No Kode Kode Pekerjaan Berat Jenis Panjang Jumlah Total Volume

1 2 3 4 5 6 7=5x6 8=7x4

A Elevasi + 21.895
1 C1 K1 WF 300 x 150 x 7 x 11 36.70 4.30 18.00 77.40 2,840.58
2 ST-1 (Struts) B1 WF 250 x 125 x 6 x 9 29.60 4.50 16.00 72.00 2,131.20
3 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 4.50 2.00 9.00 330.30
4 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12 1,010.07
28 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69 109.16
29 T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01 54.81
30 M16 M16 1.00 6.00 8.00 48.00 48.00
5 1/2 R1 (Rafter) 1/2 R1 WF 250 x 125 x 6 x 9 14.80 1.00 8.00 8.00 118.40
6 OV (Overst - 1Ek) R2 WF 200 x 100 x 5,5 x 8 21.33 2.75 18.00 49.50 1,055.84
7 1/2 OV (Overst - 1Ek) 1/2 R2 WF 200 x 100 x 5,5 x 8 10.67 1.00 18.00 18.00 191.97
8 T 12 Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01 127.01
9 A 560 Angkur M 16 - 560 1.00 6.00 18.00 108.00 108.00
10 T 10 Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03 237.44
11 M 16 Baut M 16 1.00 102.00 2.00 204.00 204.00
12 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00 41.72
13 M 16 Baut M 16 1.00 8.00 8.00 64.00 64.00
14 T9 Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00 21.26
15 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01 62.37
16 M 16 Baut M 16 1.00 6.00 18.00 108.00 108.00
17 T9 Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00 28.35
18 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 22.05
T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 15.75
19 M 16 Baut M 16 1.00 6.00 4.00 24.00 24.00
20 G1 2LC 150 x 65 x 20 x 2,3 11.00 8.40 16.00 134.40 1,478.40
21 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01 94.12
22 M 16 Baut M 16 1.00 2.00 32.00 64.00 64.00
23 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00 128.00
24 G1 2LC 150 x 65 x 20 x 2,3 11.00 43.80 6.00 262.80 2,890.80
25 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01 75.59
26 M 16 Baut M 16 1.00 2.00 54.00 108.00 108.00
27 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00 216.00

B Elevasi + 28.241
1 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 4.50 8.00 36.00 1,321.20
2 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56 3,953.38
27 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59 431.83
28 T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01 123.32
29 M16 M16 1.00 6.00 18.00 108.00 108.00
3 ST-3 (Struts) R2 WF 200 x 100 x 5,5 x 8 21.33 12.05 4.00 48.20 1,028.11
4 OV R2 WF 200 x 100 x 5,5 x 8 21.33 1.54 4.00 6.14 130.97
5 R4 L 100 x 100 x 10 15.10 8.25 4.00 33.00 498.30
6 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01 108.25
7 M 16 Baut M 16 1.00 8.00 18.00 144.00 144.00
8 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 88.20
T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 63.00
9 M 16 Baut M 16 1.00 6.00 16.00 96.00 96.00
10 T9 End Plat R2 T = 9 mm 8,750.00 0.00 24.00 0.01 45.36
11 T9 Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 24.00 0.01 68.04
12 M 16 Baut M 16 1.00 4.00 24.00 96.00 96.00
13 T9 End Plat R4 T = 9 mm 8,750.00 0.00 24.00 0.00 40.82
14 T9 Plat Sambungan R2 & R4 T = 9 mm 8,750.00 0.00 20.00 0.00 37.80
15 T9 Plat Sambungan R3 & R4 T = 9 mm 8,750.00 0.00 4.00 0.00 11.34
16 M 16 Baut M 16 1.00 2.00 24.00 48.00 48.00
17 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 4.00 0.00 8.40
18 M 16 Baut M 16 1.00 4.00 4.00 16.00 16.00
19 G1 2LC 150 x 65 x 20 x 2,3 11.00 14.00 28.00 392.00 4,312.00
20 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 112.00 0.04 329.43
21 M 16 Baut M 16 1.00 2.00 112.00 224.00 224.00
22 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 112.00 448.00 448.00
23 TR 1 Transtang D 12 0.89 1.50 188.00 282.00 250.42
24 TR 2 Transtang D 12 0.89 1.50 216.00 324.00 287.71
25 T6 Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00 15.35
26 IA Ikatan Angin D 16 1.58 9.00 8.00 72.00 113.62

C Area Kaca
1 G1 2LC 150 x 65 x 20 x 2,3 - 12.10 14.00 169.40 -
2 T9 Plat Sambungan R1 & G1 T = 9 mm - 0.00 70.00 0.02 -
3 M 16 Baut M 16 - 2.00 70.00 140.00 -
4 M 16 Baut M 16 ( CNP Ke CNP ) - 4.00 70.00 280.00 -
Detail
9

Kolom
Balok Bawah
Balok Atas

2
Gording Dalam
Gording Luar

Balok Atas
Kuda - kuda
Kuda - kuda

2C

Balok Bawah
Balok Bawah
Kuda - kuda luar

9
Gording Atas
B
A

10
Gording Kaca Gording Atas
No Kode Kode
1 2

A Elevasi + 21.895
1 C1 K1
2 ST-1 (Struts) B1
3 ST-2 (Struts) R3
4 R1 (Rafter) R1
5 R1 (Rafter) R1
6 T 10
7 M16
8 1/2 R1 (Rafter) 1/2 R1
9 OV (Overst - 1Ek) R2
10 1/2 OV (Overst - 1Ek) 1/2 R2
11 T 12
12 A 560
13 T 10
14 M 16
15 T 10
16 M 16
17 T9
18 T 10
19 M 16
20 T9
21 T 10
22 T 10
23 M 16
24 G1
25 T9
26 M 16
27 M 16
28 G1
29 T9
30 M 16
31 M 16

