Anda di halaman 1dari 298

PEMERINTAH PROVINSI SUMATERA UTARA

DINAS BINA MARGA DAN BINA KONSTRUKSI


UNIT PELAKSANA TEKNIS (UPT) BINJAI

KAJIAN TEKNIS LAPANGAN

NAMA PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN


TANJUNG PURA - TANJUNG SEKAMAT DI KAB. LANGKAT

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

ALAMAT : JLN. KARYA KASIH NO. 58 PANGKALAN MASYHUR


MEDAN JOHOR - SUMATERA UTARA

NOMOR KONTRAK : 602/KPA.UPT-B/05/SP-K/2017

TANGGAL KONTRAK : 21 JULI 2017

NILAI KONTRAK : Rp 9.320.730.800,00


(Sembilan milyar tiga ratus dua puluh juta tujuh ratus tiga puluh
ribu delapan ratus rupiah)

SUMBER DANA : APBD PROVINSI SUMATERA UTARA

KONSULTAN SUPERVISI PENYEDIA JASA


CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU
UNIT KERJA : UPT DINAS BINA MARGA DAN BINA KONSTRUKSI BINJAI PROV. SUMATERA UTARA
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT D
: DI KAB. LANGKAT
(
PROV. / KAB : SUMATERA UTARA / KAB. LANGKAT

K
NO. MATA HARGA
PEMBA URAIAN SATUAN SATUAN
YARAN (Rp.) KUANTITAS

DIVISI 1. UMUM
1.2 Mobilisasi LS 41,100,000.00 1.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 46,450,000.00 1.00
Jumlah Harga Pekerjaan DIVISI 1

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 37,574.50 1,188.45
2.2.(1) Pasangan Batu dengan Mortar M3 898,351.71 556.00
2.3.(11c) Saluran Kotak Tipe DS 38 (Box Culvert 1 x 1 M) M 3,333,218.99 12.00
Jumlah Harga Pekerjaan DIVISI 2

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa M3 37,574.50 570.75
3.2.(2a) Timbunan Pilihan dari Sumber Galian M 3
269,984.20 720.00
Jumlah Harga Pekerjaan DIVISI 3

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(2b) Lapis Pondasi Agregat Kelas S M3 674,229.01 1,350.00
Jumlah Harga Pekerjaan DIVISI 4

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A M3 716,133.44 2,700.00
5.1.(2) Lapis Pondasi Agregat Kelas B M 3
703,700.58 506.25
Jumlah Harga Pekerjaan DIVISI 5

DIVISI 6. PERKERASAN ASPAL


6.1.(1a) Lapis Resap Pengikat - Aspal Cair Liter 10,031.95 13,500.00
6.1 (2a) Lapis Perekat - Aspal Cair Liter 10,179.24 2,025.00
6.3.(5a) Laston Lapis Aus (AC-WC) Ton 1,278,999.69 1,252.80
6.3.(6a) Laston Lapis Antara (AC-BC) Ton 1,221,290.47 1,879.20
6.3.(8) Bahan Anti Pengelupasan Kg 73,645.00 454.14
Jumlah Harga Pekerjaan DIVISI 6
UNIT KERJA : UPT DINAS BINA MARGA DAN BINA KONSTRUKSI BINJAI PROV. SUMATERA UTARA
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT D
: DI KAB. LANGKAT
(
PROV. / KAB : SUMATERA UTARA / KAB. LANGKAT

K
NO. MATA HARGA
PEMBA URAIAN SATUAN SATUAN
YARAN (Rp.) KUANTITAS

DIVISI 7. PEKERJAAN STRUKTUR


7.1.(10) Beton Mutu Rendah fc’= 10 Mpa Kg 1,510,314.74 27.80
7.9.(1) Pasangan Batu Kg 963,845.32 216.00
Jumlah Harga Pekerjaan DIVISI 7
UNIT KERJA : UPT DINAS BINA MARGA DAN BINA KONSTRUKSI BINJAI PROV. SUMATERA UTARA
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT D
: DI KAB. LANGKAT
(
PROV. / KAB : SUMATERA UTARA / KAB. LANGKAT

K
NO. MATA HARGA
PEMBA URAIAN SATUAN SATUAN
YARAN (Rp.) KUANTITAS

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.1.(1) Lapis Pondasi Agregat Kelas A untuk Pekerjaan Minor M3 712,184.35 37.50
8.4.(1) Marka Jalan Termoplastik M2
163,692.12 135.00
Jumlah Harga Pekerjaan DIVISI 8
T O TAL
Pajak Pertambahan Nilai (PPn) = 10% x (A)
Total Harga Pekerjaan = (A) + (B)
Dibulatkan

PEJABAT PELAKSANA TEKNIS KEGIATAN


(UPT BINJAI)

Rizki Meidian, ST
Nip. 19760515 200903 1 00605
DAFTAR KUANTITAS DAN HARGA PENYEDIA JASA
( PEKERJAAN TAMBAH KURANG )
KONSULTAN SUPERVISI

KONTRAK REKAYASA LAPANGAN SELIS


BERTAMBAH
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT B0B0T
KUANTITAS JUMLAH HARGA
(Rp.) (%) (Rp.) (%) KUANTITAS
(Rp.)
(%)

41,100,000.00 0.485 1.00 41,100,000.00 0.485 - - -


46,450,000.00 0.548 1.00 46,450,000.00 0.548 - - -
87,550,000.00 1.033 87,550,000.00 1.033 -

44,655,414.53 0.527 1,407.30 52,878,405.98 0.624 218.85 8,222,991.45 18.41


499,483,550.76 5.895 504.40 453,128,602.52 5.346 - - -
39,998,627.88 0.472 32.00 106,663,007.68 1.258 20.00 66,664,379.80 166.67
584,137,593.17 6.894 612,670,016.18 7.229 74,887,371.25

21,445,645.88 0.253 79.04 2,969,888.48 0.035 - - -


194,388,624.00 2.294 792.00 213,827,486.40 2.523 72.00 19,438,862.40 10.00
215,834,269.88 2.547 216,797,374.88 2.558 19,438,862.40

910,209,163.50 10.742 900.00 606,806,109.00 7.159 - - -


910,209,163.50 10.742 606,806,109.00 7.159 -

1,933,560,288.00 22.819 2,700.00 1,933,560,288.00 22.813 - - -


356,248,418.63 4.204 755.64 531,744,306.27 6.274 249.39 175,495,887.65 49.26
2,289,808,706.63 27.024 2,465,304,594.27 29.087 175,495,887.65

#REF! 4,226.112 #REF!


135,431,325.00 1.598 13,500.00 135,431,325.00 1.598 - - -
20,612,961.00 0.243 2,025.00 20,612,961.00 0.243 - - -
1,602,330,811.63 18.910 1,239.30 1,585,064,315.82 18.702 - - -
2,295,049,051.22 27.085 1,862.19 2,274,274,900.33 26.833 - - -
33,445,140.30 0.395 544.86 40,126,214.70 0.473 90.72 6,681,074.40 19.98
4,086,869,289.16 48.232 4,055,509,716.85 47.849 6,681,074.40
DAFTAR KUANTITAS DAN HARGA PENYEDIA JASA
( PEKERJAAN TAMBAH KURANG )
KONSULTAN SUPERVISI

KONTRAK REKAYASA LAPANGAN SELIS


BERTAMBAH
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT B0B0T
KUANTITAS JUMLAH HARGA
(Rp.) (%) (Rp.) (%) KUANTITAS
(Rp.)
(%)

41,986,749.77 0.496 29.38 44,373,047.06 0.524 1.58 2,386,297.29 5.68


208,190,589.12 2.457 320.85 309,249,770.92 3.649 104.85 101,059,181.80 48.54
250,177,338.89 2.953 353,622,817.98 4.172 103,445,479.09
DAFTAR KUANTITAS DAN HARGA PENYEDIA JASA
( PEKERJAAN TAMBAH KURANG )
KONSULTAN SUPERVISI

KONTRAK REKAYASA LAPANGAN SELIS


BERTAMBAH
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT B0B0T
KUANTITAS JUMLAH HARGA
(Rp.) (%) (Rp.) (%) KUANTITAS
(Rp.)
(%)

26,706,913.13 0.315 62.32 44,380,832.35 0.524 24.82 17,673,919.23 66.18


22,098,436.20 0.261 201.10 32,918,485.33 0.388 66.10 10,820,049.13 48.96
48,805,349.33 0.576 77,299,317.68 0.912 28,493,968.36
8,473,391,710.54 100.00 8,475,559,946.85 100.00 408,442,643.15
847,339,171.05 847,555,994.68
9,320,730,881.59 9,323,115,941.53
9,320,730,800.00 9,323,115,900.00 Dana Sisa
2,168,236.31 0.65
3.08 752.56
KONSULTAN SUPERVISI P

###

Ir. Ramlan Tarigan, BE Suai


Site Engineer Ge
: PT. BANGUN KARYA SEMBILAN SATU

: CV. PRIMA RANCANG KONSULTAN

SELISIH
BERKURANG KETE
B0B0T RANGAN
JUMLAH HARGA
KUANTITAS
(Rp.)
(%)

- - - Tetap
- - - Tetap
-

- - - Bertambah
51.60 46,354,948.24 9.28 Berkurang
- - - Bertambah
46,354,948.24

491.71 18,475,757.40 86.15 Berkurang


- - - Bertambah
18,475,757.40

450.00 303,403,054.50 33.33 Berkurang


303,403,054.50

- - - Berkurang
- - - Bertambah
-

- - - Berkurang
- - - Bertambah
13.50 17,266,495.82 1.08 Berkurang
17.01 20,774,150.89 0.91 Berkurang
- - - Bertambah
38,040,646.71
: PT. BANGUN KARYA SEMBILAN SATU

: CV. PRIMA RANCANG KONSULTAN

SELISIH
BERKURANG KETE
B0B0T RANGAN
JUMLAH HARGA
KUANTITAS
(Rp.)
(%)

- - - Bertambah
- - - Bertambah
-
: PT. BANGUN KARYA SEMBILAN SATU

: CV. PRIMA RANCANG KONSULTAN

SELISIH
BERKURANG KETE
B0B0T RANGAN
JUMLAH HARGA
KUANTITAS
(Rp.)
(%)

- - - Bertambah
- - - Bertambah
-
406,274,406.84

Dana Sisa -2,168,236.31


(8.03) 97.46

PENYEDIA JASA

Suaimam Siringoringo, ST
General Superintendent
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 1.2
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Mobilisasi

No. URAIAN VOLUME SAT KETERANGAN

1 Mobilisasi 1.00 Ls

TOTAL VOLUME 1.00 Ls

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PEMERINTAH PROV. SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI


JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT Lembar Perhitungan
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU Kajian Teknis Lapangan
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017 1.2
Mobilisasi
HARGA JUMLAH
No. U RAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2

B. PERALATAN
Periksa lembar 1.2-2 Ls 1 15,550,000 15,550,000

C. FASILITAS KONTRAKTOR
1 Base Camp Unit 1 10,000,000 10,000,000

D. FASILITAS LABORATORIUM
1 Bituminous Testing M2 1

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS
2 Pemeliharaan Jalan Kerja / Samping LS

E.II. LAIN-LAIN Set 1


1 Komunikasi lapangan lengkap -

F. DEMOBILISASI LS 1 15,550,000 15,550,000

Total Biaya Mobilisasi 41,100,000.00


PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PEMERINTAH PROV. SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET :
PENINGKATAN STRUKTUR JALAN PROVINSI Lembar Perhitung
JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI
KAB. LANGKAT Kajian Teknis Lapan
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN 1.2
TAHUN ANGGARAN : 2017 Mobilisasi

HARGA
No. JENIS ALAT SATUAN VOLUME SATUAN
(Rp.)

