelas II M 3
3,342,281.25
25 Kayu 4/6 Kelas II M 3
3,281,512.50
26 Kayu 5/7 Kelas II M 3
3,281,512.50
27 Kayu Balok Kelas III M3 2,309,212.50
28 Kayu Papan Kelas III M3 2,369,981.25
29 Kayu Dolken ø 8-10/400 cm Batang 10,996.25
30 Bambu ø 86-8/600 cm Batang 25,000.00
31 Air Liter 64.24
32 Ijuk M 3
100,000.00
33 Tali Ijuk M3 150,000.00
34 Semen Portland Zak 80,000.00
35 Semen Portland Kg 1,600.00
36 Semen Warna Kg 11,680.00
37 Semen Nat Kg 9,344.00
38 Paku Biasa 1/2 inc-1 inc Kg 20,000.00
No Jenis Kode Satuan Harga (Rp)
39 Paku Biasa 2 inc-3 inc Kg 20,000.00
40 Paku Biasa 2 inc-5 inc Kg 20,000.00
41 Paku Biasa 5cm-7cm Kg 20,000.00
42 Paku Biasa 5cm-10cm Kg 20,000.00
43 Paku Biasa 5cm-12cm Kg 20,000.00
44 Paku 12cm Kg 20,000.00
45 Paku 10cm Kg 20,000.00
46 Paku 5cm Kg 20,000.00
47 Paku Tripleks Kg 20,000.00
48 Paku/Skrup 5cm Kg 20,000.00
49 Skrup Fixer Buah 5,000.00
50 Peofil Alluminium "T" Meter 200,000.00
51 Besi Profil Kg 16,000.00
52 Profil Allumunium Meter 200,000.00
53 Allumunium Strip Meter 160,000.00
54 Besi Baja IWF Kg 19,000.00
55 Besi Beton Kg 23,768.80
56 Rangka Metal Hollow 40.40.2mm Meter 23,000.00
57 Kawat Beton Kg 32,000.00
58 Residu Liter 28,000.00
59 Seng Gelombang 3inch x 6inch bjls 20 Lembar 46,252.80
60 Seng Plat 3inch x 6 inch bjls20 Lembar 55,000.00
61 Seng Plat 3inch x 6 inch bjls20 Meter 55,000.00
62 Genteng Metal Buah 42,000.00
63 Nok Genteng Metal Buah 50,000.00
64 Spandeck Zincallume M2 39,000.00
65 Screw Cteks 12-4 x 50 Buah 450.00
66 Screw Cteks 10 x 16-16 Buah 450.00
67 Nok Zincallume Tebal 0.35mm Meter 36,000.00
68 Baja Ringan C-75.0.8 Meter 73,000.00
69 Baja Ringan C-75.0.6 Meter 73,000.00
70 Baut(Screw driver) Buah 200.00
71 Dinabolt Buah 3,000.00
72 Reng Baja Ringan Meter 34,000.00
73 Talang Jurai Baja Ringan Meter 18,000.00
74 Sirap Kayu Buah 50,000.00
75 Nok Sirap Buah 50,000.00
76 Meni Besi Liter 48,000.00
77 Kawat Duri Meter 25,000.00
78 Kawat Jaring Galvanis Lembar 250,000.00
79 Kawat dia 4mm Kg 20,000.00
80 Besi Strip Kg 20,000.00
81 Jendela Naco Bh 120,000.00
82 Kaca Polos 3mm M2 80,000.00
83 Kaca Polos 5mm M 2
134,904.00
84 Pintu PVC (bathroom) M 2
350,000.00
85 Rolling Door Allumunium M 2
250,000.00
86 Profil Kaca Meter 50,000.00
No Jenis Kode Satuan Harga (Rp)
87 Sealant Kg 10,000.00
88 Sealant Tube 10,000.00
89 Kunci tanam antik Bh 121,413.60
90 Kunci tanam biasa Bh 73,426.32
91 Kunci tanam kamar mandi Bh 50,000.00
92 Kunci silinder Bh 50,000.00
93 Engsel Pintu Bh 25,306.67
94 Engsel Jendela Kupu-Kupu Bh 7,066.40
95 Engsel Angin Bh 6,000.00
96 Spring Knip Bh 10,000.00
97 Kait Angin Bh 5,428.28
98 Door Closer Set 25,000.00
99 Kunci Slot Bh 15,000.00
100 Playwood 4mm Lembar 69,000.00
101 Playwood 9mm Lembar 110,000.00
102 Panel Beton Pracetak Lembar 1,000,000.00
103 Kolom Beton Pracetak Batang 3,000,000.00
104 Storox -100 Kg 25,000.00
105 Waterstop Lebar 150 mm Meter 150,000.00
106 Waterstop Lebar 200 mm Meter 200,000.00
107 Waterstop Lebar 230 mm 320 mm Meter 300,000.00
108 Jaring Kawat Baja (Wiremesh) Kg 20,000.00
109 Minyak Bekisting Liter 3,372.60
110 Batu Granit Kg 18,000.00
111 Batu traso Kg 14,000.00
112 Keramik Artistik/Batu Alam Tempel Bh 7,500.00
113 Ubin Abu-Abu 40cm x 40cm Bh 26,000.00
114 Ubin Abu-Abu 30cm x 30cm Bh 14,000.00
115 Ubin Abu-Abu 20cm x 20cm Bh 6,000.00
116 Ubin Warna 40cm x 40cm Bh 16,060.00
117 Ubin Warna 30cm x 30cm Bh 8,897.24
118 Ubin Warna 20cm x 20cm Bh 4,721.64
119 Ubin Traso 40cm x 40cm Bh 30,000.00
120 Ubin Traso 30cm x 30cm Bh 16,000.00
121 Ubin Granit 40cm x 40cm Bh 35,000.00
122 Ubin Granit 30cm x 30cm Bh 33,000.00
123 Ubin Teralux Marmer 60cm x 60cm Bh 75,000.00
124 Ubin Teralux Marmer 40cm x 40cm Bh 60,000.00
125 Ubin Teralux Marmer 30cm x 30cm Bh 45,000.00
126 Plint Ubin Pc Abu-Abu 15cm x 20cm Bh 5,000.00
127 Plint Ubin Pc Abu-Abu 10cm x 30cm Bh 5,000.00
128 Plint Ubin Pc Abu-Abu 10cm x 40cm Bh 5,000.00
129 Plint Ubin Warna 10cm x 20cm Bh 5,000.00
130 Plint Ubin Warna 10cm x 30cm Bh 5,000.00
131 Plint Ubin Warna 10cm x 40cm Bh 7,066.40
132 Plint Ubin Traso 10cm x 30cm Bh 6,000.00
133 Plint Ubin Traso 10cm x 40cm Bh 6,000.00
134 Plint Ubin Granit 10cm x 30cm Bh 6,000.00
No Jenis Kode Satuan Harga (Rp)
135 Plint Ubin Granit 10cm x 40cm Bh 6,000.00
136 Plint Ubin Teralux Marmer 10cm x 30cm Bh 6,000.00
137 Plint Ubin Teralux Marmer 10cm x 40cm Bh 6,000.00
138 Plint Ubin Teralux Marmer 10cm x 60cm Bh 6,000.00
139 Traso Cor Bh 12,500.00
140 Keramik Artistik 10cm x 20cm Bh 20,000.00
141 Keramik Artistik 10cm x 10cm Bh 20,000.00
142 Keramik Artistik 5cm x 20cm Bh 20,000.00
143 Keramik 33cm x 33cm Bh 45,000.00
144 Keramik 30cm x 30cm Bh 45,000.00
145 Keramik 20cm x 20cm Bh 20,000.00
146 Keramik 10cm x 20cm Bh 20,000.00
147 Keramik 10cm x 33cm Bh 20,000.00
148 Keramik Mozaik 30cm x 30cm Bh 55,000.00
149 Plint Keramik 10cm x 20cm Bh 20,000.00
150 Plint Keramik 10cm x 10cm Bh 20,000.00
151 Plint Keramik 5cm x 20cm Bh 20,000.00
152 Plint Internal Cove 5cm x 5cm x 20cm Bh 20,000.00
153 Marmer 100cm x 100cm Bh 100,000.00
154 Karpet M2 50,000.00
155 Underlayer (pelapis bawah karpet) M2 50,000.00
156 Parquet M 2
25,000.00
157 Porselen 11cm x 11cm Bh 20,000.00
158 Porselen 10cm x 20cm Bh 20,000.00
159 Porselen 20cm x 20cm Bh 20,000.00
160 Batu Pelapis Bh 10,000.00
161 Batu Paras Bh 10,000.00
162 Batu Tempel Hitam Bh 10,000.00
163 Vinyl 30cm x 30cm Bh 35,000.00
164 Wallpaper Meter 150,000.00
165 Floor Harderner Kg 150,000.00
166 Plint Vinyl 15cm x 30cm Bh 150,000.00
167 Lem Fox Kg 20,000.00
168 Asbes Semen M 2
50,000.00
169 Akustik 30 cm x 30 cm Lembar 20,000.00
170 Akustik 30 cm x 60 cm Lembar 35,000.00
171 Akustik 60 cm x 120 cm Lembar 50,000.00
172 Tripleks tebal 3mm Lembar 63,072.00
173 Tripleks tebal 4mm Lembar 75,000.00
174 Tripleks tebal 6mm Lembar 107,065.89
175 Taekwood 4mm 90 x 220 cm Lembar 55,000.00
176 Formika Lembar 15,000.00
177 Kayu Papan Lambrisering tebal 9mm Lembar 20,000.00
178 Gypsum Board tebal 9mm Lembar 105,000.00
179 List Gypsum Board tebal 9mm Meter 25,000.00
180 List Kayu Profil Meter 22,776.00
181 Ramset Buah 50,000.00
182 Cat Menie Kg 18,886.56
No Jenis Kode Satuan Harga (Rp)
183 Plamuur Kayu Kg 18,886.56
184 Cat Dasar Kayu Kg 18,886.56
185 Cat Penutup Kayu Kg 60,385.60
186 Kuas Bh 17,537.52
187 Pengencer Kg 29,678.88
188 Ampelas Lembar 4,496.80
189 Plamuur Tembok Kg 6,424.00
190 Cat Dasar Tembok Kg 18,886.56
191 Cat Penutup Tembok Kg 55,888.80
192 Residu atau Ter Liter 11,113.52
193 Cat Menie Besi Kg 18,886.56
194 Closet Duduk Unit 2,900,000.00
195 Closet Jongkok Porslen Unit 541,000.00
196 Wastafel Unit 825,000.00
197 Bak Fibreglass Unit 500,000.00
198 Bak Cuci Piring Stainlessteel Unit 400,000.00
199 Waterdrain Bh 150,000.00
200 floor Drain Unit 15,000.00
201 Pipa Galvanis diameter 1/2inch Meter 21,000.00
202 Pipa Galvanis diameter 3/4inch Meter 25,000.00
203 Pipa Galvanis diameter 1inch Meter 28,000.00
204 Pipa Galvanis diameter 1 1/2inch Meter 33,000.00
205 Pipa Galvanis diameter 3inch Meter 71,000.00
206 Pipa Galvanis diameter 4inch Meter 88,000.00
207 Pipa PVC type AW diameter 1/2inch Meter 6,000.00
208 Pipa PVC type AW diameter 3/4inch Meter 7,000.00
209 Pipa PVC type AW diameter 1inch Meter 10,000.00
210 Pipa PVC type AW diameter 1 1/2inch Meter 12,000.00
211 Pipa PVC type AW diameter 2inch Meter 15,000.00
212 Pipa PVC type AW diameter 2 1/2inch Meter 18,000.00
213 Pipa PVC type AW diameter 3inch Meter 22,000.00
214 Pipa PVC type AW diameter 4inch Meter 26,000.00
215 Kran diameter 1/2inch Bh 21,000.00
216 Kran diameter 3/4inch Bh 21,000.00
217 Tower air Bersih 2000L Bh 3,500,000.00
218 Sealtape Bh 5,000.00
219 Wood Filer Kg 50,000.00
220 Woodstain Kg 50,000.00
221 Sanding Kg 50,000.00
222 Melamic Kg 50,000.00
223 Thiner Liter 35,000.00
224 Amplas Lbr 15,000.00
225 Karung Lbr 5,000.00
226 Trali pagar galvanis Meter 2,500,000.00
227 Pintu pagar Galvanis Meter 2,500,000.00
228 Papan Nama Kantor Bh 15,000,000.00
229 Pipa Listrik 5/8 inch Batang 7,500.00
230 Kabel Meter 10,000.00
No Jenis Kode Satuan Harga (Rp)
231 T Dus Bh 2,500.00
232 L Bow Bh 2,500.00
233 Las Dop Bh 7,500.00
234 Klem Bh 250.00
235 Mangkok Bh 7,500.00
236 Saklar Bh 75,000.00
237 Fitting Bh 50,000.00
238 MCB Bh 500,000.00

BAUBAU, JULI 2017


DIBUAT OLEH
CV. CITRAJAYA ABADI

(RIDWAN)
STAF TEKNIK
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö

Ö
Ö

Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö

Ö
Ö
Ö
Ö
Ö

Ö
Ö
Ö

Ö
Ö

Ö
Ö
Ö

Ö
Ö

Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Ö
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIPAN

A.2.2.1.1 Pembuatan 1m2 pagar sementara dari kayu tinggi 2 meter

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 63,600.00
B BAHAN
Dolken Kayu ø 8 -10/400 cm Batang 1.2500 10,996.25 13,745.31
Semen Portland Kg 5.0000 1,600.00 8,000.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton M3 0.0090 146,000.00 1,314.00
Kayu 5/7 Kelas II M3 0.0720 3,281,512.50 236,268.90
Paku Biasa 2in - 5in Kg 0.0600 20,000.00 1,200.00
Residu Liter 0.4000 28,000.00 11,200.00