B Elevasi + 28.241
1 ST-2 (Struts) R3
2 R1 (Rafter) R1
3 R1 (Rafter) R1
4 T 10
5 M16
6 ST-3 (Struts) R2
7 ST-3 (Struts) R2
8 OV R2
9 R4
10 R4
11 R4
12 T 10
13 M 16
14 T 10
15 T 10
16 M 16
17 T9
18 T9
19 M 16
20 T9
21 T9
22 M 16
23 T 10
24 M 16
25 G1
26 T9
27 M 16
28 M 16
29 TR 1
30 TR 2
31 T6
32 IA

C Area Kaca
1 G1
2 T9
3 M 16
4 M 16

1 Kolom
2 Balok
3 Kuda - kuda
4 Balok
5 Siku
6 T 12
7 T 12
8 T 10
9 T9
10 T6
11 CNP
12 A M16
13 M 20
14 M 16
15 M 16
16 TR
17 Ikatan angin
Pekerjaan Berat Jenis Panjang Jumlah Total
3 4 5 6 7=5x6

WF 300 x 150 x 7 x 11 36.70 4.14 18.00 74.48


WF 250 x 125 x 6 x 9 29.60 4.47 16.00 71.58
WF 300 x 150 x 7 x 11 36.70 4.37 2.00 8.74
WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12
WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01
M16 1.00 6.00 8.00 48.00
WF 250 x 125 x 6 x 9 8,750.00 0.00 8.00 0.01
WF 200 x 100 x 5,5 x 8 21.33 2.73 18.00 49.14
WF 200 x 100 x 5,5 x 8 8,750.00 0.00 18.00 0.02
Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01
Angkur M 16 - 560 1.00 6.00 18.00 108.00
Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03
Baut M 16 1.00 102.00 2.00 204.00
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00
Baut M 16 1.00 8.00 8.00 64.00
Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 6.00 18.00 108.00
Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 6.00 4.00 24.00
2LC 150 x 65 x 20 x 2,3 11.00 8.40 16.00 134.40
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01
Baut M 16 1.00 2.00 32.00 64.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00
2LC 150 x 65 x 20 x 2,3 11.00 43.80 6.00 262.80
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01
Baut M 16 1.00 2.00 54.00 108.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00

WF 300 x 150 x 7 x 11 36.70 4.37 8.00 34.95


WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56
WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01
M16 1.00 6.00 18.00 108.00
WF 200 x 100 x 5,5 x 8 21.33 4.34 4.00 17.36
WF 200 x 100 x 5,5 x 8 21.33 1.46 4.00 5.83
WF 200 x 100 x 5,5 x 8 21.33 1.53 4.00 6.10
L 100 x 100 x 10 15.10 3.16 4.00 12.63
L 100 x 100 x 10 15.10 2.89 4.00 11.55
L 100 x 100 x 10 15.10 2.37 4.00 9.47
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 8.00 18.00 144.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Baut M 16 1.00 6.00 16.00 96.00
End Plat R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Baut M 16 1.00 4.00 24.00 96.00
Plat Sambungan R2 & R4 T = 9 mm 8,750.00 0.00 20.00 0.00
Plat Sambungan R3 & R4 T = 9 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 2.00 24.00 48.00
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 4.00 4.00 16.00
2LC 150 x 65 x 20 x 2,3 11.00 14.00 28.00 392.00
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 112.00 0.04
Baut M 16 1.00 2.00 112.00 224.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 112.00 448.00
Transtang D 12 0.89 1.50 188.00 282.00
Transtang D 12 0.89 1.50 216.00 324.00
Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00
Ikatan Angin D 16 1.58 9.00 8.00 72.00

2LC 150 x 65 x 20 x 2,3 11.00 12.10 8.00 96.80


Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 40.00 0.01
Baut M 16 1.00 2.00 40.00 80.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 40.00 160.00

WF 300 x 150 x 7 x 11 2,722.19 Kg


WF 300 x 150 x 7 x 11 1,603.42 Kg
WF 250 x 125 x 6 x 9 7,726.85 Kg
WF 200 x 100 x 5,5 x 8 1,838.74 Kg
L 100 x 100 x 10 507.61 Kg
Plat Pelandas 124.12 Kg
Plat Sambungan Kuda kuda - Kg
Plat Sambungan 787.41 Kg
Plat Sambungan 757.14 Kg
Plat Ikatan angin 15.14 Kg
C 150 x 65 x 20 x 2,3 9,736.25 Kg
Angkur M16 - 560 108.00 bh
Baut M 20 - bh
Baut M 16 1,432.00 bh
Baut M 16 (CNP ke CNP) 952.00 bh
Transtang D 12 538.13 Kg
Ikatan Angin D 16 113.62 Kg
REDUKSI 1 REDUKSI 2 TOTAL REDUKVolume Detail
LUBANG BAUT 8=7x4 9

1.68 9.69 11.38 2,722.19 Kolom 1 2,722.19


1.28 1.28 2,117.60 Balok Bawah 3 2,117.60
- 320.68 Balok Atas 2 320.68
1.28 1.28 1,008.79 3 1,008.79
- 109.16 3 109.16
2.14 2.14 52.67 4 8 52.67
- 48.00 14 48.00
- 111.13 3 111.13
1.92 1.92 1,046.23 4 1,046.23
4
- 167.94 4 167.94
2.88 2.88 124.12 6 124.12
1
- 108.00 12 108.00
8.55 8.55 217.02 8 217.02
4
- 204.00 14 204.00
1.42 1.42 40.29 8 40.29
- 64.00 4 14 64.00
- 21.26 9 21.26
2.40 2.40 59.97 8 59.97
- 108.00 4 14 108.00
- 28.35 9 28.35
0.53 0.53 21.52 8 21.52
0.53 0.53 15.22 2 8 15.22
- 24.00 14 24.00
Gording Luar Gording Dalam

