COMPANY OVERVIEW
GEOGRAPHIC LOCATION
Block Loyak
➢ Loyak and Talang Gula Block is located in Kabupaten PALI, South Sumatera.
➢ The distance from City of Palembang approximately 171 km and can be reach by land road
with time estimation around 5 to 6 hours.
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
PETA LOKASI SUMUR
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
PENDAHULUAN
➢ Sesuai Rencana Kerja Program KSO QEI Loyak Talang Gula akan sesegera mungkin
memproduksikan Gas dari lapisan E, F, P dan Q dari sumur Candi – 2 dan Candi – 3
➢ Potensial perkiraan produksi dari kedua sumur tersebut diperkirakan sebesar 2.5
MMSCFD.
➢ Kedua sumur Candi-2 & Candi-3 sudah siap diproduksikan dan untuk menampung
produksi tersebut segera akan dibangun Gathering dan Processing Station di Yard
Candi-2 sekaligus terintegrasi dihubungkan dengan Fasilitas Produksi (Flow line) yang
Pertamina EP telah pasang untuk menghubungkan ke SP-2 Raja
➢ KSO QEI Loyak Talang Gula secara paralel sedang melengkapi persyaratan Administratif
untuk proses GSuA.
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
KSO PEP - QEI Loyak Talang Gula telah menyiapkan dan meng-inventaris asset yang ada
terutama di sumur Candi – 2 dan Candi – 3 sebagai skala prioritas seperti :
RESERVOIR
➢ Current condition:
• X-mast tree in good condition c/w pressure gauge
• Location ready for Surface facility installation.
• SITP is 1200 psig (20 March 2020)
• SICP is 1450 psig (20 March 2020)
• Distance to End of 6” Trunckline Candi-2 – SP Raja II is 60 m
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
➢ Well Name : CANDI-3
➢ Spud Date : 16 Sept 1994
➢ Layer Open :
• Layer “E-11” (1987-1990 mMD)
• Layer “F” (2006 – 2009 mMD)
➢ Well Status : Shut-in Gas
➢ Potential Production : Re-run Isochronal Test
(Last tested by PT.Pertamina EP, Layer E-11 was 39 BOP,
3,57 MMscfd. Layer F was 17 BOPD, 6,39 MMscfd)
➢Reserve
Layer E-11
IGIP = 8.884 MMSCF
Cumulative Production = 1.593 MMSCF
Remaining Reserve = 7.291 MMSCF
Layer F
IGIP = 5.405 MMSCF
Cumulative Production = 942 MMSCF
Remaining Reserve = 4.463 MMSCF
➢ Current condition:
• X-mast tree in good condition c/w pressure gauge
• Location ready for Surface facility installation.
• SITP is 750 psig (20 March 2020)
• SICP is 150 psig (20 March 2020)
• Distance to Candi-2 is 1200 m
ANALISA SAMPLE GAS
K SO PERTA M IN A E P – Q E I LO Y A K TA LA N G G ULA
L o y a k - C a n d i - Ta l a n g G u l a
Manifold
Separatror
Scrubber
Pipeline 4”
AREA-3
AREA-2
AREA-1
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
SITE VISIT JALUR TRUNCKLINE DI SP RAJA-2 PT. PERTAMINA EP
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
RENCANA PIPELINE DAN METERING SP RAJA-2
Pipeline
Ujung Pipa 6” Candi-SP Raja-2
Lokasi Metering (P=20 m, L=15m) ➢ A – B Sejauh 32 m
➢ B – C sejauh 33 m
Lokasi Hot Tap (P=14 m, L=10m) ➢ C – D sejauh 11 m
➢ D – E sejauh 10 m
➢ E – F sejauh 6 m dengan beda elevasi 1,5 m
➢ F – G sejauh 75 m
➢ G – H sejauh 16 m
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA