LAPORAN PRESTASI PEKERJAAN PT.

LUNTO PRIMA MEGAH

PROYEK : RS DARURAT CORONA BATAM


NILAI KONTRAK : Rp 5,500,000,000
NO. KONTRAK :

JUMLAH HARGA BOBOT PERIODE YANG LALU PERIODE SAAT INI S/D SAAT INI
No URAIAN PEKERJAAN remarks
KONTRAK ( Rp ) PEKERJAAN (%) PRESTASI ( %) BOBOT ( % ) PRESTASI ( %) BOBOT ( % ) PRESTASI ( %) BOBOT ( % )

1 PERSIAPAN 345,000,000 0.0627 - 65% 0.0408 65% 0.0408

2 PEKERJAAN VAC 1,065,732,100 0.1938 - 65% 0.1260 65% 0.1260

3 PEKERJAAN PLUMBING & PEMADAM KEBAKARAN 645,184,600 0.1173 - 65% 0.0762 65% 0.0762

4 PEKERJAAN ELEKTRIKAL 3,137,611,700 0.5705 - 65% 0.3708 65% 0.3708

5 PEKERJAAN ELEKTRONIK 306,471,600 0.0557 - - -

JUMLAH TOTAL 5,500,000,000 1.0000 - 0.6138 0.6138

DISETUJUI OLEH : DIPERIKSA OLEH : DI BUAT OLEH :


PT. WIJAYA KARYA BANGUNAN GEDUNG, TBK PT. WIJAYA KARYA BANGUNAN GEDUNG, TBK PT. LUNTO PRIMA MEGAH

DONY ARDONO MOCH. FIRDAUS YOSSI AL HIBBAN FRANDY ISTIADI MARYATNO SUBUR ERIK. M. GIRSANG
PROJECT MANAGER DEPUTY PROJECT MANAGER COMMERCIAL PELAKSANA UTAMA PELAKSANA PELAKSANA DIREKTUR UTAMA
BILL OF QUANTITY
PEKERJAAN VAC
PROYEK RUMAH SAKIT PULAU GALANG - BATAM

Bobot Yang lal


No. Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga Prestasi
Pekerjaan
( %)

A PEKERJAAN VAC

LANTAI - DASAR

A AC SPLIT OU / IU
Type : Wall Mounted Unit 88 693,800 61,054,400 0.0111 0%
Kapasitas : 9.000 BTU/H
AC SPLIT OU / IU
Type : Wall Mounted Unit 1 693,800 693,800 0.0001 0%
Kapasitas : 4.500 BTU/H
AC SPLIT OU / IU
Type : Wall Mounted Unit 7 693,800 4,856,600 0.0009 0%
Kapasitas : 18.000 BTU/H
AC SPLIT OU / IU
Type : Wall Mounted Unit 1 693,800 693,800 0.0001 0%
Kapasitas : 12.000 BTU/H
B AC PORTABLE OU / IU
Type : FLOOR STANDING Unit 8 1,198,400 9,587,200 0.0017 0%
Kapasitas : 29.000 BTU/H
C Pengadaan, pemasangan dan pengetesan instalasi pipa refrigerant bahan
pipa tembaga + isolasi, termasuk bracket, gantungan, support
dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- Pipa diameter 3/8 X 1/4 inch m 870 208,200 181,134,000 0.0329 0%
- Pipa diameter 1/2 X 1/4 inch m 20 239,400 4,788,000 0.0009 0%
- Pipa diameter 3/8 X 5/8 inch m 64 333,200 21,324,800 0.0039 0%
D Pengadaan, pemasangan dan pengonekan kabel kontrol AC :
dari Indoor Unit ke Outdoor Unit
- NYM 3 X 2,5 mm m 990 28,000 27,720,000 0.0050 0%
- NYM 4 X 2,5 mm m 100 36,800 3,680,000 0.0007 0%
E Pengadaan, pemasangan dan pengetesan instalasi pipa drain ac, termasuk,
,gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- Pipa PVC Class AW diameter 3/4 inch m 1131 77,500 87,652,500 0.0159 0%
- Pipa PVC Class AW diameter 1 inch m 50 87,100 4,355,000 0.0008 0%
- Pipa PVC Class AW diameter 2 inch m 120 162,900 19,548,000 0.0036 0%
- Pipa PVC Class AW diameter 4 inch m 359 400,800 143,887,200 0.0262 0%