F. PERALATAN

1 ASPHALT FINISHER Unit 1 1,750,000


2 COMPRESSOR 4000-6500 L\M Unit 1 400,000
3 CONCRETE MIXER 0.3-0.6 M3 Unit 1 100,000
4 CRANE 10 - 15 TON Unit 1 1,750,000
5 DUMP TRUCK 3,5 TON Unit 1 350,000
6 DUMP TRUCK 10 TON Unit 3 350,000
7 EXCAVATOR 80-140 HP Unit 1 1,750,000
8 FLAT BED TRUCK 3-4 M3 Unit 1 350,000
9 MOTOR GRADER >100 HP Unit 1 1,750,000
10 TANDEM ROLLER 6-8 T. Unit 1 1,750,000
11 TIRE ROLLER 8-10 T. Unit 2 1,750,000
12 WATER TANKER 3000-4500 L. Unit 1 350,000
13 ASPHALT DISTRIBUTOR Unit 1 350,000
14 SURVEY EQUIPMENT Unit 1 100,000
15 PICK UP Unit 1 250,000
Total untuk Item B pada Lembar 1

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
Lembar Perhitungan
Kajian Teknis Lapangan

1.2
Mobilisasi

JUMLAH
HARGA
(Rp.)

1,750,000
400,000
100,000
1,750,000
350,000
1,050,000
1,750,000
350,000
1,750,000
1,750,000
3,500,000
350,000
350,000
100,000
250,000
15,550,000

PENYEDIA JASA

M. IQBAL AZHARI, S.S.T


Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 1.8.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Manajemen dan Keselamatan Lalu Lintas

No. URAIAN VOLUME SAT KETERANGAN

1 Manajemen dan Keselamatan Lalu Lintas 1.00 Ls

TOTAL VOLUME 1.00 Ls

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PEMERINTAH PROV. SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN Lembar Perhitungan


TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT Kajian Teknis Lapangan
PENYEDIA JASA : PT. BANGUN KARYA SEMBILKAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN 1.8.(1)
TAHUN ANGGARAN : 2017 Manajemen dan Keselamatan
Lalu Lintas
HARGA JUMLAH
No. U RAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Data & Asumsi


1 Panjang Lokasi Pekerjaan Km 3.00
2 Total Masa Pelaksanaan Kegiatan Bln 4.00
3 Masa Mobilisasi Bln 1.00
4 Periode Pekerjaan Perkerasan Jalan Bln 3.00
5 Panjang Zona Kerja Perkerasan Jalan Km 100.00

B. Urutan Kerja
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2
Buat rencana kerja manajemen lalu lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja lalu lintas selama kontruksi menggunkan tenaga
pengatur dan figma dengan 3 shift
4 Pengalihan arus lalu lintas harus ijin PPK dan pihak terkait
5 semua rambu harus jelas dan terbaca oleh pengguna jalan

C. Peralatan Keselamatan Lalu Lintas


1 Rambu Panah Berkedip Bh
2 Rambu Suar Berkedip Portabel M'
3 Rambu tetap Informasi pengalihan/pengaturan lalu lintas Bh
4 Rambu Portabel informasi pengalihan/pengaturan lalu lintas Bh
5 Rambu penghalang Lalu lintas jenis plastik Bh 10.00 75,000 750,000
6 Rambu penghalang Lalu lintas jenis beton Bh
7 Rambu peringatan Bh 4.00 150,000 600,000
8 Rambu petunjuk Bh 4.00 150,000 600,000
9 Pagar jenis pengaman termasuk perlengkapannya M'
10 Marka jalan sementara jika diperlukan M2
11 peralatan komunikasi jika diperlukan Set 4.00 500,000 2,000,000
12 Alat Bantu Ls

D. FASILITAS LABORATORIUM
1 Pekerja (Flagman) OB 10.00 2,500,000 25,000,000
2 Koordinator/Pengatur OB 5.00 3,500,000 17,500,000

Total Biaya Mobilisasi 46,450,000

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 2.1.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Galian untuk Selokan Drainase dan Saluran Air

No. LOKASI / STA VOLUME SAT KETERANGAN

Galian untuk Selokan Drainase dan Saluran Air


1 Sta. 00+000 S/D 03+000 L/S 233.17 M3
2 Sta. 00+000 S/D 03+000 R/S 0.00 M3

TOTAL VOLUME 233.17 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 2.2.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Pasangan Batu dengan Mortar

No. LOKASI / STA VOLUME SAT KETERANGAN

Pasangan Batu dengan Mortar


1 Sta. 00+000 S/D 03+000 L/S 187.20 M3
2 Sta. 00+000 S/D 03+000 R/S 317.20 M3

TOTAL VOLUME 504.40 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
2.2.(1) Pasangan Batu dengan Mortar M3 187.20 L/S

Area = ((0,20 x 1,00) x 2)


= 0.40 M2

TOTAL
SEGMEN PANJANG AREA VOL JUMLAH
No. VOLUME KET.
STA. - STA. (M') (M2) (M3) Buah (M3)

1 00+189.0 - 00+250.0 61.00 0.40 24.40 1.00 24.40 L/S


2 00+254.0 - 00+661.0 407.00 0.40 162.80 1.00 162.80 L/S

TOTAL 468.00 187.20


KUMULATIF 468.00 187.20

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


TOTAL
SEGMEN PANJANG AREA VOL JUMLAH
No. VOLUME KET.
STA. - STA. (M') (M2) (M3) Buah (M3)

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
2.2.(1) Pasangan Batu dengan Mortar M3 317.20 R/S

Area = ((0,20 x 1,00) x 2)


= 0.40 M2

TOTAL
SEGMEN PANJANG AREA VOL JUMLAH
No. VOLUME KET.
STA. - STA. (M') (M2) (M3) Buah (M3)

1 00+160.0 - 00+200.0 40.00 0.40 16.00 1.00 16.00 R/S


2 00+209.0 - 00+319.0 110.00 0.40 44.00 1.00 44.00 R/S
3 00+322.0 - 00+661.0 339.00 0.40 135.60 1.00 135.60 R/S
4 00+775.0 - 00+784.0 9.00 0.40 3.60 1.00 3.60 R/S
5 00+960.0 - 01+186.0 226.00 0.40 90.40 1.00 90.40 R/S
6 02+281.0 - 02+350.0 69.00 0.40 27.60 1.00 27.60 R/S

TOTAL 793.00 317.20


KUMULATIF 793.00 317.20
TOTAL
SEGMEN PANJANG AREA VOL JUMLAH
No. VOLUME KET.
STA. - STA. (M') (M2) (M3) Buah (M3)
PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 2.3.(11c)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Saluran Kotak Tipe DS 38 (Box Culvert 1 x 1 M)

No. LOKASI / STA VOLUME SAT KETERANGAN

Box Culvert
1 Sta. 00+000 S/D 03+000 L/R 32.00 M'

TOTAL VOLUME 32.00 M'

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
2.3.(11c) Saluran Kotak Tipe DS 38 (Box Culvert 1 x 1 M) M' 32.00

TOTAL
SEGMEN PANJANG LEBAR JUMLAH
No. PANJANG KET.
STA - STA / KM - KM (M') (M') Buah (M')

1 00+200 - 00+209 9.00 1.30 9.00 9.00 R/S


2 00+250 - 00+254 4.00 1.30 4.00 4.00 L/S
3 01+280 - 01+281 1.30 10.00 10.00 10.00 L/R
4 71+000 - 71+001 1.30 9.00 9.00 9.00 L/R

TOTAL 32.00

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T
Nip. 19720723 200701 1 001 Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 3.1.(1a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Galian Biasa

No. LOKASI / STA VOLUME SAT KETERANGAN

Galian Biasa
1 Sta. 00+000 S/D 03+000 79.04 M3

TOTAL VOLUME 79.04 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
3.1.(1a) Galian Biasa M3 79.04

TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA - STA / KM - KM (M') (M') (M2) (M') (M3)

1 00+200 - 00+209 9.00 1.30 11.70 1.90 22.23 R/S


2 00+250 - 00+254 4.00 1.30 5.20 1.90 9.88 L/S
3 01+280 - 01+281 1.30 10.00 13.00 1.90 24.70 L/R
4 71+000 - 71+001 1.30 9.00 11.70 1.90 22.23 L/R

TOTAL 79.04

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T
Nip. 19720723 200701 1 001 Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 3.2.(2a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Timbunan Pilihan dari Sumber Galian

No. LOKASI / STA VOLUME SAT KETERANGAN

Timbunan Pilihan dari Sumber Galian


1 Sta. 00+000 S/D 03+000 L/S 41.57 M3
2 Sta. 00+000 S/D 03+000 R/S 36.96 M3

TOTAL VOLUME 78.53 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 4.2.(2b)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Pondasi Agregat Kelas S

No. LOKASI / STA VOLUME SAT KETERANGAN

LAPIS PONDASI AGREGAT KELAS S


1 Sta. 00+000 S/D 03+000 L/S 450.00 M3
2 Sta. 00+000 S/D 03+000 R/S 450.00 M3

TOTAL VOLUME 900.00 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
1 0 + 000 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
2 0 + 025 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
3 0 + 050 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
4 0 + 075 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
5 0 + 100 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
6 0 + 125 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
7 0 + 150 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
8 0 + 175 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
9 0 + 200 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
10 0 + 225 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
11 0 + 250 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
12 0 + 275 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
13 0 + 300 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
14 0 + 325 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
15 0 + 350 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
16 0 + 375 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
17 0 + 400 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
18 0 + 425 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
19 0 + 450 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
20 0 + 475 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
21 0 + 500 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
22 0 + 525 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
23 0 + 550 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
24 0 + 575 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
25 0 + 600 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
26 0 + 625 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
27 0 + 650 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
28 0 + 675 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
29 0 + 700 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
30 0 + 725 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
31 0 + 750 L/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 750.00 112.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
31 0 + 750 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
32 0 + 775 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
33 0 + 800 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
34 0 + 825 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
35 0 + 850 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
36 0 + 875 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
37 0 + 900 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
38 0 + 925 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
39 0 + 950 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
40 0 + 975 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
41 1 + 000 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
42 1 + 025 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
43 1 + 050 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
44 1 + 075 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
45 1 + 100 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
46 1 + 125 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
47 1 + 150 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
48 1 + 175 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
49 1 + 200 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
50 1 + 225 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
51 1 + 250 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
52 1 + 275 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
53 1 + 300 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
54 1 + 325 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
55 1 + 350 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
56 1 + 375 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
57 1 + 400 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
58 1 + 425 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
59 1 + 450 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
60 1 + 475 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
61 1 + 500 L/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 1,500.00 225.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
61 1 + 500 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
62 1 + 525 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
63 1 + 550 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
64 1 + 575 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
65 1 + 600 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
66 1 + 625 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
67 1 + 650 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
68 1 + 675 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
69 1 + 700 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
70 1 + 725 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
71 1 + 750 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
72 1 + 775 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
73 1 + 800 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
74 1 + 825 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
75 1 + 850 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
76 1 + 875 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
77 1 + 900 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
78 1 + 925 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
79 1 + 950 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
80 1 + 975 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
81 2 + 000 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
82 2 + 025 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
83 2 + 050 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
84 2 + 075 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
85 2 + 100 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
86 2 + 125 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
87 2 + 150 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
88 2 + 175 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
89 2 + 200 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
90 2 + 225 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
91 2 + 250 L/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 2,250.00 337.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
91 2 + 250 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
92 2 + 275 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
93 2 + 300 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
94 2 + 325 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
95 2 + 350 L/S 1.00 0.15
56.60 1.00 JEMBATAN
96 2 + 407 L/S 1.00 0.15
18.40 1.00 0.15 18.40 2.76
97 2 + 425 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
98 2 + 450 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
99 2 + 475 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
100 2 + 500 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
101 2 + 525 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
102 2 + 550 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
103 2 + 575 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
104 2 + 600 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
105 2 + 625 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
106 2 + 650 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
107 2 + 675 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
108 2 + 700 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
109 2 + 725 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
110 2 + 750 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
111 2 + 775 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
112 2 + 800 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
113 2 + 825 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
114 2 + 850 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
115 2 + 875 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
116 2 + 900 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
117 2 + 925 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
118 2 + 950 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
119 2 + 975 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
120 3 + 000 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
121 3 + 025 L/S 1.00 0.15

