Anda di halaman 1dari 8

PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.

:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

1 I QUALITY MANUAL WIKA-BG-QM-01 PEDOMAN SISTEM MANAJEMEN PT WIKA GEDUNG ANTONIUS EKO INDRIARTO 1 01/01/2009 01/03/2010 08/01/2014 22/02/2016 21/08/2017 23/07/18 05/10/2018 23/07/2019 23/07/2019 28/09/2020

2 WIKA-BG-PMS-PM-02 PROSEDUR UMUM PELAKSANAAN TINJAUAN ANTONIUS EKO INDRIARTO 1 01/01/2009 01-09-2014 16-01-2017 13-03-2020 31-03-2021 25/062021
MANAJEMEN PT WIKA GEDUNG

3 WIKA-BG-PK-PM-02 PROSEDUR UMUM MANAJEMEN PERUBAHAN RACHMADI AKBAR. D 1 01/01/2009 21/03/2016 12/07/2021

4 WIKA-BG-PEU-PM-01 PROSEDUR PENGEMBANGAN USAHA VIANDA MANAN M 1 05/10/2015

5 WIKA-BG-PEU-PM-02 PROSEDUR PENYUSUNAN RENSTRA WIKA GEDUNG VIANDA MANAN M 1 05/10/2015

6 WIKA-BG-PEU-PM-03 PROSEDUR INVESTASI GUMILAR 1 01/03/2018 22/04/2021

7 II WIKA-BG-PDSMM-PM-01 PROSEDUR PENYUSUNAN PENGENDALIAN DOKUMEN DAN ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 23-05-2016 28/09/2020 11/04/2021
SISTEM MANAJEMEN & K3L PENYIMPANAN REKAMAN

8 WIKA-BG-PDSMM-PM-02 PROSEDUR PENYUSUNAN QPLAN ANTONIUS EKO INDRIARTO 2 01/01/2009 06/06/2013 01/09/2014 22/02/2016 16-01-2017 31/07/2018 14/10/2019 22/02/2021

9 WIKA-BG-PDSMM-PM-03 PROSEDUR KETIDAKSESUAIAN CP, PTKP ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 03/08/2015 09/11/2015 30/09/2020

10 WIKA-BG-PDSMM-PM-04 PROSEDUR AUDIT INTERNAL ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 14/09/2015 25/01/2016 19/03/2018 05/10/2018 5/4/2021 20/08/2021

11 WIKA-BG-PDSMM-PM-06 PROSEDUR IDENTIFIKASI & EVALUASI PERATURAN & RACHMADI AKBAR. D 2 01/01/2009 02/04/2010 06/06/2013 01/09/2014 27/02/2015 16/11/2015 09-05-2016 28/08/2017 12/02/2018 05/10/2018 24/02/2020 5/03/2021
PERSYARATAN LAINNYA

12 WIKA-BG-PDSMM-PM-07 PROSEDUR KOMUNIKASI, KONSULTASI DAN PARTISIPASI ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 25/01/2016 17/12/2018 05/04/2021

13 WIKA-BG-PDSMM-PM-08 PROSEDUR KALIBRASI ALAT, PENGUKURAN DAN ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 10/05/2019
PEMANTAUAN LINGKUNGAN

14 WIKA-BG-PDSMM-PM-09 PROSEDUR PERSIAPAN, PENANGANAN DAN PEMULIHAN RACHMADI AKBAR. D 2 01/01/2009 01/09/2014 03/08/2015 05/03/2018 10/12/2018 04/02/2019 28/06/2021
KEADAAN DARURAT

15 WIKA-BG-PDSMM-PM-10 PROSEDUR UMUM FORMAT PROSEDUR MUTU DAN ANTONIUS EKO INDRIARTO 2 01/01/2009 01/09/2014 09-01-2017 21/09/2020
INSTRUKSI KERJA

16 WIKA-BG-PDSMM-PM-11 PEDOMAN SISTEM MANAJEMEN KESELAMATAN DAN ANTONIUS EKO INDRIARTO 2 04/01/2010 01/09/2014 16-01-2017 05/10/2018
KESEHATAN KERJA DAN LINGKUNGAN (PEDOMAN SMK3L)

17 WIKA-BG-PDSMM-PM-12 PROSEDUR LOCK OUT DAN TAG OUT ANTONIUS EKO INDRIARTO 2 04/01/2010 01/09/2014 16-01-2017

18 WIKA-BG-PDSMM-PM-13 PROSEDUR INSPEKSI PELAKSANAAN K3L ANTONIUS EKO INDRIARTO 2 04/01/2010 01/09/2014 20-05-2016

19 WIKA-BG-PDSMM-PM-14 PROSEDUR PENYELIDIKAN (INVESTIGASI) KECELAKAAN RACHMADI AKBAR. D 2 04/01/2010 01/09/2014 14/09/2015 21/09/2020 21/06/2021
KERJA & PENYAKIT AKIBAT KERJA & LAPORAN KINERJA K3L

20 WIKA-BG-PDSMM-PM-15 PROSEDUR PENGELOLAAN LIMBAH B3 DAN NON B3 RACHMADI AKBAR. D 2 04/01/2010 01/09/2014 11/04/2016 21/12/2020 07/05/2021

21 WIKA-BG-PDSMM-PM-16 PROSEDUR IJIN KERJA UNTUK PEKERJAAN BERBAHAYA ANTONIUS EKO INDRIARTO 2 04/01/2010 01/09/2014 16-01-2017
BERISIKO TINGGI DAN PELAKSANAAN DIRUANG TERBATAS

22 WIKA-BG-PDSMM-PM-17 PROSEDUR PENGOPERASIAN ALAT ANGKAT ANGKUT DAN ANTONIUS EKO INDRIARTO 2 30/08/2010 01/09/2014 24/08/2020
PEMELIHARAAN PERALATAN / MESIN

23 WIKA-BG-PDSMM-PM-18 PROSEDUR PENGELOLAAN ALAT - ALAT K3L ANTONIUS EKO INDRIARTO 2 30/08/2010 01/09/2014 12-12-2016 01/02/2019

24 WIKA-BG-PDSMM-PM-19 PROSEDUR SISTEM REWARD DARAWATI & ANTONIUS E.I 2 01/02/2012 01/09/2014

25 WIKA-BG-PDSMM-PM-20 PROSEDUR PENGELOLAAN KEPUASAN PELANGGAN ANTONIUS EKO INDRIARTO 2 11/01/2016 30-05-2016 22-08-2016 09/06/2019 22/06/2020

