I PEKERJAAN PENDAHULUAN
A Bow Plang
1 5 x 7 x 400 : 0.59 M3 Kayu Meranti
2 2,5 x 20 x 400 : 0.42 M3 Kayu Meranti
II PEKERJAAN PONDASI
A Pondasi Menerus, 1:4
1 Timbunan Pasir 5.47 M3
2 Batu Gunung 50.61 M3
3 Pasir 21.93 M3
4 Semen @50kg 137.49 ZAK
B ATAP
1 Seng Plat 26.00 M
2 Seng BJLS 12 (180 x 80) 245.00 Lbr
Seng BJLS 12 (244 x 70) 8.00 Lbr
B Plesteran Dinding (1 : 4)
1 Semen @50kg 49.45 ZAK
2 Pasir 6.49 M3
C Acian Dinding
1 Semen @50kg 45.36 ZAK
D Keramik Dinding KM
1 Semen @50kg 4.00 ZAK
2 Keramik 20x25 30.00 M²
B Penutup Palfond
1 Calsiboard (1,22 x 2,44) 3 mm 17.00 Lbr
C Rolag Bata (1 : 4)
1 Bata 972.00 M3
Page 2 of 4
HARGA JUMLAH
NO. JENIS MATERIAL VOL SAT
SATUAN HARGA Bobot % KETERANGAN
2 Semen @50kg 6.48 ZAK
3 Pasir 0.39 M3
XI PEKERJAAN PENGECATAN
A Plamir Dinding (1L : 2SP : 1/4air)
1 Semen Putih 48.12 Kg
2 Lem Rajawali 24.06 Kg
B Plamir Kozen dan Pintu
1 Plamir Kayu (Cap Pedang) 87.00 Kg
C Pengecatan Dinding
1 Cat Vinilex Warna Kuning @ 5 Kg 31.00 Klg Cat Luar
Dinding Dalam &
2 Cat Vinilex Warna Putih @ 5 Kg 38.00 Klg Plafond
D Pengecatan Kozen dan Daun Pintu
1 Cat Minyak Glotex Warna Coklat 12.00 Klg
2 Tiner B 6.00 Klg
3 Kuas 4" 4.00 Pcs
4 Kuas 2" 4.00 Pcs
Page 4 of 4