Jumlah Halaman Ini 775.00 107.76


Jumlah s/d Halaman Ini 3,025.00 445.26
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
121 3 + 025 L/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
122 3 + 050 L/S 1.00 0.15
6.60 1.00 0.15 6.60 0.99
123 3 + 057 L/S 1.00 0.15
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan L/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)

Jumlah Halaman Ini 31.60 4.74


Jumlah s/d Halaman Ini 3,056.60 450.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 0013 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
1 0 + 000 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
2 0 + 025 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
3 0 + 050 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
4 0 + 075 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
5 0 + 100 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
6 0 + 125 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
7 0 + 150 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
8 0 + 175 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
9 0 + 200 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
10 0 + 225 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
11 0 + 250 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
12 0 + 275 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
13 0 + 300 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
14 0 + 325 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
15 0 + 350 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
16 0 + 375 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
17 0 + 400 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
18 0 + 425 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
19 0 + 450 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
20 0 + 475 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
21 0 + 500 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
22 0 + 525 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
23 0 + 550 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
24 0 + 575 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
25 0 + 600 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
26 0 + 625 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
27 0 + 650 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
28 0 + 675 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
29 0 + 700 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
30 0 + 725 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
31 0 + 750 R/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 750.00 112.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
31 0 + 750 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
32 0 + 775 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
33 0 + 800 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
34 0 + 825 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
35 0 + 850 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
36 0 + 875 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
37 0 + 900 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
38 0 + 925 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
39 0 + 950 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
40 0 + 975 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
41 1 + 000 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
42 1 + 025 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
43 1 + 050 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
44 1 + 075 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
45 1 + 100 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
46 1 + 125 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
47 1 + 150 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
48 1 + 175 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
49 1 + 200 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
50 1 + 225 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
51 1 + 250 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
52 1 + 275 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
53 1 + 300 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
54 1 + 325 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
55 1 + 350 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
56 1 + 375 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
57 1 + 400 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
58 1 + 425 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
59 1 + 450 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
60 1 + 475 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
61 1 + 500 R/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 1,500.00 225.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
61 1 + 500 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
62 1 + 525 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
63 1 + 550 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
64 1 + 575 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
65 1 + 600 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
66 1 + 625 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
67 1 + 650 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
68 1 + 675 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
69 1 + 700 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
70 1 + 725 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
71 1 + 750 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
72 1 + 775 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
73 1 + 800 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
74 1 + 825 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
75 1 + 850 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
76 1 + 875 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
77 1 + 900 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
78 1 + 925 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
79 1 + 950 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
80 1 + 975 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
81 2 + 000 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
82 2 + 025 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
83 2 + 050 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
84 2 + 075 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
85 2 + 100 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
86 2 + 125 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
87 2 + 150 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
88 2 + 175 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
89 2 + 200 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
90 2 + 225 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
91 2 + 250 R/S 1.00 0.15

Jumlah Halaman Ini 750.00 112.50


Jumlah s/d Halaman Ini 2,250.00 337.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
91 2 + 250 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
92 2 + 275 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
93 2 + 300 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
94 2 + 325 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
95 2 + 350 R/S 1.00 0.15
56.60 1.00 JEMBATAN
96 2 + 407 R/S 1.00 0.15
18.40 1.00 0.15 18.40 2.76
97 2 + 425 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
98 2 + 450 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
99 2 + 475 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
100 2 + 500 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
101 2 + 525 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
102 2 + 550 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
103 2 + 575 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
104 2 + 600 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
105 2 + 625 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
106 2 + 650 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
107 2 + 675 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
108 2 + 700 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
109 2 + 725 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
110 2 + 750 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
111 2 + 775 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
112 2 + 800 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
113 2 + 825 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
114 2 + 850 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 1.00 0.15 25.00 3.75
115 2 + 875 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
116 2 + 900 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
117 2 + 925 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
118 2 + 950 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
119 2 + 975 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
120 3 + 000 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
121 3 + 025 R/S 1.00 0.15

Jumlah Halaman Ini 775.00 107.76


Jumlah s/d Halaman Ini 3,025.00 445.26
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
121 3 + 025 R/S 1.00 0.15
25.00 1.00 0.15 25.00 3.75
122 3 + 050 R/S 1.00 0.15
6.60 1.00 0.15 6.60 0.99
123 3 + 057 R/S 1.00 0.15
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAIAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 4.2.(2b)
Jalan R/S) Kelas S
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)

Jumlah Halaman Ini 31.60 4.74


Jumlah s/d Halaman Ini 3,056.60 450.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 0013 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas S

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 5.5.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Pondasi Agregat Kelas A

No. LOKASI / STA VOLUME SAT KETERANGAN

LAPIS PONDASI AGREGAT KELAS A


1 Sta. 00+000 S/D 03+000 L/S 1,350.00 M3
2 Sta. 00+000 S/D 03+000 R/S 1,350.00 M3

TOTAL VOLUME 2,700.00 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
1 0 + 000 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
2 0 + 025 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
3 0 + 050 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
4 0 + 075 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
5 0 + 100 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
6 0 + 125 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
7 0 + 150 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
8 0 + 175 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
9 0 + 200 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
10 0 + 225 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
11 0 + 250 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
12 0 + 275 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
13 0 + 300 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
14 0 + 325 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
15 0 + 350 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
16 0 + 375 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
17 0 + 400 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
18 0 + 425 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
19 0 + 450 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
20 0 + 475 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
21 0 + 500 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
22 0 + 525 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
23 0 + 550 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
24 0 + 575 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
25 0 + 600 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
26 0 + 625 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
27 0 + 650 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
28 0 + 675 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
29 0 + 700 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
30 0 + 725 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
31 0 + 750 L/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 750.00 337.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
31 0 + 750 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
32 0 + 775 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
33 0 + 800 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
34 0 + 825 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
35 0 + 850 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
36 0 + 875 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
37 0 + 900 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
38 0 + 925 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
39 0 + 950 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
40 0 + 975 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
41 1 + 000 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
42 1 + 025 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
43 1 + 050 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
44 1 + 075 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
45 1 + 100 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
46 1 + 125 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
47 1 + 150 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
48 1 + 175 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
49 1 + 200 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
50 1 + 225 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
51 1 + 250 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
52 1 + 275 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
53 1 + 300 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
54 1 + 325 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
55 1 + 350 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
56 1 + 375 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
57 1 + 400 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
58 1 + 425 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
59 1 + 450 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
60 1 + 475 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
61 1 + 500 L/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 1,500.00 675.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
61 1 + 500 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
62 1 + 525 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
63 1 + 550 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
64 1 + 575 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
65 1 + 600 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
66 1 + 625 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
67 1 + 650 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
68 1 + 675 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
69 1 + 700 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
70 1 + 725 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
71 1 + 750 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
72 1 + 775 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
73 1 + 800 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
74 1 + 825 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
75 1 + 850 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
76 1 + 875 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
77 1 + 900 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
78 1 + 925 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
79 1 + 950 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
80 1 + 975 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
81 2 + 000 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
82 2 + 025 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
83 2 + 050 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
84 2 + 075 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
85 2 + 100 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
86 2 + 125 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
87 2 + 150 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
88 2 + 175 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
89 2 + 200 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
90 2 + 225 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
91 2 + 250 L/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 2,250.00 1,012.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
91 2 + 250 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
92 2 + 275 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
93 2 + 300 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
94 2 + 325 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
95 2 + 350 L/S 2.25 0.20
56.60 2.25 JEMBATAN
96 2 + 407 L/S 2.25 0.20
18.40 2.25 0.20 41.40 8.28
97 2 + 425 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
98 2 + 450 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
99 2 + 475 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
100 2 + 500 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
101 2 + 525 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
102 2 + 550 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
103 2 + 575 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
104 2 + 600 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
105 2 + 625 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
106 2 + 650 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
107 2 + 675 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
108 2 + 700 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
109 2 + 725 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
110 2 + 750 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
111 2 + 775 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
112 2 + 800 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
113 2 + 825 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
114 2 + 850 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
115 2 + 875 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
116 2 + 900 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
117 2 + 925 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
118 2 + 950 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
119 2 + 975 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
120 3 + 000 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
121 3 + 025 L/S 2.25 0.20

Jumlah Halaman Ini 775.00 323.28


Jumlah s/d Halaman Ini 3,025.00 1,335.78
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
121 3 + 025 L/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
122 3 + 050 L/S 2.25 0.20
6.60 2.25 0.20 14.85 2.97
123 3 + 057 L/S 2.25 0.20
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan L/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)

Jumlah Halaman Ini 31.60 14.22


Jumlah s/d Halaman Ini 3,056.60 1,350.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
1 0 + 000 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
2 0 + 025 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
3 0 + 050 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
4 0 + 075 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
5 0 + 100 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
6 0 + 125 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
7 0 + 150 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
8 0 + 175 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
9 0 + 200 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
10 0 + 225 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
11 0 + 250 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
12 0 + 275 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
13 0 + 300 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
14 0 + 325 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
15 0 + 350 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
16 0 + 375 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
17 0 + 400 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
18 0 + 425 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
19 0 + 450 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
20 0 + 475 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
21 0 + 500 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
22 0 + 525 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
23 0 + 550 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
24 0 + 575 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
25 0 + 600 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
26 0 + 625 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
27 0 + 650 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
28 0 + 675 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
29 0 + 700 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
30 0 + 725 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
31 0 + 750 R/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 750.00 337.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
31 0 + 750 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
32 0 + 775 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
33 0 + 800 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
34 0 + 825 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
35 0 + 850 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
36 0 + 875 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
37 0 + 900 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
38 0 + 925 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
39 0 + 950 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
40 0 + 975 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
41 1 + 000 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
42 1 + 025 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
43 1 + 050 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
44 1 + 075 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
45 1 + 100 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
46 1 + 125 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
47 1 + 150 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
48 1 + 175 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
49 1 + 200 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
50 1 + 225 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
51 1 + 250 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
52 1 + 275 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
53 1 + 300 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
54 1 + 325 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
55 1 + 350 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
56 1 + 375 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
57 1 + 400 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
58 1 + 425 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
59 1 + 450 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
60 1 + 475 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
61 1 + 500 R/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 1,500.00 675.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
61 1 + 500 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
62 1 + 525 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
63 1 + 550 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
64 1 + 575 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
65 1 + 600 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
66 1 + 625 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
67 1 + 650 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
68 1 + 675 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
69 1 + 700 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
70 1 + 725 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
71 1 + 750 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
72 1 + 775 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
73 1 + 800 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
74 1 + 825 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
75 1 + 850 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
76 1 + 875 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
77 1 + 900 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
78 1 + 925 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
79 1 + 950 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
80 1 + 975 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
81 2 + 000 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
82 2 + 025 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
83 2 + 050 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
84 2 + 075 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
85 2 + 100 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
86 2 + 125 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
87 2 + 150 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
88 2 + 175 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
89 2 + 200 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
90 2 + 225 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
91 2 + 250 R/S 2.25 0.20