LANTAI 1

A AC SPLIT OU / IU
Type : Wall Mounted Unit 86 693,800 59,666,800 0.0108 0%
Kapasitas : 9.000 BTU/H
B AC PORTABLE OU / IU
Type : FLOOR STANDING Unit 8 1,198,400 9,587,200 0.0017 0%
Kapasitas : 29.000 BTU/H
C Pengadaan, pemasangan dan pengetesan instalasi pipa refrigerant bahan
pipa tembaga + isolasi, termasuk bracket, gantungan, support
dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- Pipa diameter 3/8 X 1/4 inch m 1290 208,200 268,578,000 0.0488 0%
- Pipa diameter 3/8 X 5/8 inch m 64 333,200 21,324,800 0.0039 0%
D Pengadaan, pemasangan dan pengonekan kabel kontrol AC :
dari Indoor Unit ke Outdoor Unit
- NYM 3 X 2,5 mm m 1390 28,000 38,920,000 0.0071 0%
- NYM 4 X 2,5 mm m 100 36,800 3,680,000 0.0007 0%
E Pengadaan, pemasangan dan pengetesan instalasi pipa drain ac, termasuk,
,gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- Pipa PVC Class AW diameter 3/4 inch m 1200 77,500 93,000,000 0.0169 0%

TOTAL 1,065,732,100 0.1938

Graha Pertamina - Jakarta 4.3 / 2 / R.1 M&E


Yang lalu Saat ini s/d saat ini

BOBOT Prestasi BOBOT Prestasi BOBOT Remarks


(%) ( %) (%) ( %) (%)

- 65% 0.0072 65% 0.0072 upah pasang

- 65% 0.0001 65% 0.0001 upah pasang

- 65% 0.0006 65% 0.0006 upah pasang

- 65% 0.0001 65% 0.0001 upah pasang

- 65% 0.0011 65% 0.0011 upah pasang

- 65% 0.0214 65% 0.0214


- 65% 0.0006 65% 0.0006
- 65% 0.0025 65% 0.0025

- 65% 0.0033 65% 0.0033


- 65% 0.0004 65% 0.0004

- 65% 0.0104 65% 0.0104


- 65% 0.0005 65% 0.0005
- 65% 0.0023 65% 0.0023
- 65% 0.0170 65% 0.0170

- 65% 0.0071 65% 0.0071 upah pasang

- 65% 0.0011 65% 0.0011 upah pasang

- 65% 0.0317 65% 0.0317


- 65% 0.0025 65% 0.0025

- 65% 0.0046 65% 0.0046


- 65% 0.0004 65% 0.0004

- 65% 0.0110 65% 0.0110

- 0.1260 0.1260

Graha Pertamina - Jakarta 4.3 / 3 / R.1 M&E


BILL OF QUANTITY
PEKERJAAN PLUMBING & PEMADAM KEBAKARAN
PROYEK RUMAH SAKIT PULAU GALANG - BATAM

Bobot
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Pekerjaan

A PEKERJAAN PLUMBING

LANTAI DASAR

1 INSTALASI AIR KOTOR DARI POMPA SEWAGE KE STP. 01


Sewage Pump.01 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 39 390,500 15,229,500 0.0028
Sewage Pump.02 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 59 390,500 23,039,500 0.0042
Sewage Pump.03 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 89 390,500 34,754,500 0.0063
STP.01 A unit 1 by other by other

2 INSTALASI AIR KOTOR DARI POMPA SEWAGE KE STP. 02


Sewage Pump.04 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 89 390,500 34,754,500 0.0063
Sewage Pump.05 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 59 390,500 23,039,500 0.0042
Sewage Pump.06 A & B unit 2 4,036,800 8,073,600 0.0015
Pipa Diameter 150 mm PIPA PVC CLASS AW m 39 390,500 15,229,500 0.0028
STP.01 B unit 1 by other by other

3 INSTALASI AIR KOTOR DARI TOILET AS 2-3 KE STP.01


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 20.00 198,000 3,960,000 0.0007

4 INSTALASI AIR KOTOR DARI TOILET AS 14-16 KE STP.01


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 22.00 198,000 4,356,000 0.0008

5 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.01 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

6 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.02 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

7 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.03 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

8 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.04 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

9 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.05 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

10 INSTALASI AIR KOTOR DARI TOILET KE POMPA SEWAGE.06 A & B


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 42.00 198,000 8,316,000 0.0015

11 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 1


- Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
- Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
- Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003

12 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 2


Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003

13 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 3


Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003

14 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 4


Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003

15 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 5


Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003

16 INSTALASI AIR BEKAS DARI TOILET KE BAK KONTROL 6


Pipa Diameter 100 mm PIPA PVC CLASS AW m 17.00 198,000 3,366,000 0.0006
Pipa Diameter 80 mm PIPA PVC CLASS AW m 6.00 133,400 800,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 27.00 65,300 1,763,100 0.0003
Bobot
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Pekerjaan

17 INSTALASI AIR BEKAS DARI TOILET AS 2-3 KE STP.01


Pipa Diameter 100 mm PIPA PVC CLASS AW m 14.00 198,000 2,772,000 0.0005
Pipa Diameter 40 mm PIPA PVC CLASS AW m 8.00 65,300 522,400 0.0001
Bobot
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Pekerjaan
18 INSTALASI AIR BEKAS DARI TOILET AS 14 -16 KE STP.02
Pipa Diameter 100 mm PIPA PVC CLASS AW m 14.00 198,000 2,772,000 0.0005
Pipa Diameter 50 mm PIPA PVC CLASS AW m 6.00 82,400 494,400 0.0001
Pipa Diameter 40 mm PIPA PVC CLASS AW m 8.00 65,300 522,400 0.0001

