Anda di halaman 1dari 11

REMARK

BAY LINE BAY LINE TRAFO BAY


A B C D E F G H
BAY LINE 1 BAY LINE 2 BAY COUPLER BAY SPARE ARAH SMELTER #2 ARAH SMELTER #3 SMELTER #1
14000 14000 14000 14000 14000 14000 14000

DS

DS/E

CVT
CB

CT

LA
LA

PT. PLN (Persero)


CVT UNIT INDUK PEMBANGUNAN
A B SULAWESI BAGIAN SELATAN
CT
JL. LETJ. HERTASNING, PANAKKUKANG
PLN MA K A S S A R
3 CT CB 3

R
BUSBAR B

BUSBAR B
DS
14000

14000
PI
S VT PT. CITRA RIANTARA SEJAHTERA

4000 3000
PI PI PI
PT. TEPPO ELECTRIC PERSADA
T DS DS DS JL. PELANDUK No.77
DS DS

1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2
1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2
MAKASSAR - INDONESIA

2 2

3000 4000
C DS DS 1x TAL 510mm2
PEKERJAAN PEMBANGUNAN
R DS GARDU INDUK 150 kV
BUSBAR A

BUSBAR A
DS DS
BANTAENG SMELTER (EXT)
14000

14000
PI
1x TAL 510mm2 & T/L 150 kV INCOMER
S VT
PI PI PI
BANTAENG SWITCHING
1x TAL 510mm2
T MK DS
MK MK Kontrak No. : 003.Pj/DAN.01.02/440000/2020
MK Tanggal : 31 Maret 2020

1 CB CB CB
CB CB 1

3000 4000 4000 3000


CT CT CT CT

1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2

1x TAL 510mm2
14000

14000
DS/E DS/E DS/E DS/E
BK.1 BK.2 BK.3
CVT CVT

OUTDOOR SWITCHYARD
1x A

m 2
LA LA LA LA LAYOUT

35m
CSR

SR 4
435m

11000
C
1x A
m2

OUTDOOR LAYOUT
SWITCHYARD
Scale ; 1:450 1 : 450

15 APRIL 2020
TL 150kV BANTAENG SMELTER (SWITCHING) - BANTAENG SMELTER (PELANGGAN)

14000 14000 14000 14000 14000 14000 14000


BAY LINE 1 BAY LINE 2 BAY COUPLER BAY SPARE BAY LINE BAY LINE TRAFO BAY
A B C D E F G H
ARAH SMELTER #2 ARAH SMELTER #3 SMELTER #1
001/EM-LAY/BAN-SME/2020

1
00
4

Copyright (c) 2020 by PT. CITRA RIANTARA SEJAHTERA, All rights reserved. Permission is granted to print and photocopy of this material for proect uses, written permissionis required for all other uses, including electronic uses
REMARK

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN
SULAWESI BAGIAN SELATAN

JL. LETJ. HERTASNING, PANAKKUKANG


PLN MA K A S S A R

1 2 3
AS WIRE
BUSBAR A BUSBAR B
14000 14000 PT. CITRA RIANTARA SEJAHTERA
SMELTER #2 PT. TEPPO ELECTRIC PERSADA
AS WIRE +18.00 JL. PELANDUK No.77

MAKASSAR - INDONESIA

ACSR 1x 435mm2
PEKERJAAN PEMBANGUNAN
GARDU INDUK 150 kV
+13.00 BANTAENG SMELTER (EXT)
& T/L 150 kV INCOMER
1x TAL 510mm2 1x TAL 510mm2
BANTAENG SWITCHING
1x TAL 510mm2
Kontrak No. : 003.Pj/DAN.01.02/440000/2020
+9.00 Tanggal : 31 Maret 2020

