No. Keterangan Volume Sat Harga Satuan Jumlah Volume Sat Harga Satuan Jumlah Keterangan
I Pekerjaan Pembongkaran
1 Pembongkaran Dinding Partisi WC lama 1.00 Ls 2,500,000 2,500,000 1.00 Ls 2,500,000 2,500,000
2 Pembongkaran Dinding Batas Belakang 9.20 m2 85,000 782,000 9.20 m2 85,000 782,000
3 Pembongkaran Lantai Keramik Dalam 142.98 m2 38,500 5,504,622 142.98 m2 38,500 5,504,622
4 Pembongkaran Keramik Depan / Teras 46.00 m2 38,500 1,771,000 46.00 m2 38,500 1,771,000
5 Pembongkaran Kanopi Depan 1.00 Lot 1,000,000 1,000,000 1.00 Lot 1,000,000 1,000,000
6 Pemindahan Pintu Samping + Tutup Lubang Bekas Pintu 1.00 unit 2,000,000 2,000,000 1.00 unit 2,000,000 2,000,000
7 Pemindahan Pintu Bawah Tangga + Tutup Lubang Bekas Pintu 1.00 unit 2,000,000 2,000,000 1.00 unit 2,000,000 2,000,000
TOTAL I 15,557,622 15,557,622
II Pekerjaan Renovasi
1 Pembuatan Kamar Mandi Baru 2 x 1.3 m + Pemasangan Closet
a Pembesian Kolom Praktis 15x15
Tul. Utama 4D10 14.88 kg 41,621 619,316 14.88 kg 41,621 619,316
Tul. Begel D6 - 150 4.40 kg 41,621 183,131 4.40 kg 41,621 183,131
b Bekisting Kolom Praktis 1.92 m2 166,339 319,371 1.92 m2 166,339 319,371
c Pengecoran Kolom Praktis 0.06 m3 1,133,340 65,280 0.06 m3 1,133,340 65,280
d Pas. Bata 1/2 Bata 12.54 m2 115,056 1,442,806 12.54 m2 115,056 1,442,806
e Plesteran Dinding 23.48 m2 36,705 861,824 23.48 m2 36,705 861,824
f Acian Dinding 23.48 m2 31,017 728,279 23.48 m2 31,017 728,279
g Pengecatan Dinding (Jotun Majestic) 23.48 m2 80,000 1,878,400 23.48 m2 80,000 1,878,400
h Pek. Keramik Lantai Wc Roman 20x20 2.60 m2 375,239 975,620 2.60 m2 412,762 1,073,182 Perubahan Ukuran Keramik Menjadi 40x40 Roman
i Pek. Keramik Dinding Wc Roman 20x40 23.48 m2 238,929 5,610,044 23.48 m2 179,196 4,207,533 Perubahan Ukuran Keramik Menjadi 20x45 Aqura
TOTAL II - 1 12,684,072 11,379,123
2 Pembuatan Atap Kanopi + Penambahan Dinding Wc
a Penambahan Dinding Belakang 1 m 14.00 m2 115,056 1,610,788 14.00 m2 115,056 1,610,788
b Plesteran Dinding Tambahan 28.00 m2 36,705 1,027,729 28.00 m2 36,705 1,027,729
c Acian Dinding Tambahan 28.00 m2 31,017 868,476 28.00 m2 31,017 868,476
d Pengecatan Dinding (Cat Minyak + No Drop) 28.00 m2 65,000 1,820,000 28.00 m2 65,000 1,820,000
e Atap Kanopi Baja Ringan 22.08 m2 350,000 7,728,000 22.08 m2 350,000 7,728,000
TOTAL II - 2 13,054,993 13,054,993
3 Penambahan Dinding Samping Bangunan + Besi Pengaman + R. Sholat
a Penambahan Dinding samping 1/2 Bata : 9.252 x 2.66 x 2.5 m 36.43 m2 115,056 4,191,501 45.37 m2 115,056 5,220,392 Perubahan Panjang 9,252 menjandi 12,829 m
b Penambahan Dinding R.Sholat L=1.7 ; t=1.5 m 2.55 m2 115,056 293,394 6.95 m2 115,056 799,354 Perubahan Dimensi L = 2,238 m ; P = 1,491 ; T = 2,5 m
c Pengecoran Lantai R.Sholat (2 x 2.66 m, +10 cm dari tempat wudhu) @wiremesh m6 0.53 m3 1,813,344 964,699 0.44 m3 1,813,344 804,390 Perubahan Dimensi L = 2,238 m ; P = 1,491
d Plesteran Dinding Tambahan Samping 41.53 m2 36,705 1,524,342 59.27 m2 36,705 2,175,390 Perubahan Panjang 9,252 menjandi 12,829 m
e Acian Dinding Tambahan Samping 36.43 m2 31,017 1,129,949 45.37 m2 31,017 1,407,319 Perubahan Panjang 9,252 menjandi 12,829 m
f Pengecatan Dinding (Cat Minyak + No Drop) 76.69 m2 65,000 4,984,694 76.69 m2 65,000 4,984,694
g Kolom Praktis
Tul. Utama 4D10 29.76 kg 41,621 1,238,632 29.76 kg 41,621 1,238,632
Tul. Begel D6 - 150 8.80 kg 41,621 366,262 8.80 kg 41,621 366,262
Bekisting 3.84 m2 166,339 638,742 3.84 m2 166,339 638,742
Pengecoran 0.12 m3 1,133,340 130,561 0.12 m3 1,133,340 130,561
h Flooring Lantai Ruang Samping 7.25 x 2.66 m (Acian Kilat) 19.29 m2 37,220 717,795 19.29 m2 37,220 717,795
i Keramik Lantai Roman 40x40 Bianca R. Sholat (P = 2.0 ; L=2.66 m) 5.32 m2 290,712 1,546,586 5.55 m2 290,712 1,613,435 Penambahan Teras Mushola 50 cm
j Pembuatan Besi Kerangkeng Pengaman (P=9.25 m; L=2x2.66 m; t= 1.30 m) 18.94 m2 350,000 6,630,260 - m2 350,000 - Tidak Dikerjakan
k Pembuatan Atap Kanopi (P = 9.25 m ; L = 2.66 m) 24.61 m2 350,000 8,613,612 19.24 m2 350,000 6,735,225 Perubahan Lebar Kanopi menjadi 1,5 m
TOTAL II - 3 32,971,030 26,832,191
No. Keterangan Volume Sat Harga Satuan Jumlah Volume Sat Harga Satuan Jumlah Keterangan
_____________ _____________