SCHEDULE
No ITEM PEKERJAAN SATUAN BOBOT FISIK
MINGGU I MINGGU II
I PEKERJAAN BONGKARAN
A Kamar Mandi 1
- Keramik Lantai m2 1.71%
- Bak Mandi Ls 1.67%
- Keramik Dinding m2
- Closet Ls 1.43%
B Kamar Mandi 2
- Keramik Lantai m2 1.71%
- Bak Mandi Ls 1.67%
- Keramik Dinding m2
- Closet Ls 1.43%
C Kitchen
- Bongkar Dek Kitchen Ls 7.16%
- Bongkar Zinc Ls
D Ruang Cuci
- Saluran Air Cuci m1 1.00%
- Bongkar Pintu Unit 0.72%
Sub Total I
II PEKERJAAN PASANGAN
A Kamar Mandi 1
- Keramik Lantai m2 0.81%
- Keramik Dinding m2
- Shower Set Unit 1.43%
- Closet Unit 3.10%
- Wastafel Unit 1.43%
- Saluran Air Panas Titik 1.91%
- Pipa Air Kotor Titik 1.91%
- Water Heater Titik 1.19%
- Tempat Sabun Unit 0.83%
- Cat Dinding + Waterproof m2 1.22%
SCHEDULE
No ITEM PEKERJAAN SATUAN BOBOT FISIK
MINGGU I MINGGU II
B Kamar Mandi 2
- Keramik Lantai m2 0.81%
- Keramik Dinding m2
- Closet Unit 3.10%
- Wastafel Unit 1.43%
- Shower Set Unit 1.43%
- Tempat Sabun Unit 0.83%
- Cat Dinding + Waterproof m2 1.22%
C Ruang Cuci
- Instalasi Air Bersih + Kran dinding Ls 0.95%
- Instalasi Air Kotor Titik 1.67%
- Pasangan Panel Pintu kayu Solid Swing Tanpa Unit
Kusen 7.16%
- Instalasi Titik Stop Kontak Titik 0.72%
D Kitchen
- Pasangan Dak Kitchen Finish Keramik (Incl Zinc Ls
dan Keran Tanam) 26.24%
- Instalasi Air Bersih Titik 0.95%
- Instalasi Air Kotor Titik 1.67%
- Instalasi Titik Stop Kontak Titik 1.43%
E Kanopi Area Jemur
- Pek. Pasangan Rangka Baja Ringan m2 5.30%
- Solartuff Bening 1,2 mm m2 7.48%
Sub Total II
III PEKERJAAN LAIN LAIN
A Kamar Mandi 1
- Pembersihan Puing Ls 2.86%
- Mobilisasi & Demobilisasi Ls 2.39%
Sub Total III
100.00%
Grand Total
PROGRESS RENOVASI JALAN RADIO IV KEBAYORAN BARU JAKARTA SELATAN
TERMIN III
No ITEM PEKERJAAN SATUAN VOL HARGA JUMLAH BOBOT FISIK
PROGRESS PROGRESS SAAT SISA PROGRESS
SEBELUMNYA INI
I PEKERJAAN BONGKARAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 95,000 359,100 1.71% -
- Bak Mandi Ls 1.00 350,000 350,000 1.67% -
- Keramik Dinding m2 95,000 -
- Closet Ls 1.00 300,000 300,000 1.43% -
B Kamar Mandi 2
- Keramik Lantai m2 3.78 95,000 359,100 1.71% -
- Bak Mandi Ls 1.00 350,000 350,000 1.67% -
- Keramik Dinding m2 95,000 -
- Closet Ls 1.00 300,000 300,000 1.43% -
C Kitchen
- Bongkar Dek Kitchen Ls 1.00 1,500,000 1,500,000 7.16% -
- Bongkar Zinc Ls - -
D Ruang Cuci
- Saluran Air Cuci m1 6.00 35,000 210,000 1.00% -
- Bongkar Pintu Unit 1.00 150,000 150,000 0.72% -
Sub Total I 3,878,200
II PEKERJAAN PASANGAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 45,000 170,100 0.81% 0.81% -
- Keramik Dinding m2 - 80,000 -
- Shower Set Unit 1.00 300,000 300,000 1.43% 1.43% -
- Closet Unit 1.00 650,000 650,000 3.10% 3.10% -
- Wastafel Unit 1.00 300,000 300,000 1.43% 1.43% -
- Saluran Air Panas Titik 1.00 400,000 400,000 1.91% 1.91% -
- Pipa Air Kotor Titik 1.00 400,000 400,000 1.91% 1.91% -
- Water Heater Titik 1.00 250,000 250,000 1.19% 1.19% -
- Tempat Sabun Unit 1.00 175,000 175,000 0.83% 0.83% -
- Cat Dinding + Waterproof m2 5.70 45,000 256,500 1.22% 1.22% -
B Kamar Mandi 2
- Keramik Lantai m2 3.78 45,000 170,100 0.81% 0.81% -
- Keramik Dinding m2 - 80,000 -
- Closet Unit 1.00 650,000 650,000 3.10% 3.10% -
- Wastafel Unit 1.00 300,000 300,000 1.43% 1.43% -
TERMIN III
No ITEM PEKERJAAN SATUAN VOL HARGA JUMLAH BOBOT FISIK
PROGRESS PROGRESS SAAT
SISA PROGRESS
SEBELUMNYA INI
I PEKERJAAN TAMBAH
A Kanopi Area Carport ( Tambahan Volume dari Kanopi Area Jemur)
- Pek. Pasangan Rangka Baja Ringan Ls 12.50 195,000 2,437,500 41.49% 41.49%
- Solartuff Bening 1,2 mm Ls 12.50 275,000 3,437,500 58.51% 29.26%