19 INSTALASI PIPA VENTILASI ALL TOILET


Pipa Diameter 40 mm PVC Class D m 15.00 56,300 844,500 0.0002
Pipa Diameter 32 mm PVC Class D m 97.00 50,000 4,850,000 0.0009

20 INSTALASI PIPA AIR BERSIH


Booster Pump.01 A & B unit 2 4,709,600 9,419,200 0.0017
Pipa Diameter 100 mm PPR PN 10 m 93 536,200 49,866,600 0.0091
Pipa Diameter 80 mm PPR PN 10 m 48 361,000 17,328,000 0.0032
Pipa Diameter 65 mm PPR PN 10 m 126 259,500 32,697,000 0.0059
Pipa Diameter 50 mm PPR PN 10 m 38 215,200 8,177,600 0.0015
Pipa Diameter 40 mm PPR PN 10 m 59 142,600 8,413,400 0.0015
Pipa Diameter 32 mm PPR PN 10 m 59 101,300 5,976,700 0.0011
Pipa Diameter 25 mm PPR PN 10 m 38 74,400 2,827,200 0.0005
Pipa Diameter 20 mm PPR PN 10 m 561 53,800 30,181,800 0.0055
Gate Valve Diameter 100 mm bh 2 7,332,000 14,664,000 0.0027
Gate Valve Diameter 65 mm bh 3 4,154,900 12,464,700 0.0023
Gate Valve Diameter 50 mm bh 24 853,600 20,486,400 0.0037
Gate Valve Diameter 40 mm bh 2 577,800 1,155,600 0.0002

LANTAI 1

1 INSTALASI PIPA AIR KOTOR MAIN LINE


Pipa Diameter 100 mm PVC Class AW m 174 198,000 34,452,000 0.0063

2 INSTALASI PIPA AIR BEKAS


Pipa Diameter 100 mm PVC Class AW m 78 198,000 15,444,000 0.0028
Pipa Diameter 40 mm PVC Class AW m 22 65,300 1,436,600 0.0003

3 INSTALASI PIPA VENT


Pipa Diameter 40 mm m 90 56,300 5,067,000 0.0009
Pipa Diameter 32 mm m 44 50,000 2,200,000 0.0004

4 INSTALASI PIPA AIR BERSIH


Pipa Diameter 50 mm m 48 215,200 10,329,600 0.0019
Pipa Diameter 40 mm m 0 142,600 -
Pipa Diameter 32 mm m 59 101,300 5,976,700 0.0011
Pipa Diameter 25 mm m 38 74,400 2,827,200 0.0005
Pipa Diameter 20 mm m 561 53,800 30,181,800 0.0055
Gate Valve Diameter 50 mm bh 24 853,600 20,486,400 0.0037

B PEKERJAAN PEMADAM KEBAKARAN

PEKERJAAN PEMASANGAN APAR


LANTAI DASAR
- PORTABLE FIRE EXTINGUISHER bh 17 58,900 1,001,300 0.0002
CAP, 3.5 KG, DRY POWDER TYPE

LANTAI 1
- PORTABLE FIRE EXTINGUISHER bh 12 58,900 706,800 0.0001
CAP, 3.5 KG, DRY POWDER TYPE

POWER HOUSE
- PORTABLE FIRE EXTINGUISHER bh 1 185,000 185,000 0.0000
CAP, 25 KG, CO2

- PORTABLE FIRE EXTINGUISHER bh 3 58,900 176,700 0.0000


CAP, 3.5 KG, DRY POWDER TYPE

TOTAL 645,184,600 0.1173


Yang lalu Saat ini s/d saat ini
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT Remarks
( %) (%) ( %) (%) ( %) (%)

0%
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0018 65% 0.0018
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0027 65% 0.0027
0% - 65% 0.0010 65% 0.0010
- 65% 0.0041 65% 0.0041

0%
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0041 65% 0.0041
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0027 65% 0.0027
0% - 65% 0.0010 65% 0.0010
- 65% 0.0018 65% 0.0018

0%
- 65% 0.0005 65% 0.0005

0%
- 65% 0.0005 65% 0.0005

0%
- 65% 0.0010 65% 0.0010

0%
- 65% 0.0010 65% 0.0010

0%
- 65% 0.0010 65% 0.0010

0%
- 65% 0.0010 65% 0.0010

0%
- 65% 0.0010 65% 0.0010

0%
- 65% 0.0010 65% 0.0010

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0004 65% 0.0004
0% - 65% 0.0001 65% 0.0001
- 65% 0.0002 65% 0.0002
Yang lalu Saat ini s/d saat ini
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT Remarks
( %) (%) ( %) (%) ( %) (%)