1.31 1.31 1,477.09 11 1,477.09


3.85 3.85 90.28 9 90.28
- 64.00 14 64.00
- 128.00 15 128.00
2.21 2.21 2,888.59 11 2,888.59
6.49 6.49 69.10 9 69.10
- 108.00 14 108.00
- 216.00 15 216.00

- 1,282.74 Balok Atas 2 1,282.74


4.33 4.33 3,949.05 Kuda - kuda 3 3,949.05
0.72 0.72 431.11 Kuda - kuda 3 431.11
4.81 4.81 118.52 8 118.52
2C
2C
- 108.00 14 108.00
- 370.20 Balok Bawah 4 370.20
- 124.40 4 124.40
0.15 0.15 129.97 Balok Bawah 4 129.97
0.18 0.18 190.57 5 190.57
0.18 0.18 174.26 Kuda - kuda luar 5 174.26
0.18 0.18 142.79 5 142.79
3.20 3.20 105.05 8 105.05
5
- 144.00 14 144.00
2.14 2.14 86.06 8 86.06
2.14 2.14 60.86 3 8 60.86
- 96.00 14 96.00
1.92 1.92 43.44 9 43.44
1.92 1.92 54.78 6 9 54.78
- 96.00 14 96.00
0.40 0.40 14.40 9 14.40
0.08 0.08 6.72 8 9 6.72
- 48.00 14 48.00
0.53 0.53 10.24 8 10.24
9
- 16.00 14 16.00
4.59 4.59 4,307.41 11 4,307.41
Gording Atas

13.46 13.46 315.97 9 315.97


- 224.00 14 224.00
- 448.00 15 448.00
- 250.42 B 16 250.42
- 287.71 A 16 287.71
0.21 0.21 15.14 10 15.14
10
- 113.62 17 113.62

1.64 1.64 1,063.16 11 1,063.16


Gording Kaca

4.81 4.81 112.85 9 112.85


80.00 14 80.00
160.00 15 160.00

2,722.19
1,603.42
7,726.85
1,838.74
507.61
124.12
-
787.41
757.14
15.14
9,736.25
108.00
-
1,432.00
952.00
538.13
113.62
No Kode Kode
1 2

A Elevasi + 21.895
1 C1 K1
2 ST-1 (Struts) B1
3 ST-2 (Struts) R3
4 R1 (Rafter) R1
5 R1 (Rafter) R1
6 T 10
7 M16
8 1/2 R1 (Rafter) 1/2 R1
9 OV (Overst - 1Ek) R2
10 1/2 OV (Overst - 1Ek) 1/2 R2
11 T 12
12 A 560
13 T 10
14 M 16
15 T 10
16 M 16
17 T9
18 T 10
19 M 16
20 T9
21 T 10
22 T 10
23 M 16
24 G1
25 T9
26 M 16
27 M 16
28 G1
29 T9
30 M 16
31 M 16

B Elevasi + 28.241
1 ST-2 (Struts) R3
2 R1 (Rafter) R1
3 R1 (Rafter) R1
4 T 10
5 M16
6 ST-3 (Struts) R2
7 ST-3 (Struts) R2
8 OV R2
9 R4
10 R4
11 R4
12 T 10
13 M 16
14 T 10
15 T 10
16 M 16
17 T9
18 T9
19 M 16
20 T9
21 T9
22 M 16
23 T 10
24 M 16
25 G1
26 T9
27 M 16
28 M 16
29 TR 1
30 TR 2
31 T6
32 IA

C Area Kaca
1 G1
2 T9
3 M 16
4 M 16

1 Kolom
2 Balok
3 Kuda - kuda
4 Balok
5 Siku
6 T 12
7 T 12
8 T 10
9 T9
10 T6
11 CNP
12 A M16
13 M 20
14 M 16
15 M 16
16 TR
17 Ikatan angin
Pekerjaan Berat Jenis Panjang Jumlah Total
3 4 5 6 7=5x6

WF 300 x 150 x 7 x 11 36.70 4.14 18.00 74.48


WF 250 x 125 x 6 x 9 29.60 4.47 16.00 71.58
WF 300 x 150 x 7 x 11 36.70 4.37 2.00 8.74
WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12
WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01
M16 1.00 6.00 8.00 48.00
WF 250 x 125 x 6 x 9 8,750.00 0.00 8.00 0.01
WF 200 x 100 x 5,5 x 8 21.33 2.73 18.00 49.14
WF 200 x 100 x 5,5 x 8 8,750.00 0.00 18.00 0.02
Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01
Angkur M 16 - 560 1.00 6.00 18.00 108.00
Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03
Baut M 16 1.00 102.00 2.00 204.00
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00
Baut M 16 1.00 8.00 8.00 64.00
Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 6.00 18.00 108.00
Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 6.00 4.00 24.00
2LC 150 x 65 x 20 x 2,3 11.00 8.40 16.00 134.40
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01
Baut M 16 1.00 2.00 32.00 64.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00
2LC 150 x 65 x 20 x 2,3 11.00 43.80 6.00 262.80
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01
Baut M 16 1.00 2.00 54.00 108.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00

WF 300 x 150 x 7 x 11 36.70 4.37 8.00 34.95


WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56
WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01
M16 1.00 6.00 18.00 108.00
WF 200 x 100 x 5,5 x 8 21.33 4.34 4.00 17.36
WF 200 x 100 x 5,5 x 8 21.33 1.46 4.00 5.83
WF 200 x 100 x 5,5 x 8 21.33 1.53 4.00 6.10
L 100 x 100 x 10 15.10 3.16 4.00 12.63
L 100 x 100 x 10 15.10 2.89 4.00 11.55
L 100 x 100 x 10 15.10 2.37 4.00 9.47
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 8.00 18.00 144.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Baut M 16 1.00 6.00 16.00 96.00
End Plat R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Baut M 16 1.00 4.00 24.00 96.00
Plat Sambungan R2 & R4 T = 9 mm 8,750.00 0.00 20.00 0.00
Plat Sambungan R3 & R4 T = 9 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 2.00 24.00 48.00
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 4.00 4.00 16.00
2LC 150 x 65 x 20 x 2,3 11.00 14.00 28.00 392.00
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 112.00 0.04
Baut M 16 1.00 2.00 112.00 224.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 112.00 448.00
Transtang D 12 0.89 1.50 188.00 282.00
Transtang D 12 0.89 1.50 216.00 324.00
Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00
Ikatan Angin D 16 1.58 9.00 8.00 72.00