Jumlah Halaman Ini 750.00 337.50


Jumlah s/d Halaman Ini 2,250.00 1,012.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
91 2 + 250 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
92 2 + 275 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
93 2 + 300 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
94 2 + 325 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
95 2 + 350 R/S 2.25 0.20
56.60 2.25 JEMBATAN
96 2 + 407 R/S 2.25 0.20
18.40 2.25 0.20 41.40 8.28
97 2 + 425 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
98 2 + 450 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
99 2 + 475 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
100 2 + 500 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
101 2 + 525 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
102 2 + 550 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
103 2 + 575 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
104 2 + 600 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
105 2 + 625 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
106 2 + 650 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
107 2 + 675 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
108 2 + 700 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
109 2 + 725 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
110 2 + 750 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
111 2 + 775 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
112 2 + 800 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
113 2 + 825 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
114 2 + 850 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
25.00 2.25 0.20 56.25 11.25
115 2 + 875 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
116 2 + 900 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
117 2 + 925 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
118 2 + 950 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
119 2 + 975 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
120 3 + 000 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
121 3 + 025 R/S 2.25 0.20

Jumlah Halaman Ini 775.00 323.28


Jumlah s/d Halaman Ini 3,025.00 1,335.78
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)
121 3 + 025 R/S 2.25 0.20
25.00 2.25 0.20 56.25 11.25
122 3 + 050 R/S 2.25 0.20
6.60 2.25 0.20 14.85 2.97
123 3 + 057 R/S 2.25 0.20
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

PERHITUNGAN (Lokasi Bahu Jenis Pekerjaan : Lapis Pon


No Item Pembayaran : 5.5.(1)
Jalan R/S) Kelas A
Lebar Tebal
Panjang Luas
No Km. Sisi Aktual Rata-rata Aktual Rata-rata Volume (M3)
(M') (M2)
(M) (M) (M) (M)

Jumlah Halaman Ini 31.60 14.22


Jumlah s/d Halaman Ini 3,056.60 1,350.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Pondasi Agregat


Kelas A

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 5.5.(2)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Pondasi Agregat Kelas B

No. LOKASI / STA VOLUME SAT KETERANGAN

LAPIS PONDASI AGREGAT KELAS B


1 Sta. 00+000 S/D 03+000 L/R 20.80 M3

LAPIS PONDASI AGREGAT KELAS B (Penutup Lubang)


1 Sta. 00+000 S/D 03+000 L/S 734.83 M3

TOTAL VOLUME 755.64 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
5.1.(2) Lapis Pondasi Agregat Kelas B M3 20.80

TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA - STA / KM - KM (M') (M') (M2) (M') (M3)

1 00+200 - 00+209 9.00 1.30 11.70 0.50 5.85 R/S


2 00+250 - 00+254 4.00 1.30 5.20 0.50 2.60 L/S
3 01+280 - 01+281 1.30 10.00 13.00 0.50 6.50 L/R
4 71+000 - 71+001 1.30 9.00 11.70 0.50 5.85 L/R

TOTAL 20.80

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T
Nip. 19720723 200701 1 001 Inspector Quantity Engineer
REPUBLIK INDONESIA PAKET PENINGKATA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

LEMBAR PER
Kajian Teknis
DEVISI : 5. PERKERASAN BERBUTIR
ITEM PEKERJAAN : 5.1.(2) Lapis Pondasi Agregat Kelas B (Reinstatment)

KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN

GAMBAR KERJA / POSISI :

L1 L2 A
L1

L1 L2

TIPE - I TIPE - II TIPE -

LEBAR LEBAR
PANJANG
NO STASIUN L1 L2 RATA 2
(M) (M) (M) (M)

1 0 + 0.00 S / D 0 + 7.00 7.00 2.50 2.50 2.50


2 0 + 23.00 S / D 0 + 28.00 5.00 2.10 2.10 2.10
3 0 + 50.00 S / D 0 + 71.00 21.00 3.00 3.00 3.00
4 0 + 71.00 S / D 0 + 85.00 14.00 4.50 4.50 4.50
5 0 + 90.00 S / D 0 + 93.00 3.00 2.20 2.20 2.20
6 0 + 95.00 S / D 0 + 140.00 45.00 4.50 4.50 4.50
7 0 + 140.00 S / D 0 + 167.00 27.00 2.00 2.00 2.00
8 0 + 185.00 S / D 0 + 187.00 2.00 2.00 2.00 2.00
9 0 + 195.00 S / D 0 + 200.00 5.00 4.30 4.30 4.30
10 0 + 202.00 S / D 0 + 217.00 15.00 2.50 2.50 2.50
11 0 + 217.00 S / D 0 + 224.00 7.00 4.50 4.50 4.50
12 0 + 225.00 S / D 0 + 230.00 5.00 1.00 1.00 1.00
13 0 + 245.00 S / D 0 + 280.00 35.00 4.30 4.30 4.30
14 0 + 290.00 S / D 0 + 307.00 17.00 4.50 4.50 4.50
15 0 + 325.00 S / D 0 + 333.00 8.00 4.00 4.00 4.00
16 0 + 335.00 S / D 0 + 345.00 10.00 2.20 2.20 2.20
17 0 + 355.00 S / D 0 + 373.00 18.00 2.00 2.00 2.00
18 0 + 385.00 S / D 0 + 397.00 12.00 4.50 4.50 4.50
19 0 + 410.00 S / D 0 + 425.00 15.00 4.30 4.30 4.30
20 0 + 430.00 S / D 0 + 440.00 10.00 2.10 2.10 2.10
21 0 + 480.00 S / D 0 + 488.00 8.00 2.00 2.00 2.00
22 0 + 495.00 S / D 0 + 497.20 2.20 4.30 4.30 4.30
23 0 + 505.00 S / D 0 + 507.00 2.00 2.00 2.00 2.00
24 0 + 515.00 S / D 0 + 520.50 5.50 4.30 4.30 4.30
25 0 + 523.00 S / D 0 + 529.00 6.00 1.80 1.80 1.80
26 0 + 532.00 S / D 0 + 539.80 7.80 4.30 4.30 4.30
27 0 + 554.00 S / D 0 + 564.00 10.00 2.20 2.20 2.20
REPUBLIK INDONESIA PAKET PENINGKATA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

LEMBAR PER
Kajian Teknis
DEVISI : 5. PERKERASAN BERBUTIR
ITEM PEKERJAAN : 5.1.(2) Lapis Pondasi Agregat Kelas B (Reinstatment)

KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN

GAMBAR KERJA / POSISI :

L1 L2 A
L1

L1 L2

TIPE - I TIPE - II TIPE -


28 0 + 579.00 S / D 0 + 593.00 14.00 2.30 2.30 2.30
29 0 + 600.00 S / D 0 + 610.00 10.00 1.50 1.50 1.50
30 0 + 632.00 S / D 0 + 635.30 3.30 1.40 1.40 1.40
31 0 + 686.00 S / D 0 + 695.80 9.80 4.50 4.50 4.50
32 0 + 707.00 S / D 0 + 716.00 9.00 3.10 3.10 3.10
33 0 + 722.00 S / D 0 + 732.00 10.00 4.30 4.30 4.30
34 0 + 750.00 S / D 0 + 785.00 35.00 4.50 4.50 4.50
35 0 + 804.00 S / D 0 + 820.00 16.00 4.50 4.50 4.50
36 0 + 832.00 S / D 0 + 835.50 3.50 1.90 1.90 1.90
37 0 + 850.00 S / D 0 + 860.20 10.20 4.50 4.50 4.50
38 0 + 875.00 S / D 0 + 879.70 4.70 2.50 2.50 2.50
39 0 + 910.00 S / D 0 + 915.00 5.00 4.50 4.50 4.50
40 0 + 975.00 S / D 0 + 978.50 3.50 2.30 2.30 2.30
41 0 + 995.00 S / D 0 + 1005.00 10.00 4.50 4.50 4.50
42 1 + 10.00 S / D 1 + 21.50 11.50 2.00 2.00 2.00
43 1 + 33.00 S / D 1 + 43.20 10.20 3.20 3.20 3.20
44 1 + 53.00 S / D 1 + 55.00 2.00 2.00 2.00 2.00
45 1 + 70.00 S / D 1 + 73.50 3.50 2.20 2.20 2.20
46 1 + 75.00 S / D 1 + 81.00 6.00 1.80 1.80 1.80
47 1 + 85.00 S / D 1 + 90.50 5.50 4.50 4.50 4.50
48 1 + 97.00 S / D 1 + 104.00 7.00 4.50 4.50 4.50
49 1 + 120.00 S / D 1 + 129.50 9.50 3.30 3.30 3.30
50 1 + 130.00 S / D 1 + 150.00 20.00 4.50 4.50 4.50
51 1 + 186.00 S / D 1 + 193.00 7.00 4.50 4.50 4.50
52 1 + 208.00 S / D 1 + 214.30 6.30 4.20 4.20 4.20
53 1 + 227.00 S / D 1 + 229.50 2.50 2.00 2.00 2.00
54 1 + 250.00 S / D 1 + 257.50 7.50 4.50 4.50 4.50
55 1 + 260.00 S / D 1 + 264.70 4.70 3.60 3.60 3.60
56 1 + 275.00 S / D 1 + 280.00 5.00 4.20 4.20 4.20
57 1 + 295.00 S / D 1 + 300.00 5.00 2.20 2.20 2.20
58 1 + 370.00 S / D 1 + 385.00 15.00 4.50 4.50 4.50
REPUBLIK INDONESIA PAKET PENINGKATA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

LEMBAR PER
Kajian Teknis
DEVISI : 5. PERKERASAN BERBUTIR
ITEM PEKERJAAN : 5.1.(2) Lapis Pondasi Agregat Kelas B (Reinstatment)

KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN

GAMBAR KERJA / POSISI :

L1 L2 A
L1

L1 L2

TIPE - I TIPE - II TIPE -


59 1 + 408.00 S / D 1 + 412.00 4.00 3.00 3.00 3.00
60 1 + 455.00 S / D 1 + 460.00 5.00 2.50 2.50 2.50
61 1 + 475.00 S / D 1 + 478.50 3.50 2.70 2.70 2.70
62 1 + 480.00 S / D 1 + 484.00 4.00 3.50 3.50 3.50
63 1 + 490.00 S / D 1 + 495.70 5.70 3.50 3.50 3.50
64 1 + 503.00 S / D 1 + 507.00 4.00 2.00 2.00 2.00
65 1 + 510.00 S / D 1 + 513.30 3.30 2.40 2.40 2.40
66 1 + 521.00 S / D 1 + 525.50 4.50 2.10 2.10 2.10
67 1 + 537.00 S / D 1 + 547.00 10.00 3.10 3.10 3.10
68 1 + 553.00 S / D 1 + 556.30 3.30 1.50 1.50 1.50
69 1 + 560.00 S / D 1 + 563.20 3.20 1.40 1.40 1.40
70 1 + 582.00 S / D 1 + 584.50 2.50 3.00 3.00 3.00
71 1 + 600.00 S / D 1 + 607.00 7.00 1.80 1.80 1.80
72 1 + 634.00 S / D 1 + 637.80 3.80 1.50 1.50 1.50
73 1 + 640.00 S / D 1 + 646.10 6.10 3.00 3.00 3.00
74 1 + 657.00 S / D 1 + 668.00 11.00 4.20 4.20 4.20
75 1 + 675.00 S / D 1 + 684.00 9.00 3.20 3.20 3.20
76 1 + 704.00 S / D 1 + 712.00 8.00 4.50 4.50 4.50
77 1 + 730.00 S / D 1 + 741.70 11.70 4.50 4.50 4.50
78 1 + 753.00 S / D 1 + 761.20 8.20 2.30 2.30 2.30
79 1 + 777.00 S / D 1 + 791.80 14.80 4.40 4.40 4.40
80 1 + 805.00 S / D 1 + 809.00 4.00 1.90 1.90 1.90
81 1 + 875.00 S / D 1 + 877.20 2.20 1.60 1.60 1.60
82 1 + 900.00 S / D 1 + 905.00 5.00 4.00 4.00 4.00
83 1 + 920.00 S / D 1 + 928.00 8.00 4.00 4.00 4.00
84 1 + 929.00 S / D 1 + 946.00 17.00 4.40 4.40 4.40
85 1 + 962.00 S / D 1 + 975.00 13.00 4.40 4.40 4.40
86 1 + 984.00 S / D 1 + 1000.00 16.00 4.40 4.40 4.40
87 2 + 18.00 S / D 2 + 25.00 7.00 4.00 4.00 4.00
88 2 + 47.00 S / D 2 + 50.50 3.50 1.80 1.80 1.80
89 2 + 75.00 S / D 2 + 90.60 15.60 4.00 4.00 4.00
REPUBLIK INDONESIA PAKET PENINGKATA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

