Anda di halaman 1dari 22

PEKERJAAN : PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP

KONTRAKTOR PELAKSANA : CV. CITRA KEMBAR


KONSULTAN PENGAWAS : CV. H&N CONS. SERTIFIKAT : Juli
JANGKA WAKTU PELAKSANAAN : 45 Hari Kalender ( 21 Juli s/d 3 September 2017) TANGGAL : 31 Juli 2017

REKAPITULASI

KONTRAK PROSENTASE PEMBAYARAN ( % )


NILAI PEKERJAAN YANG DIBAYAR
NO URAIAN NILAI BOBOT S/D BULAN BULAN S/D BULAN
( Rp ) ( Rp ) LALU INI INI RUPIAH

A PEKERJAAN TOWER AIR 74,925,096.76 46.42% 0.00% 46.42% 46.42% 74,925,096.76

B PEKERJAAN SUMUR BOR 73,518,426.47 45.54% 0.00% 6.16% 6.16% 9,948,263.20

C PEKERJAAN PENGADAAN PIPA DISTRIBUSI 12,977,000.00 8.04% 0.00% 0.00% 0.00% -

JUMLAH 161,420,523.24 84,873,359.96


PPN 10 % 16,142,052.32 8,487,336.00
100% 0.00% 52.58% 52.58%
TOTAL JUMLAH 177,562,575.56 93,360,695.96
DIBULATKAN 177,562,000.00 93,361,000.00
1 Nilai Bruto Dari Sertifikat Ini 52.58% X 177,562,000.00 93,360,393.34
2 Pengurangan :
A. Pengembalian Uang Muka
Nilai Uang Muka 0.00% 2.00% X - -
B. Nilai Pekerjaan Pada Sertifikat Yang Lalu
C. Lain -lain
3 Nilai Pekerjaan Yang Disyahkan Untuk Dibayar Pada Sertifikat Ini 93,360,393.34
4 Dibulatkan 93,360,000.00

Terbilang : Err:511

Diketahui Oleh : Diketahui Oleh : Diperiksa : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
(PPK) CV. H&N CONS. CV. CITRA KEMBAR
( PPTK )

MUCHAROM,SIP AHMAD AFANDI, SKM,MM HIKMATULLAH, ST FIRTIURLIN, SE


NIP. 19610210 198208 1 001 NIP. 19750326 199603 1 002 Supervisi Engineer Direktur
- Pipa Saringan. 10.00 Mtr 61,932.75 619,327.50 0.38% - - Mtr 0.00%
Jenis Pipa
Class
Opening Area
Out Dia
In Dia
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% - - Smr 0.00%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12.00 Jam 68,745.11 824,941.29 0.51% - - Jam 0.00%
68,438,426.47 42.40% - 4.92%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% - - Ls 0.00%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% - - Unit 0.00%
3,080,000.00 1.91% - 0.00%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% - - Ls 0.00%
180,000.00 0.11% - 0.00%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% - - Unit 0.00%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% - - Btg 0.00%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% - - Btg 0.00%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% - - Bh 0.00%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% - - Bh 0.00%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% - - Bh 0.00%
12,070,000.00 7.48% - 0.00%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% - - Ls 0.00%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% - - Ls 0.00%
727,000.00 0.45% - 0.00%
JUMLAH 161,420,523.24 76,925,096.76
PPN 10% 16,142,052.32 7,692,509.68
100% 52.58%
TOTAL JUMLAH 177,562,575.56 84,617,606.44
DIBULATKAN 177,562,000.00 84,617,000.00

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
( PPTK ) CV. H&N CONS. CV. CITRA KEMBAR

AHMAD AFANDI, SKM,MM HIKMATULLAH, ST FIRTIURLIN, SE


NIP. 19750326 199603 1 002 Supervisi Engineer Direktur
PEKERJAAN
KONSULTAN PENGAWAS
PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
PEMERINTAH KABUPATEN INDRAGIRI HILIR
LAPORAN BULANAN CV. H&N CONS.
DINAS PARIWISATA, KEPEMUDAAN DAN Nomor Kontrak : 800/DPKOK-SAPRAS/SPK/VII/2017/032
OLAHRAGA DAN KEBUDAYAAN Nilai Kontrak : Rp. 177,562.000,-
KONTRAKTOR PELAKSANA
Jl. BAHARUDIN YUSUP NO. 10 Jangka Waktu Pelaksanaan : 45 Hari Kalender ( 21 Juli s/d 3 September 2017)
TELP. (0768) 22234 TEMBILAHAN
TANGGAL S/D TANGGAL
BULAN KE : I ( SATU )
21 Juli 2017 31 Juli 2017
CV. CITRA KEMBAR

