SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 10,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 08-Sep-22
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 1 (SATU): SEPTEMBER
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK PERSENTASE SAMPAI SAAT INI


NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I
(Rp) JUMLAH HARGA BOBOT
(Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 155.372.954,17 0,628
I.B. PEKERJAAN
UNIT SISTEM
SMKK
PRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 51.840.261,08 0,209
II PEKERJAAN
PENYELENGGARAAN
STRUKTURSMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 1.181.646.489,73 4,775
III PEKERJAAN
UJI FUNGSIARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 414.860.618,57 1,676
IV PEKERJAAN
PEMASANGANMEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 180.000.000,00 0,727
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 490.849.676,45 1,984
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 2.474.570.000,00 10,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 272.202.700,00
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 2.746.772.700,00
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 2.746.772.700 10,0%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) - -
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 1.373.386.350
G PENGEMBALIAN UANG MUKA (C% x B) 412.015.905
H JUMLAH POTONGAN (F + G) 1.785.402.255
I JUMLAH SERTIFIKAT BULAN INI (E - H) 961.370.445
J PPN (11%) x 1 (11% X I) 95.270.945
K PPH FINAL (E - G) x 2,65% 22.951.637
L PEMBAYARAN LANGSUNG (I - J) - K 843.147.863
DIBULATKAN 843.147.863
TERBILANG : Delapan Ratus Empat Puluh Tiga Juta Seratus Empat Puluh Tujuh Ribu Delapan Ratus Enam Puluh Tiga Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST OKIE RIANTO, ST HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 15,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 10-Oct-22
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 2 (DUA): OKTOBER
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK PERSENTASE SAMPAI SAAT INI


NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I
(Rp) JUMLAH HARGA BOBOT
(Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 167.185.052,67 0,676
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 55.149.636,08 0,223
II PEKERJAAN
PENYELENGGARAAN
STRUKTURSMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 2.248.722.929,84 9,087
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 482.000.601,76 1,948
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 262.910.000,00 1,062
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 495.784.508,22 2,00
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 3.711.752.728,57 15,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 408.292.800,14
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 4.120.045.528,72
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 4.120.159.050 15,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 2.746.772.700 10,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 1.373.386.350
F RETENSI/JAMINAN (5% x A) 206.007.953
G PENGEMBALIAN UANG MUKA (C% x B) 175.106.760
H JUMLAH POTONGAN (F + G) 381.114.712
I JUMLAH SERTIFIKAT BULAN INI (E - H) 992.271.638
J PPN (11%) x 1 (11% X I) 98.333.225
K PPH FINAL (E - G) x 2,65% 23.689.368
L PEMBAYARAN LANGSUNG (I - J) - K 870.249.045
DIBULATKAN 870.249.045
TERBILANG : Satu Miliyar Dua Puluh Tiga Juta Delapan Ratus Dua Puluh Dua Ribu Empat Ratus Lima Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST OKIE RIANTO, ST HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 25,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 16-Nov-22
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 3 (TIGA): NOVEMBER
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI


NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 157.539.702,67 0,637
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 61.034.436,08 0,247
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 4.209.703.461,52 17,012
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 743.396.782,49 3,004
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 291.300.000,00 1,177
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 723.673.286,47 2,92
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 6.186.647.669,23 25,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 680.531.243,62
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 6.867.178.912,85
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 6.866.931.750 25,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 4.120.159.050 15,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 343.346.588
G PENGEMBALIAN UANG MUKA (C% x B) 360.513.917
H JUMLAH POTONGAN (F + G) 703.860.504
I JUMLAH SERTIFIKAT BULAN INI (E - H) 2.042.912.196
J PPN (11%) x 1 (11% X I) 202.450.758
K PPH FINAL (E - G) x 2,65% 48.772.228
L PEMBAYARAN LANGSUNG SERTIFIKAT BULANAN : (I - J) - K 1.791.689.209
DIBULATKAN 1.791.689.209
TERBILANG : Satu Milyar Tujuh Ratus Sembilan Puluh Satu Juta Enam Ratus Delapan Puluh Sembilan Ribu Dua Ratus Sembilan Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST OKIE RIANTO, ST HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 35,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 14-Dec-22
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 4 (EMPAT): DESEMBER
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI


NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 172.640.052,67 0,698
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 61.873.811,08 0,250
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 6.260.701.045,03 25,300
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 824.556.907,20 3,332
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 541.494.893,75 2,188
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 799.882.342,84 3,23
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 8.661.149.052,57 35,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 952.726.395,78
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 9.613.875.448,35
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 9.613.704.450 35,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 6.866.931.750 25,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 480.685.223
G PENGEMBALIAN UANG MUKA (C% x B) 339.913.122
H JUMLAH POTONGAN (F + G) 820.598.344
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.926.174.356
J PPN (11%) x 1 (11% X I) 190.882.143
K PPH FINAL (E - G) x 2,65% 45.985.244
L #REF! (I - J) - K 1.689.306.969
DIBULATKAN 1.689.306.969
TERBILANG : Satu Milyar Enam Ratus Delapan Puluh Sembilan Juta Tiga Ratus Enam Ribu Sembilan Ratus Enam Puluh Sembilan Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST OKIE RIANTO, ST HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 45,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 01-Feb-23
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 5 (LIMA): FEBRUARI
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI


NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 176.344.321,32 0,713
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 66.173.811,08 0,267
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 7.710.675.435,64 31,160
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 1.165.866.252,94 4,711
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 1.185.606.672,31 4,791
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 831.478.160,10 3,36
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 11.136.144.653,40 45,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 1.224.975.911,87
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 12.361.120.565,27
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 12.360.477.150 45,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 9.613.704.450 35,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 618.023.858
G PENGEMBALIAN UANG MUKA (C% x B) 319.312.326
H JUMLAH POTONGAN (F + G) 937.336.184
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.809.436.516
J PPN (11%) x 1 (11% X I) 179.313.529
K PPH FINAL (E - G) x 2,65% 43.198.259
L #REF! (I - J) - K 1.586.924.728
DIBULATKAN 1.586.924.728
TERBILANG : Satu Milyar Lima Ratus Delapan Puluh Enam Juta Sembilan Ratus Dua Puluh Empat Ribu Tujuh Ratus Dua Puluh Delapan Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST OKIE RIANTO, ST HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 50,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 15-Feb-23
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 6 (ENAM): FEBRUARI
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. ADDENDUM III : HK.02.03/ADD-III/PPK.PS/174
TANGGAL ADDENDUM III : 15 FEBRUARI 2023
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 176.344.321,32 0,713
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 66.173.811,08 0,267
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.350.770.250,04 33,746
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 1.363.562.605,35 5,510
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 1.547.756.520,62 6,255
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 867.651.412,94 3,51
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 12.372.258.921,35 50,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 1.360.948.481,35
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 13.733.207.402,70
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 13.733.863.500 50,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 12.360.477.150 45,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 1.373.386.350
F RETENSI/JAMINAN (5% x A) 686.693.175
G PENGEMBALIAN UANG MUKA (C% x B) 103.003.976
H JUMLAH POTONGAN (F + G) 789.697.151
I JUMLAH SERTIFIKAT BULAN INI (E - H) 583.689.199
J PPN (11%) x 1 (11% X I) 57.843.074
K PPH FINAL (E - G) x 2,65% 13.934.922
L PEMBAYARAN LANGSUNG (I - J) - K 511.911.203
DIBULATKAN 511.911.203
TERBILANG : Lima Ratus Sebelas Juta Sembilan Ratus Sebelas Ribu Dua Ratus Tiga Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST Ir. HARNADI HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 60,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 12-Apr-23
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 6 (ENAM): APRIL
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. ADDENDUM III : HK.02.03/ADD-III/PPK.PS/174
TANGGAL ADDENDUM III : 15 FEBRUARI 2023
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 179.817.611,14 0,727
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 71.037.561,07 0,287
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.777.726.127,69 35,472
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 2.099.383.807,82 8,484
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 2.664.059.730,38 10,766
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 1.055.174.583,65 4,26
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 14.847.199.421,76 60,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 1.633.191.936,39
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 16.480.391.358,16
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 16.480.636.200 60,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 13.733.863.500 50,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 824.031.810
G PENGEMBALIAN UANG MUKA (C% x B) 288.411.134
H JUMLAH POTONGAN (F + G) 1.112.442.944
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.634.329.757
J PPN (11%) x 1 (11% X I) 161.960.607
K PPH FINAL (E - G) x 2,65% 39.017.782
L PEMBAYARAN LANGSUNG (I - J) - K 1.433.351.368
DIBULATKAN 1.433.351.368
TERBILANG : Satu Milyar Empat Ratus Tiga Puluh Tiga Juta Tiga Ratus Lima Puluh Satu Ribu Tiga Ratus Enam Puluh Delapan Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST Ir. HARNADI HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG
SERTIFIKAT PEMBAYARAN BULANAN