2LC 150 x 65 x 20 x 2,3 11.00 12.10 8.00 96.80


Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 40.00 0.01
Baut M 16 1.00 2.00 40.00 80.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 40.00 160.00

WF 300 x 150 x 7 x 11 2,722.19 Kg


WF 300 x 150 x 7 x 11 1,603.42 Kg
WF 250 x 125 x 6 x 9 7,726.85 Kg
WF 200 x 100 x 5,5 x 8 1,838.74 Kg
L 100 x 100 x 10 507.61 Kg
Plat Pelandas 124.12 Kg
Plat Sambungan Kuda kuda - Kg
Plat Sambungan 787.41 Kg
Plat Sambungan 757.14 Kg
Plat Ikatan angin 15.14 Kg
C 150 x 65 x 20 x 2,3 9,736.25 Kg
Angkur M16 - 560 108.00 bh
Baut M 20 - bh
Baut M 16 1,432.00 bh
Baut M 16 (CNP ke CNP) 952.00 bh
Transtang D 12 538.13 Kg
Ikatan Angin D 16 113.62 Kg
REDUKSI 1 REDUKSI 2 TOTAL REDUKVolume Detail
LUBANG BAUT 8=7x4 9

1.68 9.69 11.38 2,722.19 Kolom 1 2,722.19


1.28 1.28 2,117.60 Balok Bawah 3 2,117.60
- 320.68 Balok Atas 2 320.68
1.28 1.28 1,008.79 3 1,008.79
- 109.16 3 109.16
2.14 2.14 52.67 4 8 52.67
- 48.00 14 48.00
- 111.13 3 111.13
1.92 1.92 1,046.23 4 1,046.23
4
- 167.94 4 167.94
2.88 2.88 124.12 6 124.12
1
- 108.00 12 108.00
8.55 8.55 217.02 8 217.02
4
- 204.00 14 204.00
1.42 1.42 40.29 8 40.29
- 64.00 4 14 64.00
- 21.26 9 21.26
2.40 2.40 59.97 8 59.97
- 108.00 4 14 108.00
- 28.35 9 28.35
0.53 0.53 21.52 8 21.52
0.53 0.53 15.22 2 8 15.22
- 24.00 14 24.00
Gording Luar Gording Dalam

1.31 1.31 1,477.09 11 1,477.09


3.85 3.85 90.28 9 90.28
- 64.00 14 64.00
- 128.00 15 128.00
2.21 2.21 2,888.59 11 2,888.59
6.49 6.49 69.10 9 69.10
- 108.00 14 108.00
- 216.00 15 216.00

- 1,282.74 Balok Atas 2 1,282.74


4.33 4.33 3,949.05 Kuda - kuda 3 3,949.05
0.72 0.72 431.11 Kuda - kuda 3 431.11
4.81 4.81 118.52 8 118.52
2C
2C
- 108.00 14 108.00
- 370.20 Balok Bawah 4 370.20
- 124.40 4 124.40
0.15 0.15 129.97 Balok Bawah 4 129.97
0.18 0.18 190.57 5 190.57
0.18 0.18 174.26 Kuda - kuda luar 5 174.26
0.18 0.18 142.79 5 142.79
3.20 3.20 105.05 8 105.05
5
- 144.00 14 144.00
2.14 2.14 86.06 8 86.06
2.14 2.14 60.86 3 8 60.86
- 96.00 14 96.00
1.92 1.92 43.44 9 43.44
1.92 1.92 54.78 6 9 54.78
- 96.00 14 96.00
0.40 0.40 14.40 9 14.40
0.08 0.08 6.72 8 9 6.72
- 48.00 14 48.00
0.53 0.53 10.24 8 10.24
9
- 16.00 14 16.00
4.59 4.59 4,307.41 11 4,307.41
Gording Atas

13.46 13.46 315.97 9 315.97


- 224.00 14 224.00
- 448.00 15 448.00
- 250.42 B 16 250.42
- 287.71 A 16 287.71
0.21 0.21 15.14 10 15.14
10
- 113.62 17 113.62

1.64 1.64 1,063.16 11 1,063.16


Gording Kaca

4.81 4.81 112.85 9 112.85


80.00 14 80.00
160.00 15 160.00

2,722.19
1,603.42
7,726.85
1,838.74
507.61
124.12
-
787.41
757.14
15.14
9,736.25
108.00
-
1,432.00
952.00
538.13
113.62
No Kode Kode
1 2

A Elevasi + 21.895
1 C1 K1
2 ST-1 (Struts) B1
3 ST-2 (Struts) R3
4 R1 (Rafter) R1
5 R1 (Rafter) R1
6 T 10
7 M16
8 1/2 R1 (Rafter) 1/2 R1
9 OV (Overst - 1Ek) R2
10 1/2 OV (Overst - 1Ek) 1/2 R2
11 T 12
12 A 560
13 T 10
14 M 16
15 T 10
16 M 16
17 T9
18 T 10
19 M 16
20 T9
21 T 10
22 T 10
23 M 16
24 G1
25 T9
26 M 16
27 M 16
28 G1
29 T9
30 M 16
31 M 16

