A Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi Alat
2 SMK3
3 Pencegahan Covid-19
F Pekerjaan Playground
1 Stripping/kosrekan
2 Galian tanah biasa
3 Timbunan Tanah kembali dipadatkan
4 Urugan Pasir tebal 5 cm
5 Beton K-100
6 Beton K-225
7 Bekisting
8 Acian
9 Angkur Bolt M16
10 Base Plate tebal = 12 mm
11 Kolom WF 300
12 Kolom WF 150
13 Pipa Besi 1.5 inchi
14 Pemasangan paving block Abu-abu tebal 8 cm
15 Pemasangan paving block warna tebal 8 cm
16 Pemasangan Kansteen
17 Pemasangan grass block
18 Pemasangan koral sikat
19 Gebalan rumput
20 Tanaman kecil
21 Geotextille non woven 150 gr
22 Pengadaan dan Pemasangan Kursi Taman
23 Pengadaan dan Pemasangan Lampu Taman
24 Tempat sampah, per jarak 15 m
25 Pembuatan Gazebo
26 Instalasi Penyiraman
27 Mainan anak-anak
28 Nomenklatur
29 Gapura
30 Fasum (Musholla dan MCK)
31 Instalasi Listrik
32 Asphalt
33 Base Course
G Rumah Pompa
1 Galian tanah biasa
2 Timbunan tanah dipadatkan
3 Timbunan pasir
4 Pasangan batu
5 Beton K-125
6 Beton K-225
7 Bekisting
8 Pembesian
9 Kolom H Beam 250.250.14.9
10 Balok Baja I Beam 250.125.6.79
11 Angkur Bolt m 16 u/ Pedestal
12 Mur Baut m 16
13 Plat Simpul t=10 mm
14 Pasangan Bata Merah 1/2 Bata (1 : 4)
15 Plesteran Dinding Tebal 1,5 Cm (1 : 4)
16 Acian
17 Pengecatan Dinding
18 Pek. Pasangan Bata Sumur Resapan
19 Pek. Plesteran Sumur Resapan
20 Pek. Keramik Lantai
21 Pek. Keramik Dinding Kamar mandi
22 Pek. Keramik L. Kamar mandi
23 Kloset Jongkok
24 Pekerjaan Pemasangan Kusen dan Pintu Almunium
25 Pek. Rangka Hollow Plafond
26 Pek. Pemasangan Gypsum
27 Pek. Pengecatan Gypsum
28 Pek. Rangka Atap Baja Ringan
29 Pekerjaan Atap Galvalum
30 Pek. Pemasangan Toren Air
31 Instalasi Pipa Air Bersih 3/4 " inch
32 Instalasi Pipa Air Bersih 1/2 " inch
33 Instalasi Kran Air
34 Pemasangan Floor Drain
35 Pek. Instalasi Bioipal
36 Pek. Pemasangan Bata Sumur Resapan
37 Pek. Instalasi Pipa 4" Inch
38 Pek. Instalasi Ijuk
39 Pek. Resapan Pipa 3' Inch
40 Intalasi Lampu
41 Pemindahan dan Pemasangan Pompa
8 Beton K-225
4 Pengadaan Saluran Precast U-ditch 1x1x1,2m (K-350)
3 Buangan Tanah Galian sejauh 1 Km
10 Pembesian
1 Galian tanah biasa
16 Pemasangan Batu Alam
14 Pemasangan paving block Abu-abu tebal 8 cm
11 Bekisting
30 Fasum (Musholla dan MCK)
12 Pengadaan IPR (Interlocking Permeable Revetment)
3 Pengadaan U-Dicth 0.3 X 0.3 X 1.2m (K-350)
17 Handrail
33 Base Course
4 Pemasangan paving block abu-abu tebal 8 cm
1 Stripping/kosrekan
1 Stripping/kosrekan
17 Pemasangan grass block
9 Beton K-100
6 Pengadaan U-Dicth 0.3 X 0.3 X 1.2m (K-350)
1 Pemasangan paving block Abu-abu tebal = 8 cm
19 Gebalan rumput
19 Pengadaan dan Pemasangan Kursi Taman
32 Asphalt
13 Pipa Besi 1.5 inchi
2 SMK3
18 Pengadaan dan Pemasangan Lampu Taman
11 Kolom WF 300
1 Mobilisasi dan Demobilisasi Alat
25 Pembuatan Gazebo
HARGA SATUAN JUMLAH HARGA
SATUAN VOLUME
Rp Rp
289,198,800.00
Ls 1.00 118,800,000.00 118,800,000.00 1%
Ls 1.00 129,836,300.00 129,836,300.00 1%
Ls 1.00 40,562,500.00 40,562,500.00 0%
0%
0%
87,582,370.74
m² 603.15 22,500.00 13,570,818.75 0%
m³ 163.19 20,200.00 3,296,508.70 0%
m² 57.37 887,339.09 50,904,868.92 0%
m³ 28.40 168,374.32 4,781,830.57 0%
m³ 88.8565 21,700.00 1,928,186.05 0%
Buah 75.00 109,500.00 8,212,500.00 0%
m³ 74.34 65,750.00 4,887,657.75 0%
0%
150,976,289.60
m² 60.00 22,500.00 1,350,000.00 0%
m³ 59.19 20,200.00 1,195,638.00 0%
m³ 33.75 65,750.00 2,219,062.50 0%
unit 9.50 6,999,100.00 66,491,450.00 0%
m' 9.50 123,000.00 1,168,500.00 0%
m³ 25.44 21,700.00 552,048.00 0%
btg 49.00 10,900.00 534,100.00 0%
m' 196.00 39,300.00 7,702,800.00 0%
unit 1.00 23,732,000.00 23,732,000.00 0%
Kg 1,032.75 30,600.00 31,602,150.00 0%
m² 34.90 112,500.00 3,925,800.00 0%
m³ 3.28 934,000.00 3,067,629.60 0%
m³ 6.89 1,079,900.00 7,435,111.50 0%
0%
2,490,641,565.91
m² 603.15 22,500.00 13,570,818.75 0%
m³ 2,806.31 20,200.00 56,687,522.60 0%
m³ 1,461.25 65,750.00 96,076,871.90 1%
unit 494.05 4,212,600.00 2,081,235,030.00 12%
m' 494.05 52,700.00 26,036,435.00 0%
m³ 1,345.07 21,700.00 29,187,971.26 0%
unit 1.00 23,732,000.00 23,732,000.00 0%
Kg 2,300.85 30,600.00 70,406,010.00 0%
m² 346.04 112,500.00 38,929,500.00 0%
m' 16.00 109,500.00 1,752,000.00 0%
m³ 10.74 934,000.00 10,028,358.00 0%
m³ 2.16 1,079,900.00 2,328,264.40 0%
m³ 35.28 1,152,800.00 40,670,784.00 0%
0%
9,708,362,989.76
m2
11,163.10 22,500.00 251,169,770.12 1%
m³ 32,058.90 20,200.00 647,589,734.55 4%
m³ 418.24 21,700.00 9,075,812.34 0%
m³ 31,640.66 65,750.00 2,080,373,233.91 12%
m2 1,176.00 265,200.00 311,875,200.00 2%
m' 784.00 114,800.00 90,003,200.00 1%
m' 405.00 565,600.00 229,068,000.00 1%
m' 405.00 58,100.00 23,530,500.00 0%
m³ 2,086.52 1,079,900.00 2,253,231,220.16 13%
m³ 246.70 934,000.00 230,415,465.00 1%
kg 56,224.33 30,600.00 1,720,464,583.68 10%
m2 3,513.14 112,500.00 395,227,800.00 2%
m' 760.00 491,600.00 373,616,000.00 2%
m' 760.00 13,200.00 10,032,000.00 0%
m³ 356.00 221,700.00 78,925,200.00 0%
m² 1,336.60 11,700.00 15,638,220.00 0%
m2 1,416.25 351,400.00 497,670,250.00 3%
m' 393.00 921,600.00 362,188,800.00 2%
bh 24.00 5,344,500.00 128,268,000.00 1%
unit 40.00 5,131,500.00 205,260,000.00 1%
` 0%
3,335,750,989.04
m2 11,072.91 22,500.00 249,140,445.12 1%
m³ 12.08 20,200.00 244,016.00 0%
m³ 1.34 21,700.00 29,034.60 0%
m³ 0.92 279,800.00 256,296.80 0%