0%
0% - 65% 0.0003 65% 0.0003
- 65% 0.0001 65% 0.0001
Yang lalu Saat ini s/d saat ini
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT Remarks
( %) (%) ( %) (%) ( %) (%)
0%
0% - 65% 0.0003 65% 0.0003
0% - 65% 0.0001 65% 0.0001
- 65% 0.0001 65% 0.0001

0%
0% - 65% 0.0001 65% 0.0001
- 65% 0.0006 65% 0.0006

0%
0% - 65% 0.0011 65% 0.0011
0% - 65% 0.0059 65% 0.0059
0% - 65% 0.0020 65% 0.0020
0% - 65% 0.0039 65% 0.0039
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0010 65% 0.0010
0% - 65% 0.0007 65% 0.0007
0% - 65% 0.0003 65% 0.0003
0% - 65% 0.0036 65% 0.0036
0% - 65% 0.0017 65% 0.0017
0% - 65% 0.0015 65% 0.0015
0% - 65% 0.0024 65% 0.0024
- 65% 0.0001 65% 0.0001

0%
- 65% 0.0041 65% 0.0041

0%
0% - 65% 0.0018 65% 0.0018
- 65% 0.0002 65% 0.0002

0%
0% - 65% 0.0006 65% 0.0006
- 65% 0.0003 65% 0.0003

0%
- 65% 0.0012 65% 0.0012
0%
0% - 65% 0.0007 65% 0.0007
0% - 65% 0.0003 65% 0.0003
0% - 65% 0.0036 65% 0.0036
- 65% 0.0024 65% 0.0024

0%
- 65% 0.0001 65% 0.0001

0%
- 65% 0.0001 65% 0.0001

0%
- 65% 0.0000 65% 0.0000

0%
- 65% 0.0000 65% 0.0000

- 0.0762 0.0762
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK RUMAH SAKIT PULAU GALANG - BATAM

Bobot Yang lalu Saat ini s/d saat ini


No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT
Pekerjaan
( %) (%) ( %) (%) ( %) (%)

A PEKERJAAN ELEKTRIKAL

1 PEKERJAAN PANEL
- Gardu PLN Portable 1MVA unit 1 by other
- Genset 500 KVA, Silent Type unit 2 by WIKA
- Panel Kontrol Genset unit 1 10,092,100 10,092,100 0.0018 0% - 65% 0.0012 65% 0.0012
- Trafo 1.250 Kva unit 1 40,000,000 40,000,000 0.0073 0% - 65% 0.0047 65% 0.0047
- PUTM ( incoming,metering+arrester,outgoing) unit 1 17,500,000 17,500,000 0.0032 0% - 65% 0.0021 65% 0.0021
- PDTR-(Panel Distribusi Tegangan Rendah) unit 1 16,820,100 16,820,100 0.0031 0% - 65% 0.0020 65% 0.0020
- Kapasitor Bank 800 KVAR, 525 V,+DR unit 1 6,728,100 6,728,100 0.0012 0% - 65% 0.0008 65% 0.0008
- SDP-1 unit 1 4,036,800 4,036,800 0.0007 0% - 65% 0.0005 65% 0.0005
- PP.1A / LANTAI DASAR unit 1 6,055,200 6,055,200 0.0011 0% - 65% 0.0007 65% 0.0007
- PP.2A / LANTAI DASAR unit 1 6,055,200 6,055,200 0.0011 0% - 65% 0.0007 65% 0.0007
- PP.3A / LANTAI DASAR unit 1 6,728,100 6,728,100 0.0012 0% - 65% 0.0008 65% 0.0008
- SDP-2 unit 1 4,036,800 4,036,800 0.0007 0% - 65% 0.0005 65% 0.0005
- PP.1 / LANTAI DASAR unit 1 6,055,200 6,055,200 0.0011 0% - 65% 0.0007 65% 0.0007
- PP.2 / LANTAI DASAR unit 1 6,055,200 6,055,200 0.0011 0% - 65% 0.0007 65% 0.0007
- PP.3 / LANTAI DASAR unit 1 6,728,100 6,728,100 0.0012 0% - 65% 0.0008 65% 0.0008
- SDP-3 unit 1 5,382,400 5,382,400 0.0010 0% - 65% 0.0006 65% 0.0006
- SDP-UTILITY unit 1 5,382,400 5,382,400 0.0010 0% - 65% 0.0006 65% 0.0006

2 PEKERJAAN KABEL TRAY


-
LANTAI DASAR -
- Kabel Tray 200 x 100 mm + Cover m 6 529,800 3,178,800 0.0006 0% - 65% 0.0004 65% 0.0004
- Kabel Tray 200 x 100 mm m 30 351,500 10,545,000 0.0019 0% - 65% 0.0012 65% 0.0012
- Kabel Tray 300 x 100 mm m 226 446,100 100,818,600 0.0183 0% - 65% 0.0119 65% 0.0119
- Kabel Tray 500 x 100 mm m 4 609,400 2,437,600 0.0004 0% - 65% 0.0003 65% 0.0003
- Kabel Tray 500 x 100 mm + Cover m 56 988,900 55,378,400 0.0101 0% - 65% 0.0065 65% 0.0065

