NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 176.344.321,32 0,713
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 66.173.811,08 0,267
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.350.770.250,04 33,746
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 1.363.562.605,35 5,510
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 1.547.756.520,62 6,255
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 867.651.412,94 3,51
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 12.372.258.921,35 50,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 1.360.948.481,35
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 13.733.207.402,70
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 13.733.863.500 50,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 12.360.477.150 45,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 1.373.386.350
F RETENSI/JAMINAN (5% x A) 686.693.175
G PENGEMBALIAN UANG MUKA (C% x B) 103.003.976
H JUMLAH POTONGAN (F + G) 789.697.151
I JUMLAH SERTIFIKAT BULAN INI (E - H) 583.689.199
J PPN (11%) x 1 (11% X I) 57.843.074
K PPH FINAL (E - G) x 2,65% 13.934.922
L PEMBAYARAN LANGSUNG (I - J) - K 511.911.203
DIBULATKAN 511.911.203
TERBILANG : Lima Ratus Sebelas Juta Sembilan Ratus Sebelas Ribu Dua Ratus Tiga Rupiah
NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 179.817.611,14 0,727
I.B. PEKERJAAN
UNIT SISTEM
SMKKPRODUKSI
KONSTRUKSI
DAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 71.037.561,07 0,287
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.777.726.127,69 35,472
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 2.099.383.807,82 8,484
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 2.664.059.730,38 10,766
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 1.055.174.583,65 4,26
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 14.847.199.421,76 60,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 1.633.191.936,39
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 16.480.391.358,16
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 16.480.636.200 60,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 13.733.863.500 50,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 2.746.772.700
F RETENSI/JAMINAN (5% x A) 824.031.810
G PENGEMBALIAN UANG MUKA (C% x B) 288.411.134
H JUMLAH POTONGAN (F + G) 1.112.442.944
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.634.329.757
J PPN (11%) x 1 (11% X I) 161.960.607
K PPH FINAL (E - G) x 2,65% 39.017.782
L PEMBAYARAN LANGSUNG (I - J) - K 1.433.351.368
DIBULATKAN 1.433.351.368
TERBILANG : Satu Milyar Empat Ratus Tiga Puluh Tiga Juta Tiga Ratus Lima Puluh Satu Ribu Tiga Ratus Enam Puluh Delapan Rupiah
NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK NILAI KONTRAK PERSENTASE SAMPAI SAAT INI
NILAI KONTRAK AWAL
NO. URAIAN PEKERJAAN ADDENDUM - I ADDENDUM - II ADDENDUM - III ADDENDUM - IV
(Rp) JUMLAH HARGA BOBOT
(Rp) (Rp) (Rp) (Rp)
(Rp) (%)
I.A. PEKERJAAN
UNIT SISTEM
PERSIAPAN
PRODUKSI DAN TRANSMISI AIR BAKU 162.993.660,67 185.272.611,17 185.272.611,17 198.910.111,17 179.817.611,17 179.817.611,14 0,727
I.B. PEKERJAAN
UNIT SISTEM
SMKK PRODUKSI
KONSTRUKSIDAN DISTRIBUSI AIR MINUM 86.610.061,08 86.610.061,08 86.610.061,08 86.610.061,08 80.480.061,08 71.037.561,07 0,287
II PEKERJAAN
PENYELENGGARAAN
STRUKTUR SMK3 KONSTRUKSI 6.971.464.806,89 7.464.219.255,90 8.517.688.659,70 9.197.101.391,12 8.987.625.342,22 8.777.726.127,69 35,472
III PEKERJAAN
UJI FUNGSI
ARSITEKTUR
(KOMISIONING TES) 5.364.527.455,00 4.895.840.645,66 5.147.010.368,29 5.241.338.352,68 5.506.904.361,46 2.099.383.807,82 8,484
IV PEKERJAAN
PEMASANGAN
MEKANIKAL
SAMBUNGAN
ELEKTRIKAL
RUMAH 9.998.090.729,95 9.998.090.729,95 9.187.808.106,78 8.302.068.683,11 10.118.466.267,81 2.664.059.730,38 10,766
V PEKERJAAN LANDSCAPE DAN PAGAR 2.162.013.286,41 2.115.666.696,24 1.621.310.192,98 1.719.671.403,87 2.272.739.249,94 1.055.174.583,65 4,26
1 JUMLAH PRESTASI PEKERJAAN 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 24.745.700.000,00 27.146.032.893,69 14.847.199.421,76 60,00
2 PPN (11%) x 1 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.722.027.000,00 2.986.063.618,31 1.633.191.936,39
A TOTAL ( 1 + 2 ) 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 27.467.727.000,00 30.132.097.000,00 16.480.391.358,16
B UANG MUKA TERMASUK PPN 11 % 4.120.159.050,00
C JUMLAH PENAGIHAN (C% x A) 18.079.258.200 60,00%
D JUMLAH PEMBAYARAN KOTOR SAMPAI DENGAN BULAN YANG LALU (D% x A) 15.066.048.500 50,00%
E JUMLAH KOTOR PEMBAYARAN BULAN INI (C) 3.013.209.700
F RETENSI/JAMINAN (5% x A) 903.962.910
G PENGEMBALIAN UANG MUKA (C% x B) 316.387.019
H JUMLAH POTONGAN (F + G) 1.220.349.929
I JUMLAH SERTIFIKAT BULAN INI (E - H) 1.792.859.772
J PPN (11%) x 1 (11% X I) 177.670.788
K PPH FINAL (E - G) x 2,65% 42.802.508
L PEMBAYARAN LANGSUNG (I - J) - K 1.572.386.475
DIBULATKAN 1.572.386.475
TERBILANG : Satu Milyar Lima Ratus Tujuh Puluh Dua Juta Tiga Ratus Delapan Puluh Enam Ribu Empat Ratus Tujuh Puluh Lima Rupiah