Anda di halaman 1dari 31

ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI

SERTA PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN


KSO PEP - QEI LTG KE SP-2 RAJA

KSO PERTAMINA EP – QEI LOYAK TALANG GULA


LOYAK – TALANG GULA BLOCK
KSO-PEP QEI LOYAK TALANG GULA
LOYAK-CANDI-MANIS-TALANGGULA FILED TALANG AKAR FORMATION,
SOUTH SUMATERA BASIN

COMPANY OVERVIEW

▪ Operator : PT. QEI Loyak Talang Gula


▪ Block Name : Loyak-Talang Gula
▪ Block Acreage : Block Loyak ± 5 sq.km
: Block Talang Gula ± 10 sq.km
▪ Location : Kabupaten PALI, South Sumatera
▪ Starting Contract : 28 December 2012
▪ Contract duration : 15 Years
▪ Formation Target : Talang Akar Formation (TAF)
▪ Basin / sub-basin : South Sumatera Basin / South Palembang
▪ Type of Hydrocarbon : Oil, Gas and Condensate
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

GEOGRAPHIC LOCATION

Block Loyak

Block Talang Gula

➢ Loyak and Talang Gula Block is located in Kabupaten PALI, South Sumatera.
➢ The distance from City of Palembang approximately 171 km and can be reach by land road
with time estimation around 5 to 6 hours.
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
PETA LOKASI SUMUR
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

PENDAHULUAN

➢ Sesuai Rencana Kerja Program KSO QEI Loyak Talang Gula akan sesegera mungkin
memproduksikan Gas dari lapisan E, F, P dan Q dari sumur Candi – 2 dan Candi – 3
➢ Potensial perkiraan produksi dari kedua sumur tersebut diperkirakan sebesar 2.5
MMSCFD.
➢ Kedua sumur Candi-2 & Candi-3 sudah siap diproduksikan dan untuk menampung
produksi tersebut segera akan dibangun Gathering dan Processing Station di Yard
Candi-2 sekaligus terintegrasi dihubungkan dengan Fasilitas Produksi (Flow line) yang
Pertamina EP telah pasang untuk menghubungkan ke SP-2 Raja
➢ KSO QEI Loyak Talang Gula secara paralel sedang melengkapi persyaratan Administratif
untuk proses GSuA.
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
KSO PEP - QEI Loyak Talang Gula telah menyiapkan dan meng-inventaris asset yang ada
terutama di sumur Candi – 2 dan Candi – 3 sebagai skala prioritas seperti :

SUB SURFACE (BAWAH PERMUKAAN)


▪ Melakukan uji test sumur baik di sumur Candi-2 dan Candi-3 guna memastikan kemampuan
produksi gas beserta tekanan yang diperoleh dan parameter lainnya
▪ Mengirim gas sample untuk dianalisa ke Lembaga independent (LEMIGAS) dan ke
Laboratorium Pertamina EP

SURFACE (ATAS PERMUKAAN)


▪ Pengecekan lokasi sumur dan jalan menuju sumur kondisi layak dan siap dilakukan
aktifitas pekerjaan
▪ Pengecekan kelengkapan sumur Xmas-tree, Pressure Gauge maupun Adjustable Choke dalam
kondisi baik dan layak untuk dioperasikan
▪ Jalur pipa yang ada telah terpasang sepanjang 13,6 km, tinggal pengecekan akhir dan dapat
dipastikan dapat segera digunakan
▪ Perencanaan pembangunan fasilitas produksi terpadu akan segera dikerjakan dengan durasi
sewa selama 2 (dua) tahun ,
SUB SURFACE
{Reservoir & Production)
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

RESERVOIR

▪ Formation : TALANG AKAR FORMATION


▪ SG Oil : 42.4 deg API – 62.3 deg API
▪ Gas Density : 0,61 – 1.06
▪ Initial Pressure : 2530 – 3255 psia
▪ Current Pressure : 820 – 1500 psia
▪ Permeability : 22.8 mD – 241 mD
▪ Reservoir Temperature : 226 deg F – 265 deg F
▪ Drive Mechanism : Solution Gas Drive
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
➢ Well Name : CANDI-2
➢ Spud Date : 26 Dec 1986
➢ Layer Open :
• Layer “P” (2178-2180 mMD)
• Layer “Q” (2197-2199 mMD)
• Layer “V” (2275-2276 mMD)
➢ Well Status : Shut-in Gas and Condensate
➢ Potential Production : 1 MMscfd
➢ Reserve
Layer P
• IGIP = 9.152 MMscf (P2)
Layer Q
• IGIP = 2.226 MMscf (P1)
• Cumulative Production = 437 MMscf
• Remaining Reserve = 1.533 MMscf
Layer V
• IOIP = 3 MMSTB (P2)