LEMBAR PER
Kajian Teknis
DEVISI : 5. PERKERASAN BERBUTIR
ITEM PEKERJAAN : 5.1.(2) Lapis Pondasi Agregat Kelas B (Reinstatment)

KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN

GAMBAR KERJA / POSISI :

L1 L2 A
L1

L1 L2

TIPE - I TIPE - II TIPE -


90 2 + 108.00 S / D 2 + 119.50 11.50 4.30 4.30 4.30
91 2 + 145.00 S / D 2 + 150.00 5.00 2.00 2.00 2.00
92 2 + 179.00 S / D 2 + 191.20 12.20 4.40 4.40 4.40
93 2 + 203.00 S / D 2 + 235.00 32.00 4.40 4.40 4.40
94 2 + 260.00 S / D 2 + 264.40 4.40 2.20 2.20 2.20
95 2 + 264.40 S / D 2 + 275.40 11.00 4.50 4.50 4.50
96 2 + 280.00 S / D 2 + 290.00 10.00 3.00 3.00 3.00
97 2 + 406.00 S / D 2 + 411.00 5.00 4.50 4.50 4.50
98 2 + 434.00 S / D 2 + 451.00 17.00 4.00 4.00 4.00
99 2 + 460.00 S / D 2 + 465.80 5.80 4.00 4.00 4.00
100 2 + 475.00 S / D 2 + 482.00 7.00 2.50 2.50 2.50
101 2 + 486.00 S / D 2 + 489.50 3.50 2.70 2.70 2.70
102 2 + 508.00 S / D 2 + 513.50 5.50 3.20 3.20 3.20
103 2 + 530.00 S / D 2 + 539.50 9.50 4.00 4.00 4.00
104 2 + 564.00 S / D 2 + 575.00 11.00 3.80 3.80 3.80
105 2 + 602.00 S / D 2 + 606.90 4.90 4.40 4.40 4.40
106 2 + 653.00 S / D 2 + 658.60 5.60 2.50 2.50 2.50
107 2 + 720.00 S / D 2 + 726.40 6.40 3.00 3.00 3.00
108 2 + 767.00 S / D 2 + 772.40 5.40 2.00 2.00 2.00
109 2 + 817.00 S / D 2 + 825.20 8.20 2.70 2.70 2.70
110 2 + 845.00 S / D 2 + 860.20 15.20 3.30 3.30 3.30
111 2 + 875.00 S / D 2 + 879.70 4.70 2.10 2.10 2.10
112 2 + 975.00 S / D 2 + 990.80 15.80 3.80 3.80 3.80

PENGGUNA JASA KONSULTAN


REPUBLIK INDONESIA PAKET PENINGKATA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

LEMBAR PER
Kajian Teknis
DEVISI : 5. PERKERASAN BERBUTIR
ITEM PEKERJAAN : 5.1.(2) Lapis Pondasi Agregat Kelas B (Reinstatment)

KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN

GAMBAR KERJA / POSISI :

L1 L2 A
L1

L1 L2

TIPE - I TIPE - II TIPE -

JOKO SUNARTO ANSHORI NA


Nip. 19720723 200701 1 001 Inspe
GKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB.
LANGKAT

TAHUN ANGGARAN 2017

PERHITUNGAN
eknis Lapangan
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
TGL. KONTRAK : 21 JULI 2017

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

B
L2

L1 L2
L1 L2
A B A B

TIPE - III TIPE - IV TIPE - V

TEBAL TEBAL BJ GAMBAR KERJA / POSISI


LUAS VOLUME BERAT
T1 T2 RATA 2
ASPAL A B KET
TIPE
(M) (M) (M) (M 2
) (M 3
) (T/M 3
) ( TON ) (M) (M)

0.2 17.50 3.50 R/S


0.2 10.50 2.10 R/S
0.2 63.00 12.60 R/S
0.2 63.00 12.60 L/R
0.2 6.60 1.32 R/S
0.2 202.50 40.50 L/R
0.2 54.00 10.80 R/S
0.2 4.00 0.80 L/S
0.2 21.50 4.30 L/R
0.2 37.50 7.50 R/S
0.2 31.50 6.30 L/R
0.2 5.00 1.00 L/S
0.2 150.50 30.10 L/R
0.2 76.50 15.30 L/R
0.2 32.00 6.40 L/R
0.2 22.00 4.40 R/S
0.2 36.00 7.20 R/S
0.2 54.00 10.80 L/R
0.2 64.50 12.90 L/R
0.2 21.00 4.20 R/S
0.2 16.00 3.20 R/S
0.2 9.46 1.89 L/R
0.2 4.00 0.80 L/S
0.2 23.65 4.73 L/R
0.2 10.80 2.16 L/S
0.2 33.54 6.71 L/R
0.2 22.00 4.40 R/S
GKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB.
LANGKAT

TAHUN ANGGARAN 2017

PERHITUNGAN
eknis Lapangan
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
TGL. KONTRAK : 21 JULI 2017

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

B
L2

L1 L2
L1 L2
A B A B

TIPE - III TIPE - IV TIPE - V


0.2 32.20 6.44 L/R
0.2 15.00 3.00 R/S
0.2 4.62 0.92 R/S
0.2 44.10 8.82 L/R
0.2 27.90 5.58 R/S
0.2 43.00 8.60 L/R
0.2 157.50 31.50 L/R
0.2 72.00 14.40 L/R
0.2 6.65 1.33 L/S
0.2 45.90 9.18 L/R
0.2 11.75 2.35 R/S
0.2 22.50 4.50 L/R
0.2 8.05 1.61 R/S
0.2 45.00 9.00 L/R
0.2 23.00 4.60 R/S
0.2 32.64 6.53 R/S
0.2 4.00 0.80 R/S
0.2 7.70 1.54 L/S
0.2 10.80 2.16 R/S
0.2 24.75 4.95 L/R
0.2 31.50 6.30 L/R
0.2 31.35 6.27 L/S
0.2 90.00 18.00 L/R
0.2 31.50 6.30 L/R
0.2 26.46 5.29 L/R
0.2 5.00 1.00 L/S
0.2 33.75 6.75 L/R
0.2 16.92 3.38 R/S
0.2 21.00 4.20 L/R
0.2 11.00 2.20 L/S
0.2 67.50 13.50 L/R
GKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB.
LANGKAT

TAHUN ANGGARAN 2017

PERHITUNGAN
eknis Lapangan
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
TGL. KONTRAK : 21 JULI 2017

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

B
L2

L1 L2
L1 L2
A B A B

TIPE - III TIPE - IV TIPE - V


0.2 12.00 2.40 R/S
0.2 12.50 2.50 R/S
0.2 9.45 1.89 L/S
0.2 14.00 2.80 L/R
0.2 19.95 3.99 R/S
0.2 8.00 1.60 L/S
0.2 7.92 1.58 R/S
0.2 9.45 1.89 R/S
0.2 31.00 6.20 R/S
0.2 4.95 0.99 L/S
0.2 4.48 0.90 L/S
0.2 7.50 1.50 L/S
0.2 12.60 2.52 R/S
0.2 5.70 1.14 R/S
0.2 18.30 3.66 R/S
0.2 46.20 9.24 L/R
0.2 28.80 5.76 L/R
0.2 36.00 7.20 L/R
0.2 52.65 10.53 L/R
0.2 18.86 3.77 L/S
0.2 65.12 13.02 L/R
0.2 7.60 1.52 L/S
0.2 3.52 0.70 L/S
0.2 20.00 4.00 L/R
0.2 32.00 6.40 L/R
0.2 74.80 14.96 L/R
0.2 57.20 11.44 L/R
0.2 70.40 14.08 L/R
0.2 28.00 5.60 L/R
0.2 6.30 1.26 L/S
0.2 62.40 12.48 L/R
GKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB.
LANGKAT

TAHUN ANGGARAN 2017

PERHITUNGAN
eknis Lapangan
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
TGL. KONTRAK : 21 JULI 2017

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

B
L2

L1 L2
L1 L2
A B A B

TIPE - III TIPE - IV TIPE - V


0.2 49.45 9.89 L/R
0.2 10.00 2.00 R/S
0.2 53.68 10.74 L/R
0.2 140.80 28.16 L/R
0.2 9.68 1.94 R/S
0.2 49.50 9.90 L/R
0.2 30.00 6.00 L/S
0.2 22.50 4.50 L/R
0.2 68.00 13.60 L/R
0.2 23.20 4.64 L/R
0.2 17.50 3.50 L/R
0.2 9.45 1.89 L/S
0.2 17.60 3.52 L/S
0.2 38.00 7.60 L/R
0.2 41.80 8.36 L/R
0.2 21.56 4.31 L/R
0.2 14.00 2.80 R/S
0.2 19.20 3.84 R/S
0.2 10.80 2.16 R/S
0.2 22.14 4.43 R/S
0.2 50.16 10.03 R/S
0.2 9.87 1.97 R/S
0.2 60.04 12.01 R/S

SUB TOTAL 734.83

S/D HALAMAN INI 1 734.83

SULTAN SUPERVISI PENYEDIA JASA


GKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB.
LANGKAT

TAHUN ANGGARAN 2017

PERHITUNGAN
eknis Lapangan
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
TGL. KONTRAK : 21 JULI 2017

PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU

B
L2

L1 L2
L1 L2
A B A B

TIPE - III TIPE - IV TIPE - V

ORI NASUTION, ST M. IQBAL AZHARI, S.S.T


Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 6.1.(1a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Resap Pengikat - Aspal Cair

