NO

NO URAIAN PEKERJAAN JML


FOOT PLAT 1
FP 1 (1000x1000) 18 1
FP 2 (1200x600) 1
FP3 (1300X750) 1 FP 1
FP4 (600X600) 1
LANTAI 1
K1 (15*15) 5
K2 (15*30) 2 FP 2
K3 (15*50) 15
K4 (15*60) 1
K5 (15*65) 2
K6 (15*82) 1 FP 3
LANTAI 2
K1 (15*15) 20
K2 (15*30) 2
K3 (15*50) 10 FP 4
K4 (15*60) 2
K5 (15*65) 1
K1A (15*24) 1
LANTAI 3
K1 (15*15) 10
SLOOF LT 1 LT 1
(15*25) 127.6
PONDASI
0,226+0,800*0,950 0.48735 103.6
0,226+0,800*0,650 0.33345 9
R 9
BALOK LT 2
20X40 85 LT2
15X45 10
15X25 7.9
15X20 40.6
BALOK LT 3
15X20 149

LT3
PANJANG LEBAR TINGGI
URAIAN PEKERJAAN VOL
(m) (m) (m)
2 3 4 5 6
PEKERJAAN STRUKTUR 1.000
FONDASI FOOTPLAT

Beton
Plat Tapak 1.00 X 1.00 X X
Kolom Pedestal X X X

Beton
Plat Tapak 1.20 X 0.60 X X
Kolom Pedestal X X X

Beton
Plat Tapak 1.30 X 0.75 X X
Kolom Pedestal X X X

Beton
Plat Tapak 0.60 X 0.60 X X
Kolom Pedestal X X X

KOLOM

K1 (15*15) 0.15 X 0.15 X 3.74 X


K2 (15*30) 0.15 X 0.30 X 3.74 X
K3 (15*50) 0.15 X 0.50 X 3.74 X
K4 (15*60) 0.15 X 0.60 X 3.74 X
K5 (15*65) 0.15 X 0.65 X 3.74 X
K6 (15*82) 0.15 X 0.82 X 3.74 X

K1 (15*15) 0.15 X 0.15 X 3.61 X


K2 (15*30) 0.15 X 0.30 X 3.61 X
K3 (15*50) 0.15 X 0.50 X 3.61 X
K4 (15*60) 0.15 X 0.60 X 3.61 X
K5 (15*65) 0.15 X 0.65 X 3.61 X
K1A (15*24) 0.15 X 0.2 X 3.61 X

K1 0.15 X 0.15 X 1.30 X


SLOOF LT1 0.15 X 0.25 X 127.6
R 0.30 X 0.30 X 9
BALOK LT2 0.20 X 0.40 X 85
0.15 X 0.45 X 10
0.15 X 0.25 X 7.9
0.15 X 0.20 X 40.6
BALOK LT3 0.15 X 0.20 X 149
PONDASI 0.23 X 0.80 X 0.95
0.23 X 0.80 X 0.65
JUMLAH
JUMLAH SAT
(bh)
7 8 9

18 M3
18 M3

1 M3
1 M3

1 M3
1 M3

1 M3
1 M3

5 0.42075 M3
2 0.3366 M3
15 4.2075 M3
1 0.3366 M3
2 0.7293 M3
1 0.46002 M3

20 1.6245 M3
2 0.3249 M3
10 2.7075 M3
2 0.6498 M3
1 0.351975 M3
1 0.12996 M3

10 0.2925 M3
4.785 M3
0.81 M3
6.8 M3
0.675 M3
0.29625 M3
1.218 M3
4.47 M3
103.6 50.6863 M3
9 3.01275 M3
VOLUME PEKERJAAN

PANJANG LEBAR
NO URAIAN PEKERJAAN VOL
(m) (m)
1 2 3 4 5
BAB 1 PEKERJAAN PERSIAPAN
1.1 PEKERJAAN PERSIAPAN 1.000
1 Pagar Proyek 30.00 + 20.00
2 Pembersihan Lokasi 15.00 x 10.00
3 Bowplank 30.00 + 20.00