VOLUME HARGA JUMLAH REALISASI


NO URAIAN PEKERJAAN SATUAN HARGA BOBOT CCO / ADD REALISASI
KONTRAK Rp Rp HARGA VOLUME BOBOT (%)
1 2 3 4 5 6 7 8 9 10
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% 850,000.00 1.00 Ls 0.53%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% 1,293,109.98 28.00 M1 0.80%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% 245,000.00 1.00 Ls 0.15%
2,388,109.98 1.48% 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% 111,820.80 3.33 M3 0.07%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% 5,068,217.97 728.00 M1 3.14%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% 124,501.10 0.51 M3 0.08%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% 591,288.73 0.51 M3 0.37%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% 1,458,057.16 1.28 M3 0.90%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% 1,802,073.39 128.16 Kg 1.12%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% 475,734.09 3.20 M2 0.29%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% 1,139,107.16 1.00 M3 0.71%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% 400,460.75 28.48 Kg 0.25%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% 266,973.84 18.99 Kg 0.17%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% 1,968,751.79 6.80 M2 1.22%
13,406,986.78 8.31% 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% 55,800,000.00 2.00 Bh 34.57%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% 2,800,000.00 1.00 Bh 1.73%
58,600,000.00 36.30% 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% 530,000.00 1.00 Ls 0.33%
530,000.00 0.33% 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% 2,000,000.00 1.00 Ls 1.24%
2,000,000.00 1.24% 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 50.00 Mtr 158,965.26 7,948,263.20 4.92% 7,948,263.20 50.00 Mtr 4.92%
- Dari Titik 50.00 Mtr 203,292.07 10,164,603.70 6.30% - - Mtr 0.00%
- Dari Titik 50.00 Mtr 263,368.88 13,168,444.20 8.16% - - Mtr 0.00%
- Dari Titik 30.00 Mtr 283,368.88 8,501,066.52 5.27% - - Mtr 0.00%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90.00 Mtr 251,972.55 22,677,529.29 14.05% - - Mtr 0.00%
Jenis Pipa
Class
Out Dia
In Dia
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% - - Mtr 0.00%
Jenis Pipa
Class
Out Dia
In Dia
- Pipa Saringan. 10 Mtr 61,932.75 619,327.50 0.38% - - - 0% 0% 0%
Jenis Pipa PVC.
Class AW
Opening Area 30%.
Out Dia 63mm
In Dia 50 mm.
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% - - - 0% 0% 0%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12 Jam 68,745.11 824,941.29 0.51% - - - 0% 0% 0%
Sub Total 68,438,426.47 42.40%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% - - - 0% 0% 0%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% - - - 0% 0% 0%
Sub Total 3,080,000.00 1.91%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% - - - 0% 0% 0%
Sub Total 180,000.00 0.11%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% - - - 0% 0% 0%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% - - - 0% 0% 0%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% - - - 0% 0% 0%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% - - - 0% 0% 0%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% - - - 0% 0% 0%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% - - - 0% 0% 0%
Sub Total 12,070,000.00 7.48%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% - - - 0% 0% 0%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% - - - 0% 0% 0%
Sub Total 727,000.00 0.45%
JUMLAH 161,420,523.24 BOBOT S/D MINGGU INI
PPN 10% 16,142,052.32 BOBOT MINGGU INI
100%
TOTAL JUMLAH 177,562,575.56 BOBOT MINGGU LALU
DIBULATKAN 177,562,000.00

Diperiksa Oleh : Dibuat Oleh :


KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. H&N CONS. CV. CITRA KEMBAR

EKA SARWEDI JUNAIDI


Inspector Pelaksana Lapangan
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
9.79%
9.79%
0.00%
PEMERINTAH KABUPATEN INDRAGIRI HILIR PEKERJAAN KONSULTAN PENGAWAS

DINAS PARIWISATA, KEPEMUDAAN DAN PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
LAPORAN MINGGUAN
CV. H&N CONS.
OLAHRAGA DAN KEBUDAYAAN TANGGAL S/D TANGGAL
KONTRAKTOR PELAKSANA
Jl. MINGGU KE : I (SATU)
BAHARUDIN YUSUP NO. 10 TELP. (0768) 22234 TEMBILAHAN 21 Juli 2017 28 Juli 2017
CV. CITRA KEMBAR

PROSENTASE TERHADAP
KONTRAK ASLI REALISASI VOLUME
BAGIAN PEKERJAAN (%)
NO URAIAN PEKERJAAN VOLUME KONTRAK
HARGA SATUAN JUMLAH HARGA MINGGU S/D MINGGU MINGGU S/D MINGGU
BOBOT % MINGGU INI MINGGU INI
(Rp) (Rp) LALU INI LALU INI

