RAB RENOVASI JALAN RADIO IV KEBAYORAN BARU JAKARTA SELATAN

No ITEM PEKERJAAN SATUAN VOL HARGA JUMLAH VOL


I PEKERJAAN BONGKARAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 95,000 359,100 ###
- Bak Mandi Ls 1.00 350,000 350,000 ###
- Keramik Dinding m2 95,000 - ###
- Closet Ls 1.00 300,000 300,000 ###
B Kamar Mandi 2
- Keramik Lantai m2 3.78 95,000 359,100 ###
- Bak Mandi Ls 1.00 350,000 350,000 ###
- Keramik Dinding m2 95,000 - ###
- Closet Ls 1.00 300,000 300,000 ###
C Kitchen
- Bongkar Dek Kitchen Ls 1.00 1,500,000 1,500,000 ###
- Bongkar Zinc Ls - - ###
D Ruang Cuci
- Saluran Air Cuci m1 6.00 35,000 210,000 ###
- Bongkar Pintu Unit 1.00 150,000 150,000 ###
Sub Total I 3,878,200 ###
II PEKERJAAN PASANGAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 45,000 170,100 ###
- Keramik Dinding m2 - 80,000 - ###
- Shower Set Unit 1.00 300,000 300,000 ###
- Closet Unit 1.00 650,000 650,000 ###
- Wastafel Unit 1.00 300,000 300,000 ###
- Saluran Air Panas Titik 1.00 400,000 400,000 ###
- Pipa Air Kotor Titik 1.00 400,000 400,000 ###
- Water Heater Titik 1.00 250,000 250,000 ###
- Tempat Sabun Unit 1.00 175,000 175,000 ###
- Cat Dinding + Waterproof m2 5.70 45,000 256,500 ###
B Kamar Mandi 2
- Keramik Lantai m2 3.78 45,000 170,100 ###
- Keramik Dinding m2 - 80,000 - ###
- Closet Unit 1.00 650,000 650,000 ###
- Wastafel Unit 1.00 300,000 300,000 ###
- Shower Set Unit 1.00 300,000 300,000 ###
- Tempat Sabun Unit 1.00 175,000 175,000 ###
- Cat Dinding + Waterproof m2 5.70 45,000 256,500 ###
C Ruang Cuci ###
- Instalasi Air Bersih + Kran dinding Ls 1.00 200,000 200,000 ###
- Instalasi Air Kotor Titik 1.00 350,000 350,000 ###
- Pasangan Panel Pintu kayu Solid Swing Tanpa Unit 1.00 1,500,000 1,500,000 ###
Kusen
- Instalasi Titik Stop Kontak Titik 1.00 150,000 150,000 ###
D Kitchen ###
- Pasangan Dak Kitchen Finish Keramik (Incl Zinc Ls 1.00 5,500,000 5,500,000 ###
dan Keran Tanam)
- Instalasi Air Bersih Titik 1.00 200,000 200,000 ###
- Instalasi Air Kotor Titik 1.00 350,000 350,000 ###
- Instalasi Titik Stop Kontak Titik 2.00 150,000 300,000 ###
E Kanopi Area Jemur
- Pek. Pasangan Rangka Baja Ringan m2 5.70 195,000 1,111,500 ###
- Solartuff Bening 1,2 mm m2 5.70 275,000 1,567,500 ###
Sub Total II 15,982,200 ###
III PEKERJAAN LAIN LAIN
A Kamar Mandi 1
- Pembersihan Puing Ls 1.00 600,000 600,000 ###
- Mobilisasi & Demobilisasi Ls 1.00 500,000 500,000 ###
Sub Total III 1,100,000 ###