BAB 2 PEKERJAAN BANGUNAN UTAMA


2.1 PEKERJAAN TANAH 1.000
1 Galian Tanah
- Footplate
FP1 1.30 x 1.30
FP2 1.40 x 1.40
2 Urugan Kembali
3 Urugan Pasir 1.40 x 1.40

1 Galian Tanah
- Footplate
FP1 6.00 x 17.50
2 Urugan Kembali
3 Urugan Pasir 6.00 x 17.50

2.2 PEKERJAAN STRUKTUR 1.000


1 Pondasi Footplat
FP1
- Beton
Plat Tapak 1.30 x 1.30
Kolom Pedestal 0.30 x 0.60
- Tulangan Pokok D16 (18,6)
Plat Tapak 3.20
3.20
Kolom Pedestal 24.00
- Tulangan Tengah D13 (12,5kg)
Kolom Pedestal 4.80

- Begesting 2.60 + 3.60


FP2
- Beton
Plat Tapak 1.40 x 1.40
Kolom Pedestal 0.30 x 0.60
- Tulangan Pokok D16 (18,6)
Plat Tapak 3.40
3.40
Kolom Pedestal 24.00

- Tulangan Tengah D13 (12,5kg)


Kolom Pedestal 5.20

- Begesting 2.80 + 3.60

2 Sloof 1
- Beton 0.15 x 0.30
- Tulangan Pokok D16 (18,9)
Tulangan Sloof 85.30

Tulangan Tengah p10 (7.4kg)


85.30

- Tulangan Begel p10 (7.4kg)


Begel Sloof 683.40

- Begesting 85.30

2 Sloof 2
- Beton 0.25 x 0.40
- Tulangan Pokok D16 (18,6)
Tulangan Sloof 84.00

Tulangan Tengah p10 (7.4kg)


84.00

- Tulangan Begel p10 (7.4kg)


Begel Sloof 673.00

- Begesting 84.00

2 Sloof 3
- Beton 0.25 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Sloof 95.36

Tulangan Tengah p10 (7.4kg)


95.36

- Tulangan Begel p10 (7.4kg)


Begel Sloof 763.88

- Begesting 95.36

3 Lantai Kerja
- Beton 150.00
- Wiremesh
15.00 x 10.00

4 Kolom Lantai 1
K1(30X60)
- Beton 0.30 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.60


K2(30X80)
- Beton 0.30 x 0.80
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.80

K3(25X40)
- Beton 0.25 x 0.40
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.40


4 Kolom Lantai 2
K1(30X60)
- Beton 0.30 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.60


K2(30X80)
- Beton 0.30 x 0.80
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.80

K3(25X40)
- Beton 0.25 x 0.40
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.40


K4(30X50)
- Beton 0.30 x 0.50
- Tulangan Pokok D16 (18,6)
Tulangan 4.50

- Tulangan Begel p10 (7.4kg)


Begel 31.00 x 2.00

- Begesting 4.50 x 0.40

5 Balok Lantai 2
B1(15X30)
- Beton 0.15 x 0.30
- Tulangan Pokok D16 (18,6)
Tulangan Balok 36.00
Tulangan Tengah p10 (7.4kg)
36.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 289.00

- Begesting 36.00 x 0.15

B2(25X30)
- Beton 0.25 x 0.30
- Tulangan Pokok D16 (18,6)
Tulangan Balok 47.00

Tulangan Tengah p10 (7.4kg)


47.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 377.00

- Begesting 47.00 x 0.25

B3(25X40)
- Beton 0.25 x 0.40
- Tulangan Pokok D16 (18,6)
Tulangan Balok 41.00

Tulangan Tengah p10 (7.4kg)


41.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 329.00

- Begesting 41.00 x 0.25

B4(25X60)
- Beton 0.25 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Balok 15.00

Tulangan Tengah p10 (7.4kg)