➢ Current condition:
• X-mast tree in good condition c/w pressure gauge
• Location ready for Surface facility installation.
• SITP is 1200 psig (20 March 2020)
• SICP is 1450 psig (20 March 2020)
• Distance to End of 6” Trunckline Candi-2 – SP Raja II is 60 m
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
➢ Well Name : CANDI-3
➢ Spud Date : 16 Sept 1994
➢ Layer Open :
• Layer “E-11” (1987-1990 mMD)
• Layer “F” (2006 – 2009 mMD)
➢ Well Status : Shut-in Gas
➢ Potential Production : Re-run Isochronal Test
(Last tested by PT.Pertamina EP, Layer E-11 was 39 BOP,
3,57 MMscfd. Layer F was 17 BOPD, 6,39 MMscfd)
➢Reserve
Layer E-11
IGIP = 8.884 MMSCF
Cumulative Production = 1.593 MMSCF
Remaining Reserve = 7.291 MMSCF
Layer F
IGIP = 5.405 MMSCF
Cumulative Production = 942 MMSCF
Remaining Reserve = 4.463 MMSCF
➢ Current condition:
• X-mast tree in good condition c/w pressure gauge
• Location ready for Surface facility installation.
• SITP is 750 psig (20 March 2020)
• SICP is 150 psig (20 March 2020)
• Distance to Candi-2 is 1200 m
ANALISA SAMPLE GAS
K SO PERTA M IN A E P – Q E I LO Y A K TA LA N G G ULA
L o y a k - C a n d i - Ta l a n g G u l a

DATA KOMPOSISI GAS (2012, PT. PERTAMINA EP)


K SO PERTA M IN A E P – Q E I LO Y A K TA LA N G G ULA
L o y a k - C a n d i - Ta l a n g G u l a

DATA KOMPOSISI GAS (2018, KSO PEP-QEI LTG)


K SO PERTA M IN A E P – Q E I LO Y A K TA LA N G G ULA
L o y a k - C a n d i - Ta l a n g G u l a

GAS SAMPEL ANALYSIS (LEMIGAS)


K SO PERTA M IN A E P – Q E I LO Y A K TA LA N G G ULA
L o y a k - C a n d i - Ta l a n g G u l a

GAS SAMPEL ANALYSIS (LEMIGAS)


SURFACE
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
SITE VISIT JALUR TRUNCKLINE DI CANDI-2 KSO QEI LTG
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
PRODUCTION GAS FACILITY CANDI-2

Manifold
Separatror
Scrubber

Pipeline 4”

Gas Facility Requirements Proposal:


1. Header Manifold 6. Flare
2. 3-Phase Separator 7. Generator
3. Scrubber 8. Shutdown Valve
4. Liquid ATM Tank 9. Wellhead Control Panel
5. Gas Metering 10. Pump
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

JALUR PIPA CANDI-RAJA

AREA-3

AREA-2

AREA-1
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
SITE VISIT JALUR TRUNCKLINE DI SP RAJA-2 PT. PERTAMINA EP
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA
RENCANA PIPELINE DAN METERING SP RAJA-2

Pipeline
Ujung Pipa 6” Candi-SP Raja-2
Lokasi Metering (P=20 m, L=15m) ➢ A – B Sejauh 32 m
➢ B – C sejauh 33 m
Lokasi Hot Tap (P=14 m, L=10m) ➢ C – D sejauh 11 m
➢ D – E sejauh 10 m
➢ E – F sejauh 6 m dengan beda elevasi 1,5 m
➢ F – G sejauh 75 m
➢ G – H sejauh 16 m
ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

SKEMA FLOW DIAGRAM FASILITAS PRODUKSI CANDI


ASSESMENT KELENGKAPAN SUMUR DAN FASILITAS PRODUKSI SERTA
PERSIAPAN PENGIRIMAN GAS DARI LAPANGAN
KSO PEP - QEI LTG KE SP-2 RAJA

No Parameter Satuan Keterangan


1 Total Flowrate Gas Production 2 Sumur 2,5 MMSCFD Gabungan produksi Candi-2 & Candi - 3
2 Total Flowrate Liquid 92 BWPD
3 Pressure Drop
4 Tekanan Sisa di Titik Serah 400 psig direkomendasikan oleh Pertamina EP Field Adera
5 Tekanan Well Head
5.1 Candi # 2 1200 psig Test sumur @ Maret 2020
5.2 Candi # 3 750 psig Test sumur @ Maret 2020
6 Export Pipeline 13,6 Km
THANK YOU

Anda mungkin juga menyukai