RENCANA DAN REALISASI PENGGUNAAN ASBUTON PADA PAKET IJD 2023

SATKER : SATUAN KERJA PERANGKAT DAERAH TUGAS PEMBANTUAN (SKPD-TP)


PPK : TP-01 DINAS PEKERJAAN UMUM PROV.SULTRA

RENCANA
RENCANA
TOTAL VOLUME CAMPURA
NO. PAKET PANJANG
BERASPAL
EFEKTIF (Km)
(Ton)

1 Peningkatan Jalan Ambaipua - Motaha

2 Peningkatan Jalan Wawotobi - Bts. Kab. Konut 8.325 AC-WC

8.213 AC-BC

3 Peningkatan Jalan Jalan Budi Utomo Baru


T IJD 2023
NTUAN (SKPD-TP) DINAS PU PROV.SULTRA

REALISASI PENGGUNAAN ASBUTON


RENCANA JUL AGUS SEPT
RENCANA TOTAL
TOTAL VOLUME CAMPURAN
VOLUME ASBUTON PANJANG VOLUME VOLUME PANJANG
BERASPAL PANJANG
(Ton) EFEKTIF ASBUTON ASBUTON EFEKTIF
(Ton) EFEKTIF (Km)
(Km) (Ton) (Ton) (Km)

3,445.54 241.19 4.36

5,948.89 416.42 4.409


ON RENCANA PENGGUNAAN ASBUTON
TOTAL
SEPT OKT NOP DES
VOLUME VOLUME PANJANG VOLUME PANJANG VOLUME
PANJANG PANJANG
ASBUTON ASBUTON EFEKTIF ASBUTON EFEKTIF ASBUTON
EFEKTIF (Km) EFEKTIF (Km)
(Ton) (Ton) (Km) (Ton) (Km) (Ton)

125.29 2.5 71.82 1.464 44.07 8.325

222.94 0.844 42.73 2.0 101.12 0.959 49.63 8.213


TOTAL AMP

VOLUME KETERANGAN NAMA PENYEDIA JASA


ASBUTON NAMA AMP
(Ton)

FUJIAN TIETUO
241.19 PT. AGUNG SARANA PERSADA
MACHINERY CO., LTD

416.42
AMP
NAMA PRODUSEN
KETERANGAN
KAPASITAS ASBUTON
STATUS SERTIFIKASI
PRODUKSI

Sertifikasi Kelaikan Operasi No: Bm PT. Energi Multi


1000 Kgs/Batch
0401/Bb21/761 Struktur