Anda di halaman 1dari 12

RENOVASI RUMAH E16 BAGIAN DEPAN

Harga Satuan Jumlah


No Uraian Vol Sat Total
Bahan Upah Bahan Upah
1 Pekerjaan Pembongkaran
a Pembongkaran keramik Carport 16.24 m2 - 110,000 - 1,786,400 1,786,400
b Pembongkaran Kolom Depan 1.00 Ls - 350,000 - 350,000 350,000
c Kupasan Tanah 3.36 m3 - 125,000 - 420,500 420,500

2 Pekerjaan Pemasangan
a Pemasangan keramik 30x30 Abu-Abu Hitam 29.87 m2 67,500 30,000 2,016,225 896,100 2,912,325
b Penambahan Keramik Lantai 30x30 Teras Rumah 1.67 m2 67,500 30,000 112,725 50,100 162,825

Atap Kanopi Rangka Baja Ringan BLUESCOPE – BS ZACS – KANAL C75


3 33.06 m2 187,500 87,500 6,198,750 2,892,750 9,091,500
0,75TCT
GRAND TOTAL 8,327,700 6,395,850 14,723,550
Fee 20% 1,665,540 1,279,170 2,944,710
JUMLAH 9,993,240 7,675,020 17,668,260
RENOVASI RUMAH E16 BAGIAN DALAM

Harga Satuan Jumlah


No Uraian Vol Sat Total
Bahan Upah Bahan Upah
1 Pekerjaan Pembongkaran
a Pembongkaran Dinding Belakang 3 x 2,5 m 7.50 m2 80,000 - 600,000 600,000
b Bongkar Jendela, Pintu dan Dinding untuk Pintu WC 1.00 Ls 350,000 - 350,000 350,000
c Bongkar Keramik untuk Jalur Pipa WC 12.00 m2 110,000 - 1,320,000 1,320,000
d Bongkar Kanopi Beton 1.00 Ls 80,000 - 80,000 80,000
TOTAL PEKERJAAN 1 - 2,350,000 2,350,000

2 Pekerjaan Tanah & Pondasi


a Timbunan Tanah 15.96 m3 75,000 25,000 1,197,000 399,000 1,596,000
b Galian Pondasi Tapak 0.72 m3 - 80,000 - 57,600 57,600
c Pembuatan Pondasi Tapak 50x50, t = 15cm 22.92 kg 15,500 4,000 355,186 91,661 446,846
d Bekisting Pondasi Tapak 1.20 m2 144,600 113,190 173,520 135,828 309,348
e Pengecoran Pondasi Tapak 0.15 m3 985,000 363,000 147,750 54,450 202,200
f Kolom Pondasi Tapak 10x20 cm
Tul. Utama 29.17 kg 15,500 4,000 452,166 116,688 568,854
Tul. Sengkang 13.71 kg 15,500 4,000 212,557 54,853 267,410
Bekisting Kolom 10.20 m2 144,600 113,190 1,474,920 1,154,538 2,629,458
Cor Kolom 0.34 m3 985,000 363,000 334,900 123,420 458,320
g Pas. 1 Bata Pondasi bawah sloof t=30 cm 1.80 m2 222,500 24,000 400,500 43,200 443,700
h Pas 1 Bata, Pondasi Bata Bawah Sloof Dapur & Taman 6.12 m2 222,500 24,000 1,361,700 146,880 1,508,580
i Pembuatan Septic Tank (1 x 1 x 1,5 m)
Pembesian Dinding
Horizontal 25.74 kg 15,500 4,000 398,970 102,960 501,930
Vertikal 25.74 kg 15,500 4,000 398,970 102,960 501,930
Bekisting Septic Tank 12.00 m2 144,600 113,190 1,735,200 1,358,280 3,093,480
Pengecoran Septic Tank 0.72 m3 985,000 363,000 709,200 261,360 970,560
TOTAL PEKERJAAN 2 9,352,538 4,203,678 13,556,216

