2 a Tembok Kamar 773.70 773.70 2 m 1547.40 55,000 85,107,000 b Tembok Sekat Kamar 387.00 387.00 2 m2 774.00 55,000 42,570,000 c Tembok Pagar 124.50 124.50 2 m2 249.00 55,000 13,695,000 d Tembok Pos 22.42 22.42 2 m2 44.84 55,000 2,466,200 2 e Tembok Teras 22.85 22.85 2 m 45.70 55,000 2,513,500
8 Pekerjaan Pasang Roster Lt1 1,154,400
2 a Pasang Roster 31.20 31.20 1 m 31.20 37,000 1,154,400
9 Pekerjaan Pasang Keramik Lt1 42,511,100
2 a Keramik Dinding Kamar Mandi 17.11 17.11 20 m 342.20 47,500 16,254,500 b Keramik Dinding Kamar Mandi luar 19.07 19.07 1 m2 19.07 47,500 905,825 c Keramik Dinding Dapur 22.77 22.77 1 m2 22.77 47,500 1,081,575 d Keramik Lantai Kamar Mandi 2.69 2.69 20 m2 53.80 42,500 2,286,500 e Keramik Lantai Kamar Mandi luar 2.44 2.44 1 m2 2.44 42,500 103,700 f Keramik Lantai 514.80 514.80 1 m2 514.80 42,500 21,879,000
10 Pekerjaan Lantai Cor 18,631,920
2 a Cor Lantai 321.24 321.24 1 m 321.24 58,000 18,631,920 11 Pekerjaan Septic Tank 6,339,350 2 a Tembok (Batu Bata) 42.71 42.71 1 m 42.71 75,000 3,203,250 2 b Plester & Aci 57.02 57.02 1 m 57.02 55,000 3,136,100
12 Pekerjaan Plafon Lt1 26,967,600
2 a Plafon Kamar 485.40 485.40 1 m 485.40 54,000 26,211,600 2 b Plafon Pos, Kamar Mandi Luar & Dapur 14.00 14.00 1 m 14.00 54,000 756,000
13 Pekerjaan Pintu & Jendela Lt1 5,185,000
a Pintu 21.00 21 1 Unit 21.00 105,000 2,205,000 b Pintu Kamar Mandi 21.00 21 1 Unit 21.00 80,000 1,680,000 c Jendela 20.00 20 1 Unit 20.00 65,000 1,300,000
14 Pekerjaan Pasang Closet Lt1 3,610,000
a Closet Duduk 20 20 1 Unit 20.00 175,000 3,500,000 b Closet Jongkok 1 1 1 Unit 1.00 110,000 110,000
15 Pekerjaan Bak Kontrol 526,500
a Bak Kontrol 3 3 1 Unit 3.00 175,500 526,500
16 Pekerjaan Beton Plat Dak 30,890,800
3 a Plat Dak 532.60 532.60 1 m 532.60 58,000 30,890,800
17 Pekerjaan Tembok Lt2 77,379,000
2 a Tembok Kamar (Batu Bata) 773.70 773.70 1 m 773.70 75,000 58,027,500 2 b Tembok Sekat Kamar (Herbel) 387.00 387.00 1 m 387.00 35,000 13,545,000 2 c Tembok Balcon (Batu Bata) 77.42 77.42 1 m 77.42 75,000 5,806,500
18 Pekerjaan Plester & Aci Lt2 136,193,200
2 a Tembok Kamar 773.70 773.70 2 m 1547.40 55,000 85,107,000 2 b Tembok Sekat Kamar 387.00 387.00 2 m 774.00 55,000 42,570,000 2 c Tembok Balcon 77.42 77.42 2 m 154.84 55,000 8,516,200
19 Pekerjaan Pasang Roster Lt2 1,720,870
2 a Pasang Roster 46.51 46.51 1 m 46.51 37,000 1,720,870
20 Pekerjaan Pasang Keramik Lt2 24,929,175
2 a Keramik Dinding Kamar Mandi 17.11 17.11 20 m 342.20 47,500 16,254,500 2 b Keramik Lantai Kamar Mandi 2.69 2.69 20 m 53.80 42,500 2,286,500 2 c Keramik Lantai 150.31 150.31 1 m 150.31 42,500 6,388,175
21 Pekerjaan Plafon Lt2 26,211,600
2 a Plafon Kamar 485.40 485.40 1 m 485.40 54,000 26,211,600
22 Pekerjaan Pintu & Jendela Lt2 5,000,000
a Pintu 20.00 20 1 Unit 20.00 105,000 2,100,000 b Pintu Kamar Mandi 20.00 20 1 Unit 20.00 80,000 1,600,000 c Jendela 20.00 20 1 Unit 20.00 65,000 1,300,000
23 Pekerjaan Pasang Closet Lt2 3,500,000
a Closet Duduk 20 20 1 Unit 20.00 175,000 3,500,000
24 Pekerjaan Beton Plat Dak Lt3 5,563,940
3 a Plat Dak Tandon 95.93 95.93 1 m 95.93 58,000 5,563,940
25 Pekerjaan Pasang Keramik Lt3 2,457,775
2 a Keramik Lantai 57.83 57.83 1 m 57.83 42,500 2,457,775
26 Pekerjaan Tembok Lt3 2,292,150
2 a Tembok (Herbel) 65.49 65.49 1 m 65.49 35,000 2,292,150 27 Pekerjaan Plester & Aci Lt3 7,203,900 2 a Tembok 65.49 65.49 2 m 130.98 55,000 7,203,900
28 Pekerjaan Bak Tandon 6,742,865
2 a Tembok Cor 48.88 48.88 1 m 48.88 58,000 2,835,040 2 b Keramik 82.27 82.27 1 m 82.27 47,500 3,907,825
29 Pekerjaan Pengecatan 62,784,750
2 a Pagar 124.50 124.50 2 m 249.00 12,500 3,112,500 2 b Tembok Lt1 773.70 773.70 2 m 1547.40 12,500 19,342,500 c Sekat Kamar Lt1 387.00 387.00 2 m2 774.00 12,500 9,675,000 d Tembok Lt2 773.70 773.70 2 m2 1547.40 12,500 19,342,500 e Sekat Kamar Lt2 387.00 387.00 2 m2 774.00 12,500 9,675,000 f Tembok Lt3 65.49 65.49 2 m2 130.98 12,500 1,637,250
30 Pekerjaan Pemipaan 2,880,000
a Pemasangan Pipa 3" Septic Tank Lt1 87.5 87.5 1 m 87.50 16,000 1,400,000 b Pemasangan Pipa 3" Septic Tank Lt2 92.5 92.5 1 m 92.50 16,000 1,480,000 c Pemasangan Pipa 3" Air Kotor Lt1 122 122 1 m 122.00 12,000 1,464,000 d Pemasangan Pipa 3" Air Kotor Lt2 78 78 1 m 78.00 12,000 936,000
31 Pekerjaan Saluran Pembuangan 850,000
a Galian Tanah 50 x 50cm 10 10 1 m 10.00 55,000 550,000 b Pasang Gorong- Gorong 10 10 1 m 10.00 30,000 300,000