15.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 121.00

- Begesting 15.00 x 0.25


B5(25X60)
- Beton 0.25 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Balok 22.50

Tulangan Tengah p10 (7.4kg)


22.50

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 181.00

- Begesting 22.50 x 0.25

` B6(30X60)
- Beton 0.30 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Balok 76.00

Tulangan Tengah p10 (7.4kg)


76.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 609.00

- Begesting 76.00 x 0.30

B1(15X30)
- Beton 0.15 x 0.30
- Tulangan Pokok D16 (18,6)
Tulangan Balok 119.00

Tulangan Tengah p10 (7.4kg)


119.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 953.00

- Begesting 119.00 x 0.15

B2(25X30)
- Beton 0.25 x 0.30
- Tulangan Pokok D16 (18,6)
Tulangan Balok 9.00

Tulangan Tengah p10 (7.4kg)


9.00
- Tulangan Begel p10 (7.4kg)
Tulangan Balok 73.00

- Begesting 9.00 x 0.25

B3(25X40)
- Beton 0.25 x 0.40
- Tulangan Pokok D16 (18,6)
Tulangan Balok 140.00

Tulangan Tengah p10 (7.4kg)


140.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 1121.00

- Begesting 140.00 x 0.25

B4(25X60)
- Beton 0.25 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Balok 19.00

Tulangan Tengah p10 (7.4kg)


19.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 153.00

- Begesting 19.00 x 0.25

B5(25X60)
- Beton 0.25 x 0.60
- Tulangan Pokok D16 (18,6)
Tulangan Balok 54.00

Tulangan Tengah p10 (7.4kg)


54.00

- Tulangan Begel p10 (7.4kg)


Tulangan Balok 433.00

- Begesting 54.00 x 0.25

Plat Lantai 2
- Beton 0.12 x 15.20
- Tulangan Pokok p10 (7.4kg)
Tulangan Balok 15.20 x 114.33
17.00 x 102.33

- Begesting 17.00 x 15.20

Plat Talang atap


- Beton 0.12 x 2.00
- Tulangan Pokok p10 (7.4kg)
Tulangan Balok 2.00 x 521.00
78.00 x 14.33

- Begesting 2.50 x 78.00

- Beton 0.50 x 6.00


0.25 x 2.50
- Tulangan Pokok D16(18,6)
6.00 x 117.67
17.50 x 41.00

Tulangan Pokok D16(18,6)


2.50 x 471.00

Tulangan Begel D13(12.5)


47.00 x 17.67

- Begesting 6.00 x 78.00

2 PEKERJAAN PASANGAN DINDING 1.000


1 Pasangan Batu Bata
2 Plesteran 1.80 x 259.40
3 Acian 1.70 x 259.40
4 Sponengan 4.00 x 65.00
5 Tali Air

2 PEKERJAAN ATAP 1.000


1 Rangka Atap Baja
a. Kuda"
- Plandes tb=12 mm
0.12
- Mur Baut 6.00
- IWF 100x50x5x7 (112kg/12m)
6.00

b. Reng
- Canal UNP 5x10 x6
16.00

c. Atap Spandek 6.00


EKERJAAN

TINGGI JUMLAH NO
JUMLAH SAT
(m) (bh) 1
6 7 8 9 BAB 1 PEKERJAAN PERSIAPAN
1.1
1
= 55.00 m1 2
= 198.00 m2 3
= 185.00 m'
BAB 2 PEKERJAAN BANGUNAN UTAMA
2.1
lot 1
= 115.93 m3

x 2.50 x 17.00 = 71.83


x 2.50 x 9.00 = 44.10 2
= 115.93 m 3 3
x 0.10 x 26.00 = 5.10 m3

= 315.00 m3

x 3.00 = 315.00
= 210.00 m3
x 0.10 = 10.50 m3

lot

= 20.49 m3
x 0.50 x 17.00 = 14.37 m3
x 2.00 x 17.00 = 6.12 m3
= 9253.44 kg
x 9.00 x 17.00 = 489.60 m1
x 9.00 x 17.00 = 489.60 m1
x 2.50 x 17.00 = 1020.00 m1
1999.20 = 166.60 batang
= 170.00 kg
2.00 x 17.00 = 163.20 m1
163.20 = 13.60 batang
x 17.00 = 105.40 m2

