Anda di halaman 1dari 2

UIP3B SULAWESI

AN
LIN
SA

Jl. Urip Sumoharjo KM7 Tello Baru, Panakkukang, Makassar, Sulawesi Selatan 90233
T (0411) 4092171
F - W www.pln.co.id

ANAK AGUNG NGURAH INDRA HADININGRAT/03 Agustus 2023 07:06:00/cetakan ke - 0


IMPEDANSI SUMBER DAN DATA HUBUNG SINGKAT GARDU INDUK TERSEBAR
SISTEM SULBAGSEL - UIP3B SULAWESI

GI KOLONEDALE TANPA BEBAN


MVASC IMPEDANSI SUMBER (1 PHASE TO GROUND MAX SC) IMPEDANSI SUMBER (1 PHASE TO GROUND MIN SC) IMPEDANSI SUMBER (2 PHASE MAX SC) IMPEDANSI SUMBER (2 PHASE MIN SC) HUBUNG SINGKAT
GARDU INDUK TEGANGAN (KV) 3 FASA 2 FASA 1 FASA - GROUND URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF 3 FASA 2 FASA 1 FASA - GROUND
MAX MIN MAX MIN MAX MIN R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) MAX MIN MAX MIN MAX MIN
GI KOLONEDALE 150 150 302.86 270.59 87.50 78.18 93.41 83.37 0.19905 0.41117 0.08696 0.35208 0.08630 0.35224 0.22018 0.40994 0.10743 0.35302 0.10676 0.35319 0.19905 0.41117 0.08696 0.35208 0.08630 0.35224 0.22018 0.40994 0.10743 0.35302 0.10676 0.35319 1.17 1.04 1.01 0.90 1.08 0.96
GI PAMONA 150 150 1491.48 1338.27 431.58 387.23 364.51 329.63 0.11168 0.12905 0.00381 0.07319 0.00315 0.07334 0.11243 0.12812 0.00433 0.07413 0.00366 0.07429 0.11168 0.12905 0.00381 0.07319 0.00315 0.07334 0.11243 0.12812 0.00433 0.07413 0.00366 0.07429 5.74 5.15 4.98 4.47 4.21 3.81

GI KOLONEDALE BERBEBAN 10 MW COSPHI 0.9


MVASC IMPEDANSI SUMBER (1 PHASE TO GROUND MAX SC) IMPEDANSI SUMBER (1 PHASE TO GROUND MIN SC) IMPEDANSI SUMBER (2 PHASE MAX SC) IMPEDANSI SUMBER (2 PHASE MIN SC) HUBUNG SINGKAT
GARDU INDUK TEGANGAN (KV) 3 FASA 2 FASA 1 FASA - GROUND URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF URUTAN NOL URUTAN POSITIF URUTAN NEGATIF 3 FASA 2 FASA 1 FASA - GROUND
MAX MIN MAX MIN MAX MIN R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) R0 (p.u) X0 (p.u) R1 (p.u) X1 (p.u) R2 (p.u) X2 (p.u) MAX MIN MAX MIN MAX MIN
GI KOLONEDALE 150 150 302.86 270.59 87.50 78.18 93.41 83.37 0.19905 0.41117 0.08696 0.35208 0.08630 0.35224 0.22018 0.40994 0.10743 0.35302 0.10676 0.35319 0.19905 0.41117 0.08696 0.35208 0.08630 0.35224 0.22018 0.40994 0.10743 0.35302 0.10676 0.35319 1.17 1.04 1.01 0.90 1.08 0.96
GI PAMONA 150 150 1491.48 1338.27 431.58 387.23 364.51 329.63 0.11168 0.12905 0.00381 0.07319 0.00315 0.07334 0.11243 0.12812 0.00433 0.07413 0.00366 0.07429 0.11168 0.12905 0.00381 0.07319 0.00315 0.07334 0.11243 0.12812 0.00433 0.07413 0.00366 0.07429 5.74 5.15 4.98 4.47 4.21 3.81

CATATAN :
Asumsi Beban Puncak Sistem Sulbagsel 1738.74 MW
Pembebanan Pembangkit dan Trafo Mengacu pada Logsheet BP 3 Mei 2023
Konfigurasi Sistem Mengacu pada Konfigurasi Bulan Juli 2023

Anda mungkin juga menyukai