3 Pembuatan WC
a Sloof Dinding WC 12x20 cm
Tul. Utama 10.30 kg 15,500 4,000 159,588 41,184 200,772
Tul. Sengkang 5.23 kg 15,500 4,000 81,022 20,909 101,930
Bekisting Sloof 2.40 m2 144,600 113,190 347,040 271,656 618,696
Cor Sloof 0.14 m3 985,000 363,000 141,840 52,272 194,112
b Penambahan Dinding WC 10.50 m2 89,000 12,000 934,500 126,000 1,060,500
c Plesteran Dinding WC 21.00 m2 30,000 45,000 630,000 945,000 1,575,000
d Acian Dinding WC 21.00 m2 12,500 40,000 262,500 840,000 1,102,500
e Pengecatan Dinding Dalam WC 13.35 m2 125,000 17,500 1,668,750 233,625 1,902,375
f Pengecatan Dinding Luar WC 8.84 m2 125,000 17,500 1,104,375 154,613 1,258,988
g Pas. Keramik Lantai 25x25 WC 2.25 m2 192,000 35,000 432,000 78,750 510,750
h Pas. Keramik Dinding 25x40 WC 7.65 m2 268,800 65,000 2,056,320 497,250 2,553,570
i Plat Atap Untuk Tandon Air (150x150x12)
Penulangan Tikar 30.69 kg 15,500 4,000 475,695 122,760 598,455
Bekisting 2.25 m2 144,600 113,190 325,350 254,678 580,028
Pengecoran Plat Atap 0.27 m3 985,000 363,000 265,950 98,010 363,960
j Tandon Air 1000 L 1.00 Bh 2,000,000 500,000 2,000,000 500,000 2,500,000
k Pintu WC 1.00 Bh 300,000 100,000 300,000 100,000 400,000
l Closet Jongkok 1.00 Bh 285,000 100,000 285,000 100,000 385,000
m Bak Fiber 1.00 Bh 850,000 - 850,000 - 850,000
n Floor Drain Stainless 1.00 Bh 40,000 20,000 40,000 20,000 60,000
TOTAL PEKERJAAN 3 12,359,930 4,456,706 16,816,635

4 Pekerjaan Struktur
a Penambahan Kolom Dinding Dapur & Taman 10x12 cm - 150
Tul. Utama 30.89 kg 15,500 4,000 478,764 123,552 602,316
Tul. Sengkang 9.87 kg 15,500 4,000 153,041 39,494 192,535
Bekisting Kolom 7.92 m2 144,600 113,190 1,145,232 896,465 2,041,697
Cor Kolom 0.22 m3 985,000 363,000 212,760 78,408 291,168
b Sloof Dinding Dapur & Taman 12x20 cm
Tul. Utama 26.25 kg 15,500 4,000 406,949 105,019 511,969
Tul. Sengkang 13.33 kg 15,500 4,000 206,605 53,317 259,923
Bekisting Sloof 6.12 m2 144,600 113,190 884,952 692,723 1,577,675
Cor Sloof 0.37 m3 985,000 363,000 361,692 133,294 494,986
Harga Satuan Jumlah
No Uraian Vol Sat Total
Bahan Upah Bahan Upah
c Penambahan Dinding Bata Dapur 41.10 m2 89,000 12,000 3,657,900 493,200 4,151,100
d Penambahan Dinding Roster Samping Dapur 3.90 m2 145,000 16,000 565,500 62,400 627,900
TOTAL PEKERJAAN 4 8,073,395 2,677,872 10,751,268

5 Pekerjaan Plester, Aci,Cat dan Keramik


a Plesteran Dinding Dapur & Taman 53.10 m2 30,000 45,000 1,593,000 2,389,500 3,982,500
b Acian Dinding 53.10 m2 12,500 40,000 663,750 2,124,000 2,787,750
c Pengecatan Dinding Catylax Putih 53.10 m2 125,000 17,500 6,637,500 929,250 7,566,750
d Keramik Dapur 40x40 18.85 m2 288,000 80,000 5,428,800 1,508,000 6,936,800
e Keramik Teras 40x40 4.50 m2 288,000 80,000 1,296,000 360,000 1,656,000
TOTAL PEKERJAAN 5 15,619,050 7,310,750 22,929,800