26 WIKA-BG-PDSMM-PM-21 PROSEDUR PENGUKURAN SISTEM KINERJA SMWG EKO NURACHMATWIBOWO 2 29/02/2016 12/08/2019 13/09/2020

27 WIKA-BG-PDSMM-PM-22 PROSEDUR PENYUSUNAN SHE PLAN RACHMADI AKBAR DARMAWAN 2 12/12/2017 05/10/2018 05/07/2021

28 WIKA-BG-PDSMM-PM-23 PROSEDUR PENGUKURAN PSIKOSOSIAL EKO NURACHMAT WIBOWO 2 26/11/2018

29 WIKA-BG-PDSMM-PM-24 PROSEDUR ERGONOMI EKO NURACHMAT WIBOWO 2 26/11/2018

30 WIKA-BG-PDSMM-PM-25 PROSEDUR MANAJEMEN PENGAMANAN EKO NURACHMAT WIBOWO 2 24/11/2018 06/01/2020

31 WIKA-BG-PDSMM-PM-26 PROSEDUR CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) RACHMADI AKBAR DARMAWAN 2 26/4/2021

32 WIKA-QAS-IK-01.01 INSTRUKSI KERJA PANDUAN PENYUSUNAN QUALITY CONTROL CIRCLE ANSORI 2 30/08/2019

1
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

( QCC )

33 WIKA-BG-PDSMM-IK-01 IK APAR ANTONIUS EKO INDRIARTO 2 18/01/2016

34 WIKA-BG-PDSMM-IK-02 IK TANGGA PCH ANTONIUS EKO INDRIARTO 2 15/02/2016

35 WIKA-BG-PDSMM-IK-03 IK PCH MOBILE ANTONIUS EKO INDRIARTO 2 15/02/2016

36 WIKA-BG-PDSMM-IK-04 IK PROTEKSI SHAFT DAN LUBANG VOID PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 15/02/2016

37 WIKA-BG-PDSMM-IK-05 IK RAMBU K3L, 5R DAN SPANDUK PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 31/03/2017

38 WIKA-BG-PDSMM-IK-06 IK PAGAR PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 06/08/2014 15/02/2016 01/05/2018 15/02/2019

39 WIKA-BG-PDSMM-IK-07 IK SAFETY INDUCTION KEPADA TAMU PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 12/5/2020

40 WIKA-BG-PDSMM-IK-09 IK SERAGAM PEGAWAI PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016 3/5/2020

41 WIKA-BG-PDSMM-IK-10 IK PROJECT FOLDER TREE ANTONIUS EKO INDRIARTO 2 06/08/2014

42 WIKA-BG-PDSMM-IK-11 IK LOADING-UNLOADING PASSENGER HOIST PROYEK WIKA ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016
GEDUNG
43
WIKA-BG-PDSMM-IK-12 IK JALAN KERJA DAN JALAN AKSES KERJA PROYEK WIKA ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016
GEDUNG
44
WIKA-BG-PDSMM-IK-13 IK INSTALASI LISTRIK PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016 06/02/2017 31/03/2017 31/5/2021

45 WIKA-BG-PDSMM-IK-14 IK STANDAR APD PEGAWAI PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016 12/08/2017 20/08/2019

46 WIKA-BG-PDSMM-IK-15 IK DIREKSI KEET ANTONIUS EKO INDRIARTO 2 06/08/2014 18/01/2016 31/01/2018 15/10/2019

47 WIKA-BG-PDSMM-IK-16 IK PELAKSANAAN SAFETY MORNING TALK (SMT) DI PROYEK EKO NURACHMAT WIBOWO 2 06/08/2014 12-01-2017 11/05/2020
WIKA GEDUNG
48
WIKA-BG-PDSMM-IK-17 IK SAFETY NET PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016

49 WIKA-BG-PDSMM-IK-18 IK STANDAR APD PEKERJA PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 18/01/2016 11/09/2019 27/05/2020

50 WIKA-BG-PDSMM-IK-19 IK POS SECURITI PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016

51 WIKA-BG-PDSMM-IK-20 IK SAFETY RAILING PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06/08/2014 15/02/2016

52 WIKA-BG-PDSMM-IK-21 IK BARAK PEKERJA ANTONIUS EKO INDRIARTO 2 18/01/2016 06/02/2017 28/12/2020

53 WIKA-BG-PDSMM-IK-22 IK NEON LIGHT TOWER CRANE PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 01/02/2016 27/08/2018 1/3/2020

54 WIKA-BG-PDSMM-IK-23 IK KOTAK DAN TAS P3K WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 14/12/2015 01/02/2019

55 WIKA-BG-PDSMM-IK-24 IK URINOIR PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 14/12/2015

56 WIKA-BG-PDSMM-IK-25 IK GANTUNGAN KABEL PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 06-02-2017 10/5/2021

57 WIKA-BG-PDSMM-IK-26 IK KESELAMATAN KERJA DI KETINGGIAN EKO NURACHMAT WIBOWO 2 20-03-2017 12/11/2019

58 WIKA-BG-PDSMM-IK-27 IK ALAT-ALAT PROYEK WIKA GEDUNG ANTONIUS EKO INDRIARTO 2 31/03/2017

59 WIKA-BG-PDSMM-IK-28 IK ATAP BAR CUTTER dan BAR BENDER PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 01/09/2017

60 WIKA-BG-PDSMM-IK-28 A PRINSIP DASAR ERGONOMI EKO NURACHMAT WIBOWO 2 06/11/2017

61 WIKA-BG-PDSMM-IK-29 ERGONOMI PEKERJAAN KANTOR EKO NURACHMAT WIBOWO 2 06/11/2017

62 WIKA-BG-PDSMM-IK-30 ERGONOMI PEKERJAAN FINISHING EKO NURACHMAT WIBOWO 2 06/11/2017

63 WIKA-BG-PDSMM-IK-31 PELAKSANAAN TOOLBOX MEETING EKO NURACHMAT 2 01/02/2018

64 WIKA-BG-PDSMM-IK-32 PENGGUNAAN ALAT UKUR QPASS ANTONIUS EKO INDRIARTO 2 20/07/2018

65 WIKA-BG-PDSMM-IK-33 WEGE GREEN EKO NURACHMAT WIBOWO 2 26/8/2019

66 WIKA-BG-PDSMM-IK-34 RENCANA FASILITAS SHE,RAB & PEMELIHARAAN PERALATAN SHE EKO NURACHMAT WIBOWO 2 08/06/2018 10/12/2019