JUMLAH TENAGA KERJA 273,478.21


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 337,078.21


E Overhead & Profit 15% x D 50,561.73
F Harga Satuan Pekerjaan (D+E) 387,639.94

A.2.2.1.2 Pembuatan 1m2 pagar sementara dari seng gelombang tinggi 2 meter

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.4000 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 70,600.00
B BAHAN
Dolken Kayu ø 8 -10/400 cm Batang 1.2500 10,996.25 13,745.31
Semen Portland Kg 2.5000 1,600.00 4,000.00
Seng Gelombang Lembar 1.2000 46,252.80 55,503.36
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton M3 0.0090 146,000.00 1,314.00
Kayu 5/7 Kelas II M3 0.0720 3,281,512.50 236,268.90
Paku Biasa 2in - 5in Kg 0.0600 20,000.00 1,200.00
Meni Besi Liter 0.4500 48,000.00 21,600.00
JUMLAH TENAGA KERJA 335,381.57
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 405,981.57


E Overhead & Profit 15% x D 60,897.24
F Harga Satuan Pekerjaan (D+E) 466,878.81
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIPAN

A.2.2.1.3 Pembuatan 1m2 pagar sementara dari kawat duri tinggi 1.8 meter

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.3000 120,000.00 36,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 58,600.00
B BAHAN
Dolken Kayu ø 8 -10/400 cm Batang 1.0000 10,996.25 10,996.25
Semen Portland Kg 2.0000 1,600.00 3,200.00
Kawat Duri Meter 25.0000 25,000.00 625,000.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton M3 0.0090 146,000.00 1,314.00
Paku Biasa 2in - 5in Kg 0.0600 20,000.00 1,200.00
-
-
JUMLAH TENAGA KERJA 643,460.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 702,060.25


E Overhead & Profit 15% x D 105,309.04
F Harga Satuan Pekerjaan (D+E) 807,369.29

A.2.2.1.4 Pengukuran dan pemasangan 1 Meter Bowplank

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 22,650.00
B BAHAN
Kayu 5/7 Kelas II M3 0.0120 3,281,512.50 39,378.15
Paku Biasa 2in - 3in Kg 0.0200 20,000.00 400.00
Kayu Papan 3/20 Kelas III M3 0.0070 2,369,981.25 16,589.87
-
-
-
-
-
JUMLAH TENAGA KERJA 56,368.02
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 79,018.02


E Overhead & Profit 15% x D 11,852.70
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIPAN

F Harga Satuan Pekerjaan (D+E) 90,870.72


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 85,000.00 63,750.00
Mandor L.04 OH 0.0250 130,000.00 3,250.00
-
-
JUMLAH TENAGA KERJA 67,000.00
B BAHAN
-
-
-
-
-
-
-

JUMLAH TENAGA KERJA -


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,000.00


E Overhead & Profit 15% x D 10,050.00
F Harga Satuan Pekerjaan (D+E) 77,050.00

A.2.3.1.2 Penggalian 1m3 tanah biasa sedalam 2 m

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 85,000.00 76,500.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
-
-
JUMLAH TENAGA KERJA 82,350.00
B BAHAN
-
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA -
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 82,350.00


E Overhead & Profit 15% x D 12,352.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

F Harga Satuan Pekerjaan (D+E) 94,702.50


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.9 Pengurugan kembali 1m3 galian tanah


Pengurugan kembali 1m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00

JUMLAH TENAGA KERJA 49,000.00


B BAHAN
-
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA -
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,000.00


E Overhead & Profit 15% x D 7,350.00
F Harga Satuan Pekerjaan (D+E) 56,350.00

A.2.3.1.10 Pemadatan tanah 1m3 tanah (per 20 cm)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
-
-
JUMLAH TENAGA KERJA 49,000.00
B BAHAN
-
-
-
-
-
-
JUMLAH TENAGA KERJA -
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,000.00


E Overhead & Profit 15% x D 7,350.00
F Harga Satuan Pekerjaan (D+E) 56,350.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.11 Pengurugan 1m3 dengan pasir urug

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
-
-
JUMLAH TENAGA KERJA 26,800.00
B BAHAN
Pasir Urug M3 1.2000 350,000.00 420,000.00
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA 420,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 446,800.00


E Overhead & Profit 15% x D 67,020.00
F Harga Satuan Pekerjaan (D+E) 513,820.00

A.2.3.1.12 Pemasangan 1m3 lapisan pundel campuran 1KP:3PP:7TL

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 85,000.00 68,000.00
Tukang Batu L.02 OH 0.4000 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00 6,000.00
Mandor L.04 OH 0.0800 130,000.00 10,400.00
JUMLAH TENAGA KERJA 132,400.00
B BAHAN
Kapur Padam M3 0.1350 150,000.00 20,250.00
Pasir Pasang M3 0.4000 350,000.00 140,000.00
Tanah Liat M3 0.9480 35,000.00 33,180.00
-
-
-
-
-
JUMLAH TENAGA KERJA 193,430.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 325,830.00


E Overhead & Profit 15% x D 48,874.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

F Harga Satuan Pekerjaan (D+E) 374,704.50


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.13 Pemasangan 1m2 lapisan ijuk tebal 10 cm untuk bidang resapan

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 85,000.00 12,750.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00

JUMLAH TENAGA KERJA 14,700.00


B BAHAN
Ijuk M3 6.0000 100,000.00 600,000.00
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA 600,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 614,700.00


E Overhead & Profit 15% x D 92,205.00
F Harga Satuan Pekerjaan (D+E) 706,905.00

A.2.3.1.14 Pengurugan 1 m3 sirtu padat

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Mandor L.04 OH 0.0250 130,000.00 3,250.00

JUMLAH TENAGA KERJA 24,500.00


B BAHAN
Sirtu M3 0.1860 107,923.20 20,073.72
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA 20,073.72
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,573.72


E Overhead & Profit 15% x D 6,686.06
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

F Harga Satuan Pekerjaan (D+E) 51,259.77


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.11_a Pengurugan 1m3 dengan tanah urug


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
-
-
JUMLAH TENAGA KERJA 26,800.00
B BAHAN
Timbunan Tanah Batu Kapur M3 1.2000 70,664.00 84,796.80
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA 84,796.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,596.80


E Overhead & Profit 15% x D 16,739.52
F Harga Satuan Pekerjaan (D+E) 128,336.32
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1 Pemasangan 1m3 ponasi batu belah campuran 1SP:3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 85,000.00 127,500.00
Tukang Batu L.02 OH 0.7500 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00 11,250.00
Mandor L.04 OH 0.0075 130,000.00 975.00
JUMLAH TENAGA KERJA 229,725.00
B BAHAN
Batu Gunung Belah M3 1.2000 346,000.00 415,200.00
Semen Portland Kg 202.0000 1,600.00 323,200.00
Pasir Pasang M3 0.4850 350,000.00 169,750.00
-
-
-
-

JUMLAH TENAGA KERJA 908,150.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,137,875.00


E Overhead & Profit 15% x D 170,681.25
F Harga Satuan Pekerjaan (D+E) 1,308,556.25

A.3.2.1.2 Pemasangan 1m3 ponasi batu belah campuran 1SP:4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 85,000.00 127,500.00
Tukang Batu L.02 OH 0.7500 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00 11,250.00
Mandor L.04 OH 0.0075 130,000.00 975.00
JUMLAH TENAGA KERJA 229,725.00
B BAHAN
Batu Gunung Belah M3 1.2000 346,000.00 415,200.00
Semen Portland Kg 163.0000 1,600.00 260,800.00
Pasir Pasang M3 0.5200 350,000.00 182,000.00
-
-
-
-
-
JUMLAH TENAGA KERJA 858,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,087,725.00


E Overhead & Profit 15% x D 163,158.75
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

F Harga Satuan Pekerjaan (D+E) 1,250,883.75


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.9 Pemasangan 1m3 batu kosong (anstamping)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 85,000.00 66,300.00
Tukang Batu L.02 OH 0.3900 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.0390 150,000.00 5,850.00
Mandor L.04 OH 0.0390 130,000.00 5,070.00
JUMLAH TENAGA KERJA 124,020.00
B BAHAN
Batu Gunung Belah M3 1.2000 346,000.00 415,200.00
Pasir Urug M3 0.4320 350,000.00 151,200.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 566,400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 690,420.00


E Overhead & Profit 15% x D 103,563.00
F Harga Satuan Pekerjaan (D+E) 793,983.00

A.3.2.1.10Pemasangan 1m3 pondasi siklop, 60% beton campuran 1SP:2PB:3Kr dan 40% batu belah

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.4000 85,000.00 289,000.00
Tukang Batu L.02 OH 0.8500 120,000.00 102,000.00
Kepala Tukang L.03 OH 0.0850 150,000.00 12,750.00
Mandor L.04 OH 0.1700 130,000.00 22,100.00
JUMLAH TENAGA KERJA 425,850.00
B BAHAN
Batu Gunung Belah M3 1.2000 346,000.00 415,200.00
Semen Portland Kg 41.0000 1,600.00 65,600.00
Pasir Beton M3 0.0740 350,000.00 25,900.00
Kerikil M3 0.1460 504,926.40 73,719.25
Besi Beton Kg 0.1460 23,768.80 3,470.24
Kawat Beton Kg 0.1460 32,000.00 4,672.00
-
-
JUMLAH TENAGA KERJA 588,561.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,014,411.50


E Overhead & Profit 15% x D 152,161.72
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

F Harga Satuan Pekerjaan (D+E) 1,166,573.22


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.3 Membuat 1m3 beton mutu f'c = 12.2 Mpa (K 150). Slump (12 ± 2 ) cm. w/c = 0.72

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 188,240.00
B BAHAN
Semen Portland Kg 299.0000 1,600.00 478,400.00
Pasir Beton Kg 799.0000 250.00 199,750.00
Kerikil Kg 1,017.0000 374.02 380,377.89
Air Liter 215.0000 64.24 13,811.60
-
-
-
-
JUMLAH TENAGA KERJA 1,072,339.49
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,260,579.49


E Overhead & Profit 15% x D 189,086.92
F Harga Satuan Pekerjaan (D+E) 1,449,666.41
Catatan: Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.4 Membuat 1m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100). Slump (3-6 ) cm. w/c = 0.87

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 85,000.00 102,000.00
Tukang Batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0600 130,000.00 7,800.00
JUMLAH TENAGA KERJA 136,800.00
B BAHAN
Semen Portland Kg 230.0000 1,600.00 368,000.00
Pasir Beton Kg 893.0000 250.00 223,250.00
Kerikil Kg 1,027.0000 374.02 384,118.08
Air Liter 200.0000 64.24 12,848.00
-
-
-
JUMLAH TENAGA KERJA 988,216.08
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,125,016.08


E Overhead & Profit 15% x D 168,752.41
F Harga Satuan Pekerjaan (D+E) 1,293,768.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 85,000.00 450,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.3000 120,000.00 156,000.00
Tukang Besi L.02 OH 1.0500 120,000.00 126,000.00
Kepala Tukang L.03 OH 0.2620 150,000.00 39,300.00
Mandor L.04 OH 0.2650 130,000.00 34,450.00
JUMLAH TENAGA KERJA 839,250.00
B BAHAN
Kayu Papan Kelas III M3 0.2000 2,369,981.25 473,996.25
Paku Biasa 5cm - 12cm Kg 1.5000 20,000.00 30,000.00
Minyak Bekisting Liter 0.4000 3,372.60 1,349.04
Besi Beton Kg 157.5000 23,768.80 3,743,586.00
Kawat Beton Kg 2.2500 32,000.00 72,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
JUMLAH TENAGA KERJA 5,456,521.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 6,295,771.67


E Overhead & Profit 15% x D 944,365.75
F Harga Satuan Pekerjaan (D+E) 7,240,137.43
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg + bekisting)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 85,000.00 480,250.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.5600 120,000.00 187,200.00
Tukang Besi L.02 OH 1.4000 120,000.00 168,000.00
Kepala Tukang L.03 OH 0.3230 150,000.00 48,450.00
Mandor L.04 OH 0.2830 130,000.00 36,790.00
JUMLAH TENAGA KERJA 953,690.00
B BAHAN
Kayu Papan Kelas III M3 0.2700 2,369,981.25 639,894.94
Paku Biasa 5cm - 12cm Kg 2.0000 20,000.00 40,000.00
Minyak Bekisting Liter 0.6000 3,372.60 2,023.56
Besi Beton Kg 210.0000 23,768.80 4,991,448.00
Kawat Beton Kg 3.0000 32,000.00 96,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
JUMLAH TENAGA KERJA 6,904,956.88
C PERALATAN --
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,858,646.88


E Overhead & Profit 15% x D 1,178,797.03
F Harga Satuan Pekerjaan (D+E) 9,037,443.91
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.0500 85,000.00 599,250.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.6500 120,000.00 198,000.00
Tukang Besi L.02 OH 2.1000 120,000.00 252,000.00
Kepala Tukang L.03 OH 0.4030 150,000.00 60,450.00
Mandor L.04 OH 0.3530 130,000.00 45,890.00
JUMLAH TENAGA KERJA 1,188,590.00
B BAHAN
Kayu Papan Kelas III M3 0.4000 2,369,981.25 947,992.50
Paku Biasa 5cm - 12cm Kg 4.0000 20,000.00 80,000.00
Minyak Bekisting Liter 2.0000 3,372.60 6,745.20
Besi Beton Kg 315.0000 23,768.80 7,487,172.00
Kawat Beton Kg 4.5000 32,000.00 144,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
Kayu Balok Kelas II M3 0.1500 3,281,512.50 492,226.88
Playwood 9mm Lembar 3.5000 110,000.00 385,000.00
Dolken Kayu ø 8 -10/400 cm Batang 20.0000 10,996.25 219,925.00
JUMLAH TENAGA KERJA 10,898,651.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,087,241.96
E Overhead & Profit 15% x D 1,813,086.29
F Harga Satuan Pekerjaan (D+E) 13,900,328.25