B Elevasi + 28.241
1 ST-2 (Struts) R3
2 R1 (Rafter) R1
3 R1 (Rafter) R1
4 T 10
5 M16
6 ST-3 (Struts) R2
7 ST-3 (Struts) R2
8 OV R2
9 R4
10 R4
11 R4
12 T 10
13 M 16
14 T 10
15 T 10
16 M 16
17 T9
18 T9
19 M 16
20 T9
21 T9
22 M 16
23 T 10
24 M 16
25 G1
26 T9
27 M 16
28 M 16
29 TR 1
30 TR 2
31 T6
32 IA

C Area Kaca
1 G1
2 T9
3 M 16
4 M 16

1 Kolom
2 Balok
3 Kuda - kuda
4 Balok
5 Siku
6 T 12
7 T 12
8 T 10
9 T9
10 T6
11 CNP
12 A M16
13 M 20
14 M 16
15 M 16
16 TR
17 Ikatan angin
Pekerjaan Berat Jenis Panjang Jumlah Total
3 4 5 6 7=5x6

WF 300 x 150 x 7 x 11 36.70 3.90 18.00 70.20


WF 250 x 125 x 6 x 9 29.60 3.47 16.00 55.58
WF 300 x 150 x 7 x 11 36.70 3.37 2.00 6.74
WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12
WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01
M16 1.00 6.00 8.00 48.00
WF 250 x 125 x 6 x 9 8,750.00 0.00 8.00 0.01
WF 200 x 100 x 5,5 x 8 21.33 2.73 18.00 49.14
WF 200 x 100 x 5,5 x 8 8,750.00 0.00 18.00 0.02
Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01
Angkur M 16 - 560 1.00 6.00 18.00 108.00
Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03
Baut M 16 1.00 102.00 2.00 204.00
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00
Baut M 16 1.00 8.00 8.00 64.00
Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 6.00 18.00 108.00
Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 6.00 4.00 24.00
2LC 150 x 65 x 20 x 2,3 11.00 6.50 16.00 104.00
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01
Baut M 16 1.00 2.00 32.00 64.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00
2LC 150 x 65 x 20 x 2,3 11.00 34.00 6.00 204.00
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01
Baut M 16 1.00 2.00 54.00 108.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00

WF 300 x 150 x 7 x 11 36.70 3.37 8.00 26.95


WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56
WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59
Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01
M16 1.00 6.00 18.00 108.00
WF 200 x 100 x 5,5 x 8 21.33 3.34 4.00 13.36
WF 200 x 100 x 5,5 x 8 21.33 1.46 4.00 5.83
WF 200 x 100 x 5,5 x 8 21.33 1.53 4.00 6.10
L 100 x 100 x 10 - - - -
L 100 x 100 x 10 - - - -
L 100 x 100 x 10 - - - -
Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01
Baut M 16 1.00 8.00 18.00 144.00
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01
Baut M 16 1.00 6.00 16.00 96.00
End Plat R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 24.00 0.01
Baut M 16 1.00 4.00 24.00 96.00
Plat Sambungan R2 & R4 T = 9 mm - - - -
Plat Sambungan R3 & R4 T = 9 mm - - - -
Baut M 16 - - - -
Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 4.00 0.00
Baut M 16 1.00 4.00 4.00 16.00
2LC 150 x 65 x 20 x 2,3 11.00 8.50 28.00 238.00
Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 112.00 0.04
Baut M 16 1.00 2.00 112.00 224.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 112.00 448.00
Transtang D 12 0.89 1.50 188.00 282.00
Transtang D 12 0.89 1.50 216.00 324.00
Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00
Ikatan Angin D 16 1.58 9.00 8.00 72.00

2LC 150 x 65 x 20 x 2,3 11.00 14.00 8.00 112.00


Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 40.00 0.01
Baut M 16 1.00 2.00 40.00 80.00
Baut M 16 ( CNP Ke CNP ) 1.00 4.00 40.00 160.00

WF 300 x 150 x 7 x 11 2,564.96 Kg


WF 300 x 150 x 7 x 11 1,236.42 Kg
WF 250 x 125 x 6 x 9 7,253.25 Kg
WF 200 x 100 x 5,5 x 8 1,753.42 Kg
L 100 x 100 x 10 - Kg
Plat Pelandas 124.12 Kg
Plat Sambungan Kuda kuda - Kg
Plat Sambungan 787.41 Kg
Plat Sambungan 736.01 Kg
Plat Ikatan angin 15.14 Kg
C 150 x 65 x 20 x 2,3 7,228.25 Kg
Angkur M16 - 560 108.00 bh
Baut M 20 - bh
Baut M 16 1,384.00 bh
Baut M 16 (CNP ke CNP) 952.00 bh
Transtang D 12 538.13 Kg
Ikatan Angin D 16 113.62 Kg
REDUKSI 1 REDUKSI 2 TOTAL REDUKVolume Detail
LUBANG BAUT 8=7x4 9

1.68 9.69 11.38 2,564.96 Kolom 1 2,564.96


1.28 1.28 1,644.00 Balok Bawah 3 1,644.00
- 247.28 Balok Atas 2 247.28
1.28 1.28 1,008.79 3 1,008.79
- 109.16 3 109.16
2.14 2.14 52.67 4 8 52.67
- 48.00 14 48.00
- 111.13 3 111.13
1.92 1.92 1,046.23 4 1,046.23
4
- 167.94 4 167.94
2.88 2.88 124.12 6 124.12
1
- 108.00 12 108.00
8.55 8.55 217.02 8 217.02
4
- 204.00 14 204.00
1.42 1.42 40.29 8 40.29
- 64.00 4 14 64.00
- 21.26 9 21.26
2.40 2.40 59.97 8 59.97
- 108.00 4 14 108.00
- 28.35 9 28.35
0.53 0.53 21.52 8 21.52
0.53 0.53 15.22 2 8 15.22
- 24.00 14 24.00
Gording Luar Gording Dalam

1.31 1.31 1,142.69 11 1,142.69


3.85 3.85 90.28 9 90.28
- 64.00 14 64.00
- 128.00 15 128.00
2.21 2.21 2,241.79 11 2,241.79
6.49 6.49 69.10 9 69.10
- 108.00 14 108.00
- 216.00 15 216.00