67 WIKA-BG-PDSMM-IK-35 GERBANG PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 08/06/2018 15/02/2019

2
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

68 WIKA-BG-PDSMM-IK-36 PENGGUNAAN APLIKASI CP/PTKP ONLINE ANTONIUS EKO INDRIARTO 2 13/08/2018

69 WIKA-BG-PDSMM-IK-37 ALAT PEMBUAT TALI AIR ANTONIUS EKO INDRIARTO 2 27/11/2018

70 WIKA-BG-PDSMM-IK-38 PEKERJAAN WATERPROOFING ANTONIUS EKO INDRIARTO 2 14/12/2018

71 WIKA-BG-PDSMM-IK-39 PEKERJAAN WATERSTOP ANTONIUS EKO INDRIARTO 2 14/12/2018

72 WIKA-BG-PDSMM-IK-40 CHECKLIST & LABEL INSPEKSI ALAT BANTU KERJA EKO NURACHMAT WIBOWO 2 10/12/2018

73 WIKA-BG-PDSMM-IK-41 PENGUKURAN KINERJA SHE PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 07/05/2019 05/05/2020
(KEY PERFORMANCE INDICATOR BAGIAN SHE PROYEK WIKA GEDUNG)
74
WIKA-BG-PDSMM-IK-42 STOP WORK AUTHORITY WIKA GEDUNG EKO NURACHMAT WIBOWO 2 12/04/2019

75 WIKA-BG-PDSMM-IK-43 JSA WIKA GEDUNG EKO NURACHMAT WIBOWO 2 20/06/2019

76 WIKA-BG-PDSMM-IK-44 HIRADC WIKA GEDUNG EKO NURACHMAT WIBOWO 2 20/06/2019

77 WIKA-BG-PDSMM-IK-45 RISK CONTAINMENT AUDIT (RCA) WIKA GEDUNG EKO NURACHMAT WIBOWO 2 11/07/2019

78 WIKA-BG-PDSMM-IK-46 INSTALASI LISTRIK PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 09/07/2019

79 WIKA-BG-PDSMM-IK-47 OPERASI PENGANGKATAN DI PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 18/8/2019 09/01/2020 18/12/2020

80 WIKA-BG-PDSMM-IK-48 TUGAS DAN TANGGUNGJAWAB FUNGSI 5R PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 16/9/2019

81 WIKA-BG-PDSMM-IK-49 INSPEKSI MATERIAL PEKERJAAN ANTONIUS EKO INDRIARTO 2 27/9/2019 15/11/2019

82 WIKA-BG-PDSMM-IK-50 INSPEKSI PEKERJAAN ANTONIUS EKO INDRIARTO 2 27/9/2019 14/11/2019

83 WIKA-BG-PDSMM-IK-51 5R KANTOR PUSAT SUPARJIYONO 2 14/11/2019

84 WIKA-BG-PDSMM-IK-53 PESAWAT GONDOLA TEMPORARY PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 12/12/2019

85 WIKA-BG-PDSMM-IK-54 OPERASI TOWER CRANE PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 31/12/2019

86 WIKA-BG-PDSMM-IK-55 PROTOKOL PENCEGAHAN & PENANGGULANGAN WABAH COVID - 19 ANISA YONELIA 2 08/06/2020 02/09/2020

87 WIKA-BG-PDSMM-IK-56 SECURITY DI PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 2020

88 WIKA-BG-PDSMM-IK-57 LOADING DAN UNLOADING PASSANGER HOIST DI PROYEK WIKA EKO NURACHMAT WIBOWO 2 28/08/2020
GEDUNG
89
WIKA-BG-PDSMM-IK-57 A PENYUSUNAN WORK BREAKDOWN STRUCTURE (WBS) QPLAN ANTONIUS EKO INDRIARTO 2 14/07/2020

90 WIKA-BG-PDSMM-IK-58 SAFETY DECK PROYEK WIKA GEDUNG EKO NURACHMAT WIBOWO 2 08/06/2020

91 WIKA-BG-PDSMM-IK-59 TANGKI TIMBUN EKO NURACHMAT WIBOWO 2 15/07/2020

92 WIKA-BG-SMM-IK-60 PORTABLE DOLAG TEDDY EKA PUTRA 2 31/07/2021

93 WIKA-BG-SMM-IK-61 PELAKSANAAN KEGIATAN QCC (QUALITY CONTROL CIRCLE) ANTONIUS EKO INDRIARTO 2 15/10/2020

94 WIKA-BG-SMM-IK-62 STANDAR PERSYARATAN AREA STOCKYARD DAN FABRIKASI BESI ANTONIUS EKO INDRIARTO 2 23/11/2020

95 WIKA-BG-SMM-IK-63 PANEL PRECEST ANTONIUS EKO INDRIARTO 2 30/11/2020

96 WIKA-BG-SMM-IK-63 A SAFETY SCREEN RACHMADI AKBAR. D 2 14/12/2020

97 WIKA-BG-SMM-IK-64 KANTIN PROYEK RACHMADI AKBAR. D 2 14/12/2020

98 WIKA-BG-SMM-IK-65 PROTEKSI TEPI BANGUNAN PEKERJAAN STRUKTUR NOVI YULIANI, EKO NUTACHMAT 2 25/01/2021

99 WIKA-BG-SMM-IK-66 SURAT IJIN PENGGUNAAN ALAT BANTU KERJA (SIPA) WIDYONO ADHI. P 2 16/08/2021

100 WIKA-BG-SMM-IK-67 TEMPAT CUCI SEPATU SYAMSUL BACHRI YANUAR 26/07/2021

101 WIKA-BG-SMM-IK-68 BIM SHE SALMAN BERBUDI 21/07/2021

102 WIKA-BG-SMM-IK-69 ALAT PENGECEKAN KESEJAJARAN OPENING YULIZAR FADLUI 16/08/2021

103 WIKA-BG-SMM-IK-70 ALAT BANTU LIFTING BUCKET BATA RINGAN TOMO DWIHASPUTRO 2 01/09/2021

104 III PEMASARAN WIKA-BG-PSR-PM-01 PROSEDUR PEROLEHAN POTENSI PASAR ANDY FAISAL 3 04/01/2010 01/06/2014 15/02/2016 04/11/2019