No. LOKASI / STA VOLUME SAT KETERANGAN

Lapis Resap Pengikat - Aspal Cair


1 Sta. 00+000 S/D 03+000 L/S 6,750.00 Liter
2 Sta. 00+000 S/D 03+000 R/S 6,750.00 Liter

TOTAL VOLUME 13,500.00 Liter

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
1 0 + 000 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
2 0 + 025 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
3 0 + 050 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
4 0 + 075 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
5 0 + 100 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
6 0 + 125 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
7 0 + 150 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
8 0 + 175 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
9 0 + 200 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
10 0 + 225 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
11 0 + 250 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
12 0 + 275 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
13 0 + 300 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
14 0 + 325 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
15 0 + 350 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
16 0 + 375 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
17 0 + 400 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
18 0 + 425 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
19 0 + 450 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
20 0 + 475 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
21 0 + 500 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
22 0 + 525 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
23 0 + 550 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
24 0 + 575 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
25 0 + 600 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
26 0 + 625 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
27 0 + 650 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
28 0 + 675 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
29 0 + 700 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
30 0 + 725 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
31 0 + 750 L/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 750.00 1,687.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
31 0 + 750 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
32 0 + 775 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
33 0 + 800 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
34 0 + 825 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
35 0 + 850 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
36 0 + 875 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
37 0 + 900 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
38 0 + 925 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
39 0 + 950 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
40 0 + 975 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
41 1 + 000 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
42 1 + 025 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
43 1 + 050 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
44 1 + 075 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
45 1 + 100 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
46 1 + 125 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
47 1 + 150 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
48 1 + 175 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
49 1 + 200 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
50 1 + 225 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
51 1 + 250 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
52 1 + 275 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
53 1 + 300 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
54 1 + 325 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
55 1 + 350 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
56 1 + 375 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
57 1 + 400 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
58 1 + 425 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
59 1 + 450 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
60 1 + 475 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
61 1 + 500 L/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 1,500.00 3,375.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
61 1 + 500 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
62 1 + 525 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
63 1 + 550 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
64 1 + 575 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
65 1 + 600 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
66 1 + 625 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
67 1 + 650 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
68 1 + 675 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
69 1 + 700 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
70 1 + 725 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
71 1 + 750 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
72 1 + 775 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
73 1 + 800 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
74 1 + 825 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
75 1 + 850 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
76 1 + 875 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
77 1 + 900 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
78 1 + 925 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
79 1 + 950 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
80 1 + 975 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
81 2 + 000 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
82 2 + 025 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
83 2 + 050 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
84 2 + 075 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
85 2 + 100 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
86 2 + 125 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
87 2 + 150 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
88 2 + 175 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
89 2 + 200 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
90 2 + 225 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
91 2 + 250 L/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 2,250.00 5,062.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
91 2 + 250 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
92 2 + 275 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
93 2 + 300 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
94 2 + 325 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
95 2 + 350 L/S 2.25 1.00
56.60 2.25 JEMBATAN
96 2 + 407 L/S 2.25 1.00
18.40 2.25 1.00 41.40 41.40
97 2 + 425 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
98 2 + 450 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
99 2 + 475 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
100 2 + 500 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
101 2 + 525 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
102 2 + 550 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
103 2 + 575 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
104 2 + 600 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
105 2 + 625 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
106 2 + 650 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
107 2 + 675 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
108 2 + 700 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
109 2 + 725 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
110 2 + 750 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
111 2 + 775 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
112 2 + 800 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
113 2 + 825 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
114 2 + 850 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
115 2 + 875 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
116 2 + 900 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
117 2 + 925 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
118 2 + 950 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
119 2 + 975 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
120 3 + 000 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
121 3 + 025 L/S 2.25 1.00

Jumlah Halaman Ini 775.00 1,616.40


Jumlah s/d Halaman Ini 3,025.00 6,678.90
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
121 3 + 025 L/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
122 3 + 050 L/S 2.25 1.00
6.60 2.25 1.00 14.85 14.85
123 3 + 057 L/S 2.25 1.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan L/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)

Jumlah Halaman Ini 31.60 71.10


Jumlah s/d Halaman Ini 3,056.60 6,750.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
1 0 + 000 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
2 0 + 025 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
3 0 + 050 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
4 0 + 075 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
5 0 + 100 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
6 0 + 125 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
7 0 + 150 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
8 0 + 175 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
9 0 + 200 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
10 0 + 225 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
11 0 + 250 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
12 0 + 275 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
13 0 + 300 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
14 0 + 325 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
15 0 + 350 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
16 0 + 375 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
17 0 + 400 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
18 0 + 425 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
19 0 + 450 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
20 0 + 475 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
21 0 + 500 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
22 0 + 525 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
23 0 + 550 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
24 0 + 575 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
25 0 + 600 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
26 0 + 625 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
27 0 + 650 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
28 0 + 675 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
29 0 + 700 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
30 0 + 725 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
31 0 + 750 R/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 750.00 1,687.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
31 0 + 750 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
32 0 + 775 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
33 0 + 800 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
34 0 + 825 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
35 0 + 850 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
36 0 + 875 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
37 0 + 900 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
38 0 + 925 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
39 0 + 950 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
40 0 + 975 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
41 1 + 000 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
42 1 + 025 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
43 1 + 050 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
44 1 + 075 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
45 1 + 100 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
46 1 + 125 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
47 1 + 150 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
48 1 + 175 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
49 1 + 200 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
50 1 + 225 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
51 1 + 250 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
52 1 + 275 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
53 1 + 300 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
54 1 + 325 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
55 1 + 350 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
56 1 + 375 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
57 1 + 400 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
58 1 + 425 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
59 1 + 450 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
60 1 + 475 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
61 1 + 500 R/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 1,500.00 3,375.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
61 1 + 500 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
62 1 + 525 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
63 1 + 550 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
64 1 + 575 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
65 1 + 600 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
66 1 + 625 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
67 1 + 650 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
68 1 + 675 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
69 1 + 700 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
70 1 + 725 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
71 1 + 750 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
72 1 + 775 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
73 1 + 800 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
74 1 + 825 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
75 1 + 850 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
76 1 + 875 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
77 1 + 900 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
78 1 + 925 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
79 1 + 950 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
80 1 + 975 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
81 2 + 000 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
82 2 + 025 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
83 2 + 050 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
84 2 + 075 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
85 2 + 100 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
86 2 + 125 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
87 2 + 150 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
88 2 + 175 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
89 2 + 200 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
90 2 + 225 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
91 2 + 250 R/S 2.25 1.00

Jumlah Halaman Ini 750.00 1,687.50


Jumlah s/d Halaman Ini 2,250.00 5,062.50
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
91 2 + 250 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
92 2 + 275 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
93 2 + 300 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
94 2 + 325 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
95 2 + 350 R/S 2.25 1.00
56.60 2.25 JEMBATAN
96 2 + 407 R/S 2.25 1.00
18.40 2.25 1.00 41.40 41.40
97 2 + 425 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
98 2 + 450 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
99 2 + 475 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
100 2 + 500 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
101 2 + 525 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
102 2 + 550 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
103 2 + 575 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
104 2 + 600 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
105 2 + 625 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
106 2 + 650 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
107 2 + 675 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
108 2 + 700 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
109 2 + 725 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
110 2 + 750 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
111 2 + 775 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
112 2 + 800 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
113 2 + 825 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
114 2 + 850 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 1.00 56.25 56.25
115 2 + 875 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
116 2 + 900 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
117 2 + 925 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
118 2 + 950 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
119 2 + 975 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
120 3 + 000 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
121 3 + 025 R/S 2.25 1.00

Jumlah Halaman Ini 775.00 1,616.40


Jumlah s/d Halaman Ini 3,025.00 6,678.90
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
121 3 + 025 R/S 2.25 1.00
25.00 2.25 1.00 56.25 56.25
122 3 + 050 R/S 2.25 1.00
6.60 2.25 1.00 14.85 14.85
123 3 + 057 R/S 2.25 1.00
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(1a) PERHITUNGAN (Lokasi Badan Jenis Pekerjaan : Lapis Resa
Jalan R/S) Aspal Cair
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)

Jumlah Halaman Ini 31.60 71.10


Jumlah s/d Halaman Ini 3,056.60 6,750.00

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Resap Pengikat -


Aspal Cair

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 6.1.(2a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Perekat - Aspal Cair

No. LOKASI / STA VOLUME SAT KETERANGAN

Lapis Perekat - Aspal Cair


1 Sta. 00+000 S/D 03+000 L/S 1,012.50 Liter
2 Sta. 00+000 S/D 03+000 R/S 1,012.50 Liter

TOTAL VOLUME 2,025.00 Liter

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
1 0 + 000 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
2 0 + 025 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
3 0 + 050 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
4 0 + 075 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
5 0 + 100 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
6 0 + 125 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
7 0 + 150 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
8 0 + 175 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
9 0 + 200 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
10 0 + 225 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
11 0 + 250 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
12 0 + 275 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
13 0 + 300 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
14 0 + 325 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
15 0 + 350 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
16 0 + 375 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
17 0 + 400 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
18 0 + 425 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
19 0 + 450 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
20 0 + 475 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
21 0 + 500 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
22 0 + 525 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
23 0 + 550 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
24 0 + 575 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
25 0 + 600 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
26 0 + 625 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
27 0 + 650 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
28 0 + 675 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
29 0 + 700 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
30 0 + 725 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
31 0 + 750 L/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 750.00 253.13
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
31 0 + 750 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
32 0 + 775 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
33 0 + 800 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
34 0 + 825 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
35 0 + 850 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
36 0 + 875 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
37 0 + 900 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
38 0 + 925 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
39 0 + 950 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
40 0 + 975 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
41 1 + 000 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
42 1 + 025 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
43 1 + 050 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
44 1 + 075 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
45 1 + 100 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
46 1 + 125 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
47 1 + 150 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
48 1 + 175 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
49 1 + 200 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
50 1 + 225 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
51 1 + 250 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
52 1 + 275 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
53 1 + 300 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
54 1 + 325 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
55 1 + 350 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
56 1 + 375 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
57 1 + 400 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
58 1 + 425 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
59 1 + 450 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
60 1 + 475 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
61 1 + 500 L/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 1,500.00 506.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
61 1 + 500 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
62 1 + 525 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
63 1 + 550 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
64 1 + 575 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
65 1 + 600 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
66 1 + 625 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
67 1 + 650 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
68 1 + 675 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
69 1 + 700 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
70 1 + 725 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
71 1 + 750 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
72 1 + 775 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
73 1 + 800 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
74 1 + 825 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
75 1 + 850 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
76 1 + 875 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
77 1 + 900 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
78 1 + 925 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
79 1 + 950 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
80 1 + 975 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
81 2 + 000 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
82 2 + 025 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
83 2 + 050 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
84 2 + 075 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
85 2 + 100 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
86 2 + 125 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
87 2 + 150 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
88 2 + 175 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
89 2 + 200 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
90 2 + 225 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
91 2 + 250 L/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 2,250.00 759.38
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
91 2 + 250 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
92 2 + 275 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
93 2 + 300 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
94 2 + 325 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
95 2 + 350 L/S 2.25 0.15

96 2 + 350 L/S
56.60 JEMBATAN
97 2 + 407 L/S

98 2 + 407 L/S 2.25 0.15


18.40 2.25 0.15 41.40 6.21
99 2 + 425 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
100 2 + 450 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
101 2 + 475 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
102 2 + 500 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
103 2 + 525 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
104 2 + 550 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
105 2 + 575 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
106 2 + 600 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
107 2 + 625 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
108 2 + 650 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
109 2 + 675 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
110 2 + 700 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
111 2 + 725 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
112 2 + 750 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
113 2 + 775 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
114 2 + 800 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
115 2 + 825 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
116 2 + 850 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
117 2 + 875 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
118 2 + 900 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
119 2 + 925 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
120 2 + 950 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
121 2 + 975 L/S 2.25 0.15

Jumlah Halaman Ini 725.00 225.59


Jumlah s/d Halaman Ini 2,975.00 984.96
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
121 2 + 975 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
122 3 + 000 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
123 3 + 025 L/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
124 3 + 050 L/S 2.25 0.15
6.60 2.25 0.15 14.85 2.23
125 3 + 057 L/S 2.25 0.15
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan L/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)

Jumlah Halaman Ini 81.60 27.54


Jumlah s/d Halaman Ini 3,056.60 1,012.50

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
1 0 + 000 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
2 0 + 025 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
3 0 + 050 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
4 0 + 075 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
5 0 + 100 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
6 0 + 125 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
7 0 + 150 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
8 0 + 175 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
9 0 + 200 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
10 0 + 225 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
11 0 + 250 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
12 0 + 275 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
13 0 + 300 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
14 0 + 325 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
15 0 + 350 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
16 0 + 375 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
17 0 + 400 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
18 0 + 425 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
19 0 + 450 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
20 0 + 475 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
21 0 + 500 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
22 0 + 525 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
23 0 + 550 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
24 0 + 575 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
25 0 + 600 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
26 0 + 625 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
27 0 + 650 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
28 0 + 675 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
29 0 + 700 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
30 0 + 725 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
31 0 + 750 R/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 750.00 253.13
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
31 0 + 750 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
32 0 + 775 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
33 0 + 800 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
34 0 + 825 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
35 0 + 850 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
36 0 + 875 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
37 0 + 900 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
38 0 + 925 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
39 0 + 950 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
40 0 + 975 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
41 1 + 000 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
42 1 + 025 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
43 1 + 050 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
44 1 + 075 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
45 1 + 100 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
46 1 + 125 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
47 1 + 150 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
48 1 + 175 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
49 1 + 200 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
50 1 + 225 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
51 1 + 250 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
52 1 + 275 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
53 1 + 300 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
54 1 + 325 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
55 1 + 350 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
56 1 + 375 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
57 1 + 400 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
58 1 + 425 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
59 1 + 450 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
60 1 + 475 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
61 1 + 500 R/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 1,500.00 506.25
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
61 1 + 500 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
62 1 + 525 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
63 1 + 550 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
64 1 + 575 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
65 1 + 600 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
66 1 + 625 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
67 1 + 650 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
68 1 + 675 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
69 1 + 700 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
70 1 + 725 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
71 1 + 750 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
72 1 + 775 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
73 1 + 800 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
74 1 + 825 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
75 1 + 850 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
76 1 + 875 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
77 1 + 900 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
78 1 + 925 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
79 1 + 950 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
80 1 + 975 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
81 2 + 000 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
82 2 + 025 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
83 2 + 050 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
84 2 + 075 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
85 2 + 100 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
86 2 + 125 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
87 2 + 150 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
88 2 + 175 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
89 2 + 200 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
90 2 + 225 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
91 2 + 250 R/S 2.25 0.15