m³ 0.67 934,000.00 625,780.00 0%
m³ 28.67 1,079,900.00 30,958,144.48 0%
m2 107.81 112,500.00 12,128,287.50 0%
m2 11.52 57,128.50 658,120.32 0%
bh 128.00 38,470.30 4,924,198.40 0%
m2 0.36 1,893,800.00 681,768.00 0%
Kg 3,520.00 35,773.10 125,921,312.00 1%
Kg 1,792.00 35,773.10 64,105,395.20 0%
Kg 752.33 203,902.60 153,401,635.25 1%
m2 1,714.71 265,200.00 454,741,092.00 3%
m2 280.55 289,500.00 81,218,067.00 0%
m' 468.96 114,800.00 53,836,608.00 0%
m2 1,135.32 212,500.00 241,255,500.00 1%
m2 280.55 349,600.00 98,078,881.60 1%
m2 3,714.20 56,600.00 210,223,889.80 1%
m2 273.00 271,100.00 74,010,300.00 0%
m2 3,714.20 11,700.00 43,456,175.10 0%
unit 15.00 5,131,500.00 76,972,500.00 0%
unit 13.00 5,344,500.00 69,478,500.00 0%
unit 26.20 1,391,800.00 36,465,160.00 0%
unit 3.00 37,320,000.00 111,960,000.00 1%
Ls 1.00 97,177,600.00 97,177,600.00 1%
Ls 1.00 83,500,000.00 83,500,000.00 0%
Set 2.00 27,500,000.00 55,000,000.00 0%
Ls 1.00 18,938,516.00 18,938,516.00 0%
Ls 1.00 390,282,641.47 390,282,641.47 2%
Ls 1.00 7,593,900.00 7,593,900.00 0%
ton 207.21 838,500.00 173,748,603.60 1%
m3 753.50 417,700.00 314,738,620.80 2%
0%
385,491,423.44
m³ 2,815.69 20,200.00 56,876,976.06 0%
m³ 3.94 21,700.00 85,583.38 0%
m³ 1.70 279,800.00 474,870.96 0%
m³ 4.10 947,292.50 3,884,801.74 0%
m³ 0.52 1,013,300.00 522,579.08 0%
m³ 38.12 1,079,900.00 41,161,321.53 0%
m2 44.35 112,500.00 4,989,199.50 0%
Kg 618.78 30,600.00 18,934,603.52 0%
Kg 2,607.00 35,773.10 93,260,471.70 1%
Kg 782.98 35,773.10 28,009,615.28 0%
Unit 24.00 38,470.30 923,287.20 0%
Unit 60.00 18,670.30 1,120,218.00 0%
Kg 4.92 35,773.10 176,030.48 0%
m2 89.91 141,395.10 12,712,211.30 0%
m2 179.81 171,796.47 30,890,929.21 0%
m2 179.81 57,128.50 10,272,344.14 0%
m2 179.81 30,859.73 5,548,925.08 0%
m2 5.53 183,832.00 1,016,443.89 0%
m2 5.53 182,253.72 1,007,717.27 0%
m2 10.60 300,132.75 3,181,317.11 0%
m2 12.56 328,773.50 4,129,395.16 0%
m2 2.57 300,132.75 770,680.88 0%
unit 1.00 709,335.00 709,335.00 0%
unit 2.00 5,518,422.00 11,036,843.99 0%
m2 10.60 211,003.83 2,236,577.33 0%
m2 10.60 48,347.20 512,465.82 0%
m2 10.60 30,859.73 327,103.88 0%
m2 38.09 387,875.36 14,773,008.74 0%
m2 38.09 157,806.00 6,010,357.12 0%
Unit 1.00 745,800.00 745,800.00 0%
m' 8.00 74,186.20 593,489.60 0%
m' 12.00 59,930.20 719,162.40 0%
Unit 4.00 122,155.00 488,620.00 0%
Unit 1.00 103,422.00 103,422.00 0%
Unit 1.00 5,000,800.00 5,000,800.00 0%
m2 2.39 183,832.00 438,696.68 0%
m' 8.00 212,255.45 1,698,043.60 0%
m³ 1.00 970,365.00 970,365.00 0%
m' 4.00 202,454.45 809,817.80 0%
Titik 8.00 416,449.00 3,331,592.00 0%
Ls 1.00 15,036,400.00 15,036,400.00 0%
0%
760,305,215.20
m2 845.20 265,200.00 224,147,040.00 1%
m' 211.30 114,800.00 24,257,240.00 0%
m' 659.94 565,600.00 373,260,932.80 2%
m' 659.94 58,100.00 38,342,397.80 0%
m3 33.00 934,000.00 30,819,104.60 0%
unit 13.00 5,344,500.00 69,478,500.00 0%
15,039,111,100.26
80% Rata Analisa
HARGA SATUAN JUMLAH HARGA HARGA SATUAN
Rp Rp Rp
231,359,040.00
95,040,000.00 95,040,000.00 99,792,000.00
103,869,040.00 103,869,040.00 109,062,492.00
32,450,000.00 32,450,000.00 34,072,500.00
70,065,896.59
18,000.00 10,856,655.00 6,961.00
16,160.00 2,637,206.96 29,013.43
709,871.27 40,723,895.13 851,596.16
134,699.45 3,825,464.46 43,325.43
17,360.00 1,542,548.84 29,976.07
87,600.00 6,570,000.00 86,500.00
52,600.00 3,910,126.20 51,500.00
120,781,031.68
18,000.00 1,080,000.00 6,961.00
16,160.00 956,510.40 29,013.43
52,600.00 1,775,250.00 51,500.00
5,599,280.00 53,193,160.00 7,812,500.00
98,400.00 934,800.00 86,500.00
17,360.00 441,638.40 29,976.07
8,720.00 427,280.00 9,000.00
31,440.00 6,162,240.00 28,500.00
18,985,600.00 18,985,600.00 16,500,000.00
24,480.00 25,281,720.00 22,137.52
90,000.00 3,140,640.00 96,500.00
747,200.00 2,454,103.68 716,500.00
863,920.00 5,948,089.20 841,500.00
1,992,513,252.73
18,000.00 10,856,655.00 6,961.00
16,160.00 45,350,018.08 29,013.43
52,600.00 76,861,497.52 51,500.00
3,370,080.00 1,664,988,024.00 3,906,250.00
42,160.00 20,829,148.00 43,250.00
17,360.00 23,350,377.01 29,976.07
18,985,600.00 18,985,600.00 16,500,000.00
24,480.00 56,324,808.00 22,137.52
90,000.00 31,143,600.00 96,500.00
87,600.00 1,401,600.00 86,500.00
747,200.00 8,022,686.40 716,500.00
863,920.00 1,862,611.52 841,500.00
922,240.00 32,536,627.20 926,500.00
7,930,898,391.81
18,000.00 200,935,816.09 6,961.00
16,160.00 518,071,787.64 29,013.43
17,360.00 7,260,649.87 29,976.07
52,600.00 1,664,298,587.13 51,500.00
212,160.00 249,500,160.00 249,248.61
91,840.00 72,002,560.00 158,991.67
452,480.00 183,254,400.00 351,562.50
46,480.00 18,824,400.00 49,737.50
863,920.00 1,802,584,976.13 841,500.00
747,200.00 184,332,372.00 716,500.00
24,480.00 1,376,371,666.94 22,137.52
90,000.00 316,182,240.00 96,500.00
393,280.00 298,892,800.00 412,944.00
10,560.00 8,025,600.00 11,088.00
177,360.00 63,140,160.00 186,228.00
9,360.00 12,510,576.00 27,496.58
281,120.00 398,136,200.00 295,176.00
737,280.00 289,751,040.00 774,144.00
4,275,600.00 102,614,400.00 4,489,380.00
4,105,200.00 164,208,000.00 4,310,460.00
2,668,600,791.23
18,000.00 199,312,356.10 6,961.00
16,160.00 195,212.80 29,013.43
17,360.00 23,227.68 29,976.07
223,840.00 205,037.44 235,032.00
747,200.00 500,624.00 716,500.00
863,920.00 24,766,515.58 841,500.00
90,000.00 9,702,630.00 96,500.00
45,702.80 526,496.26 47,987.94