1 2 3 4 5 6 7 8 9 10 11 12
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% 1.00 - 1.00 100% 0% 100%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% 28.00 - 28.00 100% 0% 100%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% 1.00 - 1.00 100% 0% 100%
Sub Total 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% 3.33 - 3.33 100% 0% 100%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% 728.00 - 728.00 100% 0% 100%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% 0.51 - 0.51 100% 0% 100%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% 0.51 - 0.51 100% 0% 100%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% 1.28 - 1.28 100% 0% 100%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% 128.16 - 128.16 100% 0% 100%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% 3.20 - 3.20 100% 0% 100%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% 1.00 - 1.00 100% 0% 100%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% 28.48 - 28.48 100% 0% 100%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% 18.99 - 18.99 100% 0% 100%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% 6.80 - 6.80 100% 0% 100%
Sub Total 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% - - - 0% 0% 0%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% - - - 0% 0% 0%
Sub Total 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% - - - 0% 0% 0%
Sub Total 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% - - - 0% 0% 0%
Sub Total 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr 158,965.26 7,948,263.20 4.92% - - - 0% 0% 0%
- Dari Titik 50 mtr - 100 mtr. 50.00 Mtr 203,292.07 10,164,603.70 6.30% - - - 0% 0% 0%
- Dari Titik 100 mtr - 150 mtr 50.00 Mtr 263,368.88 13,168,444.20 8.16% - - - 0% 0% 0%
- Dari Titik 150 mtr - 180 mtr 30.00 Mtr 283,368.88 8,501,066.52 5.27% - - - 0% 0% 0%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90 Mtr 251,972.55 22,677,529.29 14.05% - - - 0% 0% 0%
Jenis Pipa PVC.
Class AW
Out Dia 110 mm
In Dia 100 mm
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% - - - 0% 0% 0%
Jenis Pipa PVC
Class AW.
Out Dia 63mm
In Dia 50 mm.
AN PENGAWAS

H&N CONS.

TOR PELAKSANA

TRA KEMBAR

REALISASI BOBOT
(%) S/D MINGGU INI

13

0.53%
0.80%
0.15%
1.48%

0.07%
3.14%
0.08%
0.37%

0.90%
1.12%
0.29%

0.71%
0.25%
0.17%
1.22%
8.31%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
- Pipa Saringan. 10 Mtr 61,932.75 619,327.50 0.38% - - - 0% 0% 0%
Jenis Pipa PVC.
Class AW
Opening Area 30%.
Out Dia 63mm
In Dia 50 mm.
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% - - - 0% 0% 0%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12 Jam 68,745.11 824,941.29 0.51% - - - 0% 0% 0%
Sub Total 68,438,426.47 42.40%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% - - - 0% 0% 0%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% - - - 0% 0% 0%
Sub Total 3,080,000.00 1.91%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% - - - 0% 0% 0%
Sub Total 180,000.00 0.11%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% - - - 0% 0% 0%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% - - - 0% 0% 0%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% - - - 0% 0% 0%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% - - - 0% 0% 0%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% - - - 0% 0% 0%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% - - - 0% 0% 0%
Sub Total 12,070,000.00 7.48%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% - - - 0% 0% 0%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% - - - 0% 0% 0%
Sub Total 727,000.00 0.45%
JUMLAH 161,420,523.24 BOBOT S/D MINGGU INI
PPN 10% 16,142,052.32 BOBOT MINGGU INI
100%
TOTAL JUMLAH 177,562,575.56 BOBOT MINGGU LALU
DIBULATKAN 177,562,000.00

Diperiksa Oleh : Dibuat Oleh :


KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. H&N CONS. CV. CITRA KEMBAR

EKA SARWEDI JUNAIDI


Inspector Pelaksana Lapangan
0.00%

0.00%
0.00%
4.92%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
52.58%
42.79%
9.79%
PEMERINTAH KABUPATEN INDRAGIRI HILIR PEKERJAAN KONSULTAN PENGAWAS

DINAS PARIWISATA, KEPEMUDAAN DAN PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
LAPORAN MINGGUAN
CV. H&N CONS.
OLAHRAGA DAN KEBUDAYAAN TANGGAL S/D TANGGAL
KONTRAKTOR PELAKSANA
Jl. MINGGU KE : II (DUA)
BAHARUDIN YUSUP NO. 10 TELP. (0768) 22234 TEMBILAHAN 29 Juli 2017 31 Juli 2017
CV. CITRA KEMBAR

PROSENTASE TERHADAP
KONTRAK ASLI REALISASI VOLUME
BAGIAN PEKERJAAN (%)
NO URAIAN PEKERJAAN VOLUME KONTRAK
HARGA SATUAN JUMLAH HARGA MINGGU S/D MINGGU MINGGU S/D MINGGU
BOBOT % MINGGU INI MINGGU INI
(Rp) (Rp) LALU INI LALU INI