6 Pekerjaan Interior & Finishing


a Pemasangan Pintu Kaca Lipat L = 3m 1.00 Unit 5,000,000 1,000,000 5,000,000 1,000,000 6,000,000
b Pembuatan Meja Dapur (1,6 x 2,8 x 0,8 m) 1.00 Unit 1,592,100 1,061,400 1,592,100 1,061,400 2,653,500
Atap Kanopi Rangka Baja Ringan BLUESCOPE – BS ZACS – KANAL C75
c 30.45 m2 84,000 36,000 2,557,800 1,096,200 3,654,000
0,75TCT
d Pemasangan Plafond Gypsum 30.45 m2 123,750 41,250 3,768,188 1,256,063 5,024,250
e Pembuatan Dak Talang Air (5.8 x 0.6 x 0.2)
Pembesian 14.93 kg 15,500 4,000 231,403 59,717 291,119
Bekisting 8.12 m2 144,600 113,190 1,174,152 919,103 2,093,255
Pengecoran Dak Talang 0.70 m3 985,000 363,000 685,560 252,648 938,208
f Pembuatan Bak Kontrol (20x20x20 cm) 1.00 Unit 665,000 400,000 665,000 400,000 1,065,000
g Kitchen Zink 1.00 Bh 750,000 100,000 750,000 100,000 850,000
TOTAL PEKERJAAN 6 16,424,202 6,145,130 22,569,332

7 Instalasi Air Bersih Pipa 1/2 Inch 24.00 m 8,000 20,000 192,000 480,000 672,000
8 Instalasi Air Kotor Pipa 3 Inch 18.00 m 15,000 60,000 270,000 1,080,000 1,350,000
9 Instalasi Listrik 1.00 Ls - 3,500,000 - 3,500,000 3,500,000
GRAND TOTAL 62,291,115 32,204,136 94,495,252
Fee 20% 12,458,223 6,440,827 18,899,050
JUMLAH 74,749,338 38,644,964 113,394,302
5 org
32,204,136.27

150,000 org/hari 45 hari 33,750,000.00


No Uraian Vol Sat

1 Pekerjaan Pembongkaran
a Pembongkaran keramik Carport 16.24 m2
b Pembongkaran Kolom Depan 1.00 Ls
c Kupasan Tanah 3.36 m3

2 Pekerjaan Pemasangan
a Pemasangan keramik 30x30 Abu-Abu Hitam 29.87 m2
b Penambahan Keramik Lantai 30x30 Teras Rumah 1.67 m2

3 Atap Kanopi Rangka Baja Ringan BLUESCOPE – BS ZACS – KANAL C75 33.06 m2

1 Pekerjaan Pembongkaran
a Pembongkaran Dinding Belakang 3 x 2,5 m 7.50 m2
b Bongkar Jendela, Pintu dan Dinding untuk Pintu WC 1.00 Ls
c Bongkar Keramik untuk Jalur Pipa WC 12.00 m2
d Bongkar Kanopi Beton 1.00 Ls

2 Pekerjaan Tanah & Pondasi


a Timbunan Tanah 15.96 m3
b Galian Pondasi Tapak 0.72 m3
D10 c Pembuatan Pondasi Tapak 50x50, t = 15cm 33.60 m
d Bekisting Pondasi Tapak 1.20 m2
e Pengecoran Pondasi Tapak 0.15 m3
f Kolom Pondasi Tapak 10x20 cm
D8 Tul. Utama 68.00 m
D6 Tul. Sengkang 56.67 m
Bekisting Kolom 10.20 m2
Cor Kolom 0.34 m3
g Pas. 1 Bata Pondasi bawah sloof t=30 cm 1.80 m2
h Pas 1 Bata, Pondasi Bata Bawah Sloof Dapur & Taman 6.12 m2
i Pembuatan Septic Tank (1 x 1 x 1,5 m) 1.00 Unit
Pembesian
Dinding
D8 Horizontal 60.00 m
D8 Vertikal 60.00 m
Bekisting Septic Tank 12.00 m2
Pengecoran Septic Tank 0.72 m3

3 Pembuatan WC
a Sloof Dinding WC 12x20 cm
D8 Tul. Utama 24.00 m
D6 Tul. Sengkang 21.60 m
Bekisting Sloof 2.40 m2
Cor Sloof 0.14 m3
b Penambahan Dinding WC 10.50 m2
c Plesteran Dinding WC 21.00 m2
d Acian Dinding WC 21.00 m2
e Pengecatan Dinding Dalam WC 13.35 m2
f Pengecatan Dinding Luar WC 8.84 m2
g Pas. Keramik Lantai 25x25 WC 2.25 m2
h Pas. Keramik Dinding 25x40 WC 7.65 m2
i Plat Atap Untuk Tandon Air (150x150x12)
D10 Penulangan Tikar 45.00 m
Bekisting 2.25 m2
Pengecoran Plat Atap 0.27 m3
j Pintu WC 1.00 Bh
k Closet Jongkok 1.00 Bh
l Bak Fiber 1.00 Bh
m Krain Air 1.00 Bh
n Floor Drain 1.00 Bh