30,776.24 3,939,358.72 32,315.05
1,515,040.00 545,414.40 1,590,792.00
28,618.48 100,737,049.60 30,049.40
28,618.48 51,284,316.16 30,049.40
163,122.08 122,721,308.20 171,278.18
212,160.00 363,792,873.60 249,248.61
231,600.00 64,974,453.60 249,248.61
91,840.00 43,069,286.40 158,991.67
170,000.00 193,004,400.00 178,500.00
279,680.00 78,463,105.28 293,664.00
45,280.00 168,179,111.84 47,544.00
216,880.00 59,208,240.00 227,724.00
9,360.00 34,764,940.08 27,496.58
4,105,200.00 61,578,000.00 4,310,460.00
4,275,600.00 55,582,800.00 5,216,232.00
1,113,440.00 29,172,128.00 1,169,112.00
29,856,000.00 89,568,000.00 31,348,800.00
77,742,080.00 77,742,080.00 81,629,184.00
66,800,000.00 66,800,000.00 70,140,000.00
22,000,000.00 44,000,000.00 23,100,000.00
15,150,812.80 15,150,812.80 15,908,353.44
312,226,113.17 312,226,113.17 327,837,418.83
6,075,120.00 6,075,120.00 6,378,876.00
670,800.00 138,998,882.88 704,340.00
334,160.00 251,790,896.64 350,868.00
308,393,138.76
16,160.00 45,501,580.85 29,013.43
17,360.00 68,466.70 29,976.07
223,840.00 379,896.77 235,032.00
757,834.00 3,107,841.39 851,596.16
810,640.00 418,063.26 811,500.00
863,920.00 32,929,057.23 841,500.00
90,000.00 3,991,359.60 96,500.00
24,480.00 15,147,682.82 22,137.52
28,618.48 74,608,377.36 30,049.40
28,618.48 22,407,692.22 30,049.40
30,776.24 738,629.76 32,315.05
14,936.24 896,174.40 15,683.05
28,618.48 140,824.39 30,049.40
113,116.08 10,169,769.04 161,982.67
137,437.18 24,712,743.37 43,325.43
45,702.80 8,217,875.31 47,987.94
24,687.78 4,439,140.07 29,625.34
147,065.60 813,155.12 161,982.67
145,802.98 806,173.81 43,325.43
240,106.20 2,545,053.69 252,111.51
263,018.80 3,303,516.13 276,169.74
240,106.20 616,544.70 252,111.51
567,468.00 567,468.00 595,841.40
4,414,737.60 8,829,475.20 4,635,474.48
168,803.07 1,789,261.87 177,243.22
38,677.76 409,972.65 40,611.65
24,687.78 261,683.10 29,625.34
310,300.29 11,818,406.99 325,815.30
126,244.80 4,808,285.70 132,557.04
596,640.00 596,640.00 626,472.00
59,348.96 474,791.68 62,316.41
47,944.16 575,329.92 50,341.37
97,724.00 390,896.00 102,610.20
82,737.60 82,737.60 86,874.48
4,000,640.00 4,000,640.00 4,200,672.00
147,065.60 350,957.35 161,982.67
169,804.36 1,358,434.88 178,294.58
776,292.00 776,292.00 815,106.60
161,963.56 647,854.24 170,061.74
333,159.20 2,665,273.60 349,817.16
12,029,120.00 12,029,120.00 12,630,576.00
608,244,172.16
212,160.00 179,317,632.00 249,248.61
91,840.00 19,405,792.00 158,991.67
452,480.00 298,608,746.24 351,562.50
46,480.00 30,673,918.24 49,737.50
747,200.00 24,655,283.68 716,500.00
4,275,600.00 55,582,800.00 5,216,232.00
Ketapang
JUMLAH TOTAL 13,930,855,714.95 JUMLAH TOTAL
PPN 11% 1,532,394,128.64 PPN 11%
TOTAL 15,463,249,843.60 TOTAL
PEMBULATAN 15,463,250,000.00 PEMBULATAN
12,031,288,880.21
JUMLAH HARGA
Rp
242,926,992.00
99,792,000.00
109,062,492.00
34,072,500.00
71,997,548.50
4,198,509.75
4,734,803.83
48,854,368.62
1,230,442.13
2,663,568.67
6,487,500.00
3,828,355.50
136,580,165.85
417,660.00
1,717,305.15
1,738,125.00
74,218,750.00
821,750.00
762,591.22
441,000.00
5,586,000.00
16,500,000.00
22,862,520.37
3,367,464.00
2,353,272.60
5,793,727.50
2,296,849,955.72
4,198,509.75
81,420,776.73
75,254,127.80
1,929,882,812.50
21,367,662.50
40,319,846.64
16,500,000.00
50,935,105.30
33,392,860.00
1,384,000.00
7,693,060.50
1,814,274.00
32,686,920.00
8,174,175,716.38
77,706,345.32
930,138,710.76
12,537,197.55
1,629,493,863.83
293,116,366.73
124,649,469.73
142,382,812.50
20,143,687.50
1,755,805,233.60
176,758,758.75
1,244,667,106.45
339,017,624.00
313,837,440.00
8,426,880.00
66,297,168.00
36,751,929.66
418,043,010.00
304,238,592.00
107,745,120.00
172,418,400.00
2,819,802,409.92
77,078,517.27
350,482.28
40,107.98
215,289.31
480,055.00
24,123,787.92
10,403,375.50
552,821.07
4,136,326.66
572,685.12
105,773,902.08
53,848,531.97
128,857,373.61
427,389,086.05
69,925,700.87
74,560,733.83
202,654,620.00
82,386,260.54
176,588,067.43
62,168,652.00
102,127,882.25
64,656,900.00
67,811,016.00
30,630,734.40
94,046,400.00
81,629,184.00
70,140,000.00
46,200,000.00
15,908,353.44
327,837,418.83
6,378,876.00
145,948,827.02
264,380,441.47
339,249,823.97
81,692,890.36
118,223.66
398,891.61
3,492,355.58
418,506.78
32,074,499.56
4,279,624.46
13,698,205.94
78,338,796.23
23,528,076.83
775,561.25
940,983.12
147,865.60
14,563,149.50
7,790,397.03
8,628,769.08
5,326,968.08
895,634.60
239,554.95
2,672,306.37
3,468,691.93
647,371.94
595,841.40
9,270,948.95
1,878,724.96
430,471.29
314,019.72
12,409,327.34
5,048,699.98
626,472.00
498,531.26
604,096.42
410,440.80
86,874.48
4,200,672.00
386,555.45
1,426,356.62
815,106.60
680,246.95
2,798,537.28
12,630,576.00
600,546,280.40
210,664,926.16
33,594,939.99
232,009,453.13
32,823,666.28
23,642,278.85
67,811,016.00
14,682,128,892.73 2,526,180,750.96
1,615,034,178.20
16,297,163,070.94
16,297,163,000.00
1,755,805,233.60
1,929,882,812.50
1,629,493,863.83
1,244,667,106.45
930,138,710.76
418,043,010.00
427,389,086.05
339,017,624.00
327,837,418.83
313,837,440.00
232,009,453.13
304,238,592.00
264,380,441.47
293,116,366.73
77,706,345.32
77,078,517.27
202,654,620.00
176,758,758.75
142,382,812.50
210,664,926.16
176,588,067.43
172,418,400.00
145,948,827.02
128,857,373.61
109,062,492.00
107,745,120.00
105,773,902.08
99,792,000.00
94,046,400.00
12,437,335,721.49
NO
A.