1 2 3 4 5 6 7 8 9 10 11 12
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% - 1.00 1.00 0% 100% 100%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% - 28.00 28.00 0% 100% 100%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% - 1.00 1.00 0% 100% 100%
Sub Total 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% - 3.33 3.33 0% 100% 100%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% - 728.00 728.00 0% 100% 100%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% - 0.51 0.51 0% 100% 100%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% - 0.51 0.51 0% 100% 100%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% - 1.28 1.28 0% 100% 100%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% - 128.16 128.16 0% 100% 100%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% - 3.20 3.20 0% 100% 100%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% - 1.00 1.00 0% 100% 100%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% - 28.48 28.48 0% 100% 100%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% - 18.99 18.99 0% 100% 100%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% - 6.80 6.80 0% 100% 100%
Sub Total 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% 2.00 - 2.00 100% 0% 100%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% 1.00 - 1.00 100% 0% 100%
Sub Total 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% 1.00 - 1.00 100% 0% 100%
Sub Total 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% 1.00 - 1.00 100% 0% 100%
Sub Total 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr 158,965.26 7,948,263.20 4.92% 50.00 - 50.00 100% 0% 100%
- Dari Titik 50 mtr - 100 mtr. 50.00 Mtr 203,292.07 10,164,603.70 6.30% - - - 0% 0% 0%
- Dari Titik 100 mtr - 150 mtr 50.00 Mtr 263,368.88 13,168,444.20 8.16% - - - 0% 0% 0%
- Dari Titik 150 mtr - 180 mtr 30.00 Mtr 283,368.88 8,501,066.52 5.27% - - - 0% 0% 0%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90 Mtr 251,972.55 22,677,529.29 14.05% - - - 0% 0% 0%
Jenis Pipa PVC.
Class AW
Out Dia 110 mm
In Dia 100 mm
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% - - - 0% 0% 0%
Jenis Pipa PVC
Class AW.
Out Dia 63mm
In Dia 50 mm.
AN PENGAWAS

H&N CONS.

TOR PELAKSANA

TRA KEMBAR

REALISASI BOBOT
(%) S/D MINGGU INI

13

0.53%
0.80%
0.15%
1.48%

0.07%
3.14%
0.08%
0.37%

0.90%
1.12%
0.29%

0.71%
0.25%
0.17%
1.22%
8.31%

34.57%
1.73%
36.30%

0.33%
0.33%

1.24%
1.24%

4.92%
0.00%
0.00%
0.00%

0.00%

0.00%
PEKERJAAN : PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
KONTRAKTOR PELAKSANA : CV. CITRA KEMBAR
KONSULTAN PENGAWAS : CV. H&N CONS. SERTIFIKAT : Agustus
JANGKA WAKTU PELAKSANAAN : 45 Hari Kalender ( 21 Juli s/d 3 September 2017) TANGGAL : 09 Agustus 2017

REKAPITULASI

KONTRAK PROSENTASE PEMBAYARAN ( % )


NILAI PEKERJAAN YANG DIBAYAR
NO URAIAN NILAI BOBOT S/D BULAN BULAN S/D BULAN
( Rp ) ( Rp ) LALU INI INI RUPIAH

A PEKERJAAN TOWER AIR 74,925,096.76 46.42% 46.42% 0.00% 46.42% 74,925,096.76

B PEKERJAAN SUMUR BOR 73,518,426.47 45.54% 6.16% 39.38% 45.54% 73,518,426.47

C PEKERJAAN PENGADAAN PIPA DISTRIBUSI 12,977,000.00 8.04% 0.00% 8.04% 8.04% 12,977,000.00

JUMLAH 161,420,523.24 161,420,523.24


PPN 10 % 16,142,052.32 16,142,052.32
100% 52.58% 47.42% 100.00%
TOTAL JUMLAH 177,562,575.56 177,562,575.56
DIBULATKAN 177,562,000.00 177,563,000.00
1 Nilai Bruto Dari Sertifikat Ini 100.00% X 177,562,000.00 177,562,000.00
2 Pengurangan :
A. Pengembalian Uang Muka
Nilai Uang Muka 0.00% 0.00% X - -
B. Nilai Pekerjaan Pada Sertifikat Yang Lalu
C. Lain -lain
3 Nilai Pekerjaan Yang Disyahkan Untuk Dibayar Pada Sertifikat Ini 177,562,000.00
4 Dibulatkan 177,562,000.00

Terbilang : Err:511

Diketahui Oleh : Diketahui Oleh : Diperiksa : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
(PPK) CV. H&N CONS. CV. CITRA KEMBAR
( PPTK )