= 12.06 m3
x 0.50 x 9.00 = 8.82 m3
x 2.00 x 9.00 = 3.24 m3
= 5205.06 kg
x 9.00 x 9.00 = 275.40 m1
x 9.00 x 9.00 = 275.40 m1
x 2.50 x 9.00 = 540.00 m1
1090.80 = 90.90 batang
= 97.50 kg
2.00 x 9.00 = 93.60 m1
93.60 = 7.80 batang
x 9.00 = 57.60 m2

x 85.30 = 3.84 m3
= 806.09 kg
x 6.00 = 511.80 m1
511.80 = 42.65 batang
= 105.20 kg
X 2.00 = 170.60
170.60 = 14.22 batang
= 337.14 kg
x 0.80 = 546.72 m1
546.72 = 45.56 batang
x 0.30 x 2.00 = 51.18 m2

x 84.00 = 8.40 m3
= 1587.60 kg
x 12.00 = 1008.00 m1
1008.00 = 84.00 batang
= 103.60 kg
X 2.00 = 168.00
168.00 = 14.00 batang
= 871.54 kg
x 2.10 = 1413.30 m1
1413.30 = 117.78 batang
x 0.30 x 2.00 = 50.40 m2

x 95.36 = 14.30 m3
= 2252.88 kg
x 15.00 = 1430.40 m1
1430.40 = 119.20 batang
= 117.61
X 2.00 = 190.72
190.72 = 15.89
= 753.69 kg
x 1.60 = 1222.21 m1
1222.21 = 101.85 batang
x 0.30 x 2.00 = 57.22 m2

x 0.05 x 1.00 = 7.50 m3


= 817.33 kg
= 150.00 m2
13.23 = 13.23 lembar

x 4.50 x 21.00 = 17.01 m3


= 3572.10 kg
x 24.00 x 21.00 = 2268.00 m1
2268.00 = 189.00 batang
= 1364.93 kg
x 1.70 x 21.00 = 2213.40 m1
2213.40 = 184.45 batang
x 0.30 x 21.00 = 170.10 m2

x 4.50 x 2.00 = 2.16 m3


= 396.90 kg
x 28.00 x 2.00 = 252.00 m1
252.00 = 21.00 batang
= 160.58 kg
x 2.10 x 2.00 = 260.40 m1
260.40 = 21.70 batang
x 0.30 x 2.00 = 19.80 m2

x 4.50 x 2.00 = 0.90 m3


= 170.10 kg
x 12.00 x 2.00 = 108.00 m1
108.00 = 9.00 batang
= 91.76 kg
x 1.20 x 2.00 = 148.80 m1
148.80 = 12.40 batang
x 0.25 x 2.00 = 11.70 m2
x 4.50 x 13.00 = 10.53 m3
= 2211.30 kg
x 24.00 x 13.00 = 1404.00 m1
1404.00 = 117.00 batang
= 844.96 kg
x 1.70 x 13.00 = 1370.20 m1
1370.20 = 114.18 batang
x 0.30 x 13.00 = 105.30 m2

x 4.50 x 2.00 = 2.16 m3


= 396.90 kg
x 28.00 x 2.00 = 252.00 m1
252.00 = 21.00 batang
= 160.58 kg
x 2.10 x 2.00 = 260.40 m1
260.40 = 21.70 batang
x 0.30 x 2.00 = 19.80 m2

x 4.50 x 3.00 = 1.35 m3


= 255.15 kg
x 12.00 x 3.00 = 162.00 m1
162.00 = 13.50 batang
= 137.64 kg
x 1.20 x 3.00 = 223.20 m1
223.20 = 18.60 batang
x 0.25 x 3.00 = 17.55 m2

