• Kajian Geologi
• Kajian Reservoir
• Kajian Produksi
• Kajian Pemboran
• Kajian Keekonomian
• Kajian HSE, ASR dan CSR
• Kesimpulan dan Saran
Oil & Gas Intellectual Parade 2013
Andalusia Field Development Plan
Oleh:
1. Bagus Setyo Pambudi (TG -113090004)
2. Fida Kathartika (TM-113090006)
3. Novita Kurnia Sari (TM-113090055)
4. Michael Anggi G. A. (TM-113090095)
5. Syahrul (TM-113090128)
WIMAYA
PETROLEUM
UPN “VETERAN” YOGYAKARTA
GI
L O
E O
G
A N
J I
K A
Kajian Geologi
Tektonostratigrafi Cekungan Barito
LAPANGAN ANDALUSIA
Lokasi Selat Makassar, Block XYZ
Stratigrafi Regional Cekungan Barito
Ditemukan 1974
Original Gas in Place 310 Bscf (Volumetrik)
Lapisan Reservoir Formasi Berai
Kedalaman Top 3955 ft
Courtesy: dialihbahasakan dari Satyana dan Silitonga, 1994
Kajian Geologi
Petroleum System
Formasi Tanjung
Formasi Berai
Formasi Warukin
Formasi Dahor
Formasi Warukin
Korelasi Struktur
Korelasi Struktur ini gunanya adalah untuk mengetahui kondisi bawah permukaan yang
terjadi pada kondisi sekarang, dan juga berguna untuk menginterpretasikan
bagaimana bentuk geometri dari reservoirnya.
4530 ft
Distribusi Properti
Reservoar Lapangan
Andalusia
Matrix Acidizing
Gp (BScf) @ RF (%) @
Additional Field
Forecasting well
Comp. Inst.
Life
Scenario Schedule Plateau 2027 Plateau 2027
schedule (year)
Case I (4 wels +
compressor)
- 01/01/13 5 129 299 41.48% 96.30%
Case V (4 + 2 wels +
compressor)
01/01/13 01/01/13 6 256 296 82.54% 95.35%
Kajian Produksi
Selected Field Development Scenario
Avg Gas Rate & Reservoir Pressure Vs Time
Compressor Starts
(01/01/2014)
Decline date:
01/01/2017
Kajian Produksi
Selected Field Development Scenario
End of Production:
31/12/2018
Gp = 256 Bscf
RF = 82,44 %
Kajian Produksi
Integrated Production Forecasting
Assumption:
- Reservoir Model : Mbal Tank Model
- Well Model : Prosper Well Model (GRD-3 & GRD-4 Performance)
- Integrated Model : GAP Integrated Production Model
Kajian Produksi
Surface Facilities
GRD-1 GRD-2 GRD-3 GRD-4 Pipeline Coating:
KB (Ft MSL) 41 89 50 50 - Three layer and asphalt
GL (Ft MSL) -196 -203 -170 -205 enamel anticorrosion
Water Deph (ft) 237 292 220 255 coatings
251 Feet - Concrete weight coating
Average Water Depth
0.077 km
Hole 17
Lapangan Andalusia 1/2“@ 1510
ft
Hole 12-1/4“ @
3710 ft
Well Clasification Production Well
GR-5 : X= 577567 ; Y=
Target Coordinate
9607544 TOL 7” @ 3500 ft
Hole 8-1/2“ @
5000 ft
Tax Less
INVESTMENT
200
NPV @ DR=12%, US$
150
GAS PRICE
GAS PRODUCTION
100 INVESTMENT
50
GAS PRO-
GAS PRICE DUCTION
GAS PRICE
GAS PRODUCTION
INVESTMENT
0
70% 80% 90% 100% 110% 120% 130%
Sensitivity
Kajian Keekonomian
Sensitivitas Rate of Return (ROR)
INVESTMENT
30%
25%
GAS PRICE
ROR@ DR=12%
GAS PRODUCTION
20%
INVESTMENT
15%
GAS PRODUCTION
GAS PRICE
10%
GAS
5% PRO-
DUCTION
GAS PRICE
INVESTMENT
0%
70% 80% 90% 100% 110% 120% 130%
Sensitivity
S R
n C
a
R ,d
A S
E ,
H S
Health, Safety, and Environment
Pengelolaan Limbah
B3 NON-B3
IPAL Limbah
Insinerator B3 Organik IPAL Limbah
Limbah B-3 Domestik
RESERVOIR DESCRIPTION
Kajian Reservoir
Well Test Result
T@
Gauge Pressure Temp. P@ T@ Datum
KB Depth Gradient Gradient Gauge Gauge of 4478
Well DST Depth Depth ft TVDSS
ftSL ft MD KB psi/ft deg.F/ft psia deg.F psia
GRD-1 41 #1 & #3 4089 0,043 0,02 2021 n/a 2040
GRD-3 50 #1 4048 0,043 0,02 2020 145 2041
GRD-4 50 #1 4362 0,043 0,02 2033 150 2040