A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.3500 85,000.00 539,750.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.6500 120,000.00 198,000.00
Tukang Besi L.02 OH 1.4000 120,000.00 168,000.00
Kepala Tukang L.03 OH 0.3330 150,000.00 49,950.00
Mandor L.04 OH 0.3180 130,000.00 41,340.00
JUMLAH TENAGA KERJA 1,030,040.00
B BAHAN
Kayu Papan Kelas III M3 0.3200 2,369,981.25 758,394.00
Paku Biasa 5cm - 12cm Kg 3.2000 20,000.00 64,000.00
Minyak Bekisting Liter 1.6000 3,372.60 5,396.16
Besi Beton Kg 210.0000 23,768.80 4,991,448.00
Kawat Beton Kg 3.0000 32,000.00 96,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
Kayu Balok Kelas II M3 0.1400 3,281,512.50 459,411.75
Playwood 9mm Lembar 2.8000 110,000.00 308,000.00
Dolken Kayu ø 8 -10/400 cm Batang 16.0000 10,996.25 175,940.00
JUMLAH TENAGA KERJA 7,994,180.29
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,024,220.29
E Overhead & Profit 15% x D 1,353,633.04
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

F Harga Satuan Pekerjaan (D+E) 10,377,853.34


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 85,000.00 450,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.3000 120,000.00 156,000.00
Tukang Besi L.02 OH 1.0500 120,000.00 126,000.00
Kepala Tukang L.03 OH 0.2650 150,000.00 39,750.00
Mandor L.04 OH 0.2650 130,000.00 34,450.00
JUMLAH TENAGA KERJA 839,700.00
B BAHAN
Kayu Papan Kelas III M3 0.3200 2,369,981.25 758,394.00
Paku Biasa 5cm - 12cm Kg 3.2000 20,000.00 64,000.00
Minyak Bekisting Liter 1.6000 3,372.60 5,396.16
Besi Beton Kg 157.5000 23,768.80 3,743,586.00
Kawat Beton Kg 2.2500 32,000.00 72,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
Kayu Balok Kelas II M3 0.1200 3,281,512.50 393,781.50
Playwood 9mm Lembar 2.8000 110,000.00 308,000.00
Dolken Kayu ø 8 -10/400 cm Batang 32.0000 10,996.25 351,880.00
JUMLAH TENAGA KERJA 6,832,628.04
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,672,328.04
E Overhead & Profit 15% x D 1,150,849.21
F Harga Satuan Pekerjaan (D+E) 8,823,177.25
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 85,000.00 450,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.3000 120,000.00 156,000.00
Tukang Besi L.02 OH 1.0500 120,000.00 126,000.00
Kepala Tukang L.03 OH 0.2620 150,000.00 39,300.00
Mandor L.04 OH 0.2650 130,000.00 34,450.00
JUMLAH TENAGA KERJA 839,250.00
B BAHAN
Kayu Papan Kelas III M3 0.2400 2,369,981.25 568,795.50
Paku Biasa 5cm - 12cm Kg 3.2000 20,000.00 64,000.00
Minyak Bekisting Liter 1.6000 3,372.60 5,396.16
Besi Beton Kg 157.5000 23,768.80 3,743,586.00
Kawat Beton Kg 2.2500 32,000.00 72,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
Kayu Balok Kelas II M3 0.1600 3,281,512.50 525,042.00
Playwood 9mm Lembar 2.8000 110,000.00 308,000.00
Dolken Kayu ø 8 -10/400 cm Batang 24.0000 10,996.25 263,910.00
JUMLAH TENAGA KERJA 6,686,320.04
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,525,570.04


E Overhead & Profit 15% x D 1,128,835.51
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

F Harga Satuan Pekerjaan (D+E) 8,654,405.55


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.34 Membuat 1 m3 Plat beton bertulang (200 kg + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 85,000.00 480,250.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Tukang Kayu L.02 OH 1.5600 120,000.00 187,200.00
Tukang Besi L.02 OH 1.4000 120,000.00 168,000.00
Kepala Tukang L.03 OH 0.3230 150,000.00 48,450.00
Mandor L.04 OH 0.2830 130,000.00 36,790.00
JUMLAH TENAGA KERJA 953,690.00
B BAHAN
Kayu Papan Kelas III M3 0.2500 2,369,981.25 592,495.31
Paku Biasa 5cm - 12cm Kg 3.0000 20,000.00 60,000.00
Minyak Bekisting Liter 1.2000 3,372.60 4,047.12
Besi Beton Kg 210.0000 23,768.80 4,991,448.00
Kawat Beton Kg 3.0000 32,000.00 96,000.00
Semen Portland Kg 336.0000 1,600.00 537,600.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Kerikil M3 0.8100 504,926.40 408,990.38
Kayu Balok Kelas II M3 0.1050 3,281,512.50 344,558.81
Playwood 9mm Lembar 2.5000 110,000.00 275,000.00
Dolken Kayu ø 8 -10/400 cm Batang 14.0000 10,996.25 153,947.50
JUMLAH TENAGA KERJA 7,653,087.13
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,606,777.13


E Overhead & Profit 15% x D 1,291,016.57
F Harga Satuan Pekerjaan (D+E) 9,897,793.70

A.4.1.1.35 Membuat 1 m1 kolom praktis beton bertulang (11 x 11) cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 85,000.00 15,300.00
Tukang Batu L.02 OH 0.0200 120,000.00 2,400.00
Tukang Kayu L.02 OH 0.0200 120,000.00 2,400.00
Tukang Besi L.02 OH 0.0200 120,000.00 2,400.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0090 130,000.00 1,170.00
JUMLAH TENAGA KERJA 24,570.00
B BAHAN
Kayu Papan Kelas III M3 0.0020 2,369,981.25 4,739.96
Paku Biasa 5cm - 12cm Kg 0.0100 20,000.00 200.00
Besi Beton Kg 3.0000 23,768.80 71,306.40
Kawat Beton Kg 0.0450 32,000.00 1,440.00
Semen Portland Kg 4.0000 1,600.00 6,400.00
Pasir Beton M3 0.0060 350,000.00 2,100.00
Kerikil M3 0.0090 504,926.40 4,544.34
-
-
JUMLAH TENAGA KERJA 90,730.70
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 115,300.70


E Overhead & Profit 15% x D 17,295.11
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

F Harga Satuan Pekerjaan (D+E) 132,595.81


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.36 Membuat 1 m1 ring balok beton bertulang (10 x 15) cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 85,000.00 25,245.00
Tukang Batu L.02 OH 0.0330 120,000.00 3,960.00
Tukang Kayu L.02 OH 0.0330 120,000.00 3,960.00
Tukang Besi L.02 OH 0.0330 120,000.00 3,960.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 40,575.00
B BAHAN
Kayu Papan Kelas III M3 0.0030 2,369,981.25 7,109.94
Paku Biasa 5cm - 12cm Kg 0.0200 20,000.00 400.00
Besi Beton Kg 3.6000 23,768.80 85,567.68
Kawat Beton Kg 0.0500 32,000.00 1,600.00
Semen Portland Kg 5.5000 1,600.00 8,800.00
Pasir Beton M3 0.0090 350,000.00 3,150.00
Kerikil M3 0.0150 504,926.40 7,573.90
-
-
JUMLAH TENAGA KERJA 114,201.52
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 154,776.52


E Overhead & Profit 15% x D 23,216.48
F Harga Satuan Pekerjaan (D+E) 177,993.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1 Pemasangan 1 kg besi profil

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 85,000.00 5,100.00
Tukang Las L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 13,590.00
B BAHAN
Besi Profil Kg 1.1500 16,000.00 18,400.00

JUMLAH TENAGA KERJA 18,400.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,990.00


E Overhead & Profit 15% x D 4,798.50
F Harga Satuan Pekerjaan (D+E) 36,788.50

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 85,000.00 5,100.00
Tukang Las L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 13,590.00
B BAHAN
Besi Baja IWF Kg 1.1500 19,000.00 21,850.00

JUMLAH TENAGA KERJA 21,850.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,440.00


E Overhead & Profit 15% x D 5,316.00
F Harga Satuan Pekerjaan (D+E) 40,756.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.8 Pemasangan 1m2 pintu lipat(follding door)bahan plastik/PVC

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0440 85,000.00 3,740.00
Tukang Kayu L.02 OH 0.4400 120,000.00 52,800.00
Kepala Tukang L.03 OH 0.0440 150,000.00 6,600.00
Mandor L.04 OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 66,000.00
B BAHAN
Pintu PVC (Bathroom) M2 1.0000 350,000.00 350,000.00

-
-
-
-

JUMLAH TENAGA KERJA 350,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 416,000.00


E Overhead & Profit 15% x D 62,400.00
F Harga Satuan Pekerjaan (D+E) 478,400.00

A.4.2.1.10 Pemasangan 1m2 rolling door allumunium

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 85,000.00 85,000.00
Tukang Khusus Allumunium L.02 OH 1.0000 120,000.00 120,000.00
Kepala Tukang L.03 OH 0.1000 150,000.00 15,000.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 226,500.00
B BAHAN
Rolling Door Allumunium M2 1.0000 250,000.00 250,000.00

-
-
-
-

JUMLAH TENAGA KERJA 250,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 476,500.00


E Overhead & Profit 15% x D 71,475.00
F Harga Satuan Pekerjaan (D+E) 547,975.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.11 Pemasangan 1m1 kusen pintu allumunium

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 85,000.00 3,655.00
Tukang Khusus Allumunium L.02 OH 0.0430 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 150,000.00 645.00
Mandor L.04 OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 9,733.00
B BAHAN
Profil Allumunium Meter 1.1000 200,000.00 220,000.00
Skrup Fixer Buah 2.0000 5,000.00 10,000.00
Sealant Tube 0.0600 10,000.00 600.00
-
-
-
-

JUMLAH TENAGA KERJA 230,600.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 240,333.00


E Overhead & Profit 15% x D 36,049.95
F Harga Satuan Pekerjaan (D+E) 276,382.95

A.4.2.1.12 Pemasangan 1m2 pintu allumunium strip lebar 8cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 85,000.00 7,225.00
Tukang Khusus Allumunium L.02 OH 0.0850 120,000.00 10,200.00
Kepala Tukang L.03 OH 0.0085 150,000.00 1,275.00
Mandor L.04 OH 0.0042 130,000.00 546.00
JUMLAH TENAGA KERJA 19,246.00
B BAHAN
Profil Allumunium Meter 4.4000 200,000.00 880,000.00
Allumunium Strip Meter 14.6000 160,000.00 2,336,000.00

-
-
-
-

JUMLAH TENAGA KERJA 3,216,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,235,246.00


E Overhead & Profit 15% x D 485,286.90
F Harga Satuan Pekerjaan (D+E) 3,720,532.90
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.13 Pemasangan 1m2 pintu kaca rangka allumunium

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 44,130.00
B BAHAN
Profil Allumunium Meter 4.4000 200,000.00 880,000.00
Profil Kaca Meter 4.5000 50,000.00 225,000.00
Sealant Tube 0.2700 10,000.00 2,700.00
-
-
-
-

JUMLAH TENAGA KERJA 1,107,700.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,151,830.00


E Overhead & Profit 15% x D 172,774.50
F Harga Satuan Pekerjaan (D+E) 1,324,604.50

A.4.2.1.18 Pemasangan 1m1 / Talang Datar Jurai Seng BJLS20

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 85,000.00 7,225.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 33,225.00
B BAHAN
Seng Plat 3inch x 6inch bjls28 Meter 1.0500 55,000.00 57,750.00
Paku Biasa 1/2inch-1inch Kg 0.1500 20,000.00 3,000.00
Kayu Papan Kelas II M3 0.0190 3,342,281.25 63,503.34
-
-
-
-

JUMLAH TENAGA KERJA 124,253.34


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 157,478.34


E Overhead & Profit 15% x D 23,621.75
F Harga Satuan Pekerjaan (D+E) 181,100.10
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.20 Pemasangan 1m2 rangka besi hollow 1x 40.40.2mm, modul 60 x60 cm, untuk partisi

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Tukang Besi L.02 OH 0.2500 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00 3,750.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 56,690.00
B BAHAN
Rangka Metal Hollow 40.40.2mm Meter 3.5000 23,000.00 80,500.00
Assesoris(perkuatan, las dll) Ls 1.0000 23,000.00 23,000.00
(100% x rangka)
-
-
-
-

JUMLAH TENAGA KERJA 103,500.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 160,190.00


E Overhead & Profit 15% x D 24,028.50
F Harga Satuan Pekerjaan (D+E) 184,218.50

A.4.2.1.21 Pemasangan 1m2 rangka besi hollow 1x 40.40.2mm, modul 60 x60 cm, untuk plafond

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 85,000.00 29,750.00
Tukang Besi L.02 OH 0.3500 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00 5,250.00
Mandor L.04 OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 79,340.00
B BAHAN
Rangka Metal Hollow 40.40.2mm Meter 4.0000 23,000.00 92,000.00
Assesoris(perkuatan, las dll) Ls 1.0000 23,000.00 23,000.00
(100% x rangka)
-
-
-
-

JUMLAH TENAGA KERJA 115,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 194,340.00


E Overhead & Profit 15% x D 29,151.00
F Harga Satuan Pekerjaan (D+E) 223,491.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Batu Bata Merah Bh 70.0000 1,000.00 70,000.00
Semen Portland Kg 11.5000 1,600.00 18,400.00
Pasir Pasang M3 0.0430 350,000.00 15,050.00
-
-
-
-
-
JUMLAH TENAGA KERJA 103,450.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,400.00


E Overhead & Profit 15% x D 21,660.00
F Harga Satuan Pekerjaan (D+E) 166,060.00

A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:5PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 40,950.00
B BAHAN
Batu Bata Merah Bh 70.0000 1,000.00 70,000.00
Semen Portland Kg 9.6800 1,600.00 15,488.00
Pasir Pasang M3 0.0450 350,000.00 15,750.00
-
-
-
-
-
JUMLAH TENAGA KERJA 101,238.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 142,188.00


