Anda di halaman 1dari 2

KEBUTUHAN MATERIAL BESI TIAP LANTAI

HASIL UJI
NO URAIAN KEBUTUHAN DIBULATKAN KETERANGAN
RERATA

I. PONDASI
A. BJTD fy = 420 Mpa (Ulir)
1 D 22 2,88 2.277,50 kg 66,00 btg
2 D19 2,13 6.257,56 kg 245,00 btg
3 D 16 1,49 23.343,99 kg 1.306,00 btg
4 D 13 0,98 5.181,63 kg 443,00 btg
5 D 10 0,59 17.941,94 kg 2.522,00 btg
6 D8 - kg btg Belum Uji
B. BJTP fy = 280 Mpa (Polos)
1 P 12 0,89 - kg - btg Belum Uji
2 P 10 0,62 - kg - btg Belum Uji
3 P8 0,40 - kg - btg Belum Uji
C. Wiremesh
1 Wiremesh M10 8,51 - kg - lbr Belum Uji

II. LANTAI 1
A. BJTD fy = 420 Mpa (Ulir)
1 D 22 2,88 9.256,55 kg 268,00 btg
2 D19 2,13 2.315,33 kg 91,00 btg
3 D 16 1,49 1.272,95 kg 72,00 btg
4 D 13 0,98 514,94 kg 44,00 btg
5 D 10 0,59 5.661,59 kg 796,00 btg
6 D8 - kg btg Belum Uji
B. BJTP fy = 280 Mpa (Polos)
1 P 12 0,89 585,37 kg 55,00 btg Belum Uji
2 P 10 0,62 91,51 kg 13,00 btg Belum Uji
3 P8 0,40 58,07 kg 13,00 btg Belum Uji
C. Wiremessh
1 Wiremesh M10 8,51 11.610,62 kg 114,00 lbr Belum Uji

III. LANTAI 2
A. BJTD fy = 420 Mpa (Ulir)
1 D 22 2,88 2.167,77 kg 63,00 btg
2 D19 2,13 8.766,02 kg 344,00 btg
3 D 16 1,49 1.390,22 kg 78,00 btg
4 D 13 0,98 - kg - btg
5 D 10 0,59 20.529,50 kg 2.885,00 btg
6 D8 - kg btg Belum Uji
B. BJTP fy = 280 Mpa (Polos)
1 P 12 0,89 55,31 kg 6,00 btg Belum Uji
2 P 10 0,62 36,87 kg 5,00 btg Belum Uji
3 P8 0,40 - kg - btg Belum Uji
C. Wiremessh
1 Wiremesh M10 8,51 - kg - lbr Belum Uji

IV. LANTAI 3
A. BJTD fy = 420 Mpa (Ulir)
1 D 22 2,88 17.012,74 kg 493,00 btg
2 D19 2,13 16.361,15 kg 641,00 btg
3 D 16 1,49 1.782,34 kg 100,00 btg
4 D 13 0,98 kg - btg
5 D 10 0,59 35.088,47 kg 4.931,00 btg
6 D8 - kg btg Belum Uji
B. BJTP fy = 280 Mpa (Polos)
1 P 12 0,89 - kg - btg Belum Uji
2 P 10 0,62 - kg - btg Belum Uji
3 P8 0,40 - kg - btg Belum Uji
C. Wiremessh
1 Wiremesh M10 8,51 - kg - lbr Belum Uji
KEBUTUHAN GLOBAL MATERIAL BESI

PENDATANGAN KEKURANGAN
NO URAIAN SATUAN KEBUTUHAN KETERANGAN
21/06/2023 02/07/2023 23:20

A. BJTD fy = 420 Mpa (Ulir)


1 D 22 btg 890,00 236,00 - 654,00
2 D19 btg 1.321,00 281,00 - 1.040,00
3 D 16 btg 1.556,00 1.451,00 - 105,00
4 D 13 btg 487,00 260,00 - 227,00
5 D 10 btg 11.134,00 2.523,00 - 8.611,00
6 D8 btg - - Belum Uji
B. BJTP fy = 280 Mpa (Polos) - -
1 P 12 btg 61,00 - 61,00 Belum Uji
2 P 10 btg 18,00 - 18,00 Belum Uji
3 P8 btg 13,00 - 13,00 Belum Uji
C. Wiremesh - -
1 Wiremesh M10 lbr 114,00 - 114,00 Belum Uji