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
D.
1
2
3
4
5
6
7
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
E.
1
URAIAN PEKERJAAN
RUMAH POMPA
Galian tanah biasa
Timbunan tanah dipadatkan
Timbunan pasir
Pasangan batu
Beton K-125
Beton K-225
Bekisting
Pembesian
Kolom H Beam 250.250.14.9
Balok Baja I Beam 250.125.6.79
Angkur Bolt m 16 u/ Pedestal
Mur Baut m 16
Plat Simpul t=10 mm
Pasangan Bata Merah 1/2 Bata (1 : 4)
Plesteran Dinding Tebal 1,5 Cm (1 : 4)
Acian
Pengecatan Dinding
Pek. Pasangan Bata Sumur Resapan
Pek. Plesteran Sumur Resapan
Pek. Keramik Lantai
Pek. Keramik Dinding Kamar mandi
Pek. Keramik L. Kamar mandi
Kloset Jongkok
Pekerjaan Pemasangan Kusen dan Pintu Almunium
Pek. Rangka Hollow Plafond
Pek. Pemasangan Gypsum
Pek. Pengecatan Gypsum
Pek. Rangka Atap Baja Ringan
Pekerjaan Atap Galvalum
Pek. Pemasangan Toren Air
Instalasi Pipa Air Bersih 3/4 " inch
Instalasi Pipa Air Bersih 1/2 " inch
Instalasi Kran Air
Pemasangan Floor Drain
Pek. Instalasi Bioipal
Pek. Pemasangan Bata Sumur Resapan
Pek. Instalasi Pipa 4" Inch
Pek. Instalasi Ijuk
Pek. Resapan Pipa 3' Inch
Intalasi Lampu
Perkuatan Tebing
Galian tanah biasa
Timbunan tanah kembali
Pembuangan galian tanah dengan jarak angkut 1 Km
Pengadaan Pancang Dolken Dia. 10 - 15 cm
Pemancangan Pancang Dolken Dia. 10 - 15 cm
Geotextille Non Woven, 150 gr
Pasangan Bronjong, 2.00 X 1.0 X 0.50, mesh 10X12 Dia. 2.7 mm
Sub Total
80%
HARGA SATUAN JUMLAH HARGA HARGA SATUAN
SATUAN VOLUME
Rp Rp Rp
160,132,500.00
LS 1.00 56,100,000.00 56,100,000.00 44,880,000.00
LS 1.00 40,562,500.00 40,562,500.00 32,450,000.00
LS 1.00 63,470,000.00 63,470,000.00 50,776,000.00
5,119,770,943.59
m' 1018.7 4,051,400.00 4,127,161,180.00 3,241,120.00
unit 2 20,717,537.97 41,435,075.94 16,574,030.38
m' 128.931 2,327,767.38 300,121,376.22 1,862,213.90
unit 2 7,848,922.13 15,697,844.25 6,279,137.70
unit 2 7,848,922.13 15,697,844.25 6,279,137.70
Bh 16.00 3,772,890.00 60,366,240.00 3,018,312.00
Bh 2 9,100,190.00 18,200,380.00 7,280,152.00
Bh 28 10,512,260.00 294,343,280.00 8,409,808.00
m3 565.19 20,300.00 11,473,255.50 16,240.00
m3 453.52 117,900.00 53,469,812.29 94,320.00
m3 5.88 193,583.64 1,138,271.83 154,866.92
m3 7.35 177,475.96 1,304,448.30 141,980.77
m3 0.60 158,180.00 94,908.00 126,544.00
m2 1.47 160,859.52 236,463.50 128,687.62
m3 15.00 1,866,555.35 27,998,330.25 1,493,244.28
m3 0.30 1,101,800.00 330,540.00 881,440.00
Kg 2,689.04 42,685.50 114,782,989.12 34,148.40
m3 2.97 1,866,555.35 5,538,069.72 1,493,244.28
m2 16.96 1,643,653.00 27,871,752.65 1,314,922.40
m3 36.75 68,268.89 2,508,881.76 54,615.11
312,507,092.13
m³ 9.38 102,121.80 957,788.54 81,697.44
m³ 36.92 117,900.00 4,352,541.95 94,320.00
m³ 1.70 158,180.00 268,459.93 126,544.00
m³ 4.10 887,339.09 3,638,935.64 709,871.27
m³ 0.52 1,422,385.00 733,552.39 1,137,908.00
m³ 4.29 1,281,265.71 5,498,992.55 1,025,012.57
m2 44.35 296,258.60 13,138,606.75 237,006.88
Kg 668.79 34,600.00 23,140,077.70 27,680.00
Kg 2,607.00 42,685.50 111,281,098.50 34,148.40
Kg 782.98 42,685.50 33,421,884.96 34,148.40
Unit 24.00 38,470.30 923,287.20 30,776.24
Unit 60.00 18,670.30 1,120,218.00 14,936.24
Kg 4.92 42,685.50 210,044.67 34,148.40
m2 89.91 141,395.10 12,712,211.30 113,116.08
m2 179.81 170,326.20 30,626,558.41 136,260.96
m2 179.81 57,128.50 10,272,344.14 45,702.80
m2 179.81 30,859.73 5,548,925.08 24,687.78
m2 5.53 141,395.10 781,801.79 113,116.08
m2 5.53 170,326.20 941,767.63 136,260.96
m2 10.60 300,132.75 3,181,317.11 240,106.20
m2 12.56 328,773.50 4,129,395.16 263,018.80
m2 2.57 300,132.75 770,680.88 240,106.20
unit 1.00 709,335.00 709,335.00 567,468.00
Unit 2.00 1,766,600.00 3,533,200.00 1,413,280.00
m2 10.60 211,003.83 2,236,577.33 168,803.07
m2 10.60 48,347.20 512,465.82 38,677.76
m2 10.60 30,859.73 327,103.88 24,687.78
m2 38.09 320,746.58 12,216,274.91 256,597.26
m2 54.96 162,481.00 8,930,037.00 129,984.80
Unit 1.00 2,748,460.00 2,748,460.00 2,198,768.00
m' 8.00 74,186.20 593,489.60 59,348.96
m' 12.00 59,930.20 719,162.40 47,944.16
Unit 4.00 122,155.00 488,620.00 97,724.00
Unit 1.00 61,578.00 61,578.00 49,262.40
Unit 1.00 4,783,460.00 4,783,460.00 3,826,768.00
m2 2.39 141,395.10 337,425.27 113,116.08
m' 8.00 284,426.45 2,275,411.60 227,541.16
m³ 0.25 970,365.00 242,591.25 776,292.00
m' 4.00 202,454.45 809,817.80 161,963.56
Titik 8.00 416,449.00 3,331,592.00 333,159.20
6,043,532,771.73
m³ 17,887.50 20,300.00 363,116,250.00 16,240.00
m³ 2,182.50 21,100.00 46,050,750.00 16,880.00
m³ 15,705.00 41,944.51 658,738,603.04 33,555.61
m 2,250.00 13,100.00 29,475,000.00 10,480.00
m' 9,000.00 23,100.00 207,900,000.00 18,480.00
m2 20,250.00 10,636.36 215,386,363.64 8,509.09
m³ 10,130.00 446,482.31 4,522,865,805.05 357,185.85
1.512 1,044,122,636.16
m 2
453.74 231,088.00 104,854,862.80 184,870.40
m' 86.17 148,340.50 12,782,130.03 118,672.40
m³ 2.24 90,750.00 203,280.00 72,600.00
m³ 0.90 202,070.00 181,054.72 161,656.00
m³ 1.79 1,281,265.71 2,296,028.15 1,025,012.57
