VOLUME PEKERJAAN
Volume Aanstamping
Lebar trapesium (alas+atas)/2 Tinggi Trapesium
No Daerah Segmen
m m
1 A 0.87 0.2
2 B 1.04 0.2
3 C 1.04 0.2
4 D 1.04 0.2
5 E 1.04 0.2
6 HORIZONTAL F 1.04 0.2
7 G 1.04 0.2
8 H 1.04 0.2
HORIZONTAL
9 I 1.04 0.2
10 J 1.04 0.2
11 K 0.87 0.2
10 1 0.87 0.2
11 2 1.04 0.2
12 3 1.04 0.2
13 4 1.04 0.2
14 5 1.04 0.2
15 6 1.04 0.2
16 7 1.04 0.2
VERTIKAL
17 8 1.04 0.2
18 9 1.04 0.2
19 10 1.04 0.2
20 11 1.04 0.2
21 12 1.04 0.2
22 13 1.04 0.2
23 14 0.87 0.2
Jumlah
` TIPE 2
0.0175 LUAS 1 0.0125
0.0875 LUAS 2 0.0625
0.3 LUAS 3 0.3
0.405 m2 TOTAL 0.375
0.405 m3 VOLUME 0.3
TULANGAN POKOK
1.1685 DIAMETER 16 1.1685
9.348 m JUMLAH 8 9.348
SENGKANG KOLOM
1.96 DIAMETER 8 1.96
0.875 m TINGGI KOLOM 0.875
4.375 = 5 BUAH JUMLAH TULANGAN 4.375
9.8 m TOTAL TULANGAN 9.8
BEKISTING
0.6 B1 0.6
0.68 B2 0.68
0.35 B3 0.28
0.364 B4 0.294
1.994 m2 TOTAL 1.854
`
m2
m3
m
m
= 4 BUAH
= 8 BUAH
m
m
= 5 BUAH
m
kg
kg
KG
m2
Harga Satuan Jumlah Harga
Koefisien/
Uraian Jenis Pekerjaan Satuan Bahan/Upah Bahan Upah
Volume
Rp. Rp. Rp.
2 3 4 5 6 7
Pekerjaan Pondasi Batu Kali
1 m3 Pekerjaan Urugan Pasir
Bahan :
Pasir Urug m3 1.2 257603 309123 -
Tenaga Kerja :
Pekerja Oh 0.3 80815 - 24244.488
Mandor Oh 0.1 123988 - 12398.839
Jumlah 309123 36643.327
1 m3 Pasangan Aanstamping
Bahan :
Batu Belah 15/20 M3 1.2 204831 245797.4 -
Pasir Urug M3 0.432 257603 111284.28 -
Tenaga Kerja :
Pekerja Oh 0.78 80815 - 63036
Tukang Batu Oh 0.39 90000 - 35100
Kepala Tukang Batu Oh 0.039 100000 - 3900
Mandor Oh 0.039 123988 - 4836
Jumlah 357081.68 106871
1 m3 Pekerjaan Sloof
Bahan :
Kayu Albasia M3 0.2 700000 140000 -
Paku 4 cm s/d 7 cm Kg 3.2 14000 44800 -
Plus Oil Lt 1.6 19000 30400 -
Besi Beton Kg 138.17 7200 994802.4 -
Kawat Beton Kg 2.25 14000 31500 -
Semen PC Tiga Roda / 50 kg Zak 6.72 65000 436800 -
Pasir Beton M3 0.54 205000 110700 -
Batu Pecah Mesin 2/3 M3 0.81 146250 118462.5 -
Kayu Balok Borneo M3 0.2 3000000 600000 -
Multiplek 9 mm 120 x 240 Lbr 2.5 100000 250000 -
Dolken 7 s/d 10 Btg 12 25800 309600 -
Tenaga Keja :
Pekerja Oh 5.3 75000 397500
Tukang batu Oh 0.2 90000 18000
Tukang kayu Oh 1.3 90000 117000
Tukang Besi Beton Oh 1.05 90000 94500
Kepala tukang Oh 0.2 100000 20000
Mandor Oh 0.2 120000 24000
Jumlah 3067064.9 671000
Jumlah Harga
Bahan + Upah
Rp.
8
345766.327
463952.90001
723001.40
3738064.90
TABEL 3. RENCANA ANGGARAN BIAYA
HARGA SATUAN
NO URUTAN PEKERJAAN VOL SAT
BAHAN
1 2 3 4 5
C Pekerjaan Pondasi Batu Kali
C1 Pekerjaan Urugan Pasir 8.225 m3 309,123
C2 Pekerjaan Pasangan Aan Stamping 33.756 m3 357,082
C3 Pekerjaan Pasangan Batu Kali 70.140 m3 526,501
Jumlah
ARAN BIAYA
TOTAL
AN BAHAN TABEL 5. R
40.5072 8,297,137
14.582592 3,756,512
12,053,649
84.168 17,240,230
9539.04 12,248,127
38.15616 7,440,451
36,928,808
51,525,072
TABEL 5. REKAPITULASI KEBUTUHAN BAHAN
TOTAL
ENAGA KERJA TABEL 7. REKAPITULAS
26.32968 2,127,832
13.16484 1,184,836
1.316484 131,648
1.316484 163,229
3,607,545
105.21 8,502,542
52.605 4,734,450
5.2605 526,050
5.2605 652,241
14,415,283
18,324,228
TABEL 7. REKAPITULASI KEBUTUHAN TENAGA KERJA