E Overhead & Profit 15% x D 21,328.20
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

F Harga Satuan Pekerjaan (D+E) 163,516.20


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

Skh.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING(BATAKO)

Skh.4.4.1.1 Pemasangan 1m2 dinding batako 1/2 batako campuran 1SP:3PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1106 85,000.00 9,401.00
Tukang Batu L.02 OH 0.0341 120,000.00 4,092.00
Kepala Tukang L.03 OH 0.0030 150,000.00 450.00
Mandor L.04 OH 0.0052 130,000.00 676.00
JUMLAH TENAGA KERJA 14,619.00
B BAHAN
Batu Batako Bh 21.0000 3,800.00 79,800.00
Semen Portland Kg 5.5450 1,600.00 8,872.00
Pasir Pasang M3 0.0154 350,000.00 5,390.00
-
-
-
-

JUMLAH TENAGA KERJA 94,062.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 108,681.00


E Overhead & Profit 15% x D 16,302.15
F Harga Satuan Pekerjaan (D+E) 124,983.15

Skh.4.4.1.2 Pemasangan 1m2 dinding batako 1/2 batako campuran 1SP:5PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1106 85,000.00 9,401.00
Tukang Batu L.02 OH 0.0341 120,000.00 4,092.00
Kepala Tukang L.03 OH 0.0030 150,000.00 450.00
Mandor L.04 OH 0.0052 130,000.00 676.00
JUMLAH TENAGA KERJA 14,619.00
B BAHAN
Batu Batako Bh 21.0000 3,800.00 79,800.00
Semen Portland Kg 3.7350 1,600.00 5,976.00
Pasir Pasang M3 0.0174 350,000.00 6,090.00
-
-
-
-

JUMLAH TENAGA KERJA 91,866.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,485.00


E Overhead & Profit 15% x D 15,972.75
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

Skh.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING(BATAKO)

F Harga Satuan Pekerjaan (D+E) 122,457.75


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.3 Pemasangan 1m2 plesteran campuran 1SP:3PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 47,700.00
B BAHAN
Semen Portland Kg 7.7760 1,600.00 12,441.60
Pasir Pasang M3 0.0230 350,000.00 8,050.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 20,491.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 68,191.60


E Overhead & Profit 15% x D 10,228.74
F Harga Satuan Pekerjaan (D+E) 78,420.34

A.4.4.2.4 Pemasangan 1m2 plesteran campuran 1SP:4PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 47,700.00
B BAHAN
Semen Portland Kg 6.2400 1,600.00 9,984.00
Pasir Pasang M3 0.0240 350,000.00 8,400.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 18,384.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,084.00


E Overhead & Profit 15% x D 9,912.60
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

F Harga Satuan Pekerjaan (D+E) 75,996.60


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.26 Pemasangan 1m2 finishing siar pasangan batu kali, campuran 1SP:2PP

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 47,700.00
B BAHAN
Semen Portland Kg 6.3400 1,600.00 10,144.00
Pasir Pasang M3 0.0120 350,000.00 4,200.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 14,344.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,044.00


E Overhead & Profit 15% x D 9,306.60
F Harga Satuan Pekerjaan (D+E) 71,350.60

A.4.4.2.27 Pemasangan 1m2 acian

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 31,800.00
B BAHAN
Semen Portland Kg 3.2500 1,600.00 5,200.00
-
-
-
-
-
-
-
JUMLAH TENAGA KERJA 5,200.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,000.00


E Overhead & Profit 15% x D 5,550.00
F Harga Satuan Pekerjaan (D+E) 42,550.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 85,000.00 22,950.00
Tukang Batu L.02 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0140 150,000.00 2,100.00
Mandor L.04 OH 0.0140 130,000.00 1,820.00
JUMLAH TENAGA KERJA 43,070.00
B BAHAN
Ubin Abu-Abu 20cm x 20cm Bh 26.5000 6,000.00 159,000.00
Semen Portland Kg 10.4000 1,600.00 16,640.00
Pasir Pasang M3 0.0450 350,000.00 15,750.00
-
-
-
-
-
JUMLAH TENAGA KERJA 191,390.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 234,460.00


E Overhead & Profit 15% x D 35,169.00
F Harga Satuan Pekerjaan (D+E) 269,629.00

A.4.4.3.4 Pemasangan 1m2 lantai ubin Warna ukuran 40cm x 40cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Tukang Batu L.02 OH 0.1250 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00 1,950.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 39,890.00
B BAHAN
Ubin Warna 40cm x 40cm Bh 6.6300 16,060.00 106,477.80
Semen Portland Kg 9.8000 1,600.00 15,680.00
Semen Warna Kg 1.3000 11,680.00 15,184.00
Pasir Pasang M3 0.0450 350,000.00 15,750.00
-
-
-
-
JUMLAH TENAGA KERJA 153,091.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 192,981.80


E Overhead & Profit 15% x D 28,947.27
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

F Harga Satuan Pekerjaan (D+E) 221,929.07


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.5 Pemasangan 1m2 lantai ubin Warna ukuran 30cm x 30cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 85,000.00 22,100.00
Tukang Batu L.02 OH 0.1300 120,000.00 15,600.00
Kepala Tukang L.03 OH 0.0130 150,000.00 1,950.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 41,340.00
B BAHAN
Ubin Warna 30cm x 30cm Bh 11.8700 8,897.24 105,610.24
Semen Portland Kg 10.0000 1,600.00 16,000.00
Semen Warna Kg 1.5000 11,680.00 17,520.00
Pasir Pasang M3 0.0450 350,000.00 15,750.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 154,880.24
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 154,880.24


E Overhead & Profit 15% x D 23,232.04
F Harga Satuan Pekerjaan (D+E) 178,112.27

A.4.4.3.6 Pemasangan 1m2 lantai ubin Warna ukuran 20cm x 20cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 85,000.00 22,950.00
Tukang Batu L.02 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0140 150,000.00 2,100.00
Mandor L.04 OH 0.0140 130,000.00 1,820.00
JUMLAH TENAGA KERJA 43,070.00
B BAHAN
Ubin Warna 20cm x 20cm Bh 26.5000 4,721.64 125,123.46
Semen Portland Kg 10.4000 1,600.00 16,640.00
Semen Warna Kg 1.6200 11,680.00 18,921.60
Pasir Pasang M3 0.0450 350,000.00 15,750.00
-
-
JUMLAH TENAGA KERJA 176,435.06
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 219,505.06


E Overhead & Profit 15% x D 32,925.76
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

F Harga Satuan Pekerjaan (D+E) 252,430.82


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.46 Pemasangan 1m2 lantai parquet kayu


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 85,000.00 59,500.00
Tukang Kayu L.02 OH 0.3500 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00 5,250.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Parquet M2 11.8700 25,000.00 296,750.00
Lem Kg 10.0000 20,000.00 200,000.00

-
-
-
-
JUMLAH TENAGA KERJA 496,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 608,050.00


E Overhead & Profit 15% x D 91,207.50
F Harga Satuan Pekerjaan (D+E) 699,257.50

A.4.4.3.21 Pemasangan 1m1 plint ubin Warna ukuran 10cm x 40cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 85,000.00 7,650.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 20,450.00
B BAHAN
Plint Ubin Warna 10cm x 40cm Bh 2.6500 7,066.40 18,725.96
Semen Portland Kg 1.1400 1,600.00 1,824.00
Semen Warna Kg 0.1000 11,680.00 1,168.00
Pasir Pasang M3 0.0030 350,000.00 1,050.00
-
-
-
-
JUMLAH TENAGA KERJA 22,767.96
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,217.96


E Overhead & Profit 15% x D 6,482.69
F Harga Satuan Pekerjaan (D+E) 49,700.65
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.53 Pemasangan 1m2 dinding keramik artistik 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 85,000.00 76,500.00
Tukang Batu L.02 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.0450 150,000.00 6,750.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 143,100.00
B BAHAN
Keramik Artistik/Batu Alam Tempel Bh 53.0000 7,500.00 397,500.00
Semen Portland Kg 9.3000 1,600.00 14,880.00
Semen Warna Kg 2.7500 11,680.00 32,120.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
-
-
-
-
JUMLAH TENAGA KERJA 450,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 593,900.00


E Overhead & Profit (maksimum) 15% x D 89,085.00
F Harga Satuan Pekerjaan (D+E) 682,985.00

A.4.4.3.65 Pemasangan 1m2 paving block natural tebal 8cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Tukang Batu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0013 130,000.00 169.00
JUMLAH TENAGA KERJA 110,169.00
B BAHAN
Paving Block Natural M2 1.0100 50,000.00 50,500.00
Pasir Pasang M3 0.0500 350,000.00 17,500.00

-
-
-
-
JUMLAH TENAGA KERJA 68,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 178,169.00


E Overhead & Profit 15% x D 26,725.35
F Harga Satuan Pekerjaan (D+E) 204,894.35
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1 Pemasangan 1m2 langit-langit asbes semen, tebal 4mm, 5mm, dan 6mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 85,000.00 2,550.00
Tukang Kayu L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 150,000.00 1,050.00
Mandor L.04 OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 12,520.00
B BAHAN
Asbes Semen M2 1.1000 50,000.00 55,000.00
Paku Tripleks Kg 0.0100 20,000.00 200.00

-
-
-
-

JUMLAH TENAGA KERJA 55,200.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,720.00


E Overhead & Profit 15% x D 10,158.00
F Harga Satuan Pekerjaan (D+E) 77,878.00

A.4.5.1.2 Pemasangan 1m2 langit-langit akustik ukuran (30 x 30) cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 85,000.00 10,200.00
Tukang Kayu L.02 OH 0.1200 120,000.00 14,400.00
Kepala Tukang L.03 OH 0.0120 150,000.00 1,800.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 27,180.00
B BAHAN
Akustik 30 cm x 30 cm Lembar 12.0000 20,000.00 240,000.00
Paku Tripleks Kg 0.0500 20,000.00 1,000.00

-
-
-
-
-
JUMLAH TENAGA KERJA 241,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 268,180.00


E Overhead & Profit 15% x D 40,227.00
F Harga Satuan Pekerjaan (D+E) 308,407.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.3 Pemasangan 1m2 langit-langit akustik ukuran (30 x 60) cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 85,000.00 10,200.00
Tukang Kayu L.02 OH 0.1200 120,000.00 14,400.00
Kepala Tukang L.03 OH 0.0120 150,000.00 1,800.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 27,180.00
B BAHAN
Akustik 30 cm x 60 cm Lembar 5.8000 35,000.00 203,000.00
Paku Tripleks Kg 0.0500 20,000.00 1,000.00

-
-
-
-
-
JUMLAH TENAGA KERJA 204,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 231,180.00


E Overhead & Profit 15% x D 34,677.00
F Harga Satuan Pekerjaan (D+E) 265,857.00

A.4.5.1.4 Pemasangan 1m2 langit-langit akustik ukuran (60 x 120) cm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 22,650.00
B BAHAN
Akustik 60 cm x 120 cm Lembar 1.5000 50,000.00 75,000.00
Paku Tripleks Kg 0.0500 20,000.00 1,000.00

-
-
-
-
-
JUMLAH TENAGA KERJA 76,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,650.00


E Overhead & Profit 15% x D 14,797.50
F Harga Satuan Pekerjaan (D+E) 113,447.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.5 Pemasangan 1m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4mm, 6mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 22,650.00
B BAHAN
Tripleks Tebal 3mm Lembar 0.3750 63,072.00 23,652.00
Paku Tripleks Kg 0.0300 20,000.00 600.00

-
-
-
-
-
JUMLAH TENAGA KERJA 24,252.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,902.00


E Overhead & Profit 15% x D 7,035.30
F Harga Satuan Pekerjaan (D+E) 53,937.30

D Jumlah (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.5.1.6 Pemasangan 1m2 langit-langit lambrisering kayu, tebal 9mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 85,000.00 68,000.00
Tukang Kayu L.02 OH 0.8000 120,000.00 96,000.00
Kepala Tukang L.03 OH 0.0800 150,000.00 12,000.00
Mandor L.04 OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 181,200.00
B BAHAN
Kayu Papan Lambrisering Tebal 9mm Lembar 0.0150 20,000.00 300.00
Paku Tripleks Kg 0.0100 20,000.00 200.00

-
-
-
-
-
JUMLAH TENAGA KERJA 500.00
C PERALATAN
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 181,700.00


E Overhead & Profit 15% x D 27,255.00
F Harga Satuan Pekerjaan (D+E) 208,955.00

A.4.5.1.7 Pemasangan 1m2 langit-langit gypsum board ukuran (120 x 240) cm, tebal 9mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 16,030.00
B BAHAN
Gypsum Board Tebal 9mm Lembar 0.3640 105,000.00 38,220.00
Paku Skrup 5cm Kg 0.1100 20,000.00 2,200.00

-
-
-
-
-
JUMLAH TENAGA KERJA 40,420.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,450.00


E Overhead & Profit 15% x D 8,467.50
F Harga Satuan Pekerjaan (D+E) 64,917.50

A.4.5.1.8 Pemasangan 1m2 langit-langit Akustik ukuran (60 x 120) cm, berikut rangka alluminium

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Tukang Besi L.02 OH 0.0500 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN
Profil Alluminium T Meter 3.6000 200,000.00 720,000.00
Kawat dia 4mm Kg 0.1500 20,000.00 3,000.00
Ramset Buah 1.0500 50,000.00 52,500.00
Akustik 60 cm x 120 cm Lembar 1.5000 50,000.00 75,000.00
-
-
-
-
JUMLAH TENAGA KERJA 850,500.00
C PERALATAN
-
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 903,000.00


E Overhead & Profit 15% x D 135,450.00
F Harga Satuan Pekerjaan (D+E) 1,038,450.00