- 989.14 Balok Atas 2 989.14


4.33 4.33 3,949.05 Kuda - kuda 3 3,949.05
0.72 0.72 431.11 Kuda - kuda 3 431.11
4.81 4.81 118.52 8 118.52
2C
2C
- 108.00 14 108.00
- 284.88 Balok Bawah 4 284.88
- 124.40 4 124.40
0.15 0.15 129.97 Balok Bawah 4 129.97
- - - 5 -
- - - Kuda - kuda luar 5 -
- - - 5 -
3.20 3.20 105.05 8 105.05
5
- 144.00 14 144.00
2.14 2.14 86.06 8 86.06
2.14 2.14 60.86 3 8 60.86
- 96.00 14 96.00
1.92 1.92 43.44 9 43.44
1.92 1.92 54.78 6 9 54.78
- 96.00 14 96.00
- - - 9 -
- - - 8 9 -
- - 14 -
0.53 0.53 10.24 8 10.24
9
- 16.00 14 16.00
4.59 4.59 2,613.41 11 2,613.41
Gording Atas

13.46 13.46 315.97 9 315.97


- 224.00 14 224.00
- 448.00 15 448.00
- 250.42 B 16 250.42
- 287.71 A 16 287.71
0.21 0.21 15.14 10 15.14
10
- 113.62 17 113.62

1.64 1.64 1,230.36 11 1,230.36


Gording Kaca

4.81 4.81 112.85 9 112.85


80.00 14 80.00
160.00 15 160.00

2,564.96
1,236.42
7,253.25
1,753.42
-
124.12
-
787.41
736.01
15.14
7,228.25
108.00
-
1,384.00
952.00
538.13
113.62
Gedung : FEBI
Lantai : Dak
Pek. : Rangka Baja Tap

No Kode Pekerjaan Berat Jenis Panjang Jumlah Total Volume Detail


1 2 3 4 5 6 7=5x6 8=7x4 9

A Elevasi + 21.895
1 C1 K1 WF 300 x 150 x 7 x 11 36.70 4.30 18.00 77.40 2,840.58 Kolom
2 ST-1 (Struts) B1 WF 250 x 125 x 6 x 9 29.60 4.50 16.00 72.00 2,131.20 Balok Bawah
3 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 4.50 2.00 9.00 330.30 Balok Atas
4 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12 1,010.07
28 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69 109.16
29 T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01 54.81 4

30 M16 M16 1.00 6.00 8.00 48.00 48.00


5 1/2 R1 (Rafter) 1/2 R1 WF 250 x 125 x 6 x 9 14.80 1.00 8.00 8.00 118.40
6 OV (Overst - 1Ek) R2 WF 200 x 100 x 5,5 x 8 21.33 2.75 18.00 49.50 1,055.84
4
7 1/2 OV (Overst - 1Ek)1/2 R2 WF 200 x 100 x 5,5 x 8 10.67 1.00 18.00 18.00 191.97
8 T 12 Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01 127.01
1
9 A 560 Angkur M 16 - 560 1.00 6.00 18.00 108.00 108.00
10 T 10 Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03 237.44
4
11 M 16 Baut M 16 1.00 102.00 2.00 204.00 204.00
12 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00 41.72
13 M 16 Baut M 16 1.00 8.00 8.00 64.00 64.00 4

14 T9 Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00 21.26


15 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01 62.37
16 M 16 Baut M 16 1.00 6.00 18.00 108.00 108.00 4

17 T9 Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00 28.35


18 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 22.05
31 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 15.75 2

19 M 16 Baut M 16 1.00 6.00 4.00 24.00 24.00


20 G1 2LC 150 x 65 x 20 x 2,3 11.00 8.40 16.00 134.40 1,478.40

Gording Dalam
21 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01 94.12
22 M 16 Baut M 16 1.00 2.00 32.00 64.00 64.00
23 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00 128.00
24 G1 2LC 150 x 65 x 20 x 2,3 11.00 43.80 6.00 262.80 2,890.80

Gording Luar
25 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01 75.59
26 M 16 Baut M 16 1.00 2.00 54.00 108.00 108.00
27 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00 216.00
B Elevasi + 28.241
1 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 4.50 8.00 36.00 1,321.20 Balok Atas
2 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56 3,953.38 Kuda - kuda
27 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59 431.83 Kuda - kuda
28 T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01 123.32
29 M16 M16 1.00 6.00 18.00 108.00 108.00 2C
3 ST-3 (Struts) R2 WF 200 x 100 x 5,5 x 8 21.33 12.05 4.00 48.20 1,028.11 Balok Bawah
4 OV R2 WF 200 x 100 x 5,5 x 8 21.33 1.54 4.00 6.14 130.97 Balok Bawah
5 R4 L 100 x 100 x 10 15.10 8.25 4.00 33.00 498.30 Kuda - kuda luar
6 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01 108.25
5
7 M 16 Baut M 16 1.00 8.00 18.00 144.00 144.00
8 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 88.20
30 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 63.00 3
9 M 16 Baut M 16 1.00 6.00 16.00 96.00 96.00
10 T9 End Plat R2 T = 9 mm 8,750.00 0.00 24.00 0.01 45.36
11 T9 Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 24.00 0.01 68.04 6
12 M 16 Baut M 16 1.00 4.00 24.00 96.00 96.00
13 T9 End Plat R4 T = 9 mm 8,750.00 0.00 24.00 0.00 40.82
14 T9 Plat Sambungan R2 & R4 T = 9 mm 8,750.00 0.00 20.00 0.00 37.80
8
15 T9 Plat Sambungan R3 & R4 T = 9 mm 8,750.00 0.00 4.00 0.00 11.34
16 M 16 Baut M 16 1.00 2.00 24.00 48.00 48.00
17 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 4.00 0.00 8.40
9
9
18 M 16 Baut M 16 1.00 4.00 4.00 16.00 16.00
19 G1 2LC 150 x 65 x 20 x 2,3 11.00 14.00 28.00 392.00 4,312.00