3
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

105 WIKA-BG-PSR-PM-02 PROSEDUR PRAKUALIFIKASI ANDY FAISAL 3 04/01/2010 28/03/2016

106 WIKA-BG-PSR-PM-03 PROSEDUR PEMBENTUKAN KSO SUDARSONO SOMO. W 3 02/05/2016

107 WIKA-BG-PSR-PM-05 PROSEDUR PELAKSANAAN KONTRAK JASA KONSTRUKSI DODI SURYOSUATO 3 02/05/2016
OLEH KSO
108
WIKA-BG-PSR-PM-06 PROSEDUR PENUTUPAN KSO DODI SURYOSUASTO 3 02/05/2016

109 WIKA-BG-PK-PM-01 PROSEDUR PEROLEHAN KONTRAK ANDY FAISAL 3 01/06/2012 21/03/2016 04/11/2019

110 IV PENGADAAN WIKA-BG-PDDANLAT-PM-01 PROSEDUR PENGADAAN & PERALATAN JAROT ARI WIBOWO 4 01/01/2009 01/09/2014 01/03/2015 25/04/2017

111 WIKA-BG-PDDAN-PM-01 PROSEDUR PENGADAAN BAZARUDDIN 4 10/08/2020

112 WIKA-BG-PDDAN-KP-01 KEBIJAKAN PERUSAHAAN FUNGSI PENGADAAN BAZARUDDIN 4 01/01/2009 01/09/2014 29/02/2016 17/04/2017 08/05/2019 16/09/2019 25/11/2019 10/8/2020 26/1/2021
(WIKA-BG-PDDANLAT-KP-01) YAYUK DWI INDRIANI

113 WIKA-BG-PDDANLAT-IK-02 INSTRUKSI KERJA RENCANA PENGADAAN YAYUK DWI INDRIANI 4 01/01/2009 09/12/2019
01/09/2014
114 WIKA-BG-PDDANLAT-IK-03 INSTRUKSI KERJA PEROLEHAN KONTRAK PENGADAAN BARANG JAROT ARI WIBOWO 4 02/04/2010 29/02/2016
DAN JASA

115 WIKA-BG-PDDANLAT-IK-07 INSTRUKSI KERJA UMUM PEMELIHARAAN PERALATAN / JAROT ARI WIBOWO 4 01/01/2009 01/09/2014
MESIN

116 WIKA-BG-PDDANLAT-IK-08 INSTRUKSI KERJA PENYUSUNAN HARGA MATERIAL DAN JAROT ARI WIBOWO 4 01/01/2009 01/09/2014
ALAT

117 WIKA-BG-PDDANLAT-IK-09 INSTRUKSI KERJA APLIKASI MONITORING RA-RI PENGADAAN JAROT ARI WIBOWO 4 11/08/2012
BESI BETON

118 V SISTEM INFORMASI WIKA-BG-PDSI-PM-01 PROSEDUR MANAJEMEN JARINGAN IEDFIAN. T. AKBAR 3 21/06/2012 01/09/2014 13/11/2019

119 WIKA-BG-PDSI-PM-02 PROSEDUR MANAJEMEN PIRANTI LUNAK (SOFTWARE) IEDFIAN. T. AKBAR 3 21/06/2012 01/09/2014 13/11/2019

120 WIKA-BG-PDSI-PM-03 PROSEDUR MANAJEMEN PIRANTI KERAS (HARDWARE) IEDFIAN. T. AKBAR 3 21/06/2012 01/09/2014 13/11/2019

121 WIKA-BG-PDSI-PM-04 PROSEDUR BACK UP IEDFIAN. T. AKBAR 3 21/06/2012 01/09/2014 13/11/2019

122 WIKA-BG-PDSI-PM-05 PROSEDUR MANAJEMEN BACK UP ANTONIUS EKO INDRIARTO 3 21/06/2012 01/09/2014

123 WIKA-BG-PDSI-PM-06 PROSEDUR PENGELOLAAN DAN PERLINDUNGAN INFORMASI ANTONIUS EKO INDRIARTO 3 15/11/2015

124 WIKA-BG-PDSI-IK-01 RAPAT DARING KURNIAWAN TANJUNG 3 22/02/2021

125 VI ENGINEERING WIKA-BG-PDENG-PM-01 PROSEDUR ENJINIRING HENDRICO 5 04/01/2010 01/09/2014

126 WIKA-BG-PDENG-PM-02 PROSEDUR PENELITIAN DAN PENGEMBANGAN HENDRICO 5 04/01/2010 01/09/2014

127 WIKA-BG-PDENG-PM-03 PROSEDUR KARYA INOVASI HENDRICO 5 04/01/2010 01/09/2014 07/10/2019

128 WIKA-BG-PDENG-PM-04 PROSEDUR PEMBUATAN METODE KERJA STANDAR HENDRICO 5 04/01/2010 01/09/2014 13/11/2019

129 WIKA-BG-PDENG-PM-05 PROSEDUR QUALITY PRODUCT ASESSMENT SYSTEM HENDRAMAJI & ANTON EKO.I 5 04/01/2010 30-05-2016

130 WIKA-BG-PDENG-PM-06 PROSEDUR SURVEY DAN INVESTIGASI HENDRICO 5 04/01/2010 01/09/2014

131 WIKA-BG-PDENG-PM-07 PROSEDUR METODE PELAKSANAAN HENDRICO 5 04/01/2010 01/09/2014

132 WIKA-BG-PDENG-PM-08 PROSEDUR VA / VE HENDRICO 5 28/10/2019

133 WIKA-BG-ENG-PM-09 PROSEDUR MANAJEMEN LINGKUP DHESTRIANA RESPATI. A 5 06/03/2020

134 WIKA-BG-PDENG-PM-10 PROSEDUR BIM EXECUTION PLAN (BEP) ARDDHANU ZUNANTO HARDHI 5 21/12/2020 22/02/2021

135 WIKA-BG-PDENG-PM-11 PROSEDUR MASTER INFORMATION DELIVERY PLAN (MIDP) ARDDHANU ZUNANTO HARDHI 5 21/12/2020

136 WIKA-BG-PDENG-PM-12 PEDOMAN BUILDING INFORMATION MODELLING (BIM) PT WIJAYA ARDDHANU ZUNANTO HARDHI 5 16/12/2020
KARYA BANGUNAN GEDUNG TBK