A.4.5.1.9 Pemasangan 1m1 list langit-langit kayu profil

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 11,390.00
B BAHAN
List Kayu Profil Meter 1.0500 22,776.00 23,914.80
Paku 5cm Kg 0.0100 20,000.00 200.00
-
-
-
-
-
-
JUMLAH TENAGA KERJA 24,114.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,504.80


E Overhead & Profit 15% x D 5,325.72
F Harga Satuan Pekerjaan (D+E) 40,830.52
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT(PLAFOND)

A.4.5.1.7 Pemasangan 1m2 langit-langit gypsum board ukuran(120x240)cm, tebal 9mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 15,900.00
B BAHAN
Gypsum Board Lembar 0.3640 105,000.00 38,220.00
Paku Skrup Kg 0.1100 20,000.00 2,200.00

-
-
-
-

JUMLAH TENAGA KERJA 40,420.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,320.00


E Overhead & Profit 15% x D 8,448.00
F Harga Satuan Pekerjaan (D+E) 64,768.00

A.4.5.1.9 Pemasangan 1m1 list langit-langit kayu profil

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 21,650.00
B BAHAN
List Kayu Profil Meter 1.0500 22,776.00 23,914.80
Paku Biasa 5cm-7cm Kg 0.0100 20,000.00 200.00

-
-
-
-

JUMLAH TENAGA KERJA 24,114.80


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,764.80


E Overhead & Profit 15% x D 6,864.72
F Harga Satuan Pekerjaan (D+E) 52,629.52
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.32 Pemasangan 1m2 genteng metal

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 30,630.00
B BAHAN
Genteng Metal Buah 1.0200 42,000.00 42,840.00
Paku Biasa 1/2inch-1inch Kg 0.2000 20,000.00 4,000.00

JUMLAH TENAGA KERJA 46,840.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,470.00


E Overhead & Profit 15% x D 11,620.50
F Harga Satuan Pekerjaan (D+E) 89,090.50

A.4.5.2.36 Pemasangan 1m1 nok genteng metal

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0013 130,000.00 169.00
JUMLAH TENAGA KERJA 41,669.00
B BAHAN
Nok Genteng Metal Buah 1.1000 50,000.00 55,000.00
Paku Biasa 1/2inch-1inch Kg 0.0500 20,000.00 1,000.00

JUMLAH TENAGA KERJA 56,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,669.00


E Overhead & Profit 15% x D 14,650.35
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

F Harga Satuan Pekerjaan (D+E) 112,319.35

A.4.5.2.38 Pemasangan 1m2 atap seng gelombang

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 85,000.00 10,200.00
Tukang Kayu L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 19,080.00
B BAHAN
Seng Gelombang 3inch x 6inch bjls28 Lembar 0.7000 46,252.80 32,376.96
Paku Biasa 1/2inch-1inch Kg 0.0200 20,000.00 400.00

JUMLAH TENAGA KERJA 32,776.96


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,856.96


E Overhead & Profit 15% x D 7,778.54
F Harga Satuan Pekerjaan (D+E) 59,635.50

A.4.5.2.39 Pemasangan 1m1 nok atap seng

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 150,000.00 1,050.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 22,980.00
B BAHAN
Seng Plat 3inch x 6inch bjls28 Lembar 0.3000 55,000.00 16,500.00
Paku Biasa 1/2inch-1inch Kg 0.0400 20,000.00 800.00

JUMLAH TENAGA KERJA 17,300.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

D Jumlah (A+B+C) 40,280.00


E Overhead & Profit 15% x D 6,042.00
F Harga Satuan Pekerjaan (D+E) 46,322.00

A.4.5.2.34 Pemasangan 1m2 atap sirap kayu


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1660 85,000.00 14,110.00
Tukang Kayu L.02 OH 0.2500 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00 3,750.00
Mandor L.04 OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 48,900.00
B BAHAN
Sirap Kayu 50000 0.7000 50,000.00 35,000.00
Paku Biasa 1/2inch-1inch Kg 0.0200 20,000.00 400.00

-
-
-
-

JUMLAH TENAGA KERJA 35,400.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 84,300.00


E Overhead & Profit 15% x D 12,645.00
F Harga Satuan Pekerjaan (D+E) 96,945.00

A.4.5.2.38 Pemasangan 1m1 nok sirap


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1250 85,000.00 10,625.00
Tukang Kayu L.02 OH 0.2500 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00 3,750.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 45,155.00
B BAHAN
Seng Plat 3inch x 6inch bjls28 Lembar 0.3000 55,000.00 16,500.00
Paku Biasa 1/2inch-1inch Kg 0.0400 20,000.00 800.00

JUMLAH TENAGA KERJA 17,300.00


C PERALATAN
-
-
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,455.00


E Overhead & Profit 15% x D 9,368.25
F Harga Satuan Pekerjaan (D+E) 71,823.25
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

Skh.4.5.2 HARGA SATUAN PEKERJAAN RANGKA BAJA RINGAN DAN ATAP SPANDECK/METAL ROOF

Skh.4.5.2.1 Pemasangan 1m2 atap spandeck zincalume

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang Kayu L.02 OH 0.0800 120,000.00 9,600.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 13,580.00
B BAHAN
Spandeck Zincallume M2 1.1000 39,000.00 42,900.00
Screw Cteks 12-4 x 50 Buah 6.0000 450.00 2,700.00
Screw Cteks 10 x 16-16 Buah 2.0000 450.00 900.00
-

JUMLAH TENAGA KERJA 46,500.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,080.00


E Overhead & Profit 15% x D 9,012.00
F Harga Satuan Pekerjaan (D+E) 69,092.00

Skh.4.5.2.2 Pemasangan 1m1 pasang nok zincalume

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang Kayu L.02 OH 0.0800 120,000.00 9,600.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 13,580.00
B BAHAN
Nok Zincallume Tebal 0.35mm Meter 1.1000 36,000.00 39,600.00
Screw Cteks 10 x 16-16 Buah 6.0000 450.00 2,700.00

JUMLAH TENAGA KERJA 42,300.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,880.00


E Overhead & Profit 15% x D 8,382.00
F Harga Satuan Pekerjaan (D+E) 64,262.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

Skh.4.5.2 HARGA SATUAN PEKERJAAN RANGKA BAJA RINGAN DAN ATAP SPANDECK/METAL ROOF

Skh.4.5.2.3 Pemasangan 1m2 kuda-kuda baja ringan+reng untuk atap asbes/spandeck

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 79,000.00
B BAHAN
Baja Ringan C-75.0.8 Meter 1.4880 73,000.00 108,624.00
Baja Ringan C-75.0.6 Meter 2.2320 73,000.00 162,936.00
Baut(Screw driver) Buah 28.0000 200.00 5,600.00
Dinabolt Buah 1.6000 3,000.00 4,800.00
Reng Baja Ringan Meter 3.6000 34,000.00 122,400.00
Talang Jurai Baja Ringan Meter 0.1240 18,000.00 2,232.00

JUMLAH TENAGA KERJA 406,592.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 485,592.00


E Overhead & Profit 15% x D 72,838.80
F Harga Satuan Pekerjaan (D+E) 558,430.80

Skh.4.5.2.4 Pemasangan 1m2 kuda-kuda baja ringan+reng untuk atap genteng biasa/metal

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 79,000.00
B BAHAN
Baja Ringan C-75.0.8 Meter 1.4880 73,000.00 108,624.00
Baja Ringan C-75.0.6 Meter 2.2320 73,000.00 162,936.00
Baut(Screw driver) Buah 28.0000 200.00 5,600.00
Dinabolt Buah 1.6000 3,000.00 4,800.00
Reng Baja Ringan Meter 5.4000 34,000.00 183,600.00
Talang Jurai Baja Ringan Meter 0.1240 18,000.00 2,232.00

JUMLAH TENAGA KERJA 467,792.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 546,792.00


E Overhead & Profit 15% x D 82,018.80
F Harga Satuan Pekerjaan (D+E) 628,810.80
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 85,000.00 85,000.00
Tukang Kayu L.02 OH 3.0000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00 45,000.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 496,500.00
B BAHAN
Kayu Papan Kelas I M3 0.0400 4,595,853.75 183,834.15
Lem Kayu Kg 0.5000 20,000.00 10,000.00

JUMLAH TENAGA KERJA 193,834.15


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 690,334.15


E Overhead & Profit 15% x D 103,550.12
F Harga Satuan Pekerjaan (D+E) 793,884.27

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 85,000.00 85,000.00
Tukang Kayu L.02 OH 3.0000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00 45,000.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 496,500.00
B BAHAN
Kayu Papan Kelas II M3 0.4000 3,342,281.25 1,336,912.50
Lem Kayu Kg 0.5000 20,000.00 10,000.00

JUMLAH TENAGA KERJA 1,346,912.50


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,843,412.50


E Overhead & Profit 15% x D 276,511.88
F Harga Satuan Pekerjaan (D+E) 2,119,924.38
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 Pemasangan 1 buah kunci tanam antik

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 85,000.00 5,100.00
Tukang Kayu L.02 OH 0.6000 120,000.00 72,000.00
Kepala Tukang L.03 OH 0.0600 150,000.00 9,000.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 86,490.00
B BAHAN
Kunci Tanam Antik Bh 1.0000 121,413.60 121,413.60

JUMLAH TENAGA KERJA 121,413.60


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 207,903.60


E Overhead & Profit 15% x D 31,185.54
F Harga Satuan Pekerjaan (D+E) 239,089.14

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 69,000.00
B BAHAN
Kunci Tanam Biasa Bh 1.0000 73,426.32 73,426.32

JUMLAH TENAGA KERJA 73,426.32


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 142,426.32


E Overhead & Profit 15% x D 21,363.95
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

F Harga Satuan Pekerjaan (D+E) 163,790.27


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 85,000.00 425.00
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 68,315.00
B BAHAN
Kunci Tanam Kamar Mandi Bh 1.0000 50,000.00 50,000.00

JUMLAH TENAGA KERJA 50,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 118,315.00


E Overhead & Profit 15% x D 17,747.25
F Harga Satuan Pekerjaan (D+E) 136,062.25

A.4.6.2.4 Pemasangan 1 buah kunci silinder

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 85,000.00 425.00
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 68,315.00
B BAHAN
Kunci Silinder Bh 1.0000 50,000.00 50,000.00

JUMLAH TENAGA KERJA 50,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 118,315.00


E Overhead & Profit 15% x D 17,747.25
F Harga Satuan Pekerjaan (D+E) 136,062.25
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.5 Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 85,000.00 1,275.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 21,629.00
B BAHAN
Engsel Pintu Bh 1.0000 25,306.67 25,306.67

JUMLAH TENAGA KERJA 25,306.67


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,935.67


E Overhead & Profit 15% x D 7,040.35
F Harga Satuan Pekerjaan (D+E) 53,976.02

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0005 130,000.00 65.00
JUMLAH TENAGA KERJA 14,415.00
B BAHAN
Engsel Jendela Kupu-Kupu Bh 1.0000 7,066.40 7,066.40

JUMLAH TENAGA KERJA 7,066.40


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,481.40


E Overhead & Profit 15% x D 3,222.21
F Harga Satuan Pekerjaan (D+E) 24,703.61
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.7 Pemasangan 1 buah engsel angin

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0005 130,000.00 65.00
JUMLAH TENAGA KERJA 27,915.00
B BAHAN
Engsel Angin Bh 1.0000 6,000.00 6,000.00

JUMLAH TENAGA KERJA 6,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,915.00


E Overhead & Profit 15% x D 5,087.25
F Harga Satuan Pekerjaan (D+E) 39,002.25

A.4.6.2.8 Pemasangan 1 buah spring knip

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 85,000.00 1,275.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,565.00
B BAHAN
Spring Knip Bh 1.0000 10,000.00 10,000.00

JUMLAH TENAGA KERJA 10,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 32,565.00


E Overhead & Profit 15% x D 4,884.75
F Harga Satuan Pekerjaan (D+E) 37,449.75
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.9 Pemasangan 1 buah kait angin

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 85,000.00 1,275.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,565.00
B BAHAN
Kait Angin Bh 1.0000 5,428.28 5,428.28

JUMLAH TENAGA KERJA 5,428.28


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,993.28


E Overhead & Profit 15% x D 4,198.99
F Harga Satuan Pekerjaan (D+E) 32,192.27

A.4.6.2.10 Pemasangan 1 buah door closer

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 72,140.00
B BAHAN
Door Closer Set 1.0000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,140.00


E Overhead & Profit 15% x D 14,571.00
F Harga Satuan Pekerjaan (D+E) 111,711.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.11 Pemasangan 1 buah kunci slot

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 28,830.00
B BAHAN
Kunci Slot Bh 1.0000 15,000.00 15,000.00

JUMLAH TENAGA KERJA 15,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,830.00


E Overhead & Profit 15% x D 6,574.50
F Harga Satuan Pekerjaan (D+E) 50,404.50

A.4.6.2.16 Pemasangan 1 m2 kaca tebal 3mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 85,000.00 1,275.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 21,629.00
B BAHAN
Kaca Tebal 3mm M2 1.1000 80,000.00 88,000.00
Sealant Kg 0.0500 10,000.00 500.00

JUMLAH TENAGA KERJA 88,500.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,129.00


E Overhead & Profit 15% x D 16,519.35
F Harga Satuan Pekerjaan (D+E) 126,648.35
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 85,000.00 1,275.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 21,629.00
B BAHAN
Kaca Tebal 5mm M2 1.1000 134,904.00 148,394.40
Sealant Kg 0.0500 10,000.00 500.00