LANTAI 1
- Kabel Tray 300 x 100 mm m 162 446,100 72,268,200 0.0131 0% - 65% 0.0085 65% 0.0085
- Kabel Tray 500 x 100 mm m 2 609,400 1,218,800 0.0002 0% - 65% 0.0001 65% 0.0001
-
POWER HOUSE -
- Kabel Leader 700 x 100 mm (R.Power House) m 20 1,052,800 21,056,000 0.0038 0% - 65% 0.0025 65% 0.0025

3 PEKERJAAN KABEL FEEDER & INSTALASINYA


-
1. Kabel TR dari KWH PLN ke Trafo N2XSY 3x1Cx120mm2 (Prov) m 25 1,045,100 26,127,500 0.0048 0% - 65% 0.0031 65% 0.0031

2. Kabel TR Trafo ke Panel PDTR NYY 4(5x1Cx300)mm2 (Prov) m 25 10,899,400 272,485,000 0.0495 0% - 65% 0.0322 65% 0.0322

3. Kabel Genset dari Genset ke Panel PKG NYY 4(4x1Cx300)mm2 (Prov) m 25 8,719,600 217,990,000 0.0396 0% - 65% 0.0258 65% 0.0258

4. Kabel TR dari Panel PKG ke Panel PDTR NYY 4(5x1Cx300)mm2 (Prov) m 25 10,899,400 272,485,000 0.0495 0% - 65% 0.0322 65% 0.0322

5. Kabel TR dari Panel PDTR ke Cap. Bank NYY 3x2x1Cx185 mm2 (Prov) m 20 1,993,400 39,868,000 0.0072 0% - 65% 0.0047 65% 0.0047

6. Pentanahan
a. TRAFO BC 120 mm2 (Body Trafo) m 50 241,500 12,075,000 0.0022 0% - 65% 0.0014 65% 0.0014
NYY 120 mm2 (Netral Trafo) m 50 271,300 13,565,000 0.0025 0% - 65% 0.0016 65% 0.0016
Bobot Yang lalu Saat ini s/d saat ini
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT
Pekerjaan
( %) (%) ( %) (%) ( %) (%)

b. GENSET BC 70 mm2 (Body Genset) m 50 147,700 7,385,000 0.0013 0% - 65% 0.0009 65% 0.0009
NYY 120 mm2 (Netral Genset) m 50 271,300 13,565,000 0.0025 0% - 65% 0.0016 65% 0.0016

c. Panel PKG BC 120 mm2 m 50 241,500 12,075,000 0.0022 0% - 65% 0.0014 65% 0.0014

d. PD-TR/A BC 120 mm2 m 50 241,500 12,075,000 0.0022 0% - 65% 0.0014 65% 0.0014

e. Capacitor Bank. 800 Kva NYA 120 mm2 m 50 264,400 13,220,000 0.0024 0% - 65% 0.0016 65% 0.0016

f. Grounding system titik 6 8,750,000 52,500,000 0.0095 0% - 65% 0.0062 65% 0.0062
Control Box Grounding uk. 600 x 600 mm c/w dari pasangan bata, tutup beton,
lubang rembesan, klem, Cooper Rod dia. 25"

7. Kabel dari PD-TR/A Ke -


a. SDP-1 NYFGbY 2(4 x 240) mm2 +NYA 185 mm2 m 75 5,091,500 381,862,500 0.0694 0% - 65% 0.0451 65% 0.0451

b. SDP-2 NYFGbY 2(4 x 240) mm2 +NYA 185 mm2 m 100 5,091,500 509,150,000 0.0926 0% - 65% 0.0602 65% 0.0602

c. SDP-3 NYFGbY 4 x 95 mm2 + NYA 50mm2 m 125 1,088,800 136,100,000 0.0247 0% - 65% 0.0161 65% 0.0161

d. SDP-Utility NYFGbY 4 x 35 mm2 + NYA 16mm2 m 75 404,900 30,367,500 0.0055 0% - 65% 0.0036 65% 0.0036

8. Kabel dari SDP-1 Ke -


a. PP.1A / LANTAI DASAR NYFGbY 4 x 95 mm2 + NYA 50mm2 m 75 1,088,800 81,660,000 0.0148 0% - 65% 0.0097 65% 0.0097

b. PP.2B / LANTAI DASAR NYFGbY 4 x 95 mm2 + NYA 50mm2 m 50 1,088,800 54,440,000 0.0099 0% - 65% 0.0064 65% 0.0064

c. PP.3C / LANTAI DASAR NYY 4 x 95 mm2 + NYA 50mm2 m 10 1,003,400 10,034,000 0.0018 0% - 65% 0.0012 65% 0.0012