137 WIKA-BG-PDENG-PM-13 PROSEDUR PENGENDALIAN DOKUMEN BIM ARDDHANU ZUNANTO HARDHI 5 25/1/2021

138 WIKA-BG-PDENG-PM-14 PROSEDUR CATATAN PENYIMPANGAN DAN PELUANG PERBAIKAN ARDDHANU ZUNANTO HARDHI 5 25/1/2021

4
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

PADA BIM

139 WIKA-BG-PDENG-IK-01 INSTRUKSI KERJA SUPERVISI PROBLEM SOLVER HENDRICO 5 04/01/2010 01/09/2014 Agustus/2019

140 WIKA-BG-PDENG-IK-02 INSTRUKSI KERJA VA/VE HENDRICO 5 04/01/2010 1/6/2014

141 WIKA-BG-PDENG-IK-03 INSTRUKSI KERJA DESIGN & BUILD HENDRICO 5 04/01/2010 1/6/2014

142 WIKA-BG-PDENG-IK-04 INSTRUKSI KERJA DESAIN STRUKTUR DICKY J ASMARA 5 04/01/2010

143 WIKA-BG-PDENG-IK-05 INSTRUKSI KERJA PENGENDALIAN MUTU BETON & HENDRICO 5 04/01/2010 1/6/2014
PENGENDALIAN STANDARD DEVIASI BETON

144 WIKA-BG-PDENG-IK-06 INSTRUKSI KERJA PENERIMAAN BESI BETON UNTUK STRUKTUR HENDRICO 5 01/02/2011 1/6/2014
TAHAN GEMPA

145 WIKA-BG-PDENG-IK-07 INSTRUKSI KERJA PENGENDALIAN MUTU BETON & PENGENDALIAN HENDRICO 5 01/02/2011 01/09/2014
STANDARD DEVIASI BETON SESUAI SNI 3-2847-2002

146 WIKA-BG-PDENG-IK-08 INSTRUKSI KERJA PENGENDALIAN GAMBAR KONSTRUKSI HENDRICO 5 01/02/2011 1/6/2014

147 WIKA-BG-PDENG-IK-32 INSTRUKSI KERJA PEKERJAAN REPROOFING IGNATIA WIKA 5 07/01/2016

148 WIKA-BG-PDENG-IK-34 PENGENDALIAN SHOPDRAWING ANTONIUS EKO INDRIARTO 5 23/07/2018

149 WIKA-BG-PDENG-IK-35 INSTRUKSI KERJA BAK PERENDAM BETON ANTONIUS EKO INDRIARTO 5 24/09/2018

150 WIKA-BG-PDENG-IK-01.09.02 INSTRUKSI KERJA PERANCAH PCH (PERTH CONSTRUCTION HIRE) DHESTRIANA RESPATI. A 5 08/05/2019 5/2/2021
(WIKA-BG-PDENG-IK-36)

151 WIKA-BG-PDENG-IK-37 INSTRUKSI KERJA TERMINAL MATERIAL DHESTRIANA RESPATI. A 5 26/8/2019

152 WIKA-BG-PDENG-IK-38 INSTRUKSI KERJA PERBAIKAN SAMBUNGAN KOLOM DHESTRIANA RESPATI. A 5 06/04/2020
NGEPLINT, MELINTIR DAN KEROPOS

153 WIKA-BG-PDENG-IK-38A INSTRUKSI KERJA WORK METHOD STATEMENT DHESTRIANA RESPATI. A 5 24/2/2019

154 WIKA-BG-PDENG-IK-01.02.02 INSTRUKSI KERJA PEKERJAAN PONDASI PANCANG (HAMMER) DAVID SIDI 5 01/02/2011 5/2/2021
(WIKABG-ENG-112-P-001_a) INSTRUKSI KERJA PEKERJAAN TIANG PANCANG

155 WIKA-BG-PDENG-IK-01.02.01 INSTRUKSI KERJA PEKERJAAN BORED PILE LODYK EKO KURNIAWAN 5 01/02/2011 5/2/2021
(WIKABG-ENG-112-P-001_c)

156 WIKA-BG-PDENG-IK-01.02.03 INSTRUKSI KERJA PEKERJAAN PONDASI FRENKIE PILE MUHAMMAD TAUFAN FIRDAUS 5 01/02/2011 5/2/2021
(WIKABG-ENG-112-P-001_d)

157 WIKA-BG-PDENG-IK-01.09.01 INSTRUKSI KERJA PERANCAH RINGLOCK DHESTRIANA RESPATI 5 5/2/2021

158 WIKA-BG-PDENG-IK-01.04.02 INSTRUKSI KERJA PEKERJAAN PONDASI BATU KALI MUHAMMAD TAUFAN FIRDAUS 5 01/02/2011 5/2/2021
WIKABG-ENG-112-P-001_f

159 WIKA-BG-PDENG-IK-01.04.01 INSTRUKSI KERJA PEKERJAAN PONDASI SETAPAK MUHAMMAD TAUFAN FIRDAUS 5 01/02/2011 5/2/2021
WIKABG-ENG-112-P-001_g

160 WIKA-BG-PDENG-IK-01.04.03 INSTRUKSI KERJA PEKERJAAN PONDASI SUMURAN MUHAMMAD TAUFAN FIRDAUS 5 5/2/2021

161 WIKA-BG-PDENG-IK-01.03.01 INSTRUKSI KERJA PEKERJAAN DIAPHARGM WALL MUHAMMAD TAUFAN FIRDAUS 5 01/02/2011 5/2/2021
WIKABG-ENG-112-P-007_a

162 WIKABG-ENG-112-S-018_b INSTRUKSI KERJA PEKERJAAN BEGESTING BALOK HENDRICO 5 02-04-2012

163 WIKABG-ENG-112-S-018_c INSTRUKSI KERJA PEKERJAAN BEGESTING PELAT DAN BALOK HENDRICO 5 02-04-2012

165 WIKABG-ENG-112-S-018_d INSTRUKSI KERJA PEKERJAAN BEGESTING PLAT DAN DINDING HENDRICO 5 02-04-2012

166 WIKABG-ENG-112-S-018_g INSTRUKSI KERJA PEKERJAAN BEGESTING DINDING BASEMEN HENDRICO 5 02-04-2012
(SATECO)

167 WIKA-BG-PDENG-IK-01.07.01 INSTRUKSI KERJA PEKERJAAN KOLOM BETON INDRA WICAHYANTO P 5 5/2/2021

168 WIKA-BG-PDENG-IK-01.07.02 INSTRUKSI KERJA PEKERJAAN BALOK, PLAT LANTAI , DAN INDRA WICAHYANTO P 5 5/2/2021
KEPALA KOLOM