Grand Total 20,960,400


###

Jakarta, 15 juni 2022


TIME SCHEDULE RENOVASI JALAN RADIO IV KEBAYORAN BARU JAKARTA SELATAN

SCHEDULE
No ITEM PEKERJAAN SATUAN BOBOT FISIK
MINGGU I MINGGU II
I PEKERJAAN BONGKARAN
A Kamar Mandi 1
- Keramik Lantai m2 1.71%
- Bak Mandi Ls 1.67%
- Keramik Dinding m2
- Closet Ls 1.43%
B Kamar Mandi 2
- Keramik Lantai m2 1.71%
- Bak Mandi Ls 1.67%
- Keramik Dinding m2
- Closet Ls 1.43%
C Kitchen
- Bongkar Dek Kitchen Ls 7.16%
- Bongkar Zinc Ls
D Ruang Cuci
- Saluran Air Cuci m1 1.00%
- Bongkar Pintu Unit 0.72%
Sub Total I
II PEKERJAAN PASANGAN
A Kamar Mandi 1
- Keramik Lantai m2 0.81%
- Keramik Dinding m2
- Shower Set Unit 1.43%
- Closet Unit 3.10%
- Wastafel Unit 1.43%
- Saluran Air Panas Titik 1.91%
- Pipa Air Kotor Titik 1.91%
- Water Heater Titik 1.19%
- Tempat Sabun Unit 0.83%
- Cat Dinding + Waterproof m2 1.22%
SCHEDULE
No ITEM PEKERJAAN SATUAN BOBOT FISIK
MINGGU I MINGGU II
B Kamar Mandi 2
- Keramik Lantai m2 0.81%
- Keramik Dinding m2
- Closet Unit 3.10%
- Wastafel Unit 1.43%
- Shower Set Unit 1.43%
- Tempat Sabun Unit 0.83%
- Cat Dinding + Waterproof m2 1.22%
C Ruang Cuci
- Instalasi Air Bersih + Kran dinding Ls 0.95%
- Instalasi Air Kotor Titik 1.67%
- Pasangan Panel Pintu kayu Solid Swing Tanpa Unit
Kusen 7.16%
- Instalasi Titik Stop Kontak Titik 0.72%
D Kitchen
- Pasangan Dak Kitchen Finish Keramik (Incl Zinc Ls
dan Keran Tanam) 26.24%
- Instalasi Air Bersih Titik 0.95%
- Instalasi Air Kotor Titik 1.67%
- Instalasi Titik Stop Kontak Titik 1.43%
E Kanopi Area Jemur
- Pek. Pasangan Rangka Baja Ringan m2 5.30%
- Solartuff Bening 1,2 mm m2 7.48%
Sub Total II
III PEKERJAAN LAIN LAIN
A Kamar Mandi 1
- Pembersihan Puing Ls 2.86%
- Mobilisasi & Demobilisasi Ls 2.39%
Sub Total III
100.00%
Grand Total
PROGRESS RENOVASI JALAN RADIO IV KEBAYORAN BARU JAKARTA SELATAN