m2 102.54 296,258.60 30,377,171.81 237,006.88
m³ 17.66 1,281,265.71 22,629,394.67 1,025,012.57
m2 20.16 296,258.60 5,972,573.38 237,006.88
m³ 2.69 1,281,265.71 3,444,042.23 1,025,012.57
bh 56.00 38,470.30 2,154,336.80 30,776.24
m³ 25.85 90,750.00 2,345,978.25 72,600.00
Kg 395.99 42,685.50 16,903,150.66 34,148.40
Kg 666.11 42,685.50 28,433,115.47 34,148.40
m 74.40 792,915.00 58,992,876.00 634,332.00
m 112.46 338,904.00 38,114,499.46 271,123.20
m 112.46 243,260.00 27,357,992.64 194,608.00
m 123.28 448,318.00 55,266,849.77 358,654.40
Kg 97.44 42,685.50 4,159,275.12 34,148.40
m2 1,436.60 66,493.00 95,523,843.80 53,194.40
m 2
8,002.80 66,493.00 532,130,180.40 53,194.40
321,071,855.00
LS 1.00 321,071,855.00 321,071,855.00 256,857,484.00
128,106,000.00 134,511,300.00
44,880,000.00 47,124,000.00 47,124,000.00
32,450,000.00 34,072,500.00 34,072,500.00
50,776,000.00 53,314,800.00 53,314,800.00
4,095,816,754.87 3,794,782,624.43
3,301,728,944.00 2,900,000.00 2,954,230,000.00
33,148,060.75 17,402,731.90 34,805,463.79
240,097,100.98 1,955,324.60 252,101,956.03
12,558,275.40 6,593,094.59 13,186,189.17
12,558,275.40 6,593,094.59 13,186,189.17
48,292,992.00 3,169,227.60 50,707,641.60
14,560,304.00 7,644,159.60 15,288,319.20
235,474,624.00 8,830,298.40 247,248,355.20
9,178,604.40 29,013.43 16,397,957.64
42,775,849.83 99,036.00 44,914,642.32
910,617.46 162,610.26 956,148.33
1,043,558.64 149,079.81 1,095,736.57
75,926.40 132,871.20 79,722.72
189,170.80 135,122.00 198,629.34
22,398,664.20 1,567,906.49 23,518,597.41
264,432.00 925,512.00 277,653.60
91,826,391.30 35,855.82 96,417,710.86
4,430,455.78 1,567,906.49 4,651,978.57
22,297,402.12 1,380,668.52 23,412,272.23
2,007,105.41 57,345.87 2,107,460.68
250,005,673.70 243,590,310.66
766,230.83 29,013.43 272,113.64
3,482,033.56 109,976.07 4,060,012.37
214,767.95 132,871.20 225,506.34
2,911,148.51 851,596.16 3,492,355.58
586,841.91 811,500.00 418,506.78
4,399,194.04 841,500.00 3,611,586.73
10,510,885.40 248,857.22 11,036,429.67
18,512,062.16 22,137.52 14,805,313.77
89,024,878.80 35,855.82 93,476,122.74
26,737,507.97 35,855.82 28,074,383.37
738,629.76 32,315.05 775,561.25
896,174.40 15,683.05 940,983.12
168,035.74 35,855.82 176,437.53
10,169,769.04 161,982.67 14,563,149.50
24,501,246.73 43,325.43 7,790,397.03
8,217,875.31 47,987.94 8,628,769.08
4,439,140.07 29,625.34 5,326,968.08
625,441.43 118,771.88 656,713.50
753,414.10 143,074.01 791,084.81
2,545,053.69 252,111.51 2,672,306.37
3,303,516.13 276,169.74 3,468,691.93
616,544.70 252,111.51 647,371.94
567,468.00 595,841.40 595,841.40
2,826,560.00 1,483,944.00 2,967,888.00
1,789,261.87 177,243.22 1,878,724.96
409,972.65 40,611.65 430,471.29
261,683.10 25,922.17 274,767.26
9,773,019.92 269,427.13 10,261,670.92
7,144,029.60 136,484.04 7,501,231.08
2,198,768.00 2,308,706.40 2,308,706.40
474,791.68 62,316.41 498,531.26
575,329.92 50,341.37 604,096.42
390,896.00 102,610.20 410,440.80
49,262.40 51,725.52 51,725.52
3,826,768.00 4,018,106.40 4,018,106.40
269,940.21 118,771.88 283,437.22
1,820,329.28 238,918.22 1,911,345.74
194,073.00 815,106.60 203,776.65
647,854.24 170,061.74 680,246.95
2,665,273.60 349,817.16 2,798,537.28
4,834,826,217.39 7,865,085,492.69
290,493,000.00 29,013.43 518,977,798.88
36,840,600.00 29,976.07 65,422,772.96
526,990,882.43 51,500.00 808,807,500.00
23,580,000.00 9,000.00 20,250,000.00
166,320,000.00 28,500.00 256,500,000.00
172,309,090.91 27,496.58 556,805,757.67
3,618,292,644.04 556,596.41 5,638,321,663.19
835,298,108.93 877,063,014.38
83,883,890.24 194,113.92 88,078,084.75
10,225,704.03 124,606.02 10,736,989.23
162,624.00 76,230.00 170,755.20
144,843.78 169,738.80 152,085.96
1,836,822.52 1,076,263.20 1,928,663.65
24,301,737.45 248,857.22 25,516,824.32
18,103,515.74 1,076,263.20 19,008,691.52
4,778,058.70 248,857.22 5,016,961.64
2,755,233.78 1,076,263.20 2,892,995.47
1,723,469.44 32,315.05 1,809,642.91
1,876,782.60 76,230.00 1,970,621.73
13,522,520.53 35,855.82 14,198,646.56
22,746,492.38 35,855.82 23,883,817.00
47,194,300.80 666,048.60 49,554,015.84
30,491,599.56 284,679.36 32,016,179.54
21,886,394.11 204,338.40 22,980,713.82
44,213,479.81 376,587.12 46,424,153.81
3,327,420.10 35,855.82 3,493,791.10
76,419,075.04 55,854.12 80,240,028.79
425,704,144.32 55,854.12 446,989,351.54
256,857,484.00 269,700,358.20
256,857,484.00 269,700,358.20 269,700,358.20
10,400,910,238.89 13,184,733,100.36
Besuki
10,400,910,238.89 JUMLAH TOTAL 13,184,733,100.36
1,144,100,126.28 PPN 11% 1,450,320,641.04
11,545,010,365.17 TOTAL 14,635,053,741.40
11,545,010,000.00 PEMBULATAN 14,635,054,000.00
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 0.0127 14,583.33 184.63
L03 Mandor Jam 0.0025 29,148.84 73.81
L04 Operator Jam 0.0105 29,148.84 306.86
L05 Pembantu Operator Jam 0.0105 21,857.17 230.10
B. Bahan
SUB TOTAL
C. Peralatan
E04 Bulldozer 100-150 HP Jam 0.0025 211,092.00 534.49
E15 Wheel Loader 1.0-1.6 M3 Jam 0.0026 272,856.00 710.61
E09 Dump Truck 10-12 T Jam 0.0054 107,196.00 577.90