MUCHAROM,SIP AHMAD AFANDI, SKM,MM HIKMATULLAH, ST FIRTIURLIN, SE


NIP. 19610210 198208 1 001 NIP. 19750326 199603 1 002 Supervisi Engineer Direktur
- Pipa Saringan. 10.00 Mtr 61,932.75 619,327.50 0.38% 619,327.50 10.00 Mtr 0.38%
Jenis Pipa
Class
Opening Area
Out Dia
In Dia
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% 2,056,940.80 1.00 Smr 1.27%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12.00 Jam 68,745.11 824,941.29 0.51% 824,941.29 12.00 Jam 0.51%
68,438,426.47 42.40% 68,438,426.47 42.40%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% 600,000.00 1.00 Ls 0.37%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% 2,480,000.00 1.00 Unit 1.54%
3,080,000.00 1.91% 3,080,000.00 1.91%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% 180,000.00 1.00 Ls 0.11%
180,000.00 0.11% 180,000.00 0.11%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% 10,380,000.00 6.00 Unit 6.43%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% 1,500,000.00 50.00 Btg 0.93%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% 70,000.00 2.00 Btg 0.04%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% 60,000.00 6.00 Bh 0.04%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% 40,000.00 4.00 Bh 0.02%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% 20,000.00 2.00 Bh 0.01%
12,070,000.00 7.48% 12,070,000.00 7.48%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% 477,000.00 1.00 Ls 0.30%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% 250,000.00 1.00 Ls 0.15%
727,000.00 0.45% 727,000.00 0.45%
JUMLAH 161,420,523.24 161,420,523.24
PPN 10% 16,142,052.32 16,142,052.32
100% 100.00%
TOTAL JUMLAH 177,562,575.56 177,562,575.56
DIBULATKAN 177,562,000.00 177,562,000.00

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
( PPTK ) CV. H&N CONS. CV. CITRA KEMBAR

AHMAD AFANDI, SKM,MM HIKMATULLAH, ST FIRTIURLIN, SE


NIP. 19750326 199603 1 002 Supervisi Engineer Direktur
PEKERJAAN
KONSULTAN PENGAWAS
PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
PEMERINTAH KABUPATEN INDRAGIRI HILIR
LAPORAN BULANAN CV. H&N CONS.
DINAS PARIWISATA, KEPEMUDAAN DAN Nomor Kontrak : 800/DPKOK-SAPRAS/SPK/VII/2017/032
OLAHRAGA DAN KEBUDAYAAN Nilai Kontrak : Rp. 177,562.000,-
KONTRAKTOR PELAKSANA
Jl. BAHARUDIN YUSUP NO. 10 Jangka Waktu Pelaksanaan : 45 Hari Kalender ( 21 Juli s/d 3 September 2017)
TELP. (0768) 22234 TEMBILAHAN
TANGGAL S/D TANGGAL
BULAN KE : II ( DUA )
01 Agustus 2017 09 Agustus 2017
CV. CITRA KEMBAR

VOLUME HARGA JUMLAH REALISASI


NO URAIAN PEKERJAAN SATUAN HARGA BOBOT CCO / ADD REALISASI
KONTRAK Rp Rp HARGA VOLUME BOBOT (%)
1 2 3 4 5 6 7 8 9 10
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% 850,000.00 1.00 Ls 0.53%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% 1,293,109.98 28.00 M1 0.80%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% 245,000.00 1.00 Ls 0.15%
2,388,109.98 1.48% 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% 111,820.80 3.33 M3 0.07%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% 5,068,217.97 728.00 M1 3.14%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% 124,501.10 0.51 M3 0.08%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% 591,288.73 0.51 M3 0.37%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% 1,458,057.16 1.28 M3 0.90%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% 1,802,073.39 128.16 Kg 1.12%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% 475,734.09 3.20 M2 0.29%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% 1,139,107.16 1.00 M3 0.71%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% 400,460.75 28.48 Kg 0.25%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% 266,973.84 18.99 Kg 0.17%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% 1,968,751.79 6.80 M2 1.22%
13,406,986.78 8.31% 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% 55,800,000.00 2.00 Bh 34.57%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% 2,800,000.00 1.00 Bh 1.73%
58,600,000.00 36.30% 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% 530,000.00 1.00 Ls 0.33%
530,000.00 0.33% 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% 2,000,000.00 1.00 Ls 1.24%
2,000,000.00 1.24% 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 50.00 Mtr 158,965.26 7,948,263.20 4.92% 7,948,263.20 50.00 Mtr 4.92%
- Dari Titik 50.00 Mtr 203,292.07 10,164,603.70 6.30% 10,164,603.70 50.00 Mtr 6.30%
- Dari Titik 50.00 Mtr 263,368.88 13,168,444.20 8.16% 13,168,444.20 50.00 Mtr 8.16%
- Dari Titik 30.00 Mtr 283,368.88 8,501,066.52 5.27% 8,501,066.52 30.00 Mtr 5.27%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90.00 Mtr 251,972.55 22,677,529.29 14.05% 22,677,529.29 90.00 Mtr 14.05%
Jenis Pipa
Class
Out Dia
In Dia
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% 2,477,309.98 40.00 Mtr 1.53%
Jenis Pipa
Class
Out Dia
In Dia
- Pipa Saringan. 10 Mtr 61,932.75 619,327.50 0.38% 10.00 - 10.00 100% 0% 100%
Jenis Pipa PVC.
Class AW
Opening Area 30%.
Out Dia 63mm
In Dia 50 mm.
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% 1.00 - 1.00 100% 0% 100%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12 Jam 68,745.11 824,941.29 0.51% 12.00 - 12.00 100% 0% 100%
Sub Total 68,438,426.47 42.40%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% 1.00 - 1.00 100% 0% 100%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% 1.00 - 1.00 100% 0% 100%
Sub Total 3,080,000.00 1.91%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% - - - 0% 0% 0%
Sub Total 180,000.00 0.11%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% - - - 0% 0% 0%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% - - - 0% 0% 0%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% - - - 0% 0% 0%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% - - - 0% 0% 0%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% - - - 0% 0% 0%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% - - - 0% 0% 0%
Sub Total 12,070,000.00 7.48%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% - - - 0% 0% 0%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% - - - 0% 0% 0%
Sub Total 727,000.00 0.45%
JUMLAH 161,420,523.24 BOBOT S/D MINGGU INI
PPN 10% 16,142,052.32 BOBOT MINGGU INI
100%
TOTAL JUMLAH 177,562,575.56 BOBOT MINGGU LALU
DIBULATKAN 177,562,000.00