1x TAL 510mm2 1x TAL 510mm2


1x TAL 510mm2 1x TAL 510mm2
1x TAL 510mm2

1x TAL 510mm2 1x TAL 510mm2 1x TAL 510mm2 1x TAL 510mm2


1x TAL 510mm2

0.00 OUTDOOR SWITCHYARD


SECTION
LA CVT DS/E CT CB MK DS DS

3000 4000 4000 3000 3000


14000 10000 4000 4000 10000

POTONGAN A-A 1 : 250

Scale ; 1:250 15 APRIL 2020

002/EM-LAY/BAN-SME/2020

2
00
4

Copyright (c) 2020 by PT. CITRA RIANTARA SEJAHTERA, All rights reserved. Permission is granted to print and photocopy of this material for proect uses, written permissionis required for all other uses, including electronic uses
REMARK

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN
SULAWESI BAGIAN SELATAN

JL. LETJ. HERTASNING, PANAKKUKANG


PLN MA K A S S A R

1 2 3
AS WIRE
BUSBAR A BUSBAR B
14000 14000 PT. CITRA RIANTARA SEJAHTERA
SMELTER #3 PT. TEPPO ELECTRIC PERSADA
AS WIRE +18.00 JL. PELANDUK No.77

MAKASSAR - INDONESIA

ACSR 1x 435mm2
PEKERJAAN PEMBANGUNAN
GARDU INDUK 150 kV
+13.00 BANTAENG SMELTER (EXT)
& T/L 150 kV INCOMER
1x TAL 510mm2 1x TAL 510mm2
BANTAENG SWITCHING
1x TAL 510mm2
Kontrak No. : 003.Pj/DAN.01.02/440000/2020
+9.00 Tanggal : 31 Maret 2020

1x TAL 510mm2 1x TAL 510mm2


1x TAL 510mm2 1x TAL 510mm2
1x TAL 510mm2

1x TAL 510mm2 1x TAL 510mm2 1x TAL 510mm2 1x TAL 510mm2


1x TAL 510mm2

0.00 OUTDOOR SWITCHYARD


SECTION
LA CVT DS/E CT CB MK DS DS

3000 4000 4000 3000 3000


14000 10000 4000 4000 10000

POTONGAN B-B 1 : 650 / 1 : 300

Scale ; 1:250 15 APRIL 2020

003/EM-LAY/BAN-SME/2020

3
00
4

Copyright (c) 2020 by PT. CITRA RIANTARA SEJAHTERA, All rights reserved. Permission is granted to print and photocopy of this material for proect uses, written permissionis required for all other uses, including electronic uses
REMARK

PT. PLN (Persero)


14000 14000 14000 14000 14000 14000 14000 UNIT INDUK PEMBANGUNAN
SULAWESI BAGIAN SELATAN
BAY LINE 1 BAY LINE 2 BAY COUPLER BAY SPARE BAY LINE BAY LINE TRAFO BAY
A B C D E F G H JL. LETJ. HERTASNING, PANAKKUKANG
ARAH SMELTER #2 ARAH SMELTER #3 SMELTER #1
PLN MA K A S S A R

PT. CITRA RIANTARA SEJAHTERA


+18.00 PT. TEPPO ELECTRIC PERSADA
JL. PELANDUK No.77

MAKASSAR - INDONESIA

+13.00
PEKERJAAN PEMBANGUNAN
GARDU INDUK 150 kV
BANTAENG SMELTER (EXT)
+9.00 & T/L 150 kV INCOMER
1x TAL 510mm2 1x TAL 510mm2
1x TAL 510mm2 1x TAL 510mm2 BANTAENG SWITCHING
1x TAL 510mm2 1x TAL 510mm2

Kontrak No. : 003.Pj/DAN.01.02/440000/2020


Tanggal : 31 Maret 2020

0.00
CT DS DS

OUTDOOR SWITCHYARD
SECTION

POTONGAN C-C
Scale ; 1:350

1 : 300

15 APRIL 2020

004/EM-LAY/BAN-SME/2020

4
00
4

Copyright (c) 2020 by PT. CITRA RIANTARA SEJAHTERA, All rights reserved. Permission is granted to print and photocopy of this material for proect uses, written permissionis required for all other uses, including electronic uses