PERENCANAAN
1 Laporan Pendahuluan Buku 71,340.00
2 Laporan Antara Buku 82,320.00
3 Laporan Memorandum Disain Buku 82,320.00
4 Laporan Akhir Buku 109,760.00
5 Gambar Rencana A3 Buku 270,000.00
6 RAB Buku 58,000.00
7 Dokumen Tender Buku 82,320.00
8 Video Animasi Menit 4,000,000.00
9 Soft Copy dalam CD Keping 5,000.00
PENGAWASAN
1 Laporan Akhir Buku 109,760.00
2 Laporan Bulanan Buku 60,360.00
3 Laporan Triwulanan Buku 71,340.00
4 Album Foto Buku 200,000.00
DAFTAR BILLING RATE
BIAYA PERSONIL
BILLING RATE
NO URAIAN SATUAN
(Rp)
Tenaga Ahli
1 Tenaga Ahli Pengalaman 7 th SBOB Rp 26,400,000.00
2 Tenaga Ahli Pengalaman 6 th SBOB Rp 22,440,000.00
3 Tenaga Ahli Pengalaman 5 th SBOB Rp 21,120,000.00
4 Tenaga Ahli Pengalaman 4 th SBOB Rp 19,800,000.00
5 Tenaga Ahli Pengalaman 3 th SBOB Rp 18,480,000.00
Tenaga Penunjang
1 CAD Drafter SBOB Rp 5,860,900.00
2 Surveyor SBOB Rp 8,058,800.00
3 Administrasi/Keuangan (Clerk) SBOB Rp 4,762,000.00
KELUARAN
A. BIAYA PERSONIL
1. Team Leader (4 th)
Dasar Perhitungan :
- Menurut Jumlah Satuan Waktu SBOB
- Menurut Pengalaman Profesional yang dibutuhkan 4 Tahun
3 Ahli K3 Konstruksi
Dasar Perhitungan :
- Menurut Jumlah Satuan Waktu SBOB
- Menurut Pengalaman Profesional yang dibutuhkan 3 Tahun
Dasar Perhitungan :
- Menurut Jumlah Satuan Waktu SBOB
- Menurut Pengalaman Profesional yang dibutuhkan 4 Tahun
5 Drafter
Dasar Perhitungan :
- Menurut Jumlah Satuan Waktu SBOB
- Menurut Pengalaman Profesional yang dibutuhkan 5 Tahun
6 Admin
Dasar Perhitungan :
- Menurut Jumlah Satuan Waktu SBOB
- Menurut Pengalaman Profesional yang dibutuhkan 1 Tahun
24,987,600 17,325,000
23473200 13,750,000 13,750,000
(6,050,780) 21,250
7,067,000 4,200,000
11,000,000 11,000,000
21,907,700 (7,480,205) 17,000
7,067,000 4,200,000
11,000,000 11,000,000
21,907,700 (7,480,205) 17,000
3,065,500 2,100,000
5,500,000 7,562,000
2,222,500 2,100,000
5,500,000 7,562,000
1,801,000 1,700,000
7,562,000 7,562,000
Barang yang sudah dibeli tidak dapat ditukar/dikembalikan kecuali ada perjanjian
( ) ( ) ( )
DISC JUMLAH
0% 90,000 102000
0% 39,000 102000
0% 170,000 102000
0% 170,000 330500
0% 255,000 636500
0% 60,000
0% 18,000
0% -
0% -
0% -
712,000
0%
712,000
B. BIAYA LAPORAN DAN PEMBAHASAN
PERENCANAAN
1 Laporan Pendahuluan Buku 70,000.00
2 Laporan Antara Buku 85,000.00
3 Laporan Memorandum Disain Buku 85,000.00
4 Laporan Akhir Buku 110,000.00
5 Gambar Rencana A3 Buku 300,000.00
6 RAB Buku 65,000.00
7 Dokumen Tender Buku 85,000.00
8 Video Animasi Menit 4,000,000.00
9 Soft Copy dalam CD Keping 7,500.00
PENGAWASAN
1 Laporan Akhir Buku 109,760.00
2 Laporan Bulanan Buku 60,360.00
3 Laporan Triwulanan Buku 71,340.00
4 Album Foto Buku 200,000.00
DAFTAR BILLING RATE
BIAYA PERSONIL
BILLING RATE
NO URAIAN SATUAN
(Rp)
Tenaga Ahli
1 Tenaga Ahli Pengalaman 7 th SBOB Rp 26,400,000.00
2 Tenaga Ahli Pengalaman 6 th SBOB Rp 22,440,000.00
3 Tenaga Ahli Pengalaman 5 th SBOB Rp 21,120,000.00
4 Tenaga Ahli Pengalaman 4 th SBOB Rp 19,800,000.00
5 Tenaga Ahli Pengalaman 3 th SBOB Rp 18,480,000.00
Tenaga Penunjang
1 CAD Drafter SBOB Rp 5,800,000.00
2 Surveyor SBOB Rp 8,000,000.00
3 Administrasi/Keuangan (Clerk) SBOB Rp 4,700,000.00
KELUARAN
SUB KEGIATAN : PENYUSUNAN RENCANA, KEBIJAKAN, STRATEGI DAN TEKNIS SISTEM PENATAAN
BANGUNAN DAN LINGKUNGAN DI KAWASAN STRATEGIS DAERAH PROVINSI DAN
LINTAS DAERAH KABUPATEN/KOTA
CV. ASTITI
Konsultan Perencana