169 WIKA-BG-PDENG-IK-01.07.03 INSTRUKSI KERJA PEKERJAAN DINDING BETON INDRA WICAHYANTO P 5 02-04-2012 5/2/2021
WIKABG-ENG-112-S-018_f INSTRUKSI KERJA PEKERJAAN BEGESTING DINDING

170 WIKABG-ENG-112-S-018_h INSTRUKSI KERJA PEKERJAAN BEGESTING KEPALA KOLOM HENDRICO 5 02-04-2012

5
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

171 WIKABG-ENG-112-S-018_e INSTRUKSI KERJA PEKERJAAN BEGESTING KOLOM HENDRICO 5 02-04-2012

172 WIKA-BG-PDENG-IK-02.02.02 INSTRUKSI KERJA KERAMIK - HOMOGENUS TILE LANTAI IQBAL MAULANA 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-007_a

173 WIKA-BG-PDENG-IK-02.02.03 INSTRUKSI KERJA PEKERJAAN LANTAI GRANIT - MARMER IQBAL MAULANA 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-007_c

174 WIKA-BG-PDENG-IK-02.02.01 INSTRUKSI KERJA PEKERJAAN SCREED LANTAI IQBAL MAULANA 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-007_f

175 WIKA-BG-PDENG-IK-02.02.04 INSTRUKSI KERJA PEKERJAAN SKIRTING LANTAI IQBAL MAULANA 5 5/2/2021

176 WIKA-BG-PDENG-IK-02.01.02 INSTRUKSI KERJA PASANGAN DINDING BATA MERAH IQBAL MAULANA 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-001_a

177 WIKA-BG-PDENG-IK-02.01.01 INSTRUKSI KERJA PEKERJAAN PASANGAN DINDING BATA RINGAN DAVID SIDI 5 01/02/2011 5/2/2021
(WIKABG-ENG-112-A-001_c)

178 WIKA-BG-PDENG-IK-02.01.05 INSTRUKSI KERJA PEKERJAAN OPENING PRECAST IQBAL MAULANA 5 02-04-2012 5/2/2021
(WIKABG/ENG/112/A/005_l)

179 WIKABG-ENG-112-A-01 INSTRUKSI KERJA PEKERJAAN FINISHING HIGHRISE BUILDING HENDRICO 5 09-02-2013

180 WIKA-BG-PDENG-IK-02.01.04 INSTRUKSI KERJA PEKERJAAN ACIAN DAVID SIDI 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-002_d

181 WIKA-BG-PDENG-IK-02.01.03 INSTRUKSI KERJA PEKERJAAN PLESTERAN DAVID SIDI 5 01/02/2011 5/2/2021
WIKABG-ENG-112-A-002_a

182 WIKA-BG-PDENG-IK-02.03.01 INSTRUKSI KERJA PEKERJAAN PINTU KUSEN ALUMINIUM SEDEWA WINDITIATAMA 5 5/2/2021

183 WIKA-BG-PDENG-IK-02.03.02 INSTRUKSI KERJA PEKERJAAN JENDELA KUSEN ALUMINIUM SEDEWA WINDITIATAMA 5 5/2/2021

184 WIKA-BG-PDENG-IK-02.04.01 INSTRUKSI KERJA PEKERJAAN PLAFOND GYPSUM SEDEWA WINDITIATAMA 5 5/2/2021

185 WIKA-BG-PDENG-IK-03.02.01 INSTRUKSI KERJA PEKERJAAN INSTALASI SPRINKLER ARYA PUNTA WIBAWA 5 5/2/2021

186 WIKA-BG-PDENG-IK-03.01.01 INSTRUKSI KERJA PEKERJAAN AC VRV HANA MUSTOFA 5 5/2/2021

187 WIKA-BG-PDENG-IK-03.05.01 INSTRUKSI KERJA PEKERJAAN INSTALASI PENERANGAN & ARYA PUNTA WIBAWA 5 5/2/2021
STOP KONTAK

188 WIKA-BG-PDENG-IK-03.06.01 INSTRUKSI KERJA PEKERJAAN IP CCTV HANA MUSTOFA 5 5/2/2021

189 WIKA-BG-PDENG-IK-03.07.01 INSTRUKSI KERJA PEKERJAAN INSTALASI PIPA AIR BERSIH AHMAD NURJAMAN 5 5/2/2021

190 WIKA-BG-PDENG-IK-03.08.01 INSTRUKSI KERJA PEKERJAAN INSTALASI PIPA AIR KOTOR & BEKAS AHMAD NURJAMAN 5 5/2/2021

191 WIKA-BG-PDENG-IK-03.09.01 INSTRUKSI KERJA PEKERJAAN INSTALASI PIPA AIR HUJAN AHMAD NURJAMAN 5 5/2/2021

192 VII HUMAN CAPITAL WIKA-BG-PDHC-PM-01.01 PROSEDUR PERENCANAAN KEBUTUHAN SUMBER DAYA MANUSIA SENTOT SUBAGYA 6 21/6/2012

193 WIKA-BG-HCP-PM-02 PROSEDUR REKRUTMEN INAYATI KHAERINNISAA 6 21/6/2012 17/2/2020

194 WIKA-BG-PDHC-PM-01.03.02 PROSEDUR PELATIHAN PEGAWAI SENTOT SUBAGYA 6 21/6/2012

195 WIKA-BG-PDHC-PM-01.04 PROSEDUR PEMBERIAN JASA PRODUKSI SENTOT SUBAGYA 6 21/6/2012

196 WIKA-BG-PDHC-IK-04 INSTRUKSI KERJA PENILAIAN PEGAWAI SENTOT SUBAGYA 6 01/06/2012

197 WIKA-HCE-IK-02.01 INSTRUKSI KERJA NATURALISASI WIKA GROUP SULI FATIMAH 6 01-05-2016

198 VIII KOMERSIAL WIKA-BG-RM-PM-01 PROSEDUR SISTEM MANAJEMEN RISIKO AGUNG PRASETYO 7 01/06/2012 04/01/2016 14/05/2018 10/2/2020 15/2/2021

