RENCANA DAN REALISASI PENGGUNAAN ASBUTON PADA PAKET IJD 2023

SATKER : SATUAN KERJA PERANGKAT DAERAH TUGAS PEMBANTUAN (SKP


PPK : TP-01 DINAS PEKERJAAN UMUM PROV.SULTRA

RENCANA RENCANA
PANJANG TOTAL VOLUME CAMPURA
NO. PAKET
EFEKTIF BERASPAL
(Km) (Ton)

1 Peningkatan Jalan Ambaipua - Motaha

2 Peningkatan Jalan Wawotobi - Bts. Kab. Konut 8.325 AC-WC

8.213 AC-BC

3 Peningkatan Jalan Jalan Budi Utomo Baru

WC

SEPT VOL 1789.90479


ASB 125.293336
PANJANG 4361.36646
OKT VOL
ASB
PANJANG
NOV` VOL 1026
ASB 71.82
PANJANG 2500
DES VOL 629.63
ASB 44.0741844
PANJANG (6,853.04)

KEBUTUHA

ASPAL
BULAN
AC - BC
AGUSTUS -
SEPT 3,184.86
OKTOBER 1,497.22
NOVEMBER 1,260.44
DESEMBER -
PAKET IJD 2023
MBANTUAN (SKPD-TP) DINAS PU PROV.SULTRA

REALISASI PENGGUNAAN ASBUTON


RENCANA JUL AGUS
RENCANA TOTAL
TOTAL VOLUME CAMPURAN
VOLUME PANJANG VOLUME PANJANG
BERASPAL VOLUME ASBUTON
ASBUTON (Ton) EFEKTIF ASBUTON EFEKTIF
(Ton) (Ton)
(Km) (Ton) (Km)

3,445.54 241.19

5,948.89 416.42

BC

3184.86168
222.9403176
4409.364151766
610.48832 TOTAL WC BC
42.7341824 PANJNAG 8.32 8.21
845.2063492063 VOL 3445.536 5948.8905
1444.59
101.1213
2000
708.95
49.626535
(7,246.36)

KEBUTUHAN ASBUTON PAKET PEKERJAAN WAWOTOBI

ASPAL 7% ASBUTON DARI TOTAL


TOTAL ASPAL ASBUTON KETERANGAN
AC - WC AC - BC AC - WC
- - - - -
1,789.90 4,974.77 222.94 125.29 348.23
- 1,497.22 104.81 - 104.81 Estimasi BJ aspal core
1,637.46 2,897.90 88.23 114.62 202.85 Estimasi BJ aspal core
- - - - -
ASBUTON RENCANA PENGGUNAAN ASBUTON
SEPT OKT NOP DES
PANJANG VOLUME PANJANG VOLUME PANJANG VOLUME PANJANG VOLUME
EFEKTIF ASBUTON EFEKTIF ASBUTON EFEKTIF ASBUTON EFEKTIF ASBUTON
(Km) (Ton) (Km) (Ton) (Km) (Ton) (Km) (Ton)

4.36 125.29 2.5 71.82 1.464 44.07

4.409 222.94 8.441 42.73 2.0 101.12 -6.638 49.63

progress 14
mc sept Asbuton panjang 1 sd 13 Okt Asbuton panjang sd 18 Okt
AC-WC 1789.90479 125.293336 4361.36646
AC-BC 3184.86168 222.940318 4409.36415 291.70832 20.4195824 403.86313 318.78

610.48832
WC BC
sisa aspal

WC 6.86 1,463.63 600.68


BC 2,815.90
TOTAL AM

PANJANG VOLUME KETERANGAN NAMA PENYEDIA JASA


EFEKTIF ASBUTON NAMA AMP
(Km) (Ton)

FUJIAN TIETUO
8.325 241.19 PT. AGUNG SARANA PERSADA
MACHINERY CO., LTD

8.213 416.42

Asbuton Panjang sisa volume Asbuton Panjang

1,655.63 115.89 4,034.19


22.3146 441.343218 2,153.54 150.75 2,981.52

bulan nov
Tonase asbuton
AC-WC 1026 71.82
AC-BC 1444.59 101.1213

bulan nov
Tonase asbuton Panjnag
AC-WC 629.63 44.074184448 1,534.19
AC-BC 708.95 49.6265349999999 981.52
AMP
NAMA PRODUSEN
KETERANGAN
KAPASITAS ASBUTON
STATUS SERTIFIKASI
PRODUKSI

Sertifikasi Kelaikan Operasi No: Bm PT. Energi Multi


1000 Kgs/Batch
0401/Bb21/761 Struktur