Gording Atas
20 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 112.00 0.04 329.43
21 M 16 Baut M 16 1.00 2.00 112.00 224.00 224.00
22 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 112.00 448.00 448.00
23 TR 1 Transtang D 12 0.89 1.50 188.00 282.00 250.42 B
24 TR 2 Transtang D 12 0.89 1.50 216.00 324.00 287.71 A
25 T6 Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00 15.35
10
26 IA Ikatan Angin D 16 1.58 9.00 8.00 72.00 113.62
C Area Kaca
1 G1 2LC 150 x 65 x 20 x 2,3 - 12.10 14.00 169.40 -

Gording Kaca
2 T9 Plat Sambungan R1 & G1 T = 9 mm - 0.00 70.00 0.02 -
3 M 16 Baut M 16 - 2.00 70.00 140.00 -
4 M 16 Baut M 16 ( CNP Ke CNP ) - 4.00 70.00 280.00 -
PAKET : PERENCANAAN PEMBANGUNAN GEDUNG KULIAH TERPADU KAMPUS II
UIN SUNAN GUNUNG DJATI BANDUNG
PEMBERI TUGAS : KEMENTRIAN AGAMA RI
KONTRAKTOR : PT. WASKITA KARYA (Persero) Tbk.
KONSULTAN : PT. BENNATIN SURYA CIPTA
ITEM PEKERJAAN : STRUKTUR BAJA UIN

NO ITEM PEKERJAAN SAT VOLUME

1 PEKERJAAN BAJA
A PEKERJAAN Baja ATAP ADM
1 WF 300 x 150 x 7 x 11 Kg 2,576.34
2 WF 300 x 150 x 7 x 11 Kg 1,284.50
3 WF 250 x 125 x 6 x 9 Kg 6,739.45
4 WF 200 x 100 x 5,5 x 8 Kg 2,212.35
5 L 100 x 100 x 10 Kg -
6 Plat Pelandas Kg 127.01
7 Plat Sambungan Kuda kuda Kg 110.25
8 Plat Sambungan Kg 466.58
9 Plat Sambungan Kg 617.59
10 Plat Ikatan angin Kg 15.35
11 C 150 x 65 x 20 x 2,3 Kg 6,006.00
12 Angkur M16 - 560 bh 108.00
13 Baut M 20 bh 120.00
14 Baut M 16 bh 1,020.00
15 Baut M 16 (CNP ke CNP) bh 680.00
16 Transtang D 12 Kg 442.22
17 Ikatan Angin D 16 Kg 113.62

B PEKERJAAN Baja ATAP FTK


1 WF 300 x 150 x 7 x 11 Kg 2,840.58
2 WF 300 x 150 x 7 x 11 Kg 1,651.50
3 WF 250 x 125 x 6 x 9 Kg 7,213.05
4 WF 200 x 100 x 5,5 x 8 Kg 2,406.88
5 L 100 x 100 x 10 Kg 498.30
6 Plat Pelandas Kg 127.01
7 Plat Sambungan Kuda kuda Kg 110.25
8 Plat Sambungan Kg 458.18
9 Plat Sambungan Kg 752.11
10 Plat Ikatan angin Kg 15.35
11 C 150 x 65 x 20 x 2,3 Kg 8,681.20
12 Angkur M16 - 560 bh 108.00
13 Baut M 20 bh 120.00
14 Baut M 16 bh 1,076.00
15 Baut M 16 (CNP ke CNP) bh 792.00
16 Transtang D 12 Kg 538.13
17 Ikatan Angin D 16 Kg 113.62

C PEKERJAAN Baja ATAP FEBI


1 WF 300 x 150 x 7 x 11 Kg 2,840.58
2 WF 300 x 150 x 7 x 11 Kg 1,651.50
3 WF 250 x 125 x 6 x 9 Kg 7,213.05
4 WF 200 x 100 x 5,5 x 8 Kg 2,406.88
5 L 100 x 100 x 10 Kg 498.30
6 Plat Pelandas Kg 127.01
7 Plat Sambungan Kuda kuda Kg 110.25
8 Plat Sambungan Kg 458.18
9 Plat Sambungan Kg 752.11
NO ITEM PEKERJAAN SAT VOLUME
10 Plat Ikatan angin Kg 15.35
11 C 150 x 65 x 20 x 2,3 Kg 8,681.20
12 Angkur M16 - 560 bh 108.00
13 Baut M 20 bh 120.00
14 Baut M 16 bh 1,076.00
15 Baut M 16 (CNP ke CNP) bh 792.00
16 Transtang D 12 Kg 538.13
17 Ikatan Angin D 16 Kg 113.62