199 WIKA-BG-PMS-PM-01 PROSEDUR PENYUSUNAN SCORECARD DARAWATI 7 01/06/2012 01/11/2015 10/3/2021

200 WIKA-BG-PRD-PM-01 PROSEDUR PENYUSUNAN RKP DARAWATI 7 01/06/2012 16/11/2015 12/02/2018 21/02/2020 30/08/2021
(WIKA-BG-PR-PM-01.01)

201 WIKA-BG-PR-PM-01.02 PROSEDUR PERENCANAAN DAN PENGENDALIAN PROSES DARAWATI 7 01/06/2012 16/11/2015 06/09/2021 20/09/2021

202 WIKA-BG-PRD-PM-03 PROSEDUR PENYUSUNAN LAPORAN PROYEK SELESAI & DARAWATI 7 01/06/2012 16/11/2015 26/02/2020
(WIKA-BG-PR-PM-01.03) LPS SHARING

203 WIKA-BG-PRD-PM-07 PROSEDUR PENGELOLAAN STAKEHOLDER SINTYA KUMALA DEWI 7 3/6/2020

6
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

204 WIKA-BG-PR-PM-02 PROSEDUR PENETAPAN KATEGORI PEMBENTUKAN DAN SINTYA KUMALA DEWI 7 01/01/2009 10/04/2014 16/11/2015 04/06/2018
PEMBUBARAN PROYEK DAN UNIT PROPERTY

205 WIKA-BG-PR-PM-03 PROSEDUR PENYUSUNAN RENCANA DAN KERJA ANGGARAN DARAWATI 7 26/04/2020 5/4/2021
PERUSAHAAN (RKAP) PT. WIJAYA KARYA BANGUNAN GEDUNG Tbk

206 WIKA-BG-PR-PM-04 PROSEDUR PENYUSUNAN LAPORAN EXECUTIVE SUMMARY DARAWATI 7 21/04/2020

207 WIKA-BG-PR-PM-05 PROSEDUR PENYUSUNAN LAPORAN BULANAN DIVISI DARAWATI 7 21/04/2020

208 WIKA-BG-PMS-PM-02 PROSEDUR PENYUSUNAN LAPORAN BULANAN PPU DARAWATI 7 01/06/2012 01/11/2015 7/4/2021
(WIKA-BG-PR-IK-02) INSTRUKSI KERJA PEMBUATAN LAPORAN BULANAN PROYEK

209 IX MANAJEMEN RESIKO WIKA-BG-ERM-IK-01 PENGGUNAAN CADANGAN RISIKO PROYEK PT WIKA GEDUNG Tbk YUDIANSYAH 7 06/04/2020

210 WIKA-BG-ERM-IK-02 KAMUS RISIKO YUDIANSYAH 7 06/04/2020

211 WIKA-BG-ERM-IK-04 ASSESSMENT MANAJEMEN RISIKO YUDIANSYAH 7 06/04/2020

212 X ADMINISTRASI KONTRAK WIKA-BG-PDAK-PM-01 PROSEDUR ADMINISTRASI KONTRAK NILAM TANTRI 6 01/06/2012 01/09/2014 04/05/2020
01/03/2015
213 WIKA-BG-PDAK-PM-02 PROSEDUR PERUBAHAN KONTRAK HEIDI DUMA 6 01/06/2012 01/03/2015 19/03/2018

214 WIKA-BG-PDAK-PM-03 PROSEDUR KLAIM DAN ANTI KLAIM NILAM TANTRI 6 01/06/2012 01/09/2014
01/03/2015
215 WIKA-BG-PDAK-PM-04 PROSEDUR ADMINISTRASI SUB KONTRAK NILAM TANTRI 6 01/06/2012 01/09/2014 04/05/2020
01/03/2015
216 XI KEUANGAN WIKA-KEU-KO-02.01 KEBIJAKAN OPERASIONAL KEUANGAN BAJU WIBISONO 6 03/01/2011 01/01/2015

217 WIKA-BG-PDKEU-PM-01.01 PROSEDUR PENGELUARAN KAS DI KANTOR PUSAT M. FAJAR SE 6 04/06/2012 01/09/2014

218 WIKA-BG-PDKEU-PM-01.02 PROSEDUR PENGELUARAN KAS DI UNIT PPU M. FAJAR SE 6 04/06/2012 01/09/2014

219 WIKA-BG-PDKEU-PM-01.03 PROSEDUR PENERBITAN DOKUMEN KEUANGAN M. FAJAR SE 6 04/02/2012 01/09/2014

220 WIKA-BG-PDKEU-PM-01.04 PROSEDUR PENERIMAAN KAS DI KANTOR PUSAT M. FAJAR SE 6 04/06/2012 01/09/2014

221 WIKA-BG-PDKEU-PM-01.05 PROSEDUR PENERIMAAN KAS DI UNIT KERJA PPU M. FAJAR SE 6 04/02/2012 01/09/2014

222 WIKA-BG-PDKEU-PM-02 PROSEDUR AKUNTANSI M. FAJAR SE 6 06/06/2013

223 WIKA-BG-PDKEU-PM-03 PROSEDUR PENANGANAN PIUTANG BERMASALAH ABDUL ROHMAN 6 22/01/2014

224 WIKA-BG-KON-PM-06.01 PROSEDUR PENERIMAAN, PENANGANAN MATERIAL, PENGEMASAN M. FAJAR SE 6 01/09/2014


DAN PENYERAHAN PRODUK

225 WIKA-BG-KEU-KP-01 KEBIJAKAN OTORISASI KEUANGAN TAUFAN YUDISTIRO 6 16/04/2021

227 XII HUKUM WIKA-BG-PDSEKUM-KP-01 KEBIJAKAN PERUSAHAAN FUNGSI HUKUM DIMAS DWICAHYO 8 01/02/2012 01/04/2015 30/04/2020

228 WIKA-BG-PDSEKUM-IK-03 INSTRUKSI KERJA FORMAT STANDARD SURAT PEMBERITAHUAN BUDHI PRASETYO 8 05/03/2015

229 WIKA-BG-PDSEKUM-IK-04 INSTRUKSI KERJA PROSES PELAKSANAAN PRA-PASCA RAPAT BUDHI PRASETYO 8 01/04/2015
UMUM PEMEGANG SAHAM

230 XIII SEKRETARIS UMUM WIKA-BG-PDSEKUM-IK-01 INSTRUKSI KERJA LAPORAN HARTA KEKAYAAN AGOES WALUJO 8 09/05/2014
PENYELENGGARAAN NEGARA