PERENCANAAN
1 Laporan Pendahuluan Buku 75,000.00
2 Laporan Antara Buku 85,000.00
3 Laporan Memorandum Disain Buku 85,000.00
4 Laporan Akhir Buku 115,000.00
5 Gambar Rencana A3 Buku 300,000.00
6 RAB Buku 70,000.00
7 Dokumen Tender Buku 85,000.00
8 Video Animasi Menit 4,000,000.00
9 Soft Copy dalam CD Keping 10,000.00
PENGAWASAN
1 Laporan Akhir Buku 109,760.00
2 Laporan Bulanan Buku 60,360.00
3 Laporan Triwulanan Buku 71,340.00
4 Album Foto Buku 200,000.00
DAFTAR BILLING RATE
BIAYA PERSONIL
BILLING RATE
NO URAIAN SATUAN
(Rp)
Tenaga Ahli
1 Tenaga Ahli Pengalaman 7 th SBOB Rp 26,400,000.00
2 Tenaga Ahli Pengalaman 6 th SBOB Rp 22,440,000.00
3 Tenaga Ahli Pengalaman 5 th SBOB Rp 21,120,000.00
4 Tenaga Ahli Pengalaman 4 th SBOB Rp 19,800,000.00
5 Tenaga Ahli Pengalaman 3 th SBOB Rp 18,480,000.00
Tenaga Penunjang
1 CAD Drafter SBOB Rp 5,825,000.00
2 Surveyor SBOB Rp 8,025,000.00
3 Administrasi/Keuangan (Clerk) SBOB Rp 4,710,000.00
KELUARAN
Terbilang : Sembilan Puluh Sembilan Juta Enam Ratus Lima Ribu Lima Ratus Lima Puluh Rupiah
PERENCANAAN
1 Laporan Pendahuluan Buku 75,000.00
2 Laporan Antara Buku 85,000.00
3 Laporan Memorandum Disain Buku 85,000.00
4 Laporan Akhir Buku 120,000.00
5 Gambar Rencana A3 Buku 300,000.00
6 RAB Buku 70,000.00
7 Dokumen Tender Buku 85,000.00
8 Video Animasi Menit 4,000,000.00
9 Soft Copy dalam CD Keping 10,000.00
PENGAWASAN
1 Laporan Akhir Buku 109,760.00
2 Laporan Bulanan Buku 60,360.00
3 Laporan Triwulanan Buku 71,340.00
4 Album Foto Buku 200,000.00
DAFTAR BILLING RATE
BIAYA PERSONIL
BILLING RATE
NO URAIAN SATUAN
(Rp)
Tenaga Ahli
1 Tenaga Ahli Pengalaman 7 th SBOB Rp 26,400,000.00
2 Tenaga Ahli Pengalaman 6 th SBOB Rp 22,440,000.00
3 Tenaga Ahli Pengalaman 5 th SBOB Rp 21,120,000.00
4 Tenaga Ahli Pengalaman 4 th SBOB Rp 19,800,000.00
5 Tenaga Ahli Pengalaman 3 th SBOB Rp 18,480,000.00
Tenaga Penunjang
1 CAD Drafter SBOB Rp 5,825,000.00
2 Surveyor SBOB Rp 8,025,000.00
3 Administrasi/Keuangan (Clerk) SBOB Rp 4,710,000.00
KELUARAN
I Nyoman Lusmantara, ST
Direktur
CV. JAYA KARYA MANDIRI
KONSULTAN PERENCANA DAN PENGAWAS
BR. NEGARI SINGAPADU TENGAH SUKAWATI GIANYAR
TELP. 0361 294108, EMAIL jayakarya.mandiri@yahoo.com
I Nyoman Lusmantara, ST
Direktur
B. BIAYA LAPORAN DAN PEMBAHASAN
PERENCANAAN
1 Laporan Pendahuluan Buku 70,000.00
2 Laporan Antara Buku 80,000.00
3 Laporan Memorandum Disain Buku 80,000.00
4 Laporan Akhir Buku 110,000.00
5 Gambar Rencana A3 Buku 300,000.00
6 RAB Buku 65,000.00
7 Dokumen Tender Buku 85,000.00
8 Video Animasi Menit 4,000,000.00
9 Soft Copy dalam CD Keping 7,500.00
PENGAWASAN
1 Laporan Akhir Buku 109,760.00
2 Laporan Bulanan Buku 60,360.00
3 Laporan Triwulanan Buku 71,340.00
4 Album Foto Buku 200,000.00
DAFTAR BILLING RATE
BIAYA PERSONIL
BILLING RATE
NO URAIAN SATUAN
(Rp)
Tenaga Ahli
1 Tenaga Ahli Pengalaman 7 th SBOB Rp 26,400,000.00
2 Tenaga Ahli Pengalaman 6 th SBOB Rp 22,440,000.00
3 Tenaga Ahli Pengalaman 5 th SBOB Rp 21,120,000.00
4 Tenaga Ahli Pengalaman 4 th SBOB Rp 19,800,000.00
5 Tenaga Ahli Pengalaman 3 th SBOB Rp 18,480,000.00
Tenaga Penunjang
1 CAD Drafter SBOB Rp 5,800,000.00
2 Surveyor SBOB Rp 8,000,000.00
3 Administrasi/Keuangan (Clerk) SBOB Rp 4,700,000.00
KELUARAN
SUB KEGIATAN : PENYUSUNAN RENCANA, KEBIJAKAN, STRATEGI DAN TEKNIS SISTEM PENATAAN
BANGUNAN DAN LINGKUNGAN DI KAWASAN STRATEGIS DAERAH PROVINSI DAN
LINTAS DAERAH KABUPATEN/KOTA