Di Setujui Oleh Di Periksa Oleh Dibuat Oleh

Muhamad Aulia Azwar, ST.MT Ir Rudy Ekananda, M comm.M.Eng Ari Prambudi


Team Leader Perencana Team Leader MK Project Manager
KETERANGAN
KETERANGAN

Dibuat Oleh

Ari Prambudi
Project Manager
Gedung : ADM
Lantai : Dak
Pek. : Rangka Baja Tap

No Kode Pekerjaan Berat Jenis Panjang Jumlah Total Volume


1 2 3 4 5 6 7=5x6 8=7x4

A Elevasi + 21.895
1 C1 K1 WF 300 x 150 x 7 x 11 36.70 3.90 18.00 70.20 2,576.34
2 ST-1 (Struts) B1 WF 250 x 125 x 6 x 9 29.60 3.50 16.00 56.00 1,657.60
3 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 3.50 2.00 7.00 256.90
4 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 4.27 8.00 34.12 1,010.07
R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.46 8.00 3.69 109.16
T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 16.00 0.01 54.81
M16 M16 1.00 6.00 8.00 48.00 48.00
5 1/2 R1 (Rafter) 1/2 R1 WF 250 x 125 x 6 x 9 14.80 1.00 8.00 8.00 118.40
6 OV (Overst - 1Ek) R2 WF 200 x 100 x 5,5 x 8 21.33 3.14 18.00 56.52 1,205.57
7 1/2 OV (Overst - 1Ek)1/2 R2 WF 200 x 100 x 5,5 x 8 10.67 1.00 18.00 18.00 191.97
8 T 12 Plat Pelandas T = 12 mm 8,750.00 0.00 18.00 0.01 127.01
9 A 560 Angkur M 16 - 560 1.00 6.00 18.00 108.00 108.00
10 T 10 Plat Sambungan K1 & B1 T = 10 mm 8,750.00 0.00 64.00 0.03 237.44
11 M 16 Baut M 16 1.00 102.00 2.00 204.00 204.00
12 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 8.00 0.00 41.72
13 M 16 Baut M 16 1.00 8.00 8.00 64.00 64.00
14 T9 Stiffener T = 9 mm 8,750.00 0.00 16.00 0.00 21.26
15 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 18.00 0.01 62.37
16 M 16 Baut M 16 1.00 6.00 18.00 108.00 108.00
17 T9 Stiffener T = 9 mm 8,750.00 0.00 36.00 0.00 28.35
18 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 22.05
T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 4.00 0.00 15.75
19 M 16 Baut M 16 1.00 6.00 4.00 24.00 24.00
20 G1 2LC 150 x 65 x 20 x 2,3 11.00 6.50 16.00 104.00 1,144.00
21 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 32.00 0.01 94.12
22 M 16 Baut M 16 1.00 2.00 32.00 64.00 64.00
23 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 32.00 128.00 128.00
24 G1 2LC 150 x 65 x 20 x 2,3 11.00 34.00 6.00 204.00 2,244.00
25 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 54.00 0.01 75.59
26 M 16 Baut M 16 1.00 2.00 54.00 108.00 108.00
27 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 54.00 216.00 216.00

B Elevasi + 28.241
1 ST-2 (Struts) R3 WF 300 x 150 x 7 x 11 36.70 3.50 8.00 28.00 1,027.60
2 R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 7.42 18.00 133.56 3,953.38
R1 (Rafter) R1 WF 250 x 125 x 6 x 9 29.60 0.81 18.00 14.59 431.83
T 10 Plat Sambaung T 10 R1 dan R1 8,750.00 0.00 36.00 0.01 123.32
M16 M16 1.00 6.00 18.00 108.00 108.00
3 ST-3 (Struts) R2 WF 200 x 100 x 5,5 x 8 21.33 7.00 4.00 28.00 597.24
4 OV R2 WF 200 x 100 x 5,5 x 8 21.33 2.55 4.00 10.20 217.57
5 R4 L 100 x 100 x 10 - 8.25 4.00 33.00 -
6 T 10 Plat Sambungan K1 & R1 T = 10 mm 8,750.00 0.00 18.00 0.01 108.25
7 M 16 Baut M 16 1.00 8.00 18.00 144.00 144.00
8 T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 88.20
T 10 Plat Sambungan R1 & R3 T = 10 mm 8,750.00 0.00 16.00 0.01 63.00
9 M 16 Baut M 16 1.00 6.00 16.00 96.00 96.00
10 T9 End Plat R2 T = 9 mm 8,750.00 0.00 32.00 0.01 60.48
11 T9 Plat Sambungan R1 & R2 T = 9 mm 8,750.00 0.00 32.00 0.01 90.72
12 M 16 Baut M 16 1.00 4.00 32.00 128.00 128.00
13 T9 End Plat R4 T = 9 mm - 0.00 24.00 0.00 -
14 T9 Plat Sambungan R2 & R4 T = 9 mm - 0.00 20.00 0.00 -
15 T9 Plat Sambungan R3 & R4 T = 9 mm - 0.00 4.00 0.00 -
16 M 16 Baut M 16 - 2.00 24.00 48.00 -
17 T 10 Plat Sambungan K1 & R2 T = 10 mm 8,750.00 0.00 8.00 0.00 16.80
18 M 16 Baut M 16 1.00 4.00 8.00 32.00 32.00
19 G1 2LC 150 x 65 x 20 x 2,3 11.00 8.50 28.00 238.00 2,618.00
20 T9 Plat Sambungan R1 & G1 T = 9 mm 8,750.00 0.00 84.00 0.03 247.07
21 M 16 Baut M 16 1.00 2.00 84.00 168.00 168.00
22 M 16 Baut M 16 ( CNP Ke CNP ) 1.00 4.00 84.00 336.00 336.00
23 TR 1 Transtang D 12 0.89 1.50 188.00 282.00 250.42
24 TR 2 Transtang D 12 0.89 1.50 144.00 216.00 191.81
25 T6 Plat Sambungan Ikatan Angin T = 6 mm 8,750.00 0.00 16.00 0.00 15.35
26 IA Ikatan Angin D 16 1.58 9.00 8.00 72.00 113.62

C Area Kaca
1 G1 2LC 150 x 65 x 20 x 2,3 - 14.00 14.00 196.00 -
2 T9 Plat Sambungan R1 & G1 T = 9 mm - 0.00 70.00 0.02 -
3 M 16 Baut M 16 - 2.00 70.00 140.00 -
4 M 16 Baut M 16 ( CNP Ke CNP ) - 4.00 70.00 280.00 -
Detail
9

Kolom
Balok Bawah
Balok Atas

2
Gording Dalam
Gording Luar

Balok Atas
Kuda - kuda
Kuda - kuda

2C
Balok Bawah
Balok Bawah
Kuda - kuda luar

9
Gording Atas
B
A

10

Gording Kaca Gording Atas