4 Pekerjaan Struktur
a Penambahan Kolom Dinding Dapur & Taman 10x12 cm - 150
D8 Tul. Utama 72.00 m
D6 Tul. Sengkang 40.80 m
Bekisting Kolom 7.92 m2
Cor Kolom 0.22 m3
b Sloof Dinding Dapur & Taman 12x20 cm
D8 Tul. Utama 61.20 m
D6 Tul. Sengkang 55.08 m
Bekisting Sloof 6.12 m2
Cor Sloof 0.37 m3
c Penambahan Dinding Bata Batas Samping Kiri 3.75 m2
d Penambahan Dinding Bata Batas Samping Kanan 15.00 m2
e Penambahan Dinding Bata Batas Belakang 21.00 m2
f Penambahan Dinding Bata Samping Dapur 1.35 m2
g Penambahan Dinding Roster Samping Dapur 3.90 m2

5 Pekerjaan Plester, Aci,Cat dan Keramik


a Plesteran Dinding Dapur & Taman 53.10 m2
b Acian Dinding 53.10 m2
c Pengecatan Dinding Catylax Putih 53.10 m2
d Keramik Dapur 40x40 18.85 m2
e Keramik Teras 40x40 4.50 m2

6 Pekerjaan Interior & Finishing


a Pemasangan Pintu Kaca Lipat L = 3m 1.00 Unit
b Pembuatan Meja Dapur (1,6 x 2,8 x 0,8 m) 1.00 Unit
c Pemasangan Atap Baja Ringan Taso 65.65 30.45 m2
d Pemasangan Plafond Gypsum 30.45 m2
e Pembuatan Dak Talang Air (5.8 x 0.6 x 0.2)
D8 Pembesian 34.80 m
Bekisting 8.12 m2
Pengecoran Dak Talang 0.70 m3
f Pembuatan Bak Kontrol (20x20x20 cm) 1.00 Unit

7 Instalasi Air Bersih Pipa 1/2 Inch 24.00 m


8 Instalasi Air Kotor Pipa 3 Inch 18.00 m
9 Instalasi Listrik 1.00 Ls
Panjang Lebar Tinggi
Sisi Banyak Jumlah Pengurang
(m) (m) (m)

5.80 2.80

5.80 2.90 0.20

5.80 5.70 3.19


0.30 2.90
1.00 0.80

5.80 5.70

3.00 2.50

10.00 1.20

4.75 6.00 0.40


0.60 0.60 0.50 4.00
0.70 12.00 4.00
0.50 0.15 4.00 4.00
0.50 0.50 0.15 4.00

4.25 4.00 4.00


0.50 28.33 4.00
0.20 0.10 4.25 2.00 4.00
0.20 0.10 4.25 4.00
6.00 0.30
15.30 0.40
1.00 1.00 1.50

1.00 15.00 4.00


1.50 10.00 4.00
1.00 1.50 2.00 4.00
1.00 0.12 1.50 4.00

6.00 4.00 1.00


0.54 40.00 1.00
6.00 0.20 2.00 1.00
6.00 0.12 0.20 1.00
3.00 3.50
3.00 3.50 2.00
3.00 3.50 2.00
6.00 3.50 7.65
3.00 3.50 1.67
1.50 1.50
6.00 1.50 1.35

1.50 15.00 2.00


1.50 1.50
1.50 1.50 0.12

3.60 4.00 5.00


0.34 24.00 5.00
0.10 0.12 3.60 2.00 5.00
0.10 0.12 3.60 5.00

15.30 4.00 1.00


0.54 102.00 1.00
15.30 0.20 2.00 1.00
15.30 0.12 0.20 1.00
3.75 1.00
3.75 4.00
6.00 3.50
1.50 0.90
1.50 2.60
5.80 3.25
3.00 1.50

5.25 5.80
5.25 5.80

5.80 6.00
5.80 0.60 0.20 2.00 2.00
5.80 0.60 0.20

24.00