Diperiksa Oleh : Dibuat Oleh :


KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. H&N CONS. CV. CITRA KEMBAR

EKA SARWEDI JUNAIDI


Inspector Pelaksana Lapangan
0.38%

1.27%
0.51%
42.40%

0.37%
1.54%
1.91%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
91.96%
39.38%
52.58%
PEMERINTAH KABUPATEN INDRAGIRI HILIR PEKERJAAN KONSULTAN PENGAWAS

DINAS PARIWISATA, KEPEMUDAAN DAN PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
LAPORAN MINGGUAN
CV. H&N CONS.
OLAHRAGA DAN KEBUDAYAAN TANGGAL S/D TANGGAL
KONTRAKTOR PELAKSANA
Jl. MINGGU KE : I (SATU)
BAHARUDIN YUSUP NO. 10 TELP. (0768) 22234 TEMBILAHAN 01 Agustus 2017 06 Agustus 2017
CV. CITRA KEMBAR

PROSENTASE TERHADAP
KONTRAK ASLI REALISASI VOLUME
BAGIAN PEKERJAAN (%)
NO URAIAN PEKERJAAN VOLUME KONTRAK
HARGA SATUAN JUMLAH HARGA MINGGU S/D MINGGU MINGGU S/D MINGGU
BOBOT % MINGGU INI MINGGU INI
(Rp) (Rp) LALU INI LALU INI

1 2 3 4 5 6 7 8 9 10 11 12
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% - 1.00 1.00 0% 100% 100%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% - 28.00 28.00 0% 100% 100%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% - 1.00 1.00 0% 100% 100%
Sub Total 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% - 3.33 3.33 0% 100% 100%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% - 728.00 728.00 0% 100% 100%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% - 0.51 0.51 0% 100% 100%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% - 0.51 0.51 0% 100% 100%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% - 1.28 1.28 0% 100% 100%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% - 128.16 128.16 0% 100% 100%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% - 3.20 3.20 0% 100% 100%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% - 1.00 1.00 0% 100% 100%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% - 28.48 28.48 0% 100% 100%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% - 18.99 18.99 0% 100% 100%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% - 6.80 6.80 0% 100% 100%
Sub Total 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% - 2.00 2.00 0% 100% 100%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% - 1.00 1.00 0% 100% 100%
Sub Total 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% - 1.00 1.00 0% 100% 100%
Sub Total 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% - 1.00 1.00 0% 100% 100%
Sub Total 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr 158,965.26 7,948,263.20 4.92% - 50.00 50.00 0% 100% 100%
- Dari Titik 50 mtr - 100 mtr. 50.00 Mtr 203,292.07 10,164,603.70 6.30% 50.00 - 50.00 100% 0% 100%
- Dari Titik 100 mtr - 150 mtr 50.00 Mtr 263,368.88 13,168,444.20 8.16% 50.00 - 50.00 100% 0% 100%
- Dari Titik 150 mtr - 180 mtr 30.00 Mtr 283,368.88 8,501,066.52 5.27% 30.00 - 30.00 100% 0% 100%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90 Mtr 251,972.55 22,677,529.29 14.05% 90.00 - 90.00 100% 0% 100%
Jenis Pipa PVC.
Class AW
Out Dia 110 mm
In Dia 100 mm
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% 40.00 - 40.00 100% 0% 100%
Jenis Pipa PVC
Class AW.
Out Dia 63mm
In Dia 50 mm.
AN PENGAWAS

H&N CONS.