231 WIKA-BG-PDSEKUM-IK-02 INSTRUKSI KERJA PENOMORAN DAN FORMAT KORESPONDENSI RIZKIAWANTI. S 8 12/02/2015

232 WIKA-BG-PDSEKUM-IK-03 SAFETY DRIVING SUPARJIYONO 8 23/10/2019

233 WIKA-BG-PDSEKUM-PM-01 PROSEDUR PENGENDALIAN GRATIFIKASI AGOES WALUJO 8 19/05/2014 17/07/2018

234 WIKA-BG-PDSEKUM-PM-01 KEBIJAKAN PERUSAHAAN FUNGSI UMUM MANAJEMEN SUPARJIYONO 8 01/02/2012 07/10/2019
PERKANTORAN

235 WIKA-BG-PDSEKUM-PM-02 PROSEDUR PENGADUAN PELANGGARAN TERHADAP CODE OF BOBBY IMAM SETYA 8 19/05/2014 06/05/2018
CONDUCT (WHISTLE BLOWER)

236 WIKA-BG-PDSEKUM-PM-03 PROSEDUR PROTOKOLER FIRLAN 8 08/10/2018

237 WIKA-BG-PDSEKUM-PM-04 PROSEDUR MANAJEMEN KRISIS FIRLAN 8 15/10/2018

238 WIKA-BG-SUM-PM-05 PROSEDUR PERENCANAAN DAN PELAKSANAAN PROGRAM CSR FIRLAN 8 10/02/2020

7
PT.WIJAYA KARYA BANGUNAN GEDUNG Pusat Pengendali Dok.:
WIKA TOWER 1, LANTAI 9, JL. DI. PANJAITAN KAV 9, JAKARTA-12280 Tanggal: 20/09/2021
Tanda Tangan:
DAFTAR INDUK DOKUMEN INTERNAL
Nama: RESTU ALFIANTY REV. 00

No. Context Diagram & Activity Nomor Prosedur/IK Judul Prosedur/IK Pembuat Lokasi Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev. 05 Rev. 06 Rev. 07 Rev. 08 Rev. 09 Rev. 10 Rev. 11

239 WIKA-BG-SUM-PM-06 PROSEDUR MEDIA KOMUNIKASI INTERNAL DAN EKSTERNAL FIRLAN 8 10/02/2020

240 WIKA-BG-SUM-PM-07 PROSEDUR SISTEM MANAJEMEN ANTI PENYUAPAN*

241 WIKA-BG-SUM-PM-08 PROSEDUR PELAKSANAAN SISTEM MANAJEMEN ANTI PENYUAPAN* YUKI YATURRAHMAH 8 7/4/2021

242 WIKA-BG-SUM-PM-09 PROSEDUR PENILAIAN DAN PENINGKATAN SMAP* YUKI YATURRAHMAH 8 7/4/2021

243 WIKA-BG-SUM-PM-10 PROSEDUR PERENCANAAN SMAP* YUKI YATURRAHMAH 8 7/4/2021

244 XIV BIRO SPI WIKA BG-PDSPI-PM-01 PROSEDUR UMUM PEMERIKSAAN OLEH SATUAN PENGAWASAN FERDIAN APRIM NUGROHO 8 04/01/2012 01/09/2014 10/12/2019
INTERN DAN TINDAKLANJUTNYA

245 WIKA-BG-PDSPI-PM-02 PROSEDUR JAMINAN KUALITAS (QUALITY ASSURANCE) FERDIAN APRIM NUGROHO 8 10/12/2019
PEMERIKSAAN SPI

246 WIKA-BG-PDSPI-IK-01 INSTRUKSI KERJA PEMERIKSAAN OPERASIONAL DUKUT HERU ARYANTO 8 11/11/2019

247 WIKA-BG-PDSPI-IK-02 INSTRUKSI KERJA PEMERIKSAAN AKUNTANSI & KEUANGAN DUKUT HERU ARYANTO 8 11/11/2019

248 XV BIRO INVESTASI & KONSESI WIKA-BG-PROPERTY-PM-01 PROSEDUR PELAKSANAAN BISNIS PROPERTY R. WAHYU A. WISNU 8 01/05/2014

249 WIKA-BG-PROPERTY-PM-02 PROSEDUR PENINJAUAN PESANAN DAN PENJUALAN PROPERTY VIANDA MANAN M 8 16/11/2015 23/08/2019

250 WIKA-BG-PROPERTY-PSR-PM-02 PROSEDUR PENERAPAN PROGRAM EVERYONE IS A MARKETER ERI PRANANTO 8 14/03/2016 14-05-2016 01-09-2016 23/08/2019

251 WIKA-BG-PROPERTY-PSR-IK-01 INSTRUKSI KERJA PROGRAM PINJAM PAKAI PRAPANCA. A. WIRADISURIA 8 26/07/2017 06/09/2019

252 WIKA-BG-PROPERTY-PSR-IK-02 INSTRUKSI KERJA PERATURAN TATA TERTIB PENGHUNIAN UNIT PRAPANCA. A. WIRADISURIA 8 20/07/2017
SATUAN RUMAH SUSUN / HOUSE RULES

253 WIKA-BG-PROPERTY-BD-PM-01 PENAWARAN TANAH R. WAHYU A. WISNU 8 01/05/2014

254 WIKA-BG-PROPERTY-BD-PM-02 HIGHEST & BEST USES HAEKAL SALEH BATATY 8 01/05/2014 18/11/2019

255 WIKA-BG-PROPERTY-KOM-PM-01 PENYUSUNAN RKAP BIRO & UNIT PPU R. WAHYU A. WISNU 8 01/05/2014

256 WIKA-BG-PROPERTY-KOM-PM-02 ADMINISTRASI KONTRAK R. WAHYU A. WISNU 8 01/06/2014

257 WIKA-BG-PROPERTY-KOM-PM-03 PROSEDUR PENGADAAN NON KONSTRUKSI R. WAHYU A. WISNU 8 01/05/2014

* Tebal miring : Prosedur tidak didistribusikan ke Proyek


* Tebal miring hijau : Prosedur masih direvisi
* Merah : Prosedur baru per tanggal 20 / 09 / 2021

CATATAN : YANG BERWARNA MERAH ADALAH PROSEDUR YANG BARU PER TANGGAL 20/09/2021

Anda mungkin juga menyukai