9. Kabel dari SDP-2 Ke -


a. PP.1 / LANTAI DASAR NYFGbY 4 x 95 mm2 + NYA 50mm2 m 75 1,088,800 81,660,000 0.0148 0% - 65% 0.0097 65% 0.0097

b. PP.2 / LANTAI DASAR NYFGbY 4 x 95 mm2 + NYA 50mm2 m 50 1,088,800 54,440,000 0.0099 0% - 65% 0.0064 65% 0.0064

c. PP.3 / LANTAI DASAR NYY 4 x 95 mm2 + NYA 50mm2 m 10 1,003,400 10,034,000 0.0018 0% - 65% 0.0012 65% 0.0012

10 Kabel dari SDP-3 :


- NYM 3C x 2,5 mm ke MCB Module m 1636 32,500 53,170,000 0.0097 0% - 65% 0.0063 65% 0.0063
- NYM 3C x 2,5 mm ke AC Lobby m 219 32,500 7,117,500 0.0013 0% - 65% 0.0008 65% 0.0008

11. Kabel dari SDP-Utility Ke -


a. PP-PUMP NYFGbY 4 x 6 mm2 + NYA 6mm2 m 100 154,200 15,420,000 0.0028 0% - 65% 0.0018 65% 0.0018
Booster Pump.01 A & B NYY 4 x 6 mm2 + NYA 6 mm2 m 100 87,300 8,730,000 0.0016 0% - 65% 0.0010 65% 0.0010
Sewage Pump.01 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008
Sewage Pump.02 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008
Sewage Pump.03 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008
Sewage Pump.04 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008
Sewage Pump.05 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008
Sewage Pump.06 A & B NYY 4 x 4 mm2 + NYA 4 mm2 m 100 64,400 6,440,000 0.0012 0% - 65% 0.0008 65% 0.0008

b. PP-STP 1 NYFGbY 4 x 4 mm2 + NYA 4mm2 m 100 123,000 12,300,000 0.0022 0% - 65% 0.0015 65% 0.0015

c. PP-STP 1 NYFGbY 4 x 4 mm2 + NYA 4mm2 m 150 123,000 18,450,000 0.0034 0% - 65% 0.0022 65% 0.0022

12. Kabel dari PP-1A :


- NYM 3C x 2,5 mm ke MCB Module m 550 32,500 17,875,000 0.0033 0% - 65% 0.0021 65% 0.0021
- NYM 3C x 2,5 mm ke AC Koridor m 25 32,500 812,500 0.0001 0% - 65% 0.0001 65% 0.0001
Bobot Yang lalu Saat ini s/d saat ini
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT
Pekerjaan
( %) (%) ( %) (%) ( %) (%)
13. Kabel dari PP-2A :
- NYM 3C x 2,5 mm ke MCB Module m 544 32,500 17,680,000 0.0032 0% - 65% 0.0021 65% 0.0021
- NYM 3C x 2,5 mm ke AC Koridor m 50 32,500 1,625,000 0.0003 0% - 65% 0.0002 65% 0.0002

14. Kabel dari PP-2A :


- NYM 3C x 2,5 mm ke MCB Module m 967 32,500 31,427,500 0.0057 0% - 65% 0.0037 65% 0.0037
- NYM 3C x 2,5 mm ke AC Koridor m 25 32,500 812,500 0.0001 0% - 65% 0.0001 65% 0.0001

15. Kabel dari PP-1 :


- NYM 3C x 2,5 mm ke MCB Module m 550 32,500 17,875,000 0.0033 0% - 65% 0.0021 65% 0.0021
- NYM 3C x 2,5 mm ke AC Koridor m 25 32,500 812,500 0.0001 0% - 65% 0.0001 65% 0.0001

16 Kabel dari PP-2 :


- NYM 3C x 2,5 mm ke MCB Module m 544 32,500 17,680,000 0.0032 0% - 65% 0.0021 65% 0.0021
- NYM 3C x 2,5 mm ke AC Koridor m 50 32,500 1,625,000 0.0003 0% - 65% 0.0002 65% 0.0002

17. Kabel dari PP-3 :


- NYM 3C x 2,5 mm ke MCB Module m 967 32,500 31,427,500 0.0057 0% - 65% 0.0037 65% 0.0037
- NYM 3C x 2,5 mm ke AC Koridor m 25 32,500 812,500 0.0001 0% - 65% 0.0001 65% 0.0001

4 PENANGKAL PETIR

- FLASH VECTRON™ , Type FV6 unit 1 18,741,000 18,741,000 0.0034 0% - 65% 0.0022 65% 0.0022
Lightning Protection Air Terminal
Early Streamer Emission (ESE)
No Power Supply or Solar Cells
No Radioactive, Discharge Current 300 kA
Protection Radius : 150 Meter

- Kabel Penghantar NYY 1 x 50 mm (Double Isolator) m 50 173,300 8,665,000 0.0016 0% - 65% 0.0010 65% 0.0010

- Grounding System lot 1 8,750,000 8,750,000 0.0016 0% - 65% 0.0010 65% 0.0010
Earth Resistant <3 Ohm.
Pipa GIP 3/4 + BC 50 mm
Bak Control 40 x 40 x 40cm, Connector Cable 50 mm
Bus Bar 30 x150 x 2,5 mm, Insulator