GRD-4 50 #2 4193 0,043 0,02 2026 151 2040
Reservoir Model
System Properties Fluid Properties
Reservoir Fluid Gas Gas gravity 0.5592sp.gravity
Tank Model Single Tank Separator pressure 350psig
Abnormally Pressured No Condensate to gas ratio (CGR) 0.014STB/MMScf
Production History None Condensate gravity 50API
Compositional Model None Water Salinity 10000ppm
Mole percent H2S 0%
Mole percent CO2 0.57%
Mole percent N2 0.24%
Gas viscosity correllation Carr et al
Model water vapour yes
Kajian Reservoir
DATA BATUAN
Data Fluida
Fluid Properties Average
Model tank
Residual
End Point Exponent
Saturation
fraction fraction
Krw 0,2633 0,4 2
Krg 0,05 0,9 2
Fluid properties result
Z-average 0,8821
μg-average 0,0155 cp
SG average 0,5592
CGR average 0,0140
CO2 average 0,0057 fraction
H2S average 0,0000 fraction
N2 average 0,0024 fraction
Pvt Result (prosper) Initial condition
Temp(deg F) Pressure (Psig) Z factor Gas FVF(ft3/SCF) Gas Viscosity, cp Gas Density, lb/ft3
155 2025 0.888885 0.00758095 0.0156542 5,63614
Pseudo Pressure psi2/cp Water FVF RB/STB Water Viscosity, cp Water Density, lb/ft3 Water Compress 1/Psi Vaporized WGR STB/MMscf
3,19E+13 1,01420 0,465592 61,9799 2,94E-06 0,389298
Well Test Result GRD - 3
Delta Q 38800 Mscf
• DST #1 GRD - 3
P @ dt=0 1930 Psia
PI 1096,19 (Mscf/)/Psia
C 0.0131 bbl/Psi
Kh 2,52E+5 md.ft
Rinv 2220 ft
P@1hr 2019,31 psia
k 2070 md
Skin 195
Pavg 2020 Psia
AOFP 1,87916E+5 Mscf/D
C 8,56665 (Mscf/D)/(Psia)
N 0,656688
Test Point 4
Model tank
System Properties Tank Input Data
Tank Parameter
Reservoir Fluid Gas
Tank Type Gas
Tank Model Single Tank Name Andalusia Field
Abnormally Pressured No Temperature 155 degF
Production History None Initial Pressure 2025 psig
Porosity 0,1641 fraction
Compositional Model None
Connate water saturation 0,2633
Water compressibility Use corr 1/psi
Fluid Properties
Gas gravity 0,5592 sp.gravity
Original Gas in Place 310000 MMScf
Separator pressure 350 psig Start of Production 01/01/2010 d/m/y
Condensate to gas ratio (CGR) 0,014 STB/MMScf
Condensate gravity 50 API Water Influx
Water Salinity 10000 ppm Model None
Mole percent H2S 0 %
Mole percent CO2 0,57 % Relative Permeability
Mole percent N2 0,24 % Rel. Perm. From Corey Function
Gas viscosity correllation Carr et al Hysteresis No
Model water vapour yes
GAP Model Result
• PRODUCTION FORECAST
Reservoir pressure prediction
CONDENSATE & WATERFORECAST
LATAR BELAKANG
PENDAHULUAN
LAPANGAN ANDALUSIA
Blok XYZ
Kebisingan
Polusi suara dapat terjadi akibat peralatan-peralatan berat yang bekerja pada proses pengembangan lapangan.
Tingkat kebisingan tersebut akan diukur dan dipantau serta diberikan jarak aman (embarkasi) sehingga dapat
ditentukan batas aman baik bagi pekerja maupun bagi warga sekitar yang dekat dengan dengan daerah operasi
karena dapat berpotensi mengganggu warga. Tingkat kebisingan tempat kerja untuk 8 jam per hari (24 jam) tidak
boleh melebihi 85 dba. Tingkat kebisingan melebihi 85 dba akan menurunkan daya pendengaran tenaga kerja
dan warga sekitar, oleh karena itu alat pelindung telinga wajib dikenakan bagi para tenaga kerja.
Lanjutan
Bioremidiasi Drill Cutting
Drilling cutting Mixing Process Nutrient Adding
Ex-Bioremediation soil for topsoil Ploughing for Aeration Watering and Bacteria Adding
Lanjutan
Tinggi ± 2 meter
Kedalaman 50 cm