JUMLAH TENAGA KERJA 148,894.40


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 170,523.40


E Overhead & Profit 15% x D 25,578.51
F Harga Satuan Pekerjaan (D+E) 196,101.91
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 85,000.00 5,950.00
Tukang Cat L.02 OH 0.0090 120,000.00 1,080.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 8,320.00
B BAHAN
Cat Menie Kg 0.2000 18,886.56 3,777.31
Plamuur Kayu Kg 0.1500 18,886.56 2,832.98
Cat Dasar Kayu Kg 0.1700 18,886.56 3,210.72
Cat Penutup Kayu Kg 0.2600 60,385.60 15,700.26
Kuas Bh 0.0100 17,537.52 175.38
Pengencer Kg 0.0300 29,678.88 890.37
Ampelas Lembar 0.2000 4,496.80 899.36

JUMLAH TENAGA KERJA 27,486.37


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,806.37


E Overhead & Profit 15% x D 5,370.96
F Harga Satuan Pekerjaan (D+E) 41,177.32

A.4.7.1.8 Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Mandor L.04 OH 0.0060 130,000.00 780.00

JUMLAH TENAGA KERJA 9,280.00


B BAHAN
Residu atau Ter Liter 0.3500 11,113.52 3,889.73

JUMLAH TENAGA KERJA 3,889.73


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,169.73


E Overhead & Profit 15% x D 1,975.46
F Harga Satuan Pekerjaan (D+E) 15,145.19
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.10Pengecatan 1 m2 Tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang Cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 150,000.00 945.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 10,595.00
B BAHAN
Plamuur Tembok Kg 0.1500 6,424.00 963.60
Cat Dasar Tembok Kg 0.1700 18,886.56 3,210.72
Cat Penutup Tembok Kg 0.2600 55,888.80 14,531.09

JUMLAH TENAGA KERJA 18,705.40


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 29,300.40


E Overhead & Profit 15% x D 4,395.06
F Harga Satuan Pekerjaan (D+E) 33,695.46

A.4.7.1.16Pengecatan 1 m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang Cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 29,025.00
B BAHAN
Cat Menie Besi Kg 0.1000 18,886.56 1,888.66
Kuas Bh 0.0100 17,537.52 175.38

JUMLAH TENAGA KERJA 2,064.03


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,089.03


E Overhead & Profit 15% x D 4,663.35
F Harga Satuan Pekerjaan (D+E) 35,752.39
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 Pemasangan 1 buah closet duduk/monoblock

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.3000 85,000.00 280,500.00
Tukang Batu L.02 OH 1.1000 120,000.00 132,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 434,800.00
B BAHAN
Closet Duduk Unit 1.0000 2,900,000.00 2,900,000.00
Perlengkapan Closet Du( 6% x Closet Duduk) Ls 0.0600 2,900,000.00 174,000.00

JUMLAH TENAGA KERJA 3,074,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,508,800.00


E Overhead & Profit 15% x D 526,320.00
F Harga Satuan Pekerjaan (D+E) 4,035,120.00

A.5.1.1.2 Pemasangan 1 buah closet jongkok porselin

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 85,000.00 85,000.00
Tukang Batu L.02 OH 1.5000 120,000.00 180,000.00
Kepala Tukang L.03 OH 0.1500 150,000.00 22,500.00
Mandor L.04 OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 308,300.00
B BAHAN
Closet Jongkok Porslen Unit 1.0000 541,000.00 541,000.00
Semen Portland Kg 6.0000 1,600.00 9,600.00
Pasir Pasang M3 0.0100 350,000.00 3,500.00

JUMLAH TENAGA KERJA 554,100.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 862,400.00


E Overhead & Profit 15% x D 129,360.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

F Harga Satuan Pekerjaan (D+E) 991,760.00


Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.5 Pemasangan 1 buah wastafel

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 85,000.00 102,000.00
Tukang Batu L.02 OH 1.4500 120,000.00 174,000.00
Kepala Tukang L.03 OH 0.1500 150,000.00 22,500.00
Mandor L.04 OH 0.0600 130,000.00 7,800.00
JUMLAH TENAGA KERJA 306,300.00
B BAHAN
Wastafel Unit 1.2000 825,000.00 990,000.00
Semen Portland Kg 6.0000 1,600.00 9,600.00
Pasir Pasang M3 0.0100 350,000.00 3,500.00
Perlengkapan Wastafel ( 12% x Wastafel) Ls 0.1200 825,000.00 99,000.00

JUMLAH TENAGA KERJA 1,102,100.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,408,400.00


E Overhead & Profit 15% x D 211,260.00
F Harga Satuan Pekerjaan (D+E) 1,619,660.00

A.5.1.1.7 Pemasangan 1 buah bak fibreglass vol. 1m3

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 85,000.00 255,000.00
Tukang Batu L.02 OH 4.5000 120,000.00 540,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.9000 130,000.00 117,000.00
JUMLAH TENAGA KERJA 919,500.00
B BAHAN
Bak Fibreglass Unit 1.0000 500,000.00 500,000.00
Perlengkapan Bak Fibreg( 12% x Bak Fibreglass) Ls 0.1200 500,000.00 60,000.00

JUMLAH TENAGA KERJA 560,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,479,500.00


E Overhead & Profit 15% x D 221,925.00
F Harga Satuan Pekerjaan (D+E) 1,701,425.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.10 Pemasangan 1 buah bak air fibreglass vol. 1m3

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang Batu L.02 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.0450 150,000.00 6,750.00
Mandor L.04 OH 0.0160 130,000.00 2,080.00
JUMLAH TENAGA KERJA 88,330.00
B BAHAN
Bak Fibreglass Unit 1.0000 500,000.00 500,000.00
Perlengkapan Bak Fibreg( 12% x Bak Fibreglass) Ls 0.1200 825,000.00 99,000.00

JUMLAH TENAGA KERJA 599,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 687,330.00


E Overhead & Profit 15% x D 103,099.50
F Harga Satuan Pekerjaan (D+E) 790,429.50

A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 85,000.00 2,550.00
Tukang Batu L.02 OH 0.3000 120,000.00 36,000.00
Kepala Tukang L.03 OH 0.0300 150,000.00 4,500.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
Bak Cuci Piring Stainlessteel Unit 1.0000 400,000.00 400,000.00
Waterdrain Bh 1.0000 150,000.00 150,000.00

JUMLAH TENAGA KERJA 550,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 595,000.00


E Overhead & Profit 15% x D 89,250.00
F Harga Satuan Pekerjaan (D+E) 684,250.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.14 Pemasangan 1 buah floor drain

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Floor Drain Unit 1.0000 15,000.00 15,000.00

JUMLAH TENAGA KERJA 15,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,000.00


E Overhead & Profit 15% x D 4,500.00
F Harga Satuan Pekerjaan (D+E) 34,500.00

A.5.1.1.18 Pemasangan 1 m1 pipa galvanis diameter 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 85,000.00 4,590.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Pipa Galvanis diameter 1/2inch Meter 1.2000 21,000.00 25,200.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 21,000.00 7,350.00

JUMLAH TENAGA KERJA 32,550.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,800.00


E Overhead & Profit 15% x D 7,920.00
F Harga Satuan Pekerjaan (D+E) 60,720.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Batu L.02 OH 0.4000 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00 6,000.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 55,500.00
B BAHAN
Kran Air diameter 1/2inch Bh 1.0000 21,000.00 21,000.00
Sealtape Bh 0.2500 5,000.00 1,250.00

JUMLAH TENAGA KERJA 22,250.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,750.00


E Overhead & Profit 15% x D 11,662.50
F Harga Satuan Pekerjaan (D+E) 89,412.50

A.5.1.1.19 Pemasangan 1 buah kran diameter 3/4"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 85,000.00 850.00
Tukang Batu L.02 OH 0.4000 120,000.00 48,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00 6,000.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 55,500.00
B BAHAN
Kran Air diameter 3/4inch Bh 1.0000 21,000.00 21,000.00
Sealtape Bh 0.2500 5,000.00 1,250.00

JUMLAH TENAGA KERJA 22,250.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,750.00


E Overhead & Profit 15% x D 11,662.50
F Harga Satuan Pekerjaan (D+E) 89,412.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.20 Pemasangan 1 m1 pipa galvanis diameter 3/4"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 85,000.00 4,590.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Pipa Galvanis diameter 3/4inch Meter 1.2000 25,000.00 30,000.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 25,000.00 8,750.00

JUMLAH TENAGA KERJA 38,750.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,000.00


E Overhead & Profit 15% x D 8,850.00
F Harga Satuan Pekerjaan (D+E) 67,850.00

A.5.1.1.21 Pemasangan 1 m1 pipa galvanis diameter 1"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 85,000.00 4,590.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Pipa Galvanis diameter 1inch Meter 1.2000 28,000.00 33,600.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 28,000.00 9,800.00

JUMLAH TENAGA KERJA 43,400.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,650.00


E Overhead & Profit 15% x D 9,547.50
F Harga Satuan Pekerjaan (D+E) 73,197.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.22 Pemasangan 1 m1 pipa galvanis diameter 1 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 85,000.00 9,180.00
Tukang Batu L.02 OH 0.1800 120,000.00 21,600.00
Kepala Tukang L.03 OH 0.0180 150,000.00 2,700.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 34,130.00
B BAHAN
Pipa Galvanis diameter 1 1/2inch Meter 1.2000 33,000.00 39,600.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 33,000.00 11,550.00

JUMLAH TENAGA KERJA 51,150.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,280.00


E Overhead & Profit 15% x D 12,792.00
F Harga Satuan Pekerjaan (D+E) 98,072.00

A.5.1.1.23 Pemasangan 1 m1 pipa galvanis diameter 3"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 85,000.00 11,475.00
Tukang Batu L.02 OH 0.2250 120,000.00 27,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00 3,450.00
Mandor L.04 OH 0.0070 130,000.00 910.00
JUMLAH TENAGA KERJA 42,835.00
B BAHAN
Pipa Galvanis diameter 3inch Meter 1.2000 71,000.00 85,200.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 71,000.00 24,850.00

JUMLAH TENAGA KERJA 110,050.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 152,885.00


E Overhead & Profit 15% x D 22,932.75
F Harga Satuan Pekerjaan (D+E) 175,817.75
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.24 Pemasangan 1 m1 pipa galvanis diameter 4"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 85,000.00 11,475.00
Tukang Batu L.02 OH 0.2250 120,000.00 27,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00 3,450.00
Mandor L.04 OH 0.0070 130,000.00 910.00
JUMLAH TENAGA KERJA 42,835.00
B BAHAN
Pipa Galvanis diameter 4inch Meter 1.2000 88,000.00 105,600.00
Perlengkapan Pipa Galv( 35% x Pipa Galvanis) % 0.3500 88,000.00 30,800.00

JUMLAH TENAGA KERJA 136,400.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 179,235.00


E Overhead & Profit 15% x D 26,885.25
F Harga Satuan Pekerjaan (D+E) 206,120.25

A.5.1.1.25 Pemasangan 1 m1 pipa PVC Type AW diameter 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang Batu L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 11,420.00
B BAHAN
Pipa PVC Type AW diameter 1/2inch Meter 1.2000 6,000.00 7,200.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 6,000.00 2,100.00

JUMLAH TENAGA KERJA 9,300.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,720.00


E Overhead & Profit 15% x D 3,108.00
F Harga Satuan Pekerjaan (D+E) 23,828.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.26 Pemasangan 1 m1 pipa PVC Type AW diameter 3/4"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang Batu L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 11,420.00
B BAHAN
Pipa PVC Type AW diameter 3/4inch Meter 1.2000 7,000.00 8,400.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 7,000.00 2,450.00

JUMLAH TENAGA KERJA 10,850.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,270.00


E Overhead & Profit 15% x D 3,340.50
F Harga Satuan Pekerjaan (D+E) 25,610.50

A.5.1.1.27 Pemasangan 1 m1 pipa PVC Type AW diameter 1"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang Batu L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 11,420.00
B BAHAN
Pipa PVC Type AW diameter 1inch Meter 1.2000 10,000.00 12,000.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 10,000.00 3,500.00

JUMLAH TENAGA KERJA 15,500.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 26,920.00


E Overhead & Profit 15% x D 4,038.00
F Harga Satuan Pekerjaan (D+E) 30,958.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.28 Pemasangan 1 m1 pipa PVC Type AW diameter 1 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 85,000.00 4,590.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 17,130.00
B BAHAN
Pipa PVC Type AW diameter 1 1/2inch Meter 1.2000 12,000.00 14,400.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 12,000.00 4,200.00

JUMLAH TENAGA KERJA 18,600.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,730.00


E Overhead & Profit 15% x D 5,359.50
F Harga Satuan Pekerjaan (D+E) 41,089.50

A.5.1.1.29 Pemasangan 1 m1 pipa PVC Type AW diameter 2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 85,000.00 4,590.00
Tukang Batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.0090 150,000.00 1,350.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 17,130.00
B BAHAN
Pipa PVC Type AW diameter 2inch Meter 1.2000 15,000.00 18,000.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 15,000.00 5,250.00

JUMLAH TENAGA KERJA 23,250.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,380.00


E Overhead & Profit 15% x D 6,057.00
F Harga Satuan Pekerjaan (D+E) 46,437.00
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.30 Pemasangan 1 m1 pipa PVC Type AW diameter 2 1/2"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 85,000.00 6,885.00
Tukang Batu L.02 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0135 150,000.00 2,025.00
Mandor L.04 OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 25,630.00
B BAHAN
Pipa PVC Type AW diameter 2 1/2inch Meter 1.2000 18,000.00 21,600.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 18,000.00 6,300.00

JUMLAH TENAGA KERJA 27,900.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,530.00


E Overhead & Profit 15% x D 8,029.50
F Harga Satuan Pekerjaan (D+E) 61,559.50

A.5.1.1.31 Pemasangan 1 m1 pipa PVC Type AW diameter 3"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 85,000.00 6,885.00
Tukang Batu L.02 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0135 150,000.00 2,025.00
Mandor L.04 OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 25,630.00
B BAHAN
Pipa PVC Type AW diameter 3inch Meter 1.2000 22,000.00 26,400.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 22,000.00 7,700.00

JUMLAH TENAGA KERJA 34,100.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,730.00


