Anda di halaman 1dari 3

PT.

BINTORAYA

DEPARTEMENT PEMBANTU
TENAGA LISTRIK
BOP DIANGGARKAN 79,999
PRODUKSI (UNIT)
JAM KERJA LANGSUNG
JUMLAH JAM PERAWATAN 1,500 JAM
JUMLAH KWH 800 KWH

ALOKASI BIAYA DEPARTEMENT TENAGA LISTRIK -> PEMAKAIAN LISTRIK (KWH)


ALOKASI BIAYA DEPARTEMENT PERAWATAN -> JAM PERAWATAN
TARIF BOP DEP. A = JKL
TARIF BOP DEP. B & DEP. C = UNIT PRODUKSI
BINTORAYA

EPARTEMENT PEMBANTU DEPARTEMEN PRODUKSI


PERAWATAN A B C
113,340 801,999 509,330 330,332
150,000 UNIT 200,000 UNIT 96,250 UNIT
425,000 JKL 57,000 JKL 36,000 JKL
300 JAM 1,500 JAM 5,000 JAM 2,000 JAM 10,000
4,000 KWH 5,600 KWH 4,800 KWH 5,600 KWH 20,000
15% 15% 50% 20%
20% 28% 24% 28%