- Final Support / Tiang Penyangga lot 1 33,894,900 33,894,900 0.0062 0% - 65% 0.0040 65% 0.0040
Tiang Penyangga 20 Mtr
Pipa Galvanis (Anti Karat) 6”,5”,4”,3”,2”
Pondasi Beton (CakarAyam), Betonnizer 12 mm + 10 m

- Obstruction Lamp lot 1 7,190,600 7,190,600 0.0013 0% - 65% 0.0008 65% 0.0008
Similar 60 Watt ex. Phillips
Installation Cable (NYM Cable
Photo Cell Sensor

- Lightning Strike Counter lot 1 6,282,300 6,282,300 0.0011 0% - 65% 0.0007 65% 0.0007
No Battery Needed
Indicator Digital ( 0 – 99999 )
Box Panel 20 x 30 cm

- Material Bantu & Alat Bantu kerja lot 1 6,812,200 6,812,200 0.0012 0% - 65% 0.0008 65% 0.0008

- Biaya Instalasi + Commissioning Test Penangkal Petir lot 1 23,262,600 23,262,600 0.0042 0% - 65% 0.0027 65% 0.0027
Bobot Yang lalu Saat ini s/d saat ini
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga
Prestasi BOBOT Prestasi BOBOT Prestasi BOBOT
Pekerjaan
( %) (%) ( %) (%) ( %) (%)
TOTAL 3,137,611,700 0.5705 - 0.3708 0.3708
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK RUMAH SAKIT PULAU GALANG - BATAM

BOBOT Periode yang lalu periode saat ini s/d saat ini
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga Remarks
Prestasi BOBOT ( Prestasi BOBOT Prestasi BOBOT
PEKERJAAN
( %) %) ( %) (%) ( %) (%)

A PEKERJAAN FIRE ALARM

1 PERALATAN UTAMA FIRE ALARM


- MCP-FA kap. 1 Loop, Max. 150 Address module unit 1 3,250,000 3,250,000 0.0006 upah pasang
- MDF-FA unit 1 2,102,500 2,102,500 0.0004 upah pasang
- Annunciator unit 1 1,261,500 1,261,500 0.0002 upah pasang
- Printer unit 1 841,000 841,000 0.0002 upah pasang
- UPS 2 KVA, backup 30menit unit 1 841,000 Inclued upah pasang
- Rak peralatan termasuk Instalasi pengkabelan peralatan dan grounding System unit 1 3,250,000 3,250,000 0.0006 upah pasang
-
Kabel Dari MDF-FA
1 FRC 2 x 2,5 mm² Ke PUTR m 100 63,100 6,310,000 0.0011
2 FRC 2 x 2,5 mm² Ke Central sound system m 50 63,100 3,155,000 0.0006

Kabel Dari MDF-FA


Looping -
1 FRC Twisted Shielded AWG#18 2 Pair dari MDF-FA Ke TBFA LT.1A m 46 100,900 4,641,400 0.0008
2 FRC Twisted Shielded AWG#18 2 Pair dari TBFA LT. 1A Ke TBFA LT. 1B m 42 100,900 4,237,800 0.0008
3 FRC Twisted Shielded AWG#18 2 Pair dari TBFA LT. 1B Ke TBFA LT. 2A m 15 100,900 1,513,500 0.0003
4 FRC Twisted Shielded AWG#18 2 Pair dari TBFA LT. 2A Ke TBFA LT. 2B m 48 100,900 4,843,200 0.0009
5 FRC Twisted Shielded AWG#18 2 Pair dari TBFA LT. 2B Ke MDF-FA m 52 100,900 5,246,800 0.0010

Lantai Dasar -
1 TBFA LT.1A Lengkap dengan module Unit 1 1,250,000 1,250,000 0.0002 upah pasang
2 TBFA LT.1B Lengkap dengan module Bh 1 1,250,000 1,250,000 0.0002 upah pasang
3 Conventional Smoke Detector (Photoelectric Type) Bh 69 84,100 5,802,900 0.0011 upah pasang
4 Conventional Rate Of Rise Temp. Heat Detector Bh 31 84,100 2,607,100 0.0005 upah pasang
5 Manual Push Button Bh 6 84,100 504,600 0.0001 upah pasang
6 Alarm Bell Bh 6 84,100 504,600 0.0001 upah pasang
7 Indicator Lamp Bh 6 84,100 504,600 0.0001 upah pasang
8 End Of Line Bh 8 159,800 1,278,400 0.0002
-
NYA 2 x 1,5 mm2 + PVC HI Conduit 20 mm untuk : -
1 Conventional Smoke Detector (Photoelectric Type) Ttk 69 302,800 20,893,200 0.0038
2 Conventional Rate Of Rise Temp. Heat Detector Ttk 31 302,800 9,386,800 0.0017

FRC 2 x 1,5 mm2 untuk :