Jumlah Halaman Ini 750.00 253.13


Jumlah s/d Halaman Ini 2,250.00 759.38
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
91 2 + 250 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
92 2 + 275 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
93 2 + 300 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
94 2 + 325 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
95 2 + 350 R/S 2.25 0.15

96 2 + 350 R/S
56.60 JEMBATAN
97 2 + 407 R/S

98 2 + 407 R/S 2.25 0.15


18.40 2.25 0.15 41.40 6.21
99 2 + 425 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
100 2 + 450 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
101 2 + 475 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
102 2 + 500 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
103 2 + 525 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
104 2 + 550 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
105 2 + 575 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
106 2 + 600 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
107 2 + 625 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
108 2 + 650 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
109 2 + 675 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
110 2 + 700 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
111 2 + 725 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
112 2 + 750 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
113 2 + 775 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
114 2 + 800 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
25.00 2.25 0.15 56.25 8.44
115 2 + 825 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
116 2 + 850 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
117 2 + 875 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
118 2 + 900 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
119 2 + 925 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
120 2 + 950 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
121 2 + 975 R/S 2.25 0.15

Jumlah Halaman Ini 725.00 225.59


Jumlah s/d Halaman Ini 2,975.00 984.96
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)
121 2 + 975 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
122 3 + 000 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
123 3 + 025 R/S 2.25 0.15
25.00 2.25 0.15 56.25 8.44
124 3 + 050 R/S 2.25 0.15
6.60 2.25 0.15 14.85 2.23
125 3 + 057 R/S 2.25 0.15
Proyek : UNIT PELAKSANA TEKNIS (UPT) BINJAI Data Pendukung :

Penyedia Jasa :
PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -
Paket : TANJUNG SELAMAT DI KAB. LANGKAT
Konsultan Supervisi :

No Item Pembayaran : 6.1.(2a) PERHITUNGAN (Lokasi Badan


Jenis Pekerjaan : Lapis Perek
Jalan R/S)
Lebar Tebal Aspal Cair
Panjang Luas Volume
No Sta. Sisi Aktual Rata-rata Aktual Rata-rata
(M') (M2) (Liter)
(M) (M) (Ltr/M2) (Ltr/M2)

Jumlah Halaman Ini 81.60 27.54


Jumlah s/d Halaman Ini 3,056.60 1,012.50

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA J

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGO


Nip. 19720723 200701 1 001 Inspector Quantity Eng
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan
Kajian Teknis Lapangan

PT. Bangun Karya


Sembilan Satu
CV. Prima Rancang Kons.

Jenis Pekerjaan : Lapis Perekat - Aspal Cair

Keterangan

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 6.3.(5a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Laston Lapis Aus (AC-WC)

No. LOKASI / STA VOLUME SAT KETERANGAN

Laston Lapis Aus (AC-WC)


1 Sta. 00+000 S/D 03+000 L/R Section - 01 1,239.30 Ton

TOTAL VOLUME 1,239.30 Ton

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
LEMBAR PERHITUNGAN
DIV. VI. PERKERASAN ASPAL
6.3.(5a) Laston Lapis Aus (AC-WC)
Peningkatan Struktur Jalan Provinsi Jurusan Tanjung Pura - Tanjung Selamat di Kab. Langkat

A BERAT CAMPURAN (HOTMIX) PER M3 (2.295 t = ### Ton


B ASPAL 6.09% x A = 75.47 Ton
C ADITIF 0.30% x B = 226.42 Kg
D FILLER 1.78% x A = ### Kg
E AC-WC A - (B+D) = 92.13% = ### Ton

L/S (KIRI) R/S (KANAN)


LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
00+000 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+025 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+050 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+075 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+100 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+125 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+150 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+175 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+200 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+225 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+250 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+275 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+300 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+325 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+350 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+375 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+400 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+425 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+450 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+475 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+500 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+525 2.25 2.25
Sub Total 525.00 1,181.25 1,181.25
Kumulatif 525.00 1,181.25 1,181.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
00+525 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+550 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+575 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+600 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+625 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+650 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+675 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+700 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+725 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+750 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+775 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+800 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+825 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+850 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+875 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+900 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+925 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+950 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
00+975 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+000 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+025 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+050 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+075 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+100 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+125 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+150 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+175 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+200 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+225 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+250 2.25 2.25
Sub Total 725.00 1,631.25 1,631.25
Kumulatif 1,250.00 2,812.50 2,812.50
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
01+250 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+275 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+300 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+325 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+350 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+375 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+400 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+425 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+450 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+475 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+500 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+525 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+550 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+575 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+600 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+625 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+650 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+675 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+700 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+725 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+750 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+775 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+800 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+825 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+850 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+875 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+900 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+925 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+950 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
01+975 2.25 2.25
Sub Total 725.00 1,631.25 1,631.25
Kumulatif 1,975.00 4,443.75 4,443.75
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
01+975 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+000 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+025 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+050 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+075 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+100 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+125 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+150 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+175 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+200 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+225 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+250 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+275 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+300 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+325 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+350 2.25 2.25

02+350
56.60 JEMBATAN
02+407

02+407 2.25 2.25


18.40 2.25 41.40 0.04 1.66 2.25 41.40 0.04 1.66
02+425 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+450 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+475 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+500 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+525 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+550 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+575 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+600 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+625 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+650 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+675 2.25 2.25
Sub Total 700.00 1,447.65 1,447.65
Kumulatif 2,675.00 5,891.40 5,891.40
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
02+675 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+700 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+725 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+750 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+775 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+800 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+825 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+850 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+875 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+900 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+925 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+950 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
02+975 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
03+000 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
03+025 2.25 2.25
25.00 2.25 56.25 0.04 2.25 2.25 56.25 0.04 2.25
03+050 2.25 2.25
6.60 2.25 14.85 0.04 0.59 2.25 14.85 0.04 0.59
03+057 2.25 2.25

Sub Total 381.60 858.60 858.60


Kumulatif 3,056.60 6,750.00 6,750.00
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGORINGO, ST


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
MBAR PERHITUNGAN
V. VI. PERKERASAN ASPAL
5a) Laston Lapis Aus (AC-WC)
vinsi Jurusan Tanjung Pura - Tanjung Selamat di Kab. Langkat

TOTAL

(m3)

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50
TOTAL

(m3)
4.50

4.50

4.50

4.50

94.50
94.50
TOTAL

(m3)

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50
TOTAL

(m3)
4.50

4.50

4.50

4.50

130.50
225.00
TOTAL

(m3)

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50
TOTAL

(m3)
4.50

4.50

4.50

4.50

130.50
355.50
TOTAL

(m3)

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

3.31

4.50

4.50

4.50

4.50

4.50

4.50
TOTAL

(m3)
4.50

4.50

4.50

4.50

115.81
471.31
TOTAL

(m3)

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

4.50

1.19

68.69
540.00
TOTAL

(m3)

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 6.3.(6a)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Laston Lapis Antara (AC-BC)

No. LOKASI / STA VOLUME SAT KETERANGAN

Laston Lapis Antara (AC-BC)


1 Sta. 00+000 S/D 03+000 L/R Section - 01 1,862.19 Ton

TOTAL VOLUME 1,862.19 Ton

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
LEMBAR PERHITUNGAN
DIV. VI. PERKERASAN ASPAL
6.3.(6a) Laston Lapis Antara (AC-BC)
Peningkatan Struktur Jalan Provinsi Jurusan Tanjung Pura - Tanjung Selamat di Kab. Langkat

A BERAT CAMPURAN (HOTMIX) PER M3 (2.299 t = ### Ton


B ASPAL 5.70% x A = 106.14 Ton
C ADITIF 0.30% x B = 318.43 Kg
D FILLER 1.79% x A = ### Kg
E AC-BC A - (B+D) = 92.51% = ### Ton

L/S (KIRI) R/S (KANAN)


LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
00+000 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+025 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+050 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+075 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+100 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+125 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+150 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+175 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+200 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+225 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+250 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+275 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+300 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+325 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+350 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+375 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+400 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+425 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+450 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+475 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+500 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+525 2.25 2.25
Sub Total 525.00 1,181.25 1,181.25
Kumulatif 525.00 1,181.25 1,181.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
00+525 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+550 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+575 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+600 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+625 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+650 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+675 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+700 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+725 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+750 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+775 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+800 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+825 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+850 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+875 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+900 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+925 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+950 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
00+975 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+000 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+025 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+050 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+075 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+100 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+125 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+150 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+175 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+200 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+225 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+250 2.25 2.25
Sub Total 725.00 1,631.25 1,631.25
Kumulatif 1,250.00 2,812.50 2,812.50
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
01+250 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+275 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+300 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+325 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+350 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+375 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+400 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+425 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+450 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+475 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+500 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+525 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+550 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+575 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+600 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+625 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+650 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+675 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+700 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+725 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+750 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+775 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+800 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+825 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+850 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+875 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+900 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+925 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+950 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
01+975 2.25 2.25
Sub Total 725.00 1,631.25 1,631.25
Kumulatif 1,975.00 4,443.75 4,443.75
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
01+975 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+000 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+025 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+050 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+075 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+100 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+125 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+150 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+175 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+200 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+225 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+250 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+275 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+300 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+325 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+350 2.25 2.25
56.60 JEMBATAN
02+407 2.25 2.25
18.40 2.25 41.40 0.06 2.48 2.25 41.40 0.06 2.48
02+425 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+450 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+475 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+500 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+525 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+550 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+575 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+600 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+625 2.25 2.25
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+650 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+675 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+700 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+725 2.25 2.25
Sub Total 750.00 1,560.15 1,560.15
Kumulatif 2,725.00 6,003.90 6,003.90
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)
02+725 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+750 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+775 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+800 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+825 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+850 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+875 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+900 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+925 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+950 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
02+975 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
03+000 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
03+025 2.25 2.25
25.00 2.25 56.25 0.06 3.38 2.25 56.25 0.06 3.38
03+050 2.25 2.25
6.60 2.25 14.85 0.06 0.89 2.25 14.85 0.06 0.89
03+057 2.25 2.25

Sub Total 331.60 746.10 746.10


Kumulatif 3,056.60 6,750.00 6,750.00
L/S (KIRI) R/S (KANAN)
LOKASI / Panjang
CROSS Lebar Lebar
Lebar Luas Tebal VOL Lebar Luas Tebal VOL
SECTION rata-rata rata-rata
(m) (m) (m) (m2) (m) (m3) (m) (m) (m2) (m) (m3)

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA

JOKO SUNARTO ANSHORI NASUTION, ST SUAIMAM SIRINGORINGO, ST


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
MBAR PERHITUNGAN
V. VI. PERKERASAN ASPAL
a) Laston Lapis Antara (AC-BC)
vinsi Jurusan Tanjung Pura - Tanjung Selamat di Kab. Langkat