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN
A Tenaga
L01.1 Pekerja Jam 0.0734 14,583.33 1,070.71
L03 Mandor Jam - 29,148.84 -
L04 Operator Jam 0.1109 29,148.84 3,231.50
L05 Pembantu Operator Jam 0.1109 21,857.17 2,423.13
B. Bahan
SUB TOTAL -
C. Peralatan
E10 Excavator 100-160 HP Jam 0.0245 180,048.00 4,406.37
E09 Dump Truck 10-12 T Jam 0.0864 107,196.00 9,260.52
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 7.0000 14,583.33 102,083.33
L02.3 Tukang Batu Jam 1.4000 21,857.17 30,600.04
L03 Mandor Jam 1.4000 29,148.84 40,808.37
L04 Operator Jam 0.4819 29,148.84 14,047.63
L05 Pembantu Operator Jam 0.4819 21,857.17 10,533.58
B. Bahan
M16 Batu Kali / Belah m3 1.2100 179,306.00 216,960.26
M73 Semen kg 179.0250 1,500.00 268,537.50
M68 Pasir Beton m3 0.2718 286,066.00 77,742.64
C. Peralatan
E06 Concrete Mixer 0.3-0.6 M3 Jam 0.4819 10,872.00 5,239.52
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 0.2000 14,583.33 2,916.67
L02.3 Tukang Batu Jam 0.1000 21,857.17 2,185.72
L03 Mandor Jam 0.0500 29,148.84 1,457.44
L04 Operator Jam 0.0500 29,148.84 1,457.44
L05 Pembantu Operator Jam 0.0500 21,857.17 1,092.86
B. Bahan
C. Peralatan
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN
A Tenaga
L01.1 Pekerja Jam 0.0488 14,583.33 712.13
L03 Mandor Jam 0.0098 29,148.84 284.68
L04 Operator Jam 0.0374 29,148.84 1,091.26
L05 Pembantu Operator Jam 0.0374 21,857.17 818.28
B. Bahan
SUB TOTAL -
C. Peralatan
E04 Bulldozer 100-150 HP Jam 0.0130 211,092.00 2,748.79
E19 Vibratory Roller 5-8 T. Jam 0.0098 179,184.00 1,749.97
E23 Water Tanker 3000-4500 L. Jam 0.0146 55,884.00 818.67
Alat Bantu Ls 0.9727 600.00 583.64
E09 Dump Truck 10-12 T Jam 0.0185 107,196.00 1,988.17
E10 Excavator 100-160 HP Jam 0.0053 180,048.00 946.02
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 0.0340 14,583.33 496.50
L02.2 Tukang Besi Jam 0.0113 21,857.17 248.05
L03 Mandor Jam 0.0113 29,148.84 330.80
L04 Operator Jam 0.0053 29,148.84 154.57
L05 Pembantu Operator Jam 0.0053 21,857.17 115.90
B. Bahan
M14 Baja Tulangan Ulir kg 1.0019 17,500.00 17,533.41
M63 Kawat Bindrat kg 0.0034 25,000.00 85.11
C. Peralatan
E11 Flat Bed Truck 3-4 M3 Jam 0.0053 48,720.00 258.34
E55 Bar Bender Jam 0.0016 45,408.00 73.62
E56 Bar Cutter Jam 0.0016 45,408.00 73.62
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 1.0000 14,583.33 14,583.33
L02.1 Tukang Jam 0.2000 21,857.17 4,371.43
L03 Mandor Jam 0.2000 29,148.84 5,829.77
L04 Operator Jam 0.2000 29,148.84 5,829.77
L05 Pembantu Operator Jam 0.2000 21,857.17 4,371.43
B. Bahan
M70 Pasir Urug m3 0.0600 178,088.99 10,685.34
M154 Conblok 8x10.5x21 Abu-abu m2 1.1000 160,000.00 176,000.00
C. Peralatan
E25 Tamper Jam 0.2000 8,462.73 1,692.55
Alat Bantu Ls 1.0000 120.00 120.00
Alat Bantu Ls 1.0000 290.12 290.12
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 2.0303 14,583.33 29,608.43
L02.3 Tukang Batu Jam 0.2436 21,857.17 5,325.17
L03 Mandor Jam 0.1624 29,148.84 4,734.45
L04 Operator Jam 0.1412 29,148.84 4,116.16
L05 Pembantu Operator Jam 0.1412 21,857.17 3,086.49
B. Bahan
M118 Baja Plat kg 0.8325 13,045.00 10,859.83
M26 Beton Kelas B (K=350 kg/cm2) m3 0.0788 926,500.00 72,961.88
C. Peralatan
E20 Concrete Vibrator Jam 0.0600 9,970.00 598.20
E11 Flat Bed Truck 3-4 M3 Jam 0.0812 40,600.00 3,297.20
Alat bantu Ls 1.0000 10,000.00 10,000.00
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
SUB TOTAL -
B. Bahan
C. Peralatan
SUB TOTAL -
SUB TOTAL -
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
SUB TOTAL -
B. Bahan
C. Peralatan
SUB TOTAL -
SUB TOTAL -
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
SUB TOTAL -
B. Bahan
C. Peralatan
SUB TOTAL -
SUB TOTAL -
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 0.2918 14,583.33 4,255.68
L02.1 Tukang Jam 0.0584 21,857.17 1,275.66
L03 Mandor Jam 0.0195 29,148.84 567.08
L04 Operator Jam 0.0195 29,148.84 567.08
L05 Pembantu Operator Jam 0.0195 21,857.17 425.22
B. Bahan
M199 Geotextile N200 m2 1.1673 9,500.00 11,089.09
C. Peralatan
E11 Flat Bed Truck 3-4 M3 Jam 0.0195 40,600.00 789.85
Alat Bantu Ls 0.9727 500.00 486.36
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 1.2048 14,583.33 17,570.28
L02.3 Tukang Batu Jam 0.6024 21,857.17 13,166.97
L03 Mandor Jam 0.3012 29,148.84 8,779.77
L04 Operator Jam 0.3012 29,148.84 8,779.77
L05 Pembantu Operator Jam 0.3012 21,857.17 6,583.49
B. Bahan
C. Peralatan
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
SUB TOTAL -
B. Bahan
C. Peralatan
SUB TOTAL -
SUB TOTAL -
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN ( Rp )
A Tenaga
L01.1 Pekerja Jam 3.5000 14,583.33 51,041.67
L02.3 Tukang Batu Jam 0.7000 21,857.17 15,300.02
L03 Mandor Jam 0.7000 29,148.84 20,404.19
L04 Operator Jam 0.2410 29,148.84 7,023.82
L05 Pembantu Operator Jam 0.2410 21,857.17 5,266.79
B. Bahan
C. Peralatan
SUB TOTAL -
SUB TOTAL -
Catatan : 1. Satuan dapat berdasarkan atas Jam Operasi untuk Tenaga Kerja dan Peralatan, Volume dan/atau Ukuran