TERMIN III
No ITEM PEKERJAAN SATUAN VOL HARGA JUMLAH BOBOT FISIK
PROGRESS PROGRESS SAAT SISA PROGRESS
SEBELUMNYA INI

I PEKERJAAN BONGKARAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 95,000 359,100 1.71% -
- Bak Mandi Ls 1.00 350,000 350,000 1.67% -
- Keramik Dinding m2 95,000 -
- Closet Ls 1.00 300,000 300,000 1.43% -
B Kamar Mandi 2
- Keramik Lantai m2 3.78 95,000 359,100 1.71% -
- Bak Mandi Ls 1.00 350,000 350,000 1.67% -
- Keramik Dinding m2 95,000 -
- Closet Ls 1.00 300,000 300,000 1.43% -
C Kitchen
- Bongkar Dek Kitchen Ls 1.00 1,500,000 1,500,000 7.16% -
- Bongkar Zinc Ls - -
D Ruang Cuci
- Saluran Air Cuci m1 6.00 35,000 210,000 1.00% -
- Bongkar Pintu Unit 1.00 150,000 150,000 0.72% -
Sub Total I 3,878,200
II PEKERJAAN PASANGAN
A Kamar Mandi 1
- Keramik Lantai m2 3.78 45,000 170,100 0.81% 0.81% -
- Keramik Dinding m2 - 80,000 -
- Shower Set Unit 1.00 300,000 300,000 1.43% 1.43% -
- Closet Unit 1.00 650,000 650,000 3.10% 3.10% -
- Wastafel Unit 1.00 300,000 300,000 1.43% 1.43% -
- Saluran Air Panas Titik 1.00 400,000 400,000 1.91% 1.91% -
- Pipa Air Kotor Titik 1.00 400,000 400,000 1.91% 1.91% -
- Water Heater Titik 1.00 250,000 250,000 1.19% 1.19% -
- Tempat Sabun Unit 1.00 175,000 175,000 0.83% 0.83% -
- Cat Dinding + Waterproof m2 5.70 45,000 256,500 1.22% 1.22% -
B Kamar Mandi 2
- Keramik Lantai m2 3.78 45,000 170,100 0.81% 0.81% -
- Keramik Dinding m2 - 80,000 -
- Closet Unit 1.00 650,000 650,000 3.10% 3.10% -
- Wastafel Unit 1.00 300,000 300,000 1.43% 1.43% -
TERMIN III
No ITEM PEKERJAAN SATUAN VOL HARGA JUMLAH BOBOT FISIK
PROGRESS PROGRESS SAAT
SISA PROGRESS
SEBELUMNYA INI

- Shower Set Unit 1.00 300,000 300,000 1.43% 1.43% -


- Tempat Sabun Unit 1.00 175,000 175,000 0.83% 0.83% -
- Cat Dinding + Waterproof m2 5.70 45,000 256,500 1.22% 1.22% -
C Ruang Cuci
- Instalasi Air Bersih + Kran dinding Ls 1.00 200,000 200,000 0.95% 0.00% -
- Instalasi Air Kotor Titik 1.00 350,000 350,000 1.67% 0.00% -
- Pasangan Panel Pintu kayu Solid Swing Tanpa Unit 1.00 1,500,000 1,500,000 7.16% 7.16% -
Kusen
- Instalasi Titik Stop Kontak Titik 1.00 150,000 150,000 0.72% 0.00% -
D Kitchen
- Pasangan Dak Kitchen Finish Keramik (Incl Zinc Ls 1.00 5,500,000 5,500,000 26.24% 15.74% -
dan Keran Tanam)
- Instalasi Air Bersih Titik 1.00 200,000 200,000 0.95% -
- Instalasi Air Kotor Titik 1.00 350,000 350,000 1.67% -
- Instalasi Titik Stop Kontak Titik 2.00 150,000 300,000 1.43% 1.43% -
E Kanopi Area Jemur
- Pek. Pasangan Rangka Baja Ringan m2 5.70 195,000 1,111,500 5.30% 5.30%
- Solartuff Bening 1,2 mm m2 5.70 275,000 1,567,500 7.48% 7.48%
Sub Total II 15,982,200
III PEKERJAAN LAIN LAIN
A Kamar Mandi 1
- Pembersihan Puing Ls 1.00 600,000 600,000 2.86% 2.86% -
- Mobilisasi & Demobilisasi Ls 1.00 500,000 500,000 2.39% 1.19% -
Sub Total III 1,100,000
100.00% 51.06% 12.78%
Grand Total 20,960,400

I PEKERJAAN TAMBAH
A Kanopi Area Carport ( Tambahan Volume dari Kanopi Area Jemur)
- Pek. Pasangan Rangka Baja Ringan Ls 12.50 195,000 2,437,500 41.49% 41.49%
- Solartuff Bening 1,2 mm Ls 12.50 275,000 3,437,500 58.51% 29.26%

Grand Total 5,875,000