TOTAL

(m3)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75
TOTAL

(m3)
6.75

6.75

6.75

6.75

141.75
141.75
TOTAL

(m3)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75
TOTAL

(m3)
6.75

6.75

6.75

6.75

195.75
337.50
TOTAL

(m3)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75
TOTAL

(m3)
6.75

6.75

6.75

6.75

195.75
533.25
TOTAL

(m3)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

4.97

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75
TOTAL

(m3)
6.75

6.75

6.75

6.75

187.22
720.47
TOTAL

(m3)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

1.78

89.53
810.00
TOTAL

(m3)

PENYEDIA JASA

SUAIMAM SIRINGORINGO, ST
Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 6.3.(8)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Bahan Anti Pengelupasan

No. LOKASI / STA VOLUME SAT KETERANGAN

Laston Lapis Antara (AC-BC)


1 Sta. 00+000 S/D 03+000 L/R 318.43 Kg

Laston Lapis Aus (AC-WC)


1 Sta. 00+000 S/D 03+000 L/R 226.42 Kg

TOTAL VOLUME 544.86 Kg

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 7.1.(10)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Beton Mutu Rendah fc’= 10 Mpa

No. LOKASI / STA VOLUME SAT KETERANGAN

Beton Mutu Rendah fc’= 10 Mpa (Box Culvert)


1 Sta. 00+000 S/D 03+000 L/R 4.16 M3

Beton Mutu Rendah fc’= 10 Mpa (Lantai Mortar)


1 Sta. 00+000 S/D 01+321 L/S 9.36 M3
2 Sta. 00+000 S/D 01+321 R/S 15.86 M3

TOTAL VOLUME 29.38 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
7.1.(10) Beton Mutu Rendah fc’= 10 Mpa M3 4.16

TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA - STA / KM - KM (M') (M') (M2) (M') (M3)

1 00+200 - 00+209 9.00 1.30 11.70 0.10 1.17 R/S


2 00+250 - 00+254 4.00 1.30 5.20 0.10 0.52 L/S
3 01+280 - 01+281 1.30 10.00 13.00 0.10 1.30 L/R
4 71+000 - 71+001 1.30 9.00 11.70 0.10 1.17 L/R

TOTAL 4.16

0.15 1.00 0.15

0.15

1.00

11.00
10,00
0.15
0.10

Lantai Kerja = 10 cm (fc' = 15 Mpa)

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T
Nip. 19720723 200701 1 001 Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
7.1.(10) Beton Mutu Rendah fc’= 10 Mpa M3 9.36 L/S

TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA. - STA. (M') (M') (M2) (M') (M3)

1 00+189.0 - 00+250.0 61.00 0.40 24.40 0.05 1.22 L/S


2 00+254.0 - 00+661.0 407.00 0.40 162.80 0.05 8.14 L/S

TOTAL 468.00 9.36


KUMULATIF 468.00 9.36

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA. - STA. (M') (M') (M2) (M') (M3)

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT
DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN SUPERVISI : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

NO. MATA
URAIAN SATUAN VOLUME KET.
PEMBAYARAN
7.1.(10) Beton Mutu Rendah fc’= 10 Mpa M3 15.86 R/S

TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA. - STA. (M') (M') (M2) (M') (M3)

1 00+160.0 - 00+200.0 40.00 0.40 16.00 0.05 0.80 R/S


2 00+209.0 - 00+319.0 110.00 0.40 44.00 0.05 2.20 R/S
3 00+322.0 - 00+661.0 339.00 0.40 135.60 0.05 6.78 R/S
4 00+775.0 - 00+784.0 9.00 0.40 3.60 0.05 0.18 R/S
5 00+960.0 - 01+186.0 226.00 0.40 90.40 0.05 4.52 R/S
6 02+281.0 - 02+350.0 69.00 0.40 27.60 0.05 1.38 R/S

TOTAL 793.00 15.86


KUMULATIF 793.00 15.86

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA


TOTAL
SEGMEN PANJANG LEBAR AREA TEBAL
No. VOLUME KET.
STA. - STA. (M') (M') (M2) (M') (M3)

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 7.9.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Pasangan Batu

No. LOKASI / STA VOLUME SAT KETERANGAN

Pasangan Batu
1 Sta. 00+000 S/D 03+000 L/S 148.92 M3 Tembok Penahan
2 Sta. 00+000 S/D 03+000 R/S 171.92 M3 Tembok Penahan

TOTAL VOLUME 320.85 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 148.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

0+661 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90


4.4

0+665 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90

2+543 0.30 0.50 1.90 0.76 0.30 1.00 0.3 1.06


12.5

2+556 0.30 0.50 1.90 0.76 0.30 1.00 0.3 1.06

2+620 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82


88.5

2+709 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82

2+717 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90


REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 148.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3
25.0

2+742 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90

2+747 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94


11.6

2+759 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94

2+815 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94


3.7

2+819 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94

2+825 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94


9.5
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 148.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

2+835 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94

2+980 0.30 0.50 1.40 0.56 0.30 1.00 0.3 0.86


15.5

2+996 0.30 0.50 1.40 0.56 0.30 1.00 0.3 0.86

Total Volume
Total Volume Sampai dengan Lembar ini

PENYEDIA JASA KONSULTAN SUPERVISI PENGGUNA J


REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 148.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHAR


Nip. 19720723 200701 1 001 Inspector Quantity Engin
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

L/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3

3.96 L/S

13.25 L/S

72.57 L/S
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

L/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3
22.50 L/S

10.90 L/S

3.48 L/S

8.93 L/S
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

L/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3

13.33 L/S

148.92
148.92

PENGGUNA JASA
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

L/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3
M. IQBAL AZHARI, S.S.T
Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 171.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

0+661 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90


4.4

0+665 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90

1+439 0.30 0.50 1.00 0.40 0.30 1.00 0.3 0.70


12.0

1+451 0.30 0.50 1.00 0.40 0.30 1.00 0.3 0.70

2+546 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94


18.0

2+564 0.30 0.50 1.60 0.64 0.30 1.00 0.3 0.94

2+569 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82


REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 171.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3
91.0

2+660 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82

2+685 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82


4.0

2+689 0.30 0.50 1.30 0.52 0.30 1.00 0.3 0.82

2+708 0.30 0.50 1.40 0.56 0.30 1.00 0.3 0.86


56.0

2+764 0.30 0.50 1.40 0.56 0.30 1.00 0.3 0.86

2+769 0.30 0.50 1.00 0.40 0.30 1.00 0.3 0.70


9.8
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 171.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

2+779 0.30 0.50 1.00 0.40 0.30 1.00 0.3 0.70

2+912 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90


10.8

2+923 0.30 0.50 1.50 0.60 0.30 1.00 0.3 0.90

Total Volume
Total Volume Sampai dengan Lembar ini

PENYEDIA JASA KONSULTAN SUPERVISI PENGGUNA J


REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAM
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN ANGGARAN : 2017

LEMBAR PERHITUNGAN
KAJIAN TEKNIS LAPANGAN
NO. MATA
URAIAN Sat. KUANTITAS
PEMBAYARAN

7.9.(1) Pasangan Batu M3 171.92

SKETSA

PERHITUNGAN
Jarak Dimensi A Luas A Dimensi B Luas B Volume
Sta.
M` a b t ((a+b)/2)*t a b a+b M3

JOKO SUNARTO ANSHORI NASUTION, ST M. IQBAL AZHAR


Nip. 19720723 200701 1 001 Inspector Quantity Engin
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

R/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3

3.96 R/S

8.40 R/S

16.92 R/S
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

R/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3
74.62 R/S

3.28 R/S

48.16 R/S

6.86 R/S
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

R/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3

9.72 R/S

171.92
171.92

PENGGUNA JASA
AN PROVINSI JURUSAN TANJUNG PURA - TANJUNG SELAMAT DI KAB. LANGKAT

BAR PERHITUNGAN
N TEKNIS LAPANGAN

KETERANGAN

R/S

SKETSA

PERHITUNGAN

Volume
Ket.
Rata - rata M3

M. IQBAL AZHARI, S.S.T


Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 8.1.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Lapis Pondasi Agregat Kelas A untuk Pekerjaan Minor

No. LOKASI / STA VOLUME SAT KETERANGAN

Lapis Pondasi Agregat Kelas A untuk Pekerjaan Minor


1 Sta. 00+000 S/D 03+000 L/R 120.00 M3

TOTAL VOLUME 120.01 M3

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN KARYA SEMBILAN SATU

JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T


Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
SUMMARY
PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN DATA PENDUKUNG
TANJUNG PURA - TANJUNG PURA DI KAB. LANGKAT
NO. KONTRAK : 602/KPA.UPT-B/05/SP-K/2017
KAJIAN TEKNIS LAPANGAN
TANGGAL : 21 JULI 2017
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU ITEM 8.4.(1)
KONSULTAN : CV. PRIMA RANCANG KONSULTAN PEKERJAAN Marka Jalan Termoplastik

No. LOKASI / STA VOLUME SAT KETERANGAN

Marka Jalan Termoplastik


1 Sta. 00+000 S/D 00+396 L/R 201.10 M2

TOTAL VOLUME 201.10 M2

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
PENGAWAS LAPANGAN CV. PRIMA RANCANG KONSULTAN PT. BANGUN MITRA ABADI
JOKO SUNARTO SURIANTA TARIGAN, ST M. IQBAL AZHARI, S.S.T
Nip. 19720723 200701 1 001 Chief Inspector Quantity Engineer
REPUBLIK INDONESIA
PROVINSI SUMATERA UTARA
DINAS BINA MARGA DAN BINA KONSTRUKSI
UNIT PELAKSANA TEKNIS (UPT) BINJAI

PAKET : PENINGKATAN STRUKTUR JALAN PROVINSI JURUSAN TANJUNG PURA -


: TANJUNG SELAMAT DI KAB. LANGKAT
PENYEDIA JASA : PT. BANGUN KARYA SEMBILAN SATU
KONSULTAN : CV. PRIMA RANCANG KONSULTAN
TAHUN : 2017

No. Mata
URAIAN SATUAN VOLUME
Pembayaran

8.4.(1) Marka Jalan Termoplastik M2 201.10

SKETSA

Lay Out Pekerjaan

Perhitungan

3
Marka Module Tengah putus-putus : Lebar x Panjang x Koef. Pengali x Jumlah 4
= 0.12 x (3000 - 520) m x 3/8 x 1 sisi 5
= 112.60 M2 6

Marka Solid Jembatan & Tikungan : Lebar x Panjang x Jumlah 7


= 0.12 m x 520 m x 1 sisi 8
= 62.40 M2 9
Zebra Cross : 3 Lokasi Solid Tengah Zebra C
= 8 Modul Zebra / Lokasi = 24 Modul =
= 8 X 3 x 0.30 =
= 7.20 M2 =
=
Stop Line
= Lebar rata - rata jalan x lebar x jumlah
= 4.5 x 0.60 x 3
= 8.10 M2

TOTAL VOLUME = 201.10 M2

PENGGUNA JASA KONSULTAN SUPERVISI

JOKO SUNARTO ANSHORI NASUTION, ST


Nip. 19720723 200701 1 001 Inspector
Lembar Perhitungan
Kajian Teknis Lapangan

DIVISI :8

KETERANGAN

SKETSA

Lay Out Pekerjaan

Perhitungan

Sp. Bengkel
Pos Polisi
SD. Impres
Jl. Masjid Al Muktakin

Pos Polisi
SD. Impres
Jl. Masjid Al Muktakin
Solid Tengah Zebra Cross
3 Lokasi
Lebar x Panjang x Jumlah
0.12 m X 15 m X 6
10.80 M2

PENYEDIA JASA

M. IQBAL AZHARI, S.S.T


Quantity Engineer