E Overhead & Profit 15% x D 8,959.50
F Harga Satuan Pekerjaan (D+E) 68,689.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.32 Pemasangan 1 m1 pipa PVC Type AW diameter 4"

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 85,000.00 6,885.00
Tukang Batu L.02 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.0135 150,000.00 2,025.00
Mandor L.04 OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 25,630.00
B BAHAN
Pipa PVC Type AW diameter 4inch Meter 1.2000 26,000.00 31,200.00
Perlengkapan Pipa PVC Type ( 35% x Pipa PVC) % 0.3500 26,000.00 9,100.00

JUMLAH TENAGA KERJA 40,300.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 65,930.00


E Overhead & Profit 15% x D 9,889.50
F Harga Satuan Pekerjaan (D+E) 75,819.50
Analisis Harga Satuan Pekerjaan (AHSP)
Bidang Cipta Karya

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL

A.8.4.6.1 (K3)Pemasangan 1 buah titik lampu

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Upah % 1.0000 441,000.00 441,000.00
-
JUMLAH TENAGA KERJA 441,000.00
B BAHAN
Pipa Listrik 5/8 inch Batang 3.0000 7,500.00 22,500.00
Kabel Meter 24.0000 10,000.00 240,000.00
T Dus Bh 3.0000 2,500.00 7,500.00
L Bow Bh 4.0000 2,500.00 10,000.00
Las Dop Bh 3.0000 7,500.00 22,500.00
Klem Bh 24.0000 250.00 6,000.00
Mangkok Bh 1.0000 7,500.00 7,500.00
Saklar Bh 1.0000 75,000.00 75,000.00
Fitting Bh 1.0000 50,000.00 50,000.00

JUMLAH TENAGA KERJA 441,000.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 882,000.00


E Overhead & Profit 15% x D 132,300.00
F Harga Satuan Pekerjaan (D+E) 1,014,300.00

A.8.4.6.2 (K3)Pemasangan 1 buah MCB

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Upah % 1.0000 808,500.00 808,500.00
-
JUMLAH TENAGA KERJA 808,500.00
B BAHAN
Pipa Listrik 5/8 inch Batang 3.0000 7,500.00 22,500.00
Kabel Meter 24.0000 10,000.00 240,000.00
T Dus Bh 3.0000 2,500.00 7,500.00
L Bow Bh 4.0000 2,500.00 10,000.00
Las Dop Bh 3.0000 7,500.00 22,500.00
Klem Bh 24.0000 250.00 6,000.00
MCB Bh 1.0000 500,000.00 500,000.00

JUMLAH TENAGA KERJA 808,500.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,617,000.00


E Overhead & Profit 15% x D 242,550.00
F Harga Satuan Pekerjaan (D+E) 1,859,550.00
CV.CITRAJAYA ABADI
Jl. Limbo Wolio No. ..... Kel.Katobengke Kec. Betoambari Kota Baubau

SCHEDULE PELAKSANAAN PEKERJAAN


PEKERJAAN : PALAPA RING MIDDLE PACKAGE OPERATIONAL ROOM PLAN
LOKASI : KEC.BETOAMBARI KOTA BAUBAU
T.A : 2017
VOLUME : 1(SATU)PAKET

NO.MATA BULAN KE
NILAI PEKERJAAN
PEMBAYARA URAIAN BOBOT I II III IV KETERANGAN
(Rp)
N (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

PEKERJAAN PERSIAPAN
Pekerjaan Keselamatan dan Kesehatan Kerja (K3) 32,505,000.00 4.09 0.68 0.68 0.68 0.68 0.68 0.68 100
A.2.2.1.2 Pembuatan 1m2 pagar sementara dari seng gelombang tinggi 2 meter 32,681,516.59 4.11 1.03 1.03 1.03 1.03
Papan Nama Proyek 350,000.00 0.04 0.04
Barak Kerja 5,000,000.00 0.63 0.13 0.13 0.13 0.13 0.13
Penyediaan Air Bersih 5,000,000.00 0.63 0.10 0.10 0.10 0.10 0.10 0.10
A.2.2.1.4 Pengukuran dan Pasangan Bowplank 4,543,536.08 0.57 0.14 0.14 0.14 0.14
PEKERJAAN TANAH DAN PASIR -
A.2.3.1.2 Pek.Galian Tanah Biasa 4,573,775.62 0.57 0.29 0.29
A.2.3.1.9 Pek.Urugan Tanah Kembali 907,164.56 0.11 0.11
A.2.3.1.11_a Pek. Urugan Tanah Bawah Lantai 12,833,632.00 1.61 0.81 0.81
A.2.3.1.11 Pek.Pasir Urug Bawah Pondasi 1,695,477.55 0.21 0.21
A.2.3.1.11 Pek.Pasir Urug Bawah lantai 15,414,600.00 1.94 0.97 0.97
PEKERJAAN BATU DAN PASANGAN -
A.3.2.1.9 Pek.Pasangan Batu Kosong Pondasi 6,907,056.61 0.87 0.87
A.3.2.1.2 Pek.Pasangan Batu Gunung Pondasi 1:4 66,067,770.66 8.30 2.77 2.77 2.77
A.4.4.1.9 Pek.Pasangan Batu Bata 1/2 Batu 1:4 52,683,780.45 6.62 2.21 2.21 2.21
PEKERJAAN STRUKTUR BETON BERTULANG -
A.4.1.1.28 Pek.Pondasi Peton Bertulang 15,425,112.78 1.94 0.97 0.97
A.4.1.1.29 Pek.Sloof Beton Bertulang 21,452,837.91 2.70 1.35 1.35
A.4.1.1.30 Pek.Kolom Beton Bertulang 31,075,230.28 3.91 0.98 0.98 0.98 0.98
A.4.1.1.31 Pek.Balok Beton Bertulang 32,242,693.09 4.05 1.35 1.35 1.35 75
A.4.1.1.34 Pek.Plat Lantai Beton Bertulang 45,133,939.26 5.67 1.89 1.89 1.89
A.4.1.1.4 Pek.Bonton Lantai kerja bawah poor plat 258,753.70 0.03 0.03
PEKERJAAN PLASTERAN DAN ACIAN -
A.4.4.2.4 Pek.Plasteran Dinding 48,220,982.65 6.06 1.21 1.21 1.21 1.21 1.21
A.4.4.2.27 Pek.Acian Dinding 26,998,613.25 3.39 0.68 0.68 0.68 0.68 0.68
PEKERJAAN PASANGAN KERAMIK DAN RABAT LANTAI -
A.4.4.3.4 Pek. Pasangan Keramik Ruangan 40x40 cm 1:5 18,863,970.95 2.37 0.59 0.59 0.59 0.59
A.4.4.3.21 Pek. Pasangan Tegel Plint Keramik 10 x 40 cm 1:5 8,235,398.37 1.04 0.26 0.26 0.26 0.26
A.4.4.3.6 Pek. Pasangan Tegel Anti Slip KM/WC 20x20 cm 1:5 1,009,723.28 0.13 0.03 0.03 0.03 0.03
A.4.4.3.6 Pek. Pangan Tegel Keramik Dinding KM/WC 20x20 cm 1:5 4,038,893.10 0.51 0.13 0.13 0.13 0.13

Jangka Waktu Pelaksanaan ……………. (……………..) Hari Kalender


A.4.1.1.4 Pek. Rabat Beton Lantai 1:3:5 7,697,922.55 0.97 0.24 0.24 0.24 0.24
PEKERJAAN KUSEN, PINTU, JENDELA DAN PERLENGKAPAN -
A.4.2.1.11 Pek. Kusen Pintu / Jendela & ventilasi Allumunium 22,461,642.35 2.82 0.40 0.40 0.40 0.40 0.40 0.40 0.40
A.4.6.1.5 Pek. Pintu Panil # 3 cm 7,313,658.86 0.92 0.13 0.13 0.13 0.13 0.13 0.13 0.13
A.4.2.1.12 Pek. Pintu Allumunium 12,556,798.54 1.58 0.23 0.23 0.23 0.23 0.23 0.23 0.23
A.4.2.1.8 Pek. Pintu Kamar Mandi 807,300.00 0.10 0.01 0.01 0.01 0.01 0.01 0.01 0.01
A.4.2.1.12 Pek. Daun Jendela Allumunium 5,281,668.50 0.66 0.09 0.09 0.09 0.09 0.09 0.09 0.09
A.4.6.2.17 Pek. Pasangan Kaca Polos 5mm 1,333,100.78 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP -
Skh.4.5.2.3 Pek. Kuda-Kuda Baja Ringan 56,959,941.60 7.16 1.02 1.02 1.02 1.02 1.02 1.02 1.02
50
Skh.4.5.2.1 Pek. Atap Zincallume 7,047,384.00 0.89 0.13 0.13 0.13 0.13 0.13 0.13 0.13
A.4.5.2.36 Pek. Pas. Nok Zincalume 771,144.00 0.10 0.01 0.01 0.01 0.01 0.01 0.01 0.01
PEKERJAAN ALAT-ALAT GANTUNG -
A.4.6.2.2 Pas. Kunci Tanam 2 x Slaag 1,637,902.68 0.21 0.04 0.04 0.04 0.04 0.04
A.4.6.2.5 Pas. Engsel Pintu Kuningan 1,295,424.51 0.16 0.03 0.03 0.03 0.03 0.03
A.4.6.2.11 Pas. Grendel Pintu 504,045.00 0.06 0.01 0.01 0.01 0.01 0.01
A.4.6.2.11 Pas. Grendel Jendela 201,618.00 0.03 0.01 0.01 0.01 0.01 0.01
A.4.6.2.6 Pas. Enggsel Jendela 98,814.44 0.01 0.00 0.00 0.00 0.00 0.00
A.4.6.2.9 Pas. Kait Anggin 257,538.18 0.03 0.01 0.01 0.01 0.01 0.01
PEKERJAAN INSTALASI LISTRIK -
Pas. Titik Instalasi Listrik 4,200,000.00 0.53 0.18 0.18 0.18
Pas.. Lampu Philips 20 Watt 400,000.00 0.05 0.02 0.02 0.02
Pas.. Lampu Philips 40 Watt (neon) 600,000.00 0.08 0.03 0.03 0.03
Pas.Saklar Ganda 200,000.00 0.03 0.01 0.01 0.01
Pas. Saklar Tunggal 90,000.00 0.01 0.00 0.00 0.00
Pas. Stop Kontak 400,000.00 0.05 0.02 0.02 0.02
Pas. AC indor 40,000,000.00 5.03 1.68 1.68 1.68
Pas. Box Sekring (MCB) 750,000.00 0.09 0.03 0.03 0.03
PEKERJAAN RANGKA PLAFOND DAN PLAFOND -
A.4.2.1.20 Pek.Pasangan Rangka Plafond Hollow 1x40.40.2mm 15,658,572.50 1.97 0.98 0.98
A.4.5.1.7 Pek. Pasangan Plafond Gypsum board 5,505,280.00 0.69 0.35 0.35 25
Pek.Pasangan List Plafond Gypsum 4,142,500.00 0.52 0.26 0.26
PEKERJAAN SANITASI -
A.5.1.1.1 Pemasangan Klosed Duduk 4,035,120.00 0.51 0.25 0.25
A.5.1.1.23 Pipa GI Dia 3" 4,395,443.75 0.55 0.28 0.28
A.5.1.1.14 Floor Drain 34,500.00 0.00 0.00 0.00
A.5.1.1.5 Wastafel 1,619,660.00 0.20 0.10 0.10
A.5.1.1.12 Bak Cuci 684,250.00 0.09 0.04 0.04
A.5.1.1.31 Pipa PVC (saluran air kotor) dia 3" 2,472,822.00 0.31 0.16 0.16
A.5.1.1.25 Pipa PVC (saluran air bersig) dia1/2" 1,239,056.00 0.16 0.08 0.08
Pek.Saluran Drainase Pasangan Batu 12,314,933.79 1.55 0.77 0.77
Tower air Bersih 2000L 3,500,000.00 0.44 0.22 0.22
Septictank + Resapan 8,829,605.91 1.11 0.55 0.55
PEKERJAAN PENGECATAN DAN FINISHING -
A.4.7.1.10 Pek. Cat/Plamur Dinding Tembok 21,380,277.14 2.69 1.34 1.34
A.4.7.1.10 Pek. Cat Plafond Gypsum 2,864,114.41 0.36 0.18 0.18
PEKERJAAN ACESSORIES DAN PERLENGKAPAN -
Pas.Trali pagar galvanis 17,500,000.00 2.20 1.10 1.10
Pas.Pintu pagar Galvanis 7,500,000.00 0.94 0.47 0.47
Pas.Papan Nama Kantor 15,000,000.00 1.89 0.94 0.94
0
JUMLAH 795,661,498.23 100.00 1.81 1.81 2.00 1.30 1.77 5.95 2.89 2.89 2.32 4.53 9.40 11.04 8.26 7.25 7.25 16.13 13.39
1.81 3.62 5.62 6.92 8.69 14.64 17.53 20.42 22.75 27.28 36.68 47.72 55.98 63.24 70.49 86.61 100.00

RENCANA FISIK BULANAN % 6.92 13.50 35.56 44.02


RENCANA FISIK KUMULATIF % 6.92 20.42 55.98 100.00
REALISASI FISIK BULANAN %
REALISASI FISIK KUMULATIF %
DEVIASI + / - %

BAUBAU, JULI 2017


DISETUJUI/DIKETAHUI OLEH DIBUAT OLEH
CV. CITRAJAYA ABADI CV. CITRAJAYA ABADI

(RAFIUNDDIN, ST) (RIDWAN)


DIREKTUR STAF TEKNIK
Harga dasar satuan bahan
No Jenis Kode Satuan Harga (Rp)