TOR PELAKSANA

TRA KEMBAR

REALISASI BOBOT
(%) S/D MINGGU INI

13

0.53%
0.80%
0.15%
1.48%

0.07%
3.14%
0.08%
0.37%

0.90%
1.12%
0.29%

0.71%
0.25%
0.17%
1.22%
8.31%

34.57%
1.73%
36.30%

0.33%
0.33%

1.24%
1.24%

4.92%
6.30%
8.16%
5.27%

14.05%

1.53%
- Pipa Saringan. 10 Mtr 61,932.75 619,327.50 0.38% - 10.00 10.00 0% 100% 100%
Jenis Pipa PVC.
Class AW
Opening Area 30%.
Out Dia 63mm
In Dia 50 mm.
3 Pembersihan Sumur Secara Water Jetting (Development ) 1.00 Smr 2,056,940.80 2,056,940.80 1.27% - 1.00 1.00 0% 100% 100%
4 Penujian Sumur Termasuk Recovery (Pumping Test) 12 Jam 68,745.11 824,941.29 0.51% - 12.00 12.00 0% 100% 100%
Sub Total 68,438,426.47 42.40%
III PEKERJAAN LAIN-LAIN
1 Pekerjaan Finishing 1.00 Ls 600,000.00 600,000.00 0.37% - 1.00 1.00 0% 100% 100%
2 Pengad. & Pemas.Mesin Pompa 1.00 Unit 2,480,000.00 2,480,000.00 1.54% - 1.00 1.00 0% 100% 100%
Sub Total 3,080,000.00 1.91%
C PEKERJAAN PENGADAAN PIPA DISTRIBUSI
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi Jalur Pipa 1.00 Ls 180,000.00 180,000.00 0.11% 1.00 - 1.00 100% 0% 100%
Sub Total 180,000.00 0.11%
II PEKERJAAN PENGADAAN
1 Tangki Plastik Kapasitas 500 Liter 6.00 Unit 1,730,000.00 10,380,000.00 6.43% 6.00 - 6.00 100% 0% 100%
2 Pipa PVC dia 1/2" 50.00 Btg 30,000.00 1,500,000.00 0.93% 50.00 - 50.00 100% 0% 100%
3 Pipa PVC dia 3/4 " 2.00 Btg 35,000.00 70,000.00 0.04% 2.00 - 2.00 100% 0% 100%
4 Stop Krant PVC dia 1/2" 6.00 Bh 10,000.00 60,000.00 0.04% 6.00 - 6.00 100% 0% 100%
5 Elbo Socket 1/2" 4.00 Bh 10,000.00 40,000.00 0.02% 4.00 - 4.00 100% 0% 100%
6 Elbo 3/4" 2.00 Bh 10,000.00 20,000.00 0.01% 2.00 - 2.00 100% 0% 100%
Sub Total 12,070,000.00 7.48%
III PEKERJAAN PEMASANGAN
1 Pemasangan Pipa + Acesories Pipa 1.00 Ls 477,000.00 477,000.00 0.30% 1.00 - 1.00 100% 0% 100%
2 Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00 0.15% 1.00 - 1.00 100% 0% 100%
Sub Total 727,000.00 0.45%
JUMLAH 161,420,523.24 BOBOT S/D MINGGU INI
PPN 10% 16,142,052.32 BOBOT MINGGU INI
100%
TOTAL JUMLAH 177,562,575.56 BOBOT MINGGU LALU
DIBULATKAN 177,562,000.00

Diperiksa Oleh : Dibuat Oleh :


KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
CV. H&N CONS. CV. CITRA KEMBAR

EKA SARWEDI JUNAIDI


Inspector Pelaksana Lapangan
0.38%

1.27%
0.51%
42.40%

0.37%
1.54%
1.91%

0.11%
0.11%

6.43%
0.93%
0.04%
0.04%
0.02%
0.01%
7.48%

0.30%
0.15%
0.45%
100.00%
8.04%
91.96%
PEMERINTAH KABUPATEN INDRAGIRI HILIR PEKERJAAN KONSULTAN PENGAWAS

DINAS PARIWISATA, KEPEMUDAAN DAN PEMBUATAN SUMUR BOR DI KAWASAN EKOWISATA PANTAI SOLOP
LAPORAN MINGGUAN
CV. H&N CONS.
OLAHRAGA DAN KEBUDAYAAN TANGGAL S/D TANGGAL
KONTRAKTOR PELAKSANA
Jl. MINGGU KE : II (DUA)
BAHARUDIN YUSUP NO. 10 TELP. (0768) 22234 TEMBILAHAN 07 Agustus 2017 09 Agustus 2017
CV. CITRA KEMBAR

PROSENTASE TERHADAP
KONTRAK ASLI REALISASI VOLUME
BAGIAN PEKERJAAN (%)
NO URAIAN PEKERJAAN VOLUME KONTRAK
HARGA SATUAN JUMLAH HARGA MINGGU S/D MINGGU MINGGU S/D MINGGU
BOBOT % MINGGU INI MINGGU INI
(Rp) (Rp) LALU INI LALU INI