Berat untuk Bahan/Material.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
104 1
154 A.
155
156
157
159 B
160 1
161 2
162 3
163 4
164 5
165 6
166 7
167 8
168 9
169 10
170 11
171 12
172 13
173 14
174 15
176 17
177 18
178 19
179 20
182 C.
184 2
185 3
189 7
195 13
197 15
199 17
200 18
201 19
202 20
203 21
204 22
206 24
207 25
208 26
209 27
210 28
211 29
212 30
213 31
214 32
216 34
217 35
218 36
219 37
220 38
221 39
222 40
224 D.
226 2
227 3
228 4
229 5
230 6
231 7
233 D.
234 1
235 2
236 3
237 4
238 5
239 6
240 7
241 8
242 9
243 10
244 11
245 12
246 13
247 14
248 15
249 16
250 17
251 18
252 19
253 20
255 E.
256 1
Stripping/kosrekan
Pasangan Batu Kali 1 Pc : 4 PS
Plesteran
Timbunan Tanah kembali
Suling-Suling, Dia. 1.5 inch
Buangan Tanah Galian sejauh 1 Km
Pengadaan Saluran Precast U-ditch 2x1x1,2m (K-350)
Pemasangan Saluran Precast U-ditch 2x1x1,2m (K-350)
Pengadaan Pancang Dolken Dia. 10-15 cm, L = 4.0 m
Pemancangan Pancang Dolken Dia. 10-15 cm, L = 4.0 m
Pintu Air 0.8 x 1 m
Pembesian
Bekisting
Beton K-100
Beton K-225
Pengadaan Saluran Precast U-ditch 1x1x1,2m (K-350)
Pemasangan Saluran Precast U-ditch 1x1x1,2m (K-350)
Pintu Air 1 x 1 m
Beton K-300
Pemasangan paving block abu-abu tebal 8 cm
Pemasangan Kansteen
Pengadaan Saluran Precast U-Dicth 0.3 X 0.3 X 1.2m (K-350)
Pemasangan U-Dicth 0.3 X 0.3 X 1.2m (K-350)
Pengadaan IPR (Interlocking Permeable Revetment)
Pemasangan IPR (Interlocking Permeable Revetment)
Pasangan Rip - Rap
Geotextille non woven 150 gr
Pemasangan Batu Alam
Handrail
Pengadaan dan Pemasangan Lampu Taman
Pengadaan dan Pemasangan Kursi Taman
Urugan Pasir tebal 5 cm
Acian
Angkur Bolt M16
Base Plate tebal = 12 mm
Kolom WF 300
Kolom WF 150
Pipa Besi 1.5 inchi
Pemasangan grass block
Pemasangan koral sikat
Gebalan rumput
Tanaman kecil
Geotextille non woven 150 gr
Pengadaan dan Pemasangan Kursi Taman
Pengadaan dan Pemasangan Lampu Taman
Tempat sampah, per jarak 15 m
Pembuatan Gazebo
Instalasi Penyiraman
Mainan anak-anak
Nomenklatur
Gapura
Fasum (Musholla dan MCK)
Instalasi Listrik
Asphalt
Base Course
Timbunan pasir
Kolom H Beam 250.250.14.9
Balok Baja I Beam 250.125.6.79
Angkur Bolt m 16 u/ Pedestal
Mur Baut m 16
Plat Simpul t=10 mm
Pasangan Bata Merah 1/2 Bata (1 : 4)
Acian
Pengecatan Dinding
Pek. Pasangan Bata Sumur Resapan
Pek. Keramik Lantai
Pek. Keramik Dinding Kamar mandi
Pek. Keramik L. Kamar mandi
Kloset Jongkok
Pekerjaan Pemasangan Kusen dan Pintu Almunium
Pek. Rangka Hollow Plafond
Pek. Pemasangan Gypsum
Pek. Pengecatan Gypsum
Pek. Rangka Atap Baja Ringan
Pekerjaan Atap Galvalum
Pek. Pemasangan Toren Air
Instalasi Pipa Air Bersih 3/4 " inch
Instalasi Pipa Air Bersih 1/2 " inch
Instalasi Kran Air
Pemasangan Floor Drain
Pek. Instalasi Bioipal
Pek. Pemasangan Bata Sumur Resapan
Pek. Instalasi Pipa 4" Inch
Pek. Instalasi Ijuk
Pek. Resapan Pipa 3' Inch
Intalasi Lampu
Pemindahan dan Pemasangan Pompa
Lampu Penerangan
Galian tanah biasa Ketapang
Pekerjaan Persiapan Besuki
Mobilisasi dan Demobilisasi Alat Besuki
Pencegahan Covid-19 Besuki
SMK3 Besuki
PEKERJAAN PENINGKATAN JALUR PIPA DRAINASE KE KALI PORONG Besuki
Pengadaan dan Pemasangan PIPA HDPE DN.450, PN16, SDR11 Besuki
Pengadaan dan Pemasangan Air Valve 'Ø 450 mm Besuki
Pengadaan dan Pemasangan Pipa Baja 'Ø 450 mm Besuki
Pemasangan / Penyambungan Pipa Ø 450 mm, dan Kelengkapannya (Inlet Pompa) Besuki
Pemasangan / Penyambungan Pipa Ø 450 mm, dan Kelengkapannya (Outlet Jalur Pipa) Besuki
Bend/Elbow 45 deg. Ø 450 mm (GS-ASTM A53 A) Besuki
Bend/Elbow 45 deg. Ø 450 mm (PE-PN 16) Besuki
Stub End dia. 450 mm (PE-PN 16) Besuki
Galian tanah menggunakan alat berat Besuki
Timbunan Hasil Galian Kembali Dipadatkan Besuki
Base Course, Agregat Class A Besuki
Base Course, Agregat Class B Besuki
Urugan Pasir Besuki
Penghamparan ATB tb. 4 cm Besuki
Pemasangan Thrust Block Beton K- 250 (fc 20 Mpa) Besuki
Pemasangan dan Perakitan Baja Profil( Besi WF dan Plat ) Besuki
Pembetonan K-250 Pondasi Jembatan Besuki
Pekerjaan Pembuatan Lantai Plat Expanded Metal Besuki
Bongkar aspal lapis penetrasi Besuki
RUMAH POMPA Besuki
Timbunan tanah dipadatkan Besuki