x 4.50 x 8.00 = 5.40 m3


= 680.40 kg
x 12.00 x 8.00 = 432.00 m1
432.00 = 36.00 batang
= 458.80 kg
x 1.50 x 8.00 = 744.00 m1
744.00 = 62.00 batang
x 0.25 x 8.00 = 46.80 m2

x 36.00 = 1.62 m3
= 340.20 kg
x 6.00 = 216.00 m1
216.00 = 18.00 batang
= 44.40 kg
X 2.00 = 72.00
72.00 = 6.00 batang
= 374.26 kg
x 2.10 = 606.90 m1
606.90 = 50.58 batang
x 0.30 x 2.00 = 27.00 m2

x 47.00 = 3.53 m3
= 555.19 kg
x 7.50 = 352.50 m1
352.50 = 29.38 batang
= 57.97 kg
X 2.00 = 94.00
94.00 = 7.83 batang
= 395.22 kg
x 1.70 = 640.90 m1
640.90 = 53.41 batang
x 0.30 x 2.00 = 39.95 m2

x 41.00 = 4.10 m3
= 484.31 kg
x 7.50 = 307.50 m1
307.50 = 25.63 batang
= 50.57 kg
X 2.00 = 82.00
82.00 = 6.83 batang
= 426.06 kg
x 2.10 = 690.90 m1
690.90 = 57.58 batang
x 0.40 x 2.00 = 43.05 m2

x 15.00 = 2.25 m3
= 177.19 kg
x 7.50 = 112.50 m1
112.50 = 9.38 batang
= 18.50 kg
X 2.00 = 30.00
30.00 = 2.50 batang
= 156.70 kg
x 2.10 = 254.10 m1
254.10 = 21.18 batang
x 0.60 x 2.00 = 21.75 m2
x 22.50 = 3.38 m3
= 354.38 kg
x 10.00 = 225.00 m1
225.00 = 18.75 batang
= 27.75 kg
X 2.00 = 45.00
45.00 = 3.75 batang
= 234.40 kg
x 2.10 = 380.10 m1
380.10 = 31.68 batang
x 0.60 x 2.00 = 32.63 m2

x 76.00 = 13.68 m3
= 1197.00 kg
x 10.00 = 760.00 m1
760.00 = 63.33 batang
= 187.47 kg
X 4.00 = 304.00
304.00 = 25.33 batang
= 788.66 kg
x 2.10 = 1278.90 m1
1278.90 = 106.58 batang
x 0.60 x 2.00 = 114.00 m2

x 119.00 = 5.36 m3
= 1124.55 kg
x 6.00 = 714.00 m1
714.00 = 59.50 batang
= 146.77 kg
X 2.00 = 238.00
238.00 = 19.83 batang
= 999.06 kg
x 1.70 = 1620.10 m1
1620.10 = 135.01 batang
x 0.30 x 2.00 = 89.25 m2

x 9.00 = 0.68 m3
= 106.31 kg
x 7.50 = 67.50 m1
67.50 = 5.63 batang
= 11.10 kg
X 2.00 = 18.00
18.00 = 1.50 batang
= 85.53 kg
x 1.90 = 138.70 m1
138.70 = 11.56 batang
x 0.30 x 2.00 = 7.65 m2

x 140.00 = 14.00 m3
= 1653.75 kg
x 7.50 = 1050.00 m1
1050.00 = 87.50 batang
= 172.67 kg
X 2.00 = 280.00
280.00 = 23.33 batang
= 1451.70 kg
x 2.10 = 2354.10 m1
2354.10 = 196.18 batang
x 0.40 x 2.00 = 147.00 m2

x 19.00 = 2.85 m3
= 224.44 kg
x 7.50 = 142.50 m1
142.50 = 11.88 batang
= 23.43 kg
X 2.00 = 38.00
38.00 = 3.17 batang
= 198.14 kg
x 2.10 = 321.30 m1
321.30 = 26.78 batang
x 0.60 x 2.00 = 27.55 m2