1 2 3 4 5 6 7 8 9 10 11 12
A PEKERJAAN TOWER AIR
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 Ls 850,000.00 850,000.00 0.53% - 1.00 1.00 0% 100% 100%
2 Pek. Pengukuran/ Pas. Bowplank 28.00 M1 46,182.50 1,293,109.98 0.80% - 28.00 28.00 0% 100% 100%
3 Pek. Papan Nama Kegiatan 1.00 Ls 245,000.00 245,000.00 0.15% - 1.00 1.00 0% 100% 100%
Sub Total 2,388,109.98 1.48%
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3.33 M3 33,600.00 111,820.80 0.07% - 3.33 3.33 0% 100% 100%
2 Pek. Pemasangan Cerucuk Bakau Ø 10-12 Panjang 7 728.00 M1 6,961.84 5,068,217.97 3.14% - 728.00 728.00 0% 100% 100%
2 Pek. Pasir Urug Bawah Pondasi 0.51 M3 243,166.21 124,501.10 0.08% - 0.51 0.51 0% 100% 100%
3 Pek. Cor Lantai Kerja Camp 1:3:5 T. 10 Cm 0.51 M3 1,154,860.80 591,288.73 0.37% - 0.51 0.51 0% 100% 100%
4 Pek. Tapak Pondasi
- Beton Campuran 1:2:3 1.28 M3 1,139,107.16 1,458,057.16 0.90% - 1.28 1.28 0% 100% 100%
- Besi Beton Polos Ø 12 mm 128.16 Kg 14,061.12 1,802,073.39 1.12% - 128.16 128.16 0% 100% 100%
- Bekisting 3.20 M2 148,666.90 475,734.09 0.29% - 3.20 3.20 0% 100% 100%
5 Pek. Umpak
- Beton Campuran 1:2:3 1.00 M3 1,139,107.16 1,139,107.16 0.71% - 1.00 1.00 0% 100% 100%
- Besi Beton Polos Ø 10 mm 28.48 Kg 14,061.12 400,460.75 0.25% - 28.48 28.48 0% 100% 100%
- Besi Beton Polos Ø 8 mm 18.99 Kg 14,061.12 266,973.84 0.17% - 18.99 18.99 0% 100% 100%
- Bekisting 6.80 M2 289,522.32 1,968,751.79 1.22% - 6.80 6.80 0% 100% 100%
Sub Total 13,406,986.78 8.31%
III PEKERJAAN RANGKA TOWER AIR
1 Pembuatan Rangka Tower Air+Atap+Pemasangan dan Pengecatan 2.00 Bh 27,900,000.00 55,800,000.00 34.57% - 2.00 2.00 0% 100% 100%
2 Pembuatan Pembuatan Rumah Mesin 1.00 Bh 2,800,000.00 2,800,000.00 1.73% - 1.00 1.00 0% 100% 100%
Sub Total 58,600,000.00 36.30%
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 530,000.00 530,000.00 0.33% - 1.00 1.00 0% 100% 100%
Sub Total 530,000.00 0.33%
B PEKERJAAN SUMUR BOR
I PEKERJAAN PENDAHULUAN
1 Mobilisasi & Demobilisasi Peralatan Bor 1.00 Ls 2,000,000.00 2,000,000.00 1.24% - 1.00 1.00 0% 100% 100%
Sub Total 2,000,000.00 1.24%
II PEKERJAAN SUMUR BOR
1 Pembuatan Pilot Hole Maximum 150 mm,termasuk pengadaan Bentonit,
Air Pelaksanaan Simplefield Permability Test dll.
- Dari Titik 0 mtr - 50 mtr. 50.00 Mtr 158,965.26 7,948,263.20 4.92% - 50.00 50.00 0% 100% 100%
- Dari Titik 50 mtr - 100 mtr. 50.00 Mtr 203,292.07 10,164,603.70 6.30% - 50.00 50.00 0% 100% 100%
- Dari Titik 100 mtr - 150 mtr 50.00 Mtr 263,368.88 13,168,444.20 8.16% - 50.00 50.00 0% 100% 100%
- Dari Titik 150 mtr - 180 mtr 30.00 Mtr 283,368.88 8,501,066.52 5.27% - 30.00 30.00 0% 100% 100%
2 Pengadaan dan Pemasangan Pipa & Saringan (Screen)
- Pipa Jambang / Pump House Chasing. 90 Mtr 251,972.55 22,677,529.29 14.05% - 90.00 90.00 0% 100% 100%
Jenis Pipa PVC.
Class AW
Out Dia 110 mm
In Dia 100 mm
- Pipa Naik. 40.00 Mtr 61,932.75 2,477,309.98 1.53% - 40.00 40.00 0% 100% 100%
Jenis Pipa PVC
Class AW.
Out Dia 63mm
In Dia 50 mm.
AN PENGAWAS

H&N CONS.

TOR PELAKSANA

TRA KEMBAR

REALISASI BOBOT
(%) S/D MINGGU INI

13

0.53%
0.80%
0.15%
1.48%

0.07%
3.14%
0.08%
0.37%

0.90%
1.12%
0.29%

0.71%
0.25%
0.17%
1.22%
8.31%

34.57%
1.73%
36.30%

0.33%
0.33%

1.24%
1.24%

4.92%
6.30%
8.16%
5.27%

14.05%

1.53%

Anda mungkin juga menyukai