150 KV

KONDISI NORMAL

150 KV

SKANG
2

SKANG
KOPEL 1
2

KONDISI BLACK OUT

KOPEL 1

MKALE
1

SOPPENG 2 2 PAREPARE 1
Pasti, 20 MVA 150/20 KV

MKALE
1

SOPPENG 2 2 PAREPARE 1
Pasti, 20 MVA 150/20 KV

MBARU
1
UNINDO, 30 MVA 150/20 KV

MBARU
1 2
A B A

UNINDO, 30 MVA 150/20 KV

1 2

21 KV

AREVA

MODALEK

21 KV

AREVA

MODALEK

SPARE
P S

UNINDO 50 KVA 20 KV/380 V

Pauwels, 200 KVA 20 KV/380 V

SPARE
P S

UNINDO 50 KVA 20 KV/380 V

F1

PS ng do e . Te j e n . T ka F5 a n g n g . P ka F4 En re . ng F3 pa ap a t .R ari F2 mp .A

F1

PS o n g d e . Te j e n . T ka F5 a n g g . P ka n F4 n re .E ng F3 pa ap a t .R ari F2 mp .A

PT. PLN (PERSERO) WILAYAH SULSEL, SULTRA, SULBAR AP2B SISTEM SULSEL

SINGLE LINE DIAGRAM GI. SIDRAP


Revisi :
Agustinus.s

Diketahui:
File: TRAGI SDRAP-OP.visio

Diperiksa:
M.Tahir.R

Dibuat :
Lukman

KETERANGAN:
PMT POSISI CLOSE PMT POSISI OPEN PMS POSISI CLOSE PMS POSISI OPEN TEG.150 kV TEG.20 kV TEG.380 V

MANAJER ASMAN OPERASI Bag. Operasi 30 Agst 11 Arjun

PROSEDUR OPERASI STANDAR LOKAL GI SIDRAP