x 54.00 = 8.10 m3
= 850.50 kg
x 10.00 = 540.00 m1
540.00 = 45.00 batang
= 66.60 kg
X 2.00 = 108.00
108.00 = 9.00 batang
= 560.74 kg
x 2.10 = 909.30 m1
909.30 = 75.78 batang
x 0.60 x 2.00 = 78.30 m2

x 17.00 = 31.01 m3
= 2143.37 kg
x 2.00 = 3475.73 m1
x 2.00 = 3479.33 m1
3475.73 = 289.64 batang

= 258.40 m2

x 78.00 = 18.72 m3
= 1285.13 kg
x 2.00 = 2084.00 m1
x 2.00 = 2236.00 m1
2084.00 = 173.67 batang

= 195.00 m2

x 17.50 = 52.50 m3
x 47.00 = 29.38
= 4484.03 kg
x 2.00 = 1412.00 m1
x 2.00 = 1435.00 m1
2847.00 = 237.25 batang
= 3709.13 kg
x 2.00 = 2355.00 m1
2355.00 = 196.25 batang

= 1729.86 kg
x 2.00 = 1660.67 m1
1660.67 = 138.39 batang
= 468.00 m2

lot
= 259.40 m2
= 466.92 m2
= 440.98 m2
= 260.00 m2
= 0.00 m2

lot

= 8.17 kg
x 7.00 = 0.84 m2
0.29 = 0.29 lembar

x 7.00 = 42.00 bh
= 1176.00 kg
x 14.00 = 84.00 m1
84.00 = 7.00 batang

= 2098.13 kg
x 14.00 = 224.00 m1
224.00 = 37.33 batang
x 16.00 = 96.00 m2
PANJANG LEBAR TINGGI JUMLAH
URAIAN PEKERJAAN VOL
(m) (m) (m) (bh)
2 3 4 5 6 7
KERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN 1.000
Pagar Proyek
Pembersihan Lokasi
Bowplank

KERJAAN BANGUNAN UTAMA


PEKERJAAN TANAH 1.000
Galian Tanah
Footplate
FP1
FP2
Urugan Kembali
Urugan pasir
JUMLAH SAT
8 9
LT 1 LT 2 LT 3
LAMPU SPOTLIGHT 12
LAMPU DOWNLIGHT 15 10
LED STRIP 63,5 M 63.6
LAMPU DINDING 10 12
TITIK EXHAUST FAN 2
LAMPU GANTUNG 4 6
LAMPU MANGKOK 1 1

STOP KONTAK (30) 3


STOP KONTAK (60) 6 8
STOP KONTAK (100) 4 1
STOP KONTAK (140)
STOP KONTAK (90)
STOP KONTAK AC 40 DR PLAVON 2
KABEL JARINGAN TV 3
BOX METER 1
SAKLAR TUNGGAL (140) 3 1
SAKLAR SERI (140) 6 4
SAKLAR HOTEL TUNGGAL (140)
SAKLAR HOTEL SERI (140) 1 5
SAKLAR TUNGGAL (60) 4
SAKLAR HOTEL SERI (60) 8
ISTALASI LISTRIK
BOX PANEL 1 1
PANEL SWITCH 1

GRANITE TILE SANTORINI WHITE MOTIF MARBLE GLOSSY EX. TITANIUM 120X240 109.8 69.9
GRANITE TILE TEVERE BEIGE MOTIF MARBLE MATT EX. ESSENZA 60X60 20.7
GRANITE TILE PRESTIGE WHITE MOTIF MARBLE GLOSSY EX. TITANIUM 120X240 5.96 24.584
TUMBLED MARBLE 10X10 35.1
COR BETON
BORDER GRANITE 0.645
RUMPUT 9
GRANITE TANGGA 8.856
GRANITE TILE 60X120 SINCERE GRANIT MOTIF MARBLE GLAZED FINISH POLISHED MBZM2 2.8 9.92