NO. KONTRAK : HK.02.03/SPK/PPK.PS/583 PRESENTASE YANG DICAPAI : 60,000%


TANGGAL KONTRAK : 14 Juli 2022 SERTIFIKAT BULANAN : MC ( MONTHLY CERTIFIKATE)
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% TANGGAL : 24-May-23
NO. ADDENDUM I : HK.02.03/ASDD-1/PPK.PS/785 PERIODE MC 8 (DELAPAN): MEI
TANGGAL ADDENDUM I : 07 SEPTEMBER 2022 KONTRAKTOR: PT. TIGA JAYA KENCANA
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11% KONSULTAN MANAJEMEN KONSTRUKSI: PT. MANGGALAKARYA BANGUN SARANA
NO. ADDENDUM II : HK.02.03/ADD-II/PPK.PS/1006
TANGGAL ADDENDUM II : 08 NOVEMBER 2022
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. ADDENDUM III : HK.02.03/ADD-III/PPK.PS/174
TANGGAL ADDENDUM III : 15 FEBRUARI 2023
NILAI KONTRAK : Rp 27.467.727.000 Include Ppn 11%
NO. ADDENDUM III : HK.02.03/ADD-IV/PPK.PS/358
TANGGAL ADDENDUM III : 28 APRIL 2023
NILAI KONTRAK : Rp 30.132.097.000 Include Ppn 11%
NO. SPMK : HK.02.03/SPK/PPK.PS/584

TANGGAL SPMK : 14 Juli 2022

NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III ADDENDUM - IV
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 179.817.611,17 179.817.611,14 0,727
I.B. PEKERJAAN
UNIT SISTEM
SMKK PRODUKSI
KONSTRUKSIDAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 80.480.061,08 71.037.561,07 0,287
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.987.625.342,22 8.777.726.127,69 35,472
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 5.506.904.361,46 2.099.383.807,82 8,484
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 10.118.466.267,81 2.664.059.730,38 10,766
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 2.272.739.249,94 1.055.174.583,65 4,26
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 27.146.032.893,69 14.847.199.421,76 60,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.986.063.618,31 1.633.191.936,39
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 30.132.097.000,00 16.480.391.358,16
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 18.079.258.200 60,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 15.066.048.500 50,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 3.013.209.700
F RETENSI/JAMINAN (5% x A) 903.962.910
G PENGEMBALIAN UANG MUKA (C% x B) 316.387.019
H JUMLAH POTONGAN (F + G) 1.220.349.929
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.792.859.772
J PPN (11%) x 1 (11% X I) 177.670.788
K PPH FINAL (E - G) x 2,65% 42.802.508
L PEMBAYARAN LANGSUNG (I - J) - K 1.572.386.475
DIBULATKAN 1.572.386.475
TERBILANG : Satu Milyar Lima Ratus Tujuh Puluh Dua Juta Tiga Ratus Delapan Puluh Enam Ribu Empat Ratus Tujuh Puluh Lima Rupiah

DISETUJUI OLEH, DIPERIKSA OLEH, DIBUAT OLEH,


PEJABAT PEMBUAT KOMITMEN PRASARANA STRATEGIS KONSULTAN MANAJEMEN KONSTRUKSI KONTRAKTOR PELAKSANA
SATUAN KERJA PELAKSANAAN PRASARANA PT. MANGGALAKARYA BANGUN SARANA PT. TIGA JAYA KENCANA
PEMUKIMAN WIL I PROVINSI NTT

HENDRO NDOLU, ST Ir. HARNADI HIRONIMUS SONBAY, ST


NIP. 19870317 201101 1 005 TEAM LEADER KEPALA CABANG

Anda mungkin juga menyukai