1 Manual Push Button Ttk 6 1,825,000 10,950,000 0.0020
2 Alarm Bell Ttk 6 1,825,000 10,950,000 0.0020
3 Indicator Lamp Ttk 6 1,825,000 10,950,000 0.0020

Lantai 1
1 TBFA LT.2A Lengkap dengan module Unit 1 1,250,000 1,250,000 0.0002 upah pasang
2 TBFA LT.2B Lengkap dengan module Bh 1 1,250,000 1,250,000 0.0002 upah pasang
3 Conventional Smoke Detector (Photoelectric Type) Bh 40 84,100 3,364,000 0.0006 upah pasang
4 Conventional Rate Of Rise Temp. Heat Detector Bh 26 84,100 2,186,600 0.0004 upah pasang
5 Manual Push Button Bh 4 84,100 336,400 0.0001 upah pasang
6 Alarm Bell Bh 4 84,100 336,400 0.0001 upah pasang
7 Indicator Lamp Bh 4 84,100 336,400 0.0001 upah pasang
8 End Of Line Bh 5 159,800 799,000 0.0001

Page 14
BOBOT Periode yang lalu periode saat ini s/d saat ini
No Uraian Pekerjaan Satuan Vol Harga Satuan Jumlah Harga Remarks
Prestasi BOBOT ( Prestasi BOBOT Prestasi BOBOT
PEKERJAAN
( %) %) ( %) (%) ( %) (%)
NYA 2 x 1,5 mm2 + PVC HI Conduit 20 mm untuk : -
1 Conventional Smoke Detector (Photoelectric Type) Ttk 40 302,800 12,112,000 0.0022
2 Conventional Rate Of Rise Temp. Heat Detector Ttk 26 302,800 7,872,800 0.0014

FRC 2 x 1,5 mm2 untuk : -


1 Manual Push Button Ttk 4 1,825,000 7,300,000 0.0013
2 Alarm Bell Ttk 4 1,825,000 7,300,000 0.0013
3 Indicator Lamp Ttk 4 1,825,000 7,300,000 0.0013

B PEKERJAAN FIRE TATA SUARA

Ruang Kontrol
1 MDF-SS Unit 1 1,261,500 1,261,500 0.0002 upah pasang
2 Speaker Selector 4 Channel Unit 1 1,682,000 1,682,000 0.0003 upah pasang
3 Emergency Microphone Unit 1 1,682,000 1,682,000 0.0003 upah pasang
4 Power Amplifier 480 W Unit 2 1,682,000 3,364,000 0.0006 upah pasang
5 Mixer Pre-Amplifier Unit 1 1,682,000 1,682,000 0.0003 upah pasang
6 Sound Repeater Unit 1 1,682,000 1,682,000 0.0003 upah pasang
7 Remote Microphone Unit 1 1,682,000 1,682,000 0.0003 upah pasang
8 AM / FM Radio Tunner 2 Nos + Pemutar CD/MP3 NOS (3 Disk) + USB Unit 1 1,682,000 1,682,000 0.0003 upah pasang
9 Rak peralatan termasuk Instalasi pengkabelan peralatan dan System Grounding ls 1 5,887,000 5,887,000 0.0011 upah pasang
10 UPS 2kVA, back up 30menit Unit 1 1,682,000 1,682,000 0.0003 upah pasang

Kabel FRC 4(1 x 2.5mm2) dlm pipa conduit dia. 20 mm dari :


1 MDF-TS ke TBTS-1 m 21 116,100 2,438,100 0.0004
2 MDF-TS ke TBTS-2A m 44 116,100 5,108,400 0.0009
3 MDF-TS ke TBTS-2B m 27 116,100 3,134,700 0.0006

Lantai Dasar
1 TB-SS 1 Unit 1 2,500,000 2,500,000 0.0005
2 Ceiling speaker 6 Watt + Box Speaker Unit 91 84,100 7,653,100 0.0014 upah pasang
3 Volume Control Unit 38 67,300 2,557,400 0.0005 upah pasang
Instalasi
4 NYMHY 2 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk speaker Ttk 91 313,900 28,564,900 0.0052
5 NYMHY 3 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Volume Control Ttk 38 560,100 21,283,800 0.0039

Lantai 1
1 TB-SS 2A Unit 1 2,500,000 2,500,000 0.0005
2 TB-SS 2B Unit 1 2,500,000 2,500,000 0.0005
3 Ceiling speaker 6 Watt + Box Speaker Unit 56 84,100 4,709,600 0.0009 upah pasang
4 Volume Control Unit 28 67,300 1,884,400 0.0003 upah pasang
Instalasi
5 NYMHY 2 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk speaker Ttk 46 313,900 14,439,400 0.0026
6 NYMHY 3 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Volume Control Ttk 28 560,100 15,682,800 0.0029

C PEKERJAAN TELEPHONE Opsional Opsional

D PEKERJAAN CCTV Opsional Opsional

SUB TOTAL 306,471,600 0.0557 - - - - - -