Timbunan pasir Besuki
Bekisting Besuki
Plat Simpul t=10 mm Besuki
Plesteran Dinding Tebal 1,5 Cm (1 : 4) Besuki
Pengecatan Dinding Besuki
Pek. Pasangan Bata Sumur Resapan Besuki
Pek. Plesteran Sumur Resapan Besuki
Pek. Keramik Lantai Besuki
Pek. Keramik Dinding Kamar mandi Besuki
Pek. Keramik L. Kamar mandi Besuki
Pekerjaan Pemasangan Kusen dan Pintu Almunium Besuki
Pek. Rangka Hollow Plafond Besuki
Pek. Pemasangan Gypsum Besuki
Pek. Pengecatan Gypsum Besuki
Pek. Rangka Atap Baja Ringan Besuki
Pekerjaan Atap Galvalum Besuki
Pek. Pemasangan Toren Air Besuki
Instalasi Pipa Air Bersih 3/4 " inch Besuki
Instalasi Pipa Air Bersih 1/2 " inch Besuki
Pemasangan Floor Drain Besuki
Pek. Instalasi Bioipal Besuki
Pek. Pemasangan Bata Sumur Resapan Besuki
Pek. Instalasi Pipa 4" Inch Besuki
Pek. Instalasi Ijuk Besuki
Pek. Resapan Pipa 3' Inch Besuki
Intalasi Lampu Besuki
Perkuatan Tebing Besuki
Timbunan tanah kembali Besuki
Pembuangan galian tanah dengan jarak angkut 1 Km Besuki
Pengadaan Pancang Dolken Dia. 10 - 15 cm Besuki
Pemancangan Pancang Dolken Dia. 10 - 15 cm Besuki
Geotextille Non Woven, 150 gr Besuki
Pasangan Bronjong, 2.00 X 1.0 X 0.50, mesh 10X12 Dia. 2.7 mm Besuki
Pembangunan Workshop Alat Berat Besuki
Pekerjaan Persiapan Besuki
Pekerjaan Bouwplank Besuki
Pekerjaan Galian Pondasi Footplate Besuki
Pekerjaan Pasir Urug Pondasi Footplate tebal 10 Cm Besuki
Pekerjaan Beton FootPlate K-225 Besuki
Pekerjaan Bekisting Sloof Besuki
Pekerjaan Sloof Beton K-225 Besuki
Pekerjaan Bekisting Pedestal Besuki
Pekerjaan Pedestal Kolom Beton K-225 Pipa Baja 10" inch Besuki
Angkur Bolt M19 Besuki
Pekerjaan Urugan Tanah Setinggi Sloof Besuki
Besi pondasi plat tebal 2 cm Besuki
Besi plat atas tebal 1.5 cm Besuki
Besi Galvanis kolom diameter 10 inch Besuki
Besi Galvanis rangka atap diameter 4 inch Besuki
Besi Galvanis rangka atap diameter 2 inch Besuki
Besi Galvanis rangka atap diameter 3 inch Besuki
Besi Canal C lebar 15 cm Besuki
Dinding galvalum tebal 0.3 mm Besuki
Atap galvalum tebal 0,3 mm Besuki
Pekerjaan Lain - lain Besuki
Kistdan dan Dewatering Besuki
m2 Rp 6,961
m3 Rp 851,596
M2 Rp 43,325
M3 Rp 29,976
M3 Rp 86,500
M3 Rp 51,500
Bh Rp 7,812,500
m' Rp 86,500
btg Rp 9,000
m' Rp 28,500
unit Rp 16,500,000
Kg Rp 22,138
m2 Rp 96,500
m3 Rp 716,500
m3 Rp 841,500
Bh Rp 3,906,250
m' Rp 43,250
Unit Rp 20,625,000
m3 Rp 926,500
m2 Rp 249,249
m Rp 158,992
Bh Rp 351,563
m' Rp 49,738
m' Rp 412,944
m' Rp 11,088
m³ Rp 186,228
m² Rp 27,497
m2 Rp 295,176
m' Rp 774,144
bh Rp 5,216,232
unit Rp 4,310,460
m³ Rp 235,032
m2 Rp 47,988
bh Rp 32,315
m2 Rp 1,590,792
Kg Rp 30,049
Kg Rp 30,049
Kg Rp 171,278
m2 Rp 178,500
m2 Rp 293,664
m2 Rp 47,544
m2 Rp 227,724
m2 Rp 9,828
unit Rp 4,310,460
unit Rp 4,489,380
unit Rp 1,169,112
unit Rp 31,348,800
Ls Rp 81,629,184
Ls Rp 70,140,000
Set Rp 23,100,000
Ls Rp 15,908,353
Ls Rp 327,837,419
Ls Rp 6,378,876
ton Rp 704,340
m3 Rp 350,868
m³ Rp 235,032
Kg Rp 30,049
Kg Rp 30,049
Unit Rp 32,315
Unit Rp 15,683
Kg Rp 30,049
m2 Rp 161,983
m2 Rp 47,988
m2 Rp 29,625
m2 Rp 154,419
m2 Rp 252,112
m2 Rp 276,170
m2 Rp 252,112
unit Rp 595,841
unit Rp 4,635,474
m2 Rp 177,243
m2 Rp 40,612
m2 Rp 29,625
m2 Rp 325,815
m2 Rp 132,557
Unit Rp 626,472
m' Rp 62,316
m' Rp 50,341
Unit Rp 102,610
Unit Rp 86,874
Unit Rp 4,200,672
m2 Rp 154,419
m' Rp 178,295
m³ Rp 815,107
m' Rp 170,062
Titik Rp 349,817
Ls Rp 12,630,576
unit Rp 5,216,232
m3 Rp 29,013
Ls
Ls
Ls
KETAPANG
HARGA ATAS PERHITUNGAN AHS
JUMLAH TOTAL Rp 17,208,309,644 100.00% JUMLAH TOTAL Rp 14,682,128,893
PPN 11 % Rp 1,892,914,061 PPN 11 % Rp 1,615,034,178
TOTAL Rp 19,101,223,704 TOTAL Rp 16,297,163,071
PEMBULATAN Rp 19,101,224,000 PEMBULATAN Rp 16,297,163,000
BESUKI
HARGA ATAS PERHITUNGAN AHS
JUMLAH TOTAL Rp 13,001,137,799 100.00% JUMLAH TOTAL Rp 13,184,733,100
PPN 11 % Rp 1,430,125,158 PPN 11 % Rp 1,450,320,641
TOTAL Rp 14,431,262,956 TOTAL Rp 14,635,053,741
PEMBULATAN Rp 14,431,263,000 PEMBULATAN Rp 14,635,054,000
DEVIASI
85.32% JUMLAH TOTAL Rp 2,526,180,751
DEVIASI
101.41% JUMLAH TOTAL -Rp 183,595,302
Lampiran Penawaran - Ketapang
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA