1st Submit1
1st Submit1
Planting
10mm thk. with finishes
Brickwall planters with
washed aggregate finish
Compacted subgrade
RC slab
Plantings distance
Plantings
10mm thk. with finishes
Brickwall planters with
washed aggregate finish
Compacted subgrade
FALL FALL FALL FALL FALL
RC slab
Drainage outlet
Drainage level SECTION B-B
PERINCIAN KOTAK PENANAMAN
B1 B-B B-B E1
HR
TANGGA 8
B1a
RUANG LANSKAP
CHWP-1
CHWP-2
CHWP-4
CHWP-3
A-A
No. 1 CHILLER
No. 2 CHILLER
E2
No. 3 CHILLER
No. 4 CHILLER
600RT
600RT
300RT
300RT
CWP-4
CWP-3
CWP-1
CWP-2
TANGGA 3 TANGGA 1
LOCKER (P) 22.56m.p. 22.56m.p.
56.27 m.p.
E4
RECEPTION
71.84 m.p. LIFT LOBI
HOTEL
91.20 m.p.
GYMNASIUM
ELV + TEL
RISER
SPD JACUZZI RUANG REAKRASI
B4 SPD SPD
SERVICE LIF LOBI 1
SERVIS
POOL DECK
RISER RISER
P.B.A. ELEK
SERVIS / LIF
62.46 m.p. KOLAM KANAK-KANAK
RISER
SERVIS /
BOMBA BOMBA 10 E5
STEAM
16.80m.p. 16.80m.p. P.B.A. LIF LOBI
BILIK STEAM
RUANG LANSKAP
MOTOR RISER
10.44 m.p. 3.75 m.p.
CHWS
'STUDIO LIF DN
JANITOR OFFICE' 9
LALUAN 32.88 m.p. KOLAM RENANG
43.66 m.p.
B5 ORANG DEWASA
E6
CK
MALE
CHANGING ROOM
KOLAM RENANG
DE
RUANG 72.67m.p.
RUANG FEMALE ORANG DEWASA
URUT (P)
OL
TANGGA 4
A3 20.47 m.p.
A4
A5
A6 F1 Habitat Design Architects
PELAN LANSKAP TINGKAT 7 ( PODIUM ) A7
F2
sendirian berhad
A8
A9
A10
U
PELAN LANDSKAP PELAN LANDSKAP
SKALA: 1: 500 PELAN KUNCI, PELAN LOKASI