51 Profil Allumunium Meter 100,000.00


52 Allumunium Strip Meter 80,000.00
55 Rangka Metal Hollow 40.40.2mm Meter 50,000.00
63 Spandeck Zincallume M 2
90,000.00
64 Screw Cteks 12-4 x 50 Buah 5,000.00
65 Screw Cteks 10 x 16-16 Buah 5,000.00
66 Nok Zincallume Tebal 0.35mm Meter 50,000.00
67 Baja Ringan C-75.0.8 Meter 50,000.00
68 Baja Ringan C-75.0.6 Meter 50,000.00
69 Baut(Screw driver) Buah 50,000.00
70 Dinabolt Buah 50,000.00
71 Reng Baja Ringan Meter 50,000.00
72 Talang Jurai Baja Ringan Meter 50,000.00
Rp 926,385,000.00
Sembilan Ratus Dua Puluh Enam Juta Tiga Ratus Delapan Puluh Lima Ribu Rupiah

926,385,000.00 926385000 000 0 0 0 0 000


926385000 926385 385 385 Ribu 3 Tiga Ratus 8 Delapan Puluh 5 Lima Ribu Tiga Ratus Delapan Puluh Lima Ribu
926000 926 926 926 Juta 9 Sembilan Ratus 2 Dua Puluh 6 Enam Juta Sembilan Ratus Dua Puluh Enam Juta
00 0 0 Milyar 0 0 0 000
00 0 0 trilyun 0 0 0 000
Rupiah Rupiah
Harga dasar satuan upah

No Jenis Kode Satuan Harga (Rp)

1 Pekerja L.01 OH 96,000.00


2 Tukang Batu L.02 OH 133,000.00
3 Tukang Besi L.02 OH 133,000.00
4 Tukang Kayu L.02 OH 133,000.00
5 Tukang Cat L.02 OH 133,000.00
6 Tukang Las L.02 OH 133,000.00
7 Tukang Pipa L.02 OH 133,000.00
8 Kepala Tukang L.03 OH 157,000.00
9 Mandor L.04 OH 157,000.00
Harga dasar satuan bahan

No Jenis Kode Satuan Harga (Rp)

1 Pasir Beton M3 745,000.00


2 Pasir Pasang M3 745,000.00
3 Pasir Urug M 3
745,000.00
4 Sirtu M 3
445,000.00
5 Pasir Beton Kg 532.14
6 Batu Gunung Belah M3 250,000.00
7 Batu Gunung Pecah 5-7cm M3 475,000.00
8 Kerikil M 3
1,200,000.00
9 Kerikil Kg 888.89
10 Koral Beton M3 450,000.00
11 Kapur Padam M 3
150,000.00
12 Kapur M3 150,000.00
13 Tanah Timbunan Batu Kapur M 3
95,000.00
14 Tanah Liat M 3
68,000.00
15 Batu Bata Merah Bh 1,000.00
16 Batu Batako Bh 3,500.00
17 Kayu Balok Kelas I M3 5,200,000.00
18 Kayu Papan Kelas I M3 5,200,000.00
19 Kayu Balok Kelas II.A M3 3,100,000.00
20 Kayu Papan Kelas II.A M 3
3,100,000.00
21 Kayu Balok Kelas II M 3
3,100,000.00
22 Kayu Papan Kelas II M3 3,100,000.00
23 Kayu 4/6 Kelas II M 3
3,100,000.00
24 Kayu 5/7 Kelas II M 3
3,100,000.00
25 Kayu Balok Kelas III M3 2,400,000.00
26 Kayu Papan Kelas III M3
2,400,000.00
27 Kayu Dolken ø 8-10/400 cm Batang 25,000.00
28 Bambu ø 86-8/600 cm Batang 25,000.00
29 Air Liter 100.00
30 Ijuk M3 100,000.00
31 Tali Ijuk M3 150,000.00
32 Semen Portland Zak 95,000.00
33 Semen Portland Kg 1,900.00
34 Semen Warna Kg 10,000.00
35 Semen Nat Kg 12,000.00
36 Paku Biasa 1/2 inc-1 inc Kg 20,000.00
37 Paku Biasa 2 inc-3 inc Kg 20,000.00
38 Paku Biasa 2 inc-5 inc Kg 20,000.00
39 Paku Biasa 5cm-7cm Kg 20,000.00
40 Paku Biasa 5cm-10cm Kg 20,000.00
41 Paku Biasa 5cm-12cm Kg 20,000.00
42 Paku 12cm Kg 20,000.00
43 Paku 10cm Kg 20,000.00
44 Paku 5cm Kg 20,000.00
45 Paku Tripleks Kg 20,000.00
46 Paku/Skrup 5cm Kg 20,000.00
47 Peofil Alluminium "T" Meter 50,000.00
48 Besi Profil Kg 16,000.00
49 Besi Baja IWF Kg 19,000.00
50 Besi Beton Kg 11,800.00
51 Kawat Beton Kg 30,000.00
52 Residu Liter 28,000.00
53 Seng Gelombang 3inch x 6inch bjls 28 Lembar 52,000.00
54 Seng Plat 3inch x 6 inch bjls28 Lembar 55,000.00
55 Genteng Metal Buah 42,000.00
56 Nok Genteng Metal Buah 50,000.00
Harga dasar satuan bahan

No Jenis Kode Satuan Harga (Rp)

57 Sirap Kayu Buah 50,000.00


58 Nok Sirap Buah 50,000.00
59 Meni Besi Liter 48,000.00
60 Kawat Duri Meter 25,000.00
61 Kawat Jaring Galvanis Lembar 250,000.00
62 Kawat dia 4mm Kg 20,000.00
63 Besi Strip Kg 20,000.00
64 Jendela Naco Bh 120,000.00
65 Kaca Polos 3mm M2 80,000.00
66 Kaca Polos 5mm M2 100,000.00
67 Sealant Kg 10,000.00
68 Kunci tanam antik Bh 75,000.00
69 Kunci tanam biasa Bh 50,000.00
70 Kunci tanam kamar mandi Bh 50,000.00
71 Kunci silinder Bh 50,000.00
72 Engsel Pintu Bh 35,000.00
73 Engsel Jendela Kupu-Kupu Bh 25,000.00
74 Engsel Angin Bh 10,000.00
75 Spring Knip Bh 10,000.00
76 Kait Angin Bh 10,000.00
77 Door Closer Set 25,000.00
78 Kunci Slot Bh 15,000.00
79 Playwood 4mm Lembar 69,000.00
80 Playwood 9mm Lembar 110,000.00
81 Panel Beton Pracetak Lembar 1,000,000.00
82 Kolom Beton Pracetak Batang 3,000,000.00
83 Storox -100 Kg 25,000.00
84 Waterstop Lebar 150 mm Meter 150,000.00
85 Waterstop Lebar 200 mm Meter 200,000.00
86 Waterstop Lebar 230 mm 320 mm Meter 300,000.00
87 Jaring Kawat Baja (Wiremesh) Kg 20,000.00
88 Minyak Bekisting Liter 15,000.00
89 Batu Grani Kg 18,000.00
90 Batu traso Kg 14,000.00
91 Ubin Abu-Abu 40cm x 40cm Bh 26,000.00
92 Ubin Abu-Abu 30cm x 30cm Bh 14,000.00
93 Ubin Abu-Abu 20cm x 20cm Bh 6,000.00
94 Ubin Warna 40cm x 40cm Bh 32,000.00
95 Ubin Warna 30cm x 30cm Bh 20,000.00
96 Ubin Warna 20cm x 20cm Bh 7,000.00
97 Ubin Traso 40cm x 40cm Bh 30,000.00
98 Ubin Traso 30cm x 30cm Bh 16,000.00
99 Ubin Granit 40cm x 40cm Bh 35,000.00
100 Ubin Granit 30cm x 30cm Bh 33,000.00
101 Ubin Teralux Marmer 60cm x 60cm Bh 75,000.00
102 Ubin Teralux Marmer 40cm x 40cm Bh 60,000.00
103 Ubin Teralux Marmer 30cm x 30cm Bh 45,000.00
104 Plint Ubin Pc Abu-Abu 15cm x 20cm Bh 20,000.00
105 Plint Ubin Pc Abu-Abu 10cm x 30cm Bh 20,000.00
106 Plint Ubin Pc Abu-Abu 10cm x 40cm Bh 20,000.00
107 Plint Ubin Warna 10cm x 20cm Bh 20,000.00
108 Plint Ubin Warna 10cm x 30cm Bh 20,000.00
109 Plint Ubin Warna 10cm x 40cm Bh 20,000.00
110 Plint Ubin Traso 10cm x 30cm Bh 20,000.00
111 Plint Ubin Traso 10cm x 40cm Bh 20,000.00
112 Plint Ubin Granit 10cm x 30cm Bh 20,000.00
113 Plint Ubin Granit 10cm x 40cm Bh 20,000.00
114 Plint Ubin Teralux Marmer 10cm x 30cm Bh 20,000.00
115 Plint Ubin Teralux Marmer 10cm x 40cm Bh 20,000.00
116 Plint Ubin Teralux Marmer 10cm x 60cm Bh 20,000.00
117 Traso Cor Bh 12,500.00
118 Keramik Artistik 10cm x 20cm Bh 20,000.00
119 Keramik Artistik 10cm x 10cm Bh 20,000.00
120 Keramik Artistik 5cm x 20cm Bh 20,000.00
121 Keramik 33cm x 33cm Bh 45,000.00
122 Keramik 30cm x 30cm Bh 45,000.00
123 Keramik 20cm x 20cm Bh 20,000.00
Harga dasar satuan bahan

No Jenis Kode Satuan Harga (Rp)

124 Keramik 10cm x 20cm Bh 20,000.00


125 Keramik 10cm x 33cm Bh 20,000.00
126 Keramik Mozaik 30cm x 30cm Bh 55,000.00
127 Plint Keramik 10cm x 20cm Bh 20,000.00
128 Plint Keramik 10cm x 10cm Bh 20,000.00
129 Plint Keramik 5cm x 20cm Bh 20,000.00
130 Plint Internal Cove 5cm x 5cm x 20cm Bh 20,000.00
131 Marmer 100cm x 100cm Bh 100,000.00
132 Karpet M2 50,000.00
133 Underlayer (pelapis bawah karpet) M2 50,000.00
134 Parquet M 2
25,000.00
135 Porselen 11cm x 11cm Bh 20,000.00
136 Porselen 10cm x 20cm Bh 20,000.00
137 Porselen 20cm x 20cm Bh 20,000.00
138 Batu Pelapis Bh 10,000.00
139 Batu Paras Bh 10,000.00
140 Batu Tempel Hitam Bh 10,000.00
141 Vinyl 30cm x 30cm Bh 35,000.00
142 Wallpaper Meter 150,000.00
143 Floor Harderner Kg 150,000.00
144 Plint Vinyl 15cm x 30cm Bh 150,000.00
145 Lem Fox Kg 20,000.00
146 Asbes Semen M2 50,000.00
147 Akustik 30 cm x 30 cm Lembar 20,000.00
148 Akustik 30 cm x 60 cm Lembar 35,000.00
149 Akustik 60 cm x 120 cm Lembar 50,000.00
150 Tripleks tebal 3mm Lembar 50,000.00
151 Tripleks tebal 4mm Lembar 55,000.00
152 Tripleks tebal 6mm Lembar 60,000.00
153 Kayu Papan Lambrisering tebal 9mm Lembar 20,000.00
154 Gypsum Board tebal 9mm Lembar 70,000.00
155 List Kayu Profil Meter 35,000.00
156 Ramset Buah 50,000.00
157 Cat Menie Kg 25,000.00
158 Plamuur Kayu Kg 25,000.00
159 Cat Dasar Kayu Kg 25,000.00
160 Cat Penutup Kayu Kg 25,000.00
161 Kuas Bh 25,000.00
162 Pengencer Kg 25,000.00
163 Ampelas Lembar 25,000.00
164 Plamuur Tembok Kg 25,000.00
165 Cat Dasar Tembok Kg 25,000.00
166 Cat Penutup Tembok Kg 25,000.00
167 Residu atau Ter Liter 25,000.00
168 Cat Menie Besi Kg 30,000.00
169 Closet Duduk Unit 3,800,000.00
170 Closet Jongkok Porslen Unit 250,000.00
171 Wastafel Unit 3,000,000.00
172 Bak Fibreglass Unit 3,000,000.00
173 Bak Cuci Piring Stainlessteel Unit 3,000,000.00
174 Waterdrain Bh 150,000.00
175 floor Drain Unit 150,000.00
176 Pipa Galvanis diameter 1/2inch Meter 1,000.00
177 Pipa Galvanis diameter 3/4inch Meter 1,000.00
178 Pipa Galvanis diameter 1inch Meter 1,000.00
179 Pipa Galvanis diameter 1 1/2inch Meter 1,000.00
180 Pipa Galvanis diameter 3inch Meter 1,000.00
181 Pipa Galvanis diameter 4inch Meter 1,000.00
182 Pipa PVC type AW diameter 1/2inch Meter 12,500.00
183 Pipa PVC type AW diameter 3/4inch Meter 17,000.00
184 Pipa PVC type AW diameter 1inch Meter 1,000.00
185 Pipa PVC type AW diameter 1 1/2inch Meter 1,000.00
186 Pipa PVC type AW diameter 2inch Meter 1,000.00
187 Pipa PVC type AW diameter 2 1/2inch Meter 1,000.00
188 Pipa PVC type AW diameter 3inch Meter 1,000.00
189 Pipa PVC type AW diameter 4inch Meter 1,000.00
190 Kran diameter 1/2inch Bh 1,000.00
Harga dasar satuan bahan

No Jenis Kode Satuan Harga (Rp)

191 Kran diameter 3/4inch Bh 1,000.00


192 Sealtape Bh 1,000.00
193 Wood Filer Kg 50,000.00
194 Woodstain Kg 50,000.00
195 Sanding Kg 50,000.00
196 Melamic Kg 50,000.00
197 Thiner Liter 35,000.00
198 Amplas Lbr 15,000.00
199 Karung Lbr